HYDER CONSULTING
Planning & Project Management of
Water & Wastewater Projects
Presented by James Somerville Group Director (Water & Environment)
SAWEA Workshop 2007
4TH December 2007
• A Brief Introduction to Hyder Consulting
• Stages in Development – Industry Drivers and Planning
& Procurement Methods (1970s to 2000s)
• Case Study 1 – Doha North Wastewater Scheme
• Case Study 2 – Dublin Bay Project
• Future Trends & Issues
• Some Lessons Learned
INTRODUCTION
Overview
A BRIEF INTRODUCTION to HYDER CONSULTING
Hyder Consulting Offices Worldwide
Australia
Bahrain
China
Cyprus
Germany
Australia
UK/Europe
Middle East
East Asia
Hong Kong
Ireland
New Zealand
Qatar
Romania
Russia
UAE
UK
Vietnam
• Transport, Property and Water & Environment Sectors
• 4000 staff (1200 in the Middle East)
• US$ 400m turnover
A BRIEF INTRODUCTION to HYDER CONSULTING
Sectors and Resources
UK
Germany
Middle East
Far East
Australia
• Three Cities Drainage (Buraidah, Hofuf/Mubarraz & Qatif)
• Saihat, Qatif, Riyadh, Qassim, Taif and Abha
• Marafiq Corporatisation and Jeddah PPP Transactions
• Capital Cities – Cairo, Abu Dhabi, Doha, Kuwait, Istanbul, Athens,
Dublin and London
A BRIEF INTRODUCTION to HYDER CONSULTING
Work in Saudi Arabia 1967 – 2007
• Main Drivers
– Increased legislation/regulation
– Whole-life costing
– Increased risk sharing by clients
– Outsourcing of O&M (Abu Dhabi)
– Asset Management Planning techniques required
– Availability of new advanced treatment technologies
• Planning & Procurement
– Planning by Client with Consultant Support
– DB, DBO and DBFO contracts by Contractors
– Growth in Partnering, PPP and PFI in the industry
– Long-term (10-30 years) O&M by Contractors
STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS
1990s
• Main Drivers
– Need for economic certainty in project outcome
– Growth in Design & Build contracting
– Growing need to reuse water (TSE) requiring more
advanced treatment
• Planning & Procurement
– Planning and Project Management by Consultant
– Design & Build by Contractor and Supervision
by Consultant
– Operation & Maintenance by Client
– Growing client expertise with expatriate technical support
– Changing roles of Consultant and Contractor
STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS
1980s
• Main Drivers
– Public Health Issues - provision of clean water supplies
and wastewater disposal
– Often a lack of client technical experience
and immaturity of local markets
• Planning & Procurement
– Planning, Design and Project Management
by Consultant
– Construction by Contractor and Supervision
by Consultant
– Operation and Maintenance by Client
STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS
1970s
• Main Drivers
– Development and Population Growth – Private Development boom
– Increased environmental protection and higher treatment
standards required with enforcement
– Ageing infrastructure
– Demand for cost efficiencies, O&M effectiveness and
performance and customer satisfaction
– Climate Change – Water shortages and flooding risks
– Increased time and programme pressures
• Planning & Procurement
– Continued growth in privatisation and outsourcing of services
– Need for fast-track planning and procurement methods
– Closer working relationships between Clients & Consultants
and Clients, Consultants and Contractors
STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS
2000s
• Population served: 1.2m
• Contracts: 4 no. modified FIDIC/traditional
• Flow: 324,000 m3/d average (2 phases)
(10 m3/d peak)
• DBO (10 years)
CASE STUDY 1
Doha North Wastewater Scheme
STW
PS70
• Population served: 1.7m
• Contracts: 5 no. FIDIC/traditional
• Flow: 490,000m3/d average
(23m3/d peak)
• DBO (20 years)
CASE STUDY 2
Dublin Bay Project
ST OR MWAT E R
T R E AT ME NT
MAIN L IFT
PUMPING
STATION
DODDER VAL L EY
GR AVITY SEWER
DUN LAOGHAIR E
PUMPING
STATION
SUTTON
PUMPING
STATION
(CONTR ACT Nos. 3A & 3B)
PR OPOSED SUBMAR INE
PIPE L INE
(CONTR ACT No. 4)
TANK ER WASTE
F INE
SCR EENS
CHP
SAMPL INGSAMPL ING
6 No.
AER ATED GR IT
CHANNE LS
GAS
HOLDER
DIGESTOR S
DEWATER ING
CENTR IFUGES
THER MAL
DR Y ER S
TO AGR ICULTUR E
(BY R OAD)
F INE
SCR EENS
THICKENING/
BE L T PR ESSES
HY DR OLY SIS
POWER
R ECY CLE
TO PL ANT
STR AINPR ESSGR IT
TANK
R ECEPTION UNITR ECEPTION UNIT
RE TURN
ACTIVATE D
SL UDGE
2X 12No. SECONDAR Y
SEQUENCING BATCH
R EACTOR TANKS
(C + N)
2X 6No. PR IMAR Y
L AME L L A
SETTLEMENT TANKS
5 No.
SCR EW
L IFT
PUMPS
STOR MWATER
OVER FLOW
SCR EENINGS
ULTR AVIOL ET
DIS INFECTIONFLOW
METER S OUTFAL L WITH
ESB COOL ING
WATER
SL UDGE
T R E AT ME NT
GR IT, FATS,
OILS,
GR EASE
2 No.
GR IT TANK S
6 No. STOR MWATER
SETTLEMENT TANKS
PUMPING
STATION
TO BUILDINGS
PRIMARY
SL UDGE
SL UDGE
HOL DING
TANK
HE AT
E NE RGY
R BI
SCR EENS
INLE T
SUMP
ODOURODOUR
CONTROLCONTROL
GR IT
SLUDGE TANKS
DR Y ING PLANT
SAMPL INGSAMPL ING
SAMPL INGSAMPL ING
FUTUR E
EXPANSION
OF TR E ATMENT
WASTE
SE CONDARY
SL UDGE
OVER FLOW
TO R IVER L IF FEY
SAMPL INGSAMPL ING
SAMPL INGSAMPL ING
INT E R ME DIAT E
L IF T
PUMPING
ST AT ION
ST OR MWAT E R
T R E AT ME NT
MAIN L IFT
PUMPING
STATION
DODDER VAL L EY
GR AVITY SEWER
DUN LAOGHAIR E
PUMPING
STATION
SUTTON
PUMPING
STATION
(CONTR ACT Nos. 3A & 3B)
PR OPOSED SUBMAR INE
PIPE L INE
(CONTR ACT No. 4)
TANK ER WASTE
F INE
SCR EENS
CHP
SAMPL INGSAMPL ING
6 No.
AER ATED GR IT
CHANNE LS
GAS
HOLDER
DIGESTOR S
DEWATER ING
CENTR IFUGES
THER MAL
DR Y ER S
TO AGR ICULTUR E
(BY R OAD)
F INE
SCR EENS
THICKENING/
BE L T PR ESSES
HY DR OLY SIS
POWER
R ECY CLE
TO PL ANT
STR AINPR ESSGR IT
TANK
R ECEPTION UNITR ECEPTION UNIT
RE TURN
ACTIVATE D
SL UDGE
2X 12No. SECONDAR Y
SEQUENCING BATCH
R EACTOR TANKS
(C + N)
2X 6No. PR IMAR Y
L AME L L A
SETTLEMENT TANKS
5 No.
SCR EW
L IFT
PUMPS
STOR MWATER
OVER FLOW
SCR EENINGS
ULTR AVIOL ET
DIS INFECTIONFLOW
METER S OUTFAL L WITH
ESB COOL ING
WATER
SL UDGE
T R E AT ME NT
GR IT, FATS,
OILS,
GR EASE
2 No.
GR IT TANK S
6 No. STOR MWATER
SETTLEMENT TANKS
PUMPING
STATION
TO BUILDINGS
PRIMARY
SL UDGE
SL UDGE
HOL DING
TANK
HE AT
E NE RGY
R BI
SCR EENS
INLE T
SUMP
ODOURODOUR
CONTROLCONTROL
GR IT
SLUDGE TANKS
DR Y ING PLANT
ODOURODOUR
CONTROLCONTROL
GR IT
SLUDGE TANKS
DR Y ING PLANT
SAMPL INGSAMPL ING
SAMPL INGSAMPL ING
FUTUR E
EXPANSION
OF TR E ATMENT
WASTE
SE CONDARY
SL UDGE
OVER FLOW
TO R IVER L IF FEY
SAMPL INGSAMPL ING
SAMPL INGSAMPL ING
INT E R ME DIAT E
L IF T
PUMPING
ST AT ION
• Experienced technical resources are becoming more scarce
• International competition increasing and new players - (multi-cultural implementation)
• Construction costs are rising – (fixed price / indexed ?)
• More effective planning & procurement required and efficiencies in O&M delivered
• More integrated infrastructure planning and implementation required
• Is Private Sector ready and able to participate
long-term in infrastructure and services provision?
• Are there socio-economic difficulties
in the privatisation of infrastructure and services?
• Is long-term sustainability of infrastructure assured?
Water is an increasingly valuable resource
- and must be used and reused efficiently !
FUTURE TRENDS & ISSUES
• Benefit of engaging independent and experienced Consultants
- Key Client/Consultant relationship during planning & procurement phases
• Agreed level of risk sharing determined in contracts (FIDIC/bespoke)
• Engage the market then use selective procurement
• Need good data to be made available to Tenderers
• Maximise flexibility - but minimise interference
and variations
• Fair payment mechanisms to reflect risk
and uncertainties
• Minimise/eliminate adversarial approach to contracts
Choose Consultants and Contractors by value not cost !
SOME LESSONS LEARNED