HYDER CONSULTING

Planning & Project Management of

Water & Wastewater Projects

Presented by James Somerville Group Director (Water & Environment)

SAWEA Workshop 2007

4TH December 2007

• A Brief Introduction to Hyder Consulting

• Stages in Development – Industry Drivers and Planning

& Procurement Methods (1970s to 2000s)

• Case Study 1 – Doha North Wastewater Scheme

• Case Study 2 – Dublin Bay Project

• Future Trends & Issues

• Some Lessons Learned

INTRODUCTION

Overview

A BRIEF INTRODUCTION to HYDER CONSULTING

Hyder Consulting Offices Worldwide

Australia

Bahrain

China

Cyprus

Germany

Australia

UK/Europe

Middle East

East Asia

Hong Kong

Ireland

New Zealand

Qatar

Romania

Russia

UAE

UK

Vietnam

• Transport, Property and Water & Environment Sectors

• 4000 staff (1200 in the Middle East)

• US$ 400m turnover

A BRIEF INTRODUCTION to HYDER CONSULTING

Sectors and Resources

UK

Germany

Middle East

Far East

Australia

• Three Cities Drainage (Buraidah, Hofuf/Mubarraz & Qatif)

• Saihat, Qatif, Riyadh, Qassim, Taif and Abha

• Marafiq Corporatisation and Jeddah PPP Transactions

• Capital Cities – Cairo, Abu Dhabi, Doha, Kuwait, Istanbul, Athens,

Dublin and London

A BRIEF INTRODUCTION to HYDER CONSULTING

Work in Saudi Arabia 1967 – 2007

• Main Drivers

– Increased legislation/regulation

– Whole-life costing

– Increased risk sharing by clients

– Outsourcing of O&M (Abu Dhabi)

– Asset Management Planning techniques required

– Availability of new advanced treatment technologies

• Planning & Procurement

– Planning by Client with Consultant Support

– DB, DBO and DBFO contracts by Contractors

– Growth in Partnering, PPP and PFI in the industry

– Long-term (10-30 years) O&M by Contractors

STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS

1990s

• Main Drivers

– Need for economic certainty in project outcome

– Growth in Design & Build contracting

– Growing need to reuse water (TSE) requiring more

advanced treatment

• Planning & Procurement

– Planning and Project Management by Consultant

– Design & Build by Contractor and Supervision

by Consultant

– Operation & Maintenance by Client

– Growing client expertise with expatriate technical support

– Changing roles of Consultant and Contractor

STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS

1980s

• Main Drivers

– Public Health Issues - provision of clean water supplies

and wastewater disposal

– Often a lack of client technical experience

and immaturity of local markets

• Planning & Procurement

– Planning, Design and Project Management

by Consultant

– Construction by Contractor and Supervision

by Consultant

– Operation and Maintenance by Client

STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS

1970s

• Main Drivers

– Development and Population Growth – Private Development boom

– Increased environmental protection and higher treatment

standards required with enforcement

– Ageing infrastructure

– Demand for cost efficiencies, O&M effectiveness and

performance and customer satisfaction

– Climate Change – Water shortages and flooding risks

– Increased time and programme pressures

• Planning & Procurement

– Continued growth in privatisation and outsourcing of services

– Need for fast-track planning and procurement methods

– Closer working relationships between Clients & Consultants

and Clients, Consultants and Contractors

STAGES IN DEVELOPMENT– INDUSTRY DRIVERS and PLANNING & PROCUREMENT METHODS

2000s

• Population served: 1.2m

• Contracts: 4 no. modified FIDIC/traditional

• Flow: 324,000 m3/d average (2 phases)

(10 m3/d peak)

• DBO (10 years)

CASE STUDY 1

Doha North Wastewater Scheme

STW

PS70

• Population served: 1.7m

• Contracts: 5 no. FIDIC/traditional

• Flow: 490,000m3/d average

(23m3/d peak)

• DBO (20 years)

CASE STUDY 2

Dublin Bay Project

ST OR MWAT E R

T R E AT ME NT

MAIN L IFT

PUMPING

STATION

DODDER VAL L EY

GR AVITY SEWER

DUN LAOGHAIR E

PUMPING

STATION

SUTTON

PUMPING

STATION

(CONTR ACT Nos. 3A & 3B)

PR OPOSED SUBMAR INE

PIPE L INE

(CONTR ACT No. 4)

TANK ER WASTE

F INE

SCR EENS

CHP

SAMPL INGSAMPL ING

6 No.

AER ATED GR IT

CHANNE LS

GAS

HOLDER

DIGESTOR S

DEWATER ING

CENTR IFUGES

THER MAL

DR Y ER S

TO AGR ICULTUR E

(BY R OAD)

F INE

SCR EENS

THICKENING/

BE L T PR ESSES

HY DR OLY SIS

POWER

R ECY CLE

TO PL ANT

STR AINPR ESSGR IT

TANK

R ECEPTION UNITR ECEPTION UNIT

RE TURN

ACTIVATE D

SL UDGE

2X 12No. SECONDAR Y

SEQUENCING BATCH

R EACTOR TANKS

(C + N)

2X 6No. PR IMAR Y

L AME L L A

SETTLEMENT TANKS

5 No.

SCR EW

L IFT

PUMPS

STOR MWATER

OVER FLOW

SCR EENINGS

ULTR AVIOL ET

DIS INFECTIONFLOW

METER S OUTFAL L WITH

ESB COOL ING

WATER

SL UDGE

T R E AT ME NT

GR IT, FATS,

OILS,

GR EASE

2 No.

GR IT TANK S

6 No. STOR MWATER

SETTLEMENT TANKS

PUMPING

STATION

TO BUILDINGS

PRIMARY

SL UDGE

SL UDGE

HOL DING

TANK

HE AT

E NE RGY

R BI

SCR EENS

INLE T

SUMP

ODOURODOUR

CONTROLCONTROL

GR IT

SLUDGE TANKS

DR Y ING PLANT

SAMPL INGSAMPL ING

SAMPL INGSAMPL ING

FUTUR E

EXPANSION

OF TR E ATMENT

WASTE

SE CONDARY

SL UDGE

OVER FLOW

TO R IVER L IF FEY

SAMPL INGSAMPL ING

SAMPL INGSAMPL ING

INT E R ME DIAT E

L IF T

PUMPING

ST AT ION

ST OR MWAT E R

T R E AT ME NT

MAIN L IFT

PUMPING

STATION

DODDER VAL L EY

GR AVITY SEWER

DUN LAOGHAIR E

PUMPING

STATION

SUTTON

PUMPING

STATION

(CONTR ACT Nos. 3A & 3B)

PR OPOSED SUBMAR INE

PIPE L INE

(CONTR ACT No. 4)

TANK ER WASTE

F INE

SCR EENS

CHP

SAMPL INGSAMPL ING

6 No.

AER ATED GR IT

CHANNE LS

GAS

HOLDER

DIGESTOR S

DEWATER ING

CENTR IFUGES

THER MAL

DR Y ER S

TO AGR ICULTUR E

(BY R OAD)

F INE

SCR EENS

THICKENING/

BE L T PR ESSES

HY DR OLY SIS

POWER

R ECY CLE

TO PL ANT

STR AINPR ESSGR IT

TANK

R ECEPTION UNITR ECEPTION UNIT

RE TURN

ACTIVATE D

SL UDGE

2X 12No. SECONDAR Y

SEQUENCING BATCH

R EACTOR TANKS

(C + N)

2X 6No. PR IMAR Y

L AME L L A

SETTLEMENT TANKS

5 No.

SCR EW

L IFT

PUMPS

STOR MWATER

OVER FLOW

SCR EENINGS

ULTR AVIOL ET

DIS INFECTIONFLOW

METER S OUTFAL L WITH

ESB COOL ING

WATER

SL UDGE

T R E AT ME NT

GR IT, FATS,

OILS,

GR EASE

2 No.

GR IT TANK S

6 No. STOR MWATER

SETTLEMENT TANKS

PUMPING

STATION

TO BUILDINGS

PRIMARY

SL UDGE

SL UDGE

HOL DING

TANK

HE AT

E NE RGY

R BI

SCR EENS

INLE T

SUMP

ODOURODOUR

CONTROLCONTROL

GR IT

SLUDGE TANKS

DR Y ING PLANT

ODOURODOUR

CONTROLCONTROL

GR IT

SLUDGE TANKS

DR Y ING PLANT

SAMPL INGSAMPL ING

SAMPL INGSAMPL ING

FUTUR E

EXPANSION

OF TR E ATMENT

WASTE

SE CONDARY

SL UDGE

OVER FLOW

TO R IVER L IF FEY

SAMPL INGSAMPL ING

SAMPL INGSAMPL ING

INT E R ME DIAT E

L IF T

PUMPING

ST AT ION

• Experienced technical resources are becoming more scarce

• International competition increasing and new players - (multi-cultural implementation)

• Construction costs are rising – (fixed price / indexed ?)

• More effective planning & procurement required and efficiencies in O&M delivered

• More integrated infrastructure planning and implementation required

• Is Private Sector ready and able to participate

long-term in infrastructure and services provision?

• Are there socio-economic difficulties

in the privatisation of infrastructure and services?

• Is long-term sustainability of infrastructure assured?

Water is an increasingly valuable resource

- and must be used and reused efficiently !

FUTURE TRENDS & ISSUES

• Benefit of engaging independent and experienced Consultants

- Key Client/Consultant relationship during planning & procurement phases

• Agreed level of risk sharing determined in contracts (FIDIC/bespoke)

• Engage the market then use selective procurement

• Need good data to be made available to Tenderers

• Maximise flexibility - but minimise interference

and variations

• Fair payment mechanisms to reflect risk

and uncertainties

• Minimise/eliminate adversarial approach to contracts

Choose Consultants and Contractors by value not cost !

SOME LESSONS LEARNED

Thank you