PLANNING 8, ENVIRONMENT ACT 1987 YARRA PLANNING satimq
Report referred to in Permit Nq. relating to Condition No. ll
For a d on behalf of the ResponebAuthority TE‘o iLz-APAGES •YJA0-
This is NOT a Building Permit
SUSTAINABILITY MANAGEMENT PLAN (SMP)
16-26 Farmer St, Richmond
Client: 429 Swan St Pty Ltd
Issue: V1
29/07/16
0--C° RECEIVED
5 OCT 2016
N—otzertcs€ 441:Aviti %49titiltAlrkt, ottolir
Urban Digestor
ABN 84 151 437 348
Level 8 , 180 Russell Street
Melbourne, VIC 3000
(03) 9639 4936
idrz ■2 enlaua bowiir
f f C EWeE2
ou psp911 oi ;IA gs2boop6 vniouo
:Gisoua io couqwou
li,t611.6C# j0 !LI b131.111► j 140.
,;: VCI irk
1. Executive Summary 2
2. Contents 3
3. Introduction 4
4. Energy Efficiency 5
4.1 Greenhouse gas emissions - Benchmark vs. Proposed Development. 5
4.2 Passive Design & Energy-Ratings 6
4.3 Heating, Ventilation & Air-conditioning (HVAC) 7
4.4 Hot Water Service 8
4.5 Lighting 9
4.6 Cooking 10
4.7 Clothes Drying 10
4.8 Occupant Appliances 10
4.9 Renewable Energy 11
4.10 Metering 11
5. Water Efficiency 12
5.1 Fixtures & Fittings 12
6. Stormwater Management 13
6.1 Stormwater Strategy 13
7. Indoor Environment Quality (IEQ) 14
7.1 Daylight 14
7.2 Thermal Comfort 14
7.3 Natural Ventilation 14
7.4 Volatile Organic Compounds (VOCs) 15
7.5 Formaldehyde 15
8. Transport 16
8.1 Transport Plan 16
9. Building Materials 18
9.1 Concrete & Embodied Energy 18
10. Waste 18
10.1 Waste Management Plan 18
102 Construction & Demolition Waste Target 19
11. Building & Construction Management 19
11.1 Building User's Guide (BUG) 19
11.2 Environmental Management Plan (EMP) 19
12. Urban Ecology 20
12.1 Reuse of Previously developed Land 20
13. Innovation 20
14. Appendix 1 - Energy Rating Review 21
15. Appendix 2 - STEPS Report 22
SECE-1‘1" 5 oci 106
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p3 of 22
294.6/500 Total Sustainability Score
Category
Greenhouse Emissions from Energy
Peak Energy Use
Mains (Drinking) Water Use
Stormwater Quality Impacts
Building Material Impacts
■ Required Score
■ Project Score
Urban Digestor was commissioned by 429 Swan St Pty Ltd to provide an Ecologically Sustainable Design (ESD)
assessment of the proposed townhouses 16-26 Farmer St, Richmond in the Municipality of Yarra.
The purpose of this Sustainability Management Plan (SMP) report is to convey to council how the project has considered,
evaluated and incorporated a range of sustainability initiatives that combined create a development proposal that goes
beyond a minimum compliance approach to sustainability. To address Yarra's ESD objectives, Urban Digestor has
structured the report according to the SDAPP themes to succinctly outline the project's sustainability initiatives. A
benchmark business-as-usual or minimum compliance building has been the basis to compare the proposed
development against and to allow an accurate analysis of ESD measures. In the Appendix a STEPS assessment can be
found to show compliance in this regard. The table below summarises the projects STEPS performance.
The project achieved the following scores in the STEPS tool.
The key outcomes for the development are listed below:
• Cross ventilation to townhouses available through openable windows
• 5 star gas instantaneous hot water system to each dwelling
• High-efficiency LED lighting to all townhouses & common areas, with motion sensor control to common areas.
• Cabling will be provided for individual PV systems on each roof.
• The car park is naturally ventilated.
• Water-efficient fixtures & fittings
• 15,000L rainwater collection & reuse system plumbed to toilets, irrigation and bin-wash to reduce potable water
use.
• Low-VOC interior paints to create healthy interiors
• Bicycle racks for occupants & great access to public transport & walkable neighbourhood
• Construction & Waste Management & Environment Management Plan to be created by contractor
• Re-development of previously developed site, which minimises urban sprawl and vegetation areas.
It is envisaged that this SMP will be endorsed as part of the town planning permit documentation to ensure that the
intent captured herein is transferred into subsequent stages of the project.
RECS1\11) 5 on 11.1*
Urban Digestor, Level 8, 180 Russell St Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p2 of 22
The case for Sustainable Design
Today, buildings produce 20% of Australia's greenhouse gas emissions through the use of energy during operation.
What's more, the construction of buildings, including demolition waste, contributes 40% of all the materials sent to
landfill. And in operation, buildings use large amounts of potable water for non—drinking purposes. For environmental,
economic and social reasons, Victorian Councils are now focusing on the built environment to assist in the creation of a
sustainable community. Therefore, Council's planning application process includes sustainable design considerations.
What is Sustainable Design
Sustainable design is a key priority in the development of today's built environment. Sustainable design protects our
environment, secures today's living standards and future—proofs our community against rising energy, water and waste
disposal costs. Several Victorian Councils have developed a consistent and transparent sustainable design assessment
process. This process offers a high level of planning certainty relevant to sustainable design, and ensures that it has been
considered during the early project phase — when it achieves the greatest benefits at the lowest cost.
Sustainable Design in the Planning Process (SDAPP)
The Sustainable Design Assessment in the Planning Process
(SDAPP) program refers to the inclusion of key environmental
performance considerations into the planning permit
approvals process in order to achieve more sustainable
building outcomes for the long-term benefit of the wider
community. Projects are evaluated across the following
categories:
Energy Efficiency
Water Efficiency
Stormwater Management
Indoor Environment Quality (IEQ)
Transport
Building Materials
Waste
Building & Construction Management
Urban Ecology
- Innovation
RECEIVED
5 OCI 7111 Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, 'I: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p4 of 22
-41C
SKey Initiatives
t% 4. Energy Efficiency
''ta• To ensure the efficient use of energy, to reduce the total operating greenhouse emissions and to
reduce energy peak demand
6-star average energy-rating based on preliminary specification, with minimum rating of 5.2 stars demonstrating a good standard of passive design. Cross ventilation to townhouses through operable windows. Multi-head reverse cycle split system within 1-star of most energy efficient available will be installed. 5 star gas instantaneous hot water system to each dwelling Naturally ventilated garage LED Lighting throughout dwellings, common corridors & carparks Motion sensor control to all common areas & carparks Wiring to roof should purchaser wish to install PV panels.
4.1 Greenhouse gas emissions - Benchmark vs. Proposed Development.
Outlined below is a summary showing the predicted reduction in greenhouse emissions for the development, compared
to a minimum compliance approach. The graph shows a reduction from a typical apartment of 29% through the selected
energy-efficiency measures implemented in the development.
Typical Dwelling
Proposed
0 2000 4000 6000 8000 10000
kg CO2 / yr / dwelling ■ Heating ■ Cooling ■Water Heating Lighting ■ Clothes Drying Misc Equip ■ Renewable Electricity
RECE1V ED 5 OCI 1016
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, 7: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p5 of 22
4.2 town Passive Design & Energy-Ratings
Standard Practice or Minimum Requirement
Proposed Development
Energy-rating: 6-star average energy-rating over
development, 5-star minimum for individual apartment.
76M1/m2 heating, 42MJ/m2 cooling for a 66%/33% split
assumption.
Operable Areas: Opening area at 5% of floor area to
habitable spaces (NCC Vol.2 Min. Operable Areas 3.12.4.1)
Section 11-2 Compliance: Floor, wall and roof construction to
comply with NCC Vol1 Section J requirements
Residential - Average energy-rating of 6 stars with
preliminary specification (in Appendix 1).
Opening area to NCC requirements
Passive Design Review — Preliminary Energy Rating Results for Dwellings
Please refer to the table attached in Appendix 1 which outlines the preliminary energy-rating results for the units based
on a single common preliminary specification.
The preliminary results show that using the reference specification the units are currently performing to the following
level:
Average Star Rating across development
6.0 stars (6 required)
Minimum Star Roting across development
5.2 stars (5 required)
Average Area
88.9m2
Average Heating (MJ/yr) across development 75MJ/m2/year
Average Cooling(MJ/yr) 41MJ/m2/year
A range of changes to the thermal-fabric specification were modelled to determine their impact on the energy ratings.
Resulting from this preliminary modelling, a preliminary specification has been selected.
Daylight is available to all living spaces & bedrooms.
Natural ventilation via operable windows is available to all townhouses through operable windows and doors to
unenclosed, naturally ventilated corridors.
Thermal mass will be available in the form of concrete floors to act as a temperature stabilizer within each dwelling,
storing solar heat absorbed during the day to be later released at night. These measures to capture, store and utilize
winter solar gains are then maximised through insulating the dwellings with insulation and glazing specifications as
shown in Appendix 1.
Shading
Most of the development is oriented to the North for good solar access. These windows are either shaded by a mixture
of balcony overhangs and/or adjustable shading devices. Shading is addressed by energy rating requirements. Unshaded
east and west facing glazing will require higher performance glazing.
Natural Ventilation
Natural cross ventilation windows is available to all townhouses through operable windows and doors to the unenclosed,
naturally ventilated corridors.
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected] 5
61'1
UD - Farmer St, Richmond - Sustainability Management Plan v1 p6 of 22
4.3 Heating, Ventilation & Air-conditioning (HVAC)
Summary
Multi-head split system air-conditioning has been selected as the preferred system of choice for the
development. A minimum EER/COP of 3.25/3.75 (equivalent to 3-stars) has been committed to for the wall-mounted
reverse-cycle air-conditioning systems for the development.
Car park is naturally ventilated.
Naturally ventilated townhouses
Standard Practice or Minimum Requirement Proposed Development
Air-conditioning: MEPS minimum energy performance
standard requirement of EER/COP of 3.1/3.1.
Apartment Ventilation: Operable area min 5% of floor area
Multi-head reverse cycle split system within 1-star of
most energy efficient available will be installed.
Car park is naturally ventilated.
for habitable spaces. Bathroom/toilet ventilation: 25L/s min
(if no natural ventilation) Unenclosed,
dwellings
naturally ventilated corridors to all
Common Area Ventilation: As per AS1668.2
Un-tempered mechanically ventilated common area with no
control solution.
Car park Ventilation: As per AS1668.2. Fan power to flow
ratio of 0.5W/(L/s). If > 40 carparks then require ventilation
control by CO monitoring
Air-conditioner Energy Rating & Typical Dwelling Air-conditioning Electricity Use, Cost & Emissions
The energy efficiency of residential air-conditioners (non-centralised & non-multi-head) is labelled by their energy-
rating. The summary below shows the impact on the residents for the variety of energy-ratings. Again it should be noted
that high star-rating air-conditioners (5-star+) are generally small capacity so need to be confirmed for the calculated
loads, but should be possible for the small dwellings.
Multi-head reverse cycle split system within 1-star of most energy efficient available will be installed.
AC Star Rating S'a Min.
gifks
Energy (MJ/yr) 7,673 7673 7673 7673 7673
Efficiency (COP) 3.25 3.8 4.25 4.75 5.25
Electricity Used (kWh/yr) 656 568 502 449 406
Running Cost ($/yr) $171 $148 $130 $117 106
Emissions (kg CO2./yr) 859 745 657 588 532
Reduction (%) 5% 17% 27% 35% 41%
Heating & Cooling Systems
7673
5.75
371
$96
486
46%
1111
Multi-head split system / air-conditioning system have been selected based on the objectives of providing an energy-
efficient & cost-effective solution to heating & cooling the dwellings.
Multihead ceiling / wall-mounted reverse-cycle air-
conditioning illaC° ES) oci 106
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348,1: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p7 of 22
4.3 Heating, Ventilation & Air-conditioning (HVAC)
Multihead split air-conditioning systems are similar to
single wall mounted air-conditioners, but they allow
several indoor units to run off a single external
condenser.
Advantages
101/111♦4111.,
Disadvantages
=st
Visually unobtrusive Typically more expensive than multiple single
Single external condenser for multiple indoor splits
units External noise of condenser
Indoor units are individually controllable.
Cost Implications ($) —$7,000 to $10,000 per apartment typical.
Energy, Running Cost & Multihead systems are not subject to the energy-rating labelling system, but have similar
Emissions Performance efficiencies to single split units.
Ventilation of Common Areas
No mechanical ventilation of common corridors — unenclosed and naturally ventilated
Mechanical Ventilation of Car Park
- The car park does not require a ventilation system.
4.4 Hot Water Service
Standard Practice or Minimum
Proposed Development
Requirement
No specific regulatory energy-efficiency requirement Individual 5-star rated instantaneous gas hot water system to
for Class 2 (apartments).
Electric hot water systems typically unacceptable to
Council.
Centralised instantaneous gas hot water service has
been assumed as the minimum benchmark for the
project.
each dwelling.
5 star gas instantaneous systems
Instantaneous (or continuous) gas systems are tankless systems that rely on a single large gas boiler to heat water for
the house. This means that hot water is produced on demand and there are no storage heat losses.
ckiEC°\11) .1"`
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p8 of 22
4.5 Lighting
Standard Practice or Minimum
Requirement
Dwellings: Load <5W/m2.
Common Areas: Load <8W/m2
Car parks: Load <6W/m2
No control systems (motion sensors etc.) required.
Proposed Development
Commitment to LED lighting throughout - dwellings
common areas & car parks
Motion sensors and/or Daylight sensors to areas of intermittent
use (bin-rooms, corridors, car parks).
Out of the range of systems evaluated for the project (halogen, compact fluorescent & LED), an LED solution has been
selected. Outlined below is the summary of the evaluation.
Lamp Technology
Halogen (though usually higher than 5W/m2)
CFL or mini-CFL
LED (Selected)
Capitol Cost
Difference
$2,577
$3,865
Electricity Usage over Dev (kWh/yr)
Running Cost over Dev
($/yr)
Emissions over Dev (kg
CO2e/yr)
Simple
Payback (yrs)
n/a
2.1
2.7
8464 $2,200 11,088
3809 $990 4,990
3,881 2963 $770
Lighting Solutions - Common Area
T5 fluorescent lighting (minimum) to car parks, LED being considered subject to further evaluation.
LED
Advantages
• High luminous efficacy (70 to 120 lumen/W)
• Long lifespan (10,000 to 20000hrs+ downlights,
20000 to 40000hrs tubes)
• Adds little heat load to building
Cost Implications ($) —$13 to $27 typical for lamp
Disadvantages
• Relatively high capital cost
• Some restrictions of fitting type and/or range of
choice
• Some quality control issues for low cost brands
• Downlights penetrate building fabric (see Downlight
Covers below)
Lighting Controls:
Lighting controls can have large effects on the total energy consumption of buildings, with a variety of methods to
switch and control circuits. Motion detection will control common area corridor & car park lighting systems.
Motion detection (occupancy sensors, PIRs, MDs etc.) can be useful for spaces occupied intermittently such as corridors,
car parks, hallways, laundries & stores. Appropriate precaution needs to be given to maintaining a low light level for
some areas such as common areas & car parks, with a standard recommendation being 75% of circuits on motion
detection.
Daylight sensors (photocells, PEs etc.) can be useful for areas that receive adequate natural light that operation is not
required. Lighting can be switched entirely on/off when natural light reach a certain level (on/off daylight control), or
continuously dimmed up or down as natural conditions permit (dimming daylight control).
& lobbies. CeC°\ V° This development will commit to motion detectors to spaces of intermittent use like the carpark and common corridors
10i
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348,1": (03) 9639 4936, E: [email protected]
3
UD - Farmer St, Richmond - Sustainability Management Plan v1 p9 of 22
4.6 Cooking
Standard Practice or Minimum
Proposed Development
Requirement
Cooktops: Gas cooktops
Gas cooktop & electric ovens
Ovens: Electric ovens
Gas Cooktop
Cooktop Efficiencies, Running Cost & Emissions
a a a a 600
400
200
0
$140
$120
$100
$80
$60
$40
$20
$-
800 ■ Energy (kWh/yr per apartment) • Emissions (kg CO2e/yr) ■ Running Cost ($/yr)
Electric Electric Solid Electric Electric Radiant Electric Ceramic Plate Ceramic Coil Induction
(Halogen) (Standard)
4.7 Clothes Drying
Standard Practice or Minimum Requirement
Clothes Line: No requirement
Clothes Dryer: 1-star Energy-rating (MEPS)
Has been assumed that no dryers will be provided to apartments.
Proposed Development
Each dwelling will be provided with a small clothesline to
be concealed on balcony or within the dwellings.
4.8 Occupant Appliances
Standard Practice or Minimum Requirement
Items that carry an energy-rating label:
Refrigerators, televisions, clothes-washers, computer-
monitors & dishwashers.
Items subject to MEPS:
Computers & set-top boxes
Proposed Development
As per standard practice
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p10 of 22
1111111111111111
WARM PRONOED TO ALLOW FOR CONNECTION OF SOLAR PANELS BY TOWNHOUSE PURCHASER (TIN
;11,1101111111111111111111111111 =
z • i
llttl
ROOF
maxim' salsa
4.9 Renewable Energy
Summary
The developer will include wiring that will allow the purchaser add-on of a solar PV array to their dwelling's roof.
4.10 Metering
Standard Practice or Minimum Requirement Current or Recommended Development
Sub-metering typically now required on all unit's electricity,
cold-water & hot-water connections.
Standard practice typically to have utilities install meters for
each & charge occupants directly.
Urban Digestor, Level 8, 180 Russell St Melbourne
UD - Farmer St, Richmond - Sustainability Management Plan v1
As for benchmark
Additional sub-metering of Common Area HVAC,
Lighting, Pumps & Lift to enable the future body
corporate to monitor shared systems. --11e6 \\°)
CJ "*
ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
p11 of 22
5. Water Efficiency To ensure the efficient use of water, to reduce total operating potable water use and to encourage the
appropriate use of alternative water sources
Key Initiatives
High efficiency fixtures & fittings have been committed to across the development
including:
• 4 Star WELS Rated Toilets
• 4 Star WELS Rated Bathroom & kitchen tap sets
• 3 Star WELS Rated Shower
5.1 Fixtures & Fittings
Standard Practice or Minimum Requirement
Toilets: 3 Star WELS (9L/4.5L full/half flush) typical practice.
Min is 1-star 9L/4.5L full/half flush.
Basin & kitchen taps: 3 Star WELS (7.5 to 9L/min) typical
practice. Min is 2-star (9 to 12L/min).
Shower: 3 Star (<9L/min) WELS typical practice. Min is 2-star
(9 to 12L/min).
Washing machines: 2.5 Star WELS minimum (15.12 to
17.50L/kg washed).
Dishwashers: 1 Star WELS (1.64 to 2.12L/place setting)
Note: Assumed that no washing machines or dishwashers
will be provided to apartments.
Efficient Fixtures & Fittings
Benchmark Development
Proposed Development
The proposed specification for fixtures & fittings across
the development (i.e. retail & residential) has been
outlined below.
• Toilets: 4 Star WELS 3.5L/Flush)
• Basin taps: 4 Star WELS (>6L/min but .1. 7.5L/min)
• Shower: 3 Star (> 6L/min but 5_ 7.5L/min)WELS
No dishwashers or washing machines will be provided to
townhouses. They will be tenant supplied.
Rainwater collection to toilets to all townhouses (as
outlined in stormwater section)
Showers: Showers are a large user of potable water within dwellings, and a range of efficient showerheads are available.
It is commonly the assumption that lower water usage means a less satisfactory showering experience but recent
research has shown this not to be the case and that is more related to design quality than WELS rating. See:
http://www.choice.com.au/reviews-and-tests/household/energy-a nd-waterisaving -water/water-efficient-
showerheads-review-a nd-compa re.aspx#ixzz2yu6ZA5GF%22
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p12 of 22
6. Stormwater Management To reduce the impact of stormwater run-off, to improve the water quality of stormwater run-off, to
achieve best practice stormwater quality outcomes and to incorporate the use of water sensitive urban design, including rainwater re-use.
Key Initiatives
15000L tank collecting rain off 497m2 of roof area. Rainwater to be reused for toilet flushing, irrigation and bin wash
6.1 Stormwater Strategy
Standard Practice or
Minimum Requirement
Proposed Development
A minimum stormwater rating of 100% on the Melbourne Water STORM tool is required.
The proposed stormwater management strategy for the development is the
capture & use of rainwater for toilets and irrigation to act as stormwater
detention & filtration systems.
497m2 of roof area drains to a 15000L tank plumbed to toilets of all units &
irrigation.
110% STORM score achieved with the system noted above.
Melbourne Water STORM Rating Report
Transact:KIND 330060
Municipality YARRA
Rainfall Station: YARRA
Address: 16-28 Farmer Street
Richmond
VIC 3121
AISSeSIOr. Urban Digeator
Development Type: Residential - MUltl.r■
Allotment Site (m2): 670.00
STORM Rating %: 110
Description Impervious Area Treatment Type Treatment Occupants i Treatment % Tank Water (m2) Area/Volume Number Of Supply
(m2 or L) Bedrooms Reliabitty (%)
Roofs TH1-5 258.00 Rainwater Tank 8,000.00 10 154.00 86.00
Non-permeable areas 173.00 None 0.00 0 0.00 0.00
Roofs TI16-9 239.00 Rainwater Tank 7,000.00 8 142.30 90.70
Date Generated. 13-4.pr-2016 Program Version: 1.0.0
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1 p13 of 22
Vt7 7.1 Daylight
Key Initiatives
7. Indoor Environment Quality (IEQ) To achieve a healthy indoor environment quality for the wellbeing of building occupants.
• Natural light available to all dwellings and shops.
• Cross-ventilation opportunities to all retail & residential areas
• Low or Zero VOC internal paints to be used throughout the development
• Joinery specified will be low-formaldehyde (El-rated or better)
Summary
All habitable rooms (bedrooms and living areas) throughout the development have access to natural light. The
development has been design with a central courtyard to allow for natural light and ventilation to all townhouses. There
are no borrowed light rooms across the development.
7.2 Thermal Comfort
Summary
As noted in the passive design review, a good thermal fabric and cross ventilation
opportunities will allow occupants to adjust their thermal conditions of their
dwellings.
26
26
„24
a u
16
too wann
lotte too
too cold
14
01
0/ 03
0.4
Alr flow wIaity In A
7.3 Natural Ventilation
Summary
The ability to naturally ventilate all townhouses has been integrated into the development with the central courtyard
and corridors. All habitable rooms having access to fresh-air through the provision of operable windows & doors.
Urban Digestor, Level 8, 180 Russell St, Melbourne
ABN: 84 151 437 348, T: (03) 9639 4936, E: info©urbandigestor.com.au
UD - Farmer St, Richmond - Sustainability Management Plan v1 p14 of 22
7.4 Volatile Organic Compounds (VOCs)
Summary
Volatile organic compounds or VOCs are indoor pollutants that arise from off-gassing from synthetic
(and some natural) materials after they are installed within a building, subsequently being breathed in
by occupants. The impact of VOCs on occupants range from the minor to the severe, including effects
headaches, eye nose & throat irritation, dizziness, and at some levels, toxicity and the potential to lead
to chronic diseases or cancer.
The development is committing to specifying paints only with a Low or Zero VOC content to Greenstar IEQ levels, as
there are many cost comparable brands available for most applications.
A more difficult source of VOCs to eliminate is those via sealants, glues, adhesives & carpets. The project team will make
a commitment to fully explore alternative Low or Zero VOC products for such applications.
7.5 FORMALDEHYDE
SUMMARY, RECOMMENDATIONS & OUTSTANDING DECISIONS
Another common source of indoor pollutants of concern to the health of occupants is formaldehyde,
which is typically found in engineered timber products such as used in joinery, cabinetry & other
reconstituted wood products, panels & sheeting.
It is recommended that low formaldehyde materials, E0 super, E0 or El rated be specified for engineered
timber products such as MDF etc. Again, it is recommended that such a commitment be capitalised upon in marketing
materials to promote the health aspects of the development.
EO HCHO
Emission Class E3 E2 El E0
Formaldehyde Emission Greater than Less than or Less than or Less than or
Limit (mg/I) 2.0 equal to 2.0 equal to 1.0 equal to 0.5
Greater than Less than or Less than or Less than or Emissions Limit (ppm)
0.16 equal to 0.16 equal to 0.08 equal to 0.041
Super EO
Less than or
equal to 0.3
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, 7: (03) 9639 4936, E: [email protected]
UD - Farmer St, Richmond - Sustainability Management Plan v1
8. Transport
To minimise car dependency and to ensure that the built environment is designed to promote the use
of public transport, walking & cycling.
Key Initiatives
• Provision of secure bike storage to each townhouse in the garage.
• Walk-score of 87 indicating development has access to range of walkable services,
minimising requirements for car travel.
8.1 Transport Plan
Summary
The site is well served by alternate transport modes which are suitable for residents, staff and visitors to the area. Outlined
below is a summary of the sustainable transport initiatives contained within the development.
Refer to the Traffic Engineering Report for further information.
Public Transport
The site has is well served by public transport with the following services operating in the vicinity of the site:
Trams
• 70 and 75 near doorstep
• 24, 48 & 109, 78 & 79 within lkm walk
Trains
• Burney Station 100m walk
• East Richmond & Hawthorn station within 1km walk
• Richmond Station (transport exchange hub) within 2km
The figure below shows the public transport routes within close proximity of the site, many of which provide connections
with other public transport options.
tk‘:cONI ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]...
61. p16 of 22 5
Urban Digestor, Level 8, 180 Russell St, Melbourne
UD - Farmer St, Richmond - Sustainability Management Plan v1
"*..nd 4r
C u1rr.. s, 1
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
4■•■
nem.,
„. ,
- "4ts,
W•01, ;
L.,„, .„.
itIrstril 17.1 t'
tip I ss
Nersus- I' Id U
11 z a
0 1 6
c■P ma e Ows'St
I
s I
g.
I
in U' rI S` 4.
fa
1 tl
a I"
N
5 f:. IfFs•1 Wier •
4111
C ft
Fq,
Very Walkable
Most errands can be accomplished on foot
r Walk Scare
87 About your score
Add scores to your site
Cyclist Facilities
The City of Yarra is well serviced by the Principal Bicycle Network (PBN) with on-road and informal bicycle paths directly
linking the City of Yarra with the surrounding municipalities of Melbourne and the CBD.
The site has excellent access to bicycle infrastructure with informal bicycle facilities on many major and minor roads in
close proximity of the subject site. Cycling has been encouraged within the development through the provision of bike
storage within the garage space of each townhouse.
Walkability
Easy access of retail, commercial & social services within walkable distance of a development can contribute to
reductions in car & other fossil-fuel transportation, as well contribute to a richer social dynamic. The Walk-Score for the
site is listed below, suggesting that the site is very suitable for urban infill & densification. See:
16 Farmer Street Richmond, Melbourne, 3121
Commute to Downtown Melbourne 6 040, 9 min 0) 22 min A 60+ min View Routes
Favorite Map Nearby Apartments
i
UD - Farmer St, Richmond - Sustainability Management Plan v1 p17 of 22
10. Waste To ensure waste avoidance reuse and recycling during the construction & operation stages of
development.
Key Initiatives Comingled recycling waste collection provided
A construction and demolition waste plan will be required from the contractor
Recycling G
Garbage vim=
9. Building Materials To minimise the environmental impact of materials used by encouraging the use of materials with a
favourable lifecycle assessment.
Key Initiatives Design-team evaluating & exploring "green" concrete mixes to reduce environmental
impact of concrete
9.1 Concrete & Embodied Energy
Summary
The development is exploring methods & measures to reduce the embodied emissions of the concrete used in the
development, through such measures as recycled aggregates, cement substitutes.
Summary
Victoria's Getting Full Value (2013 waste and resource recovery policy) sets the
foundation for Victoria to get the best value it can from waste resources, while
protecting the health of its communities and the environment. The principles
outlined in the policy complement the principles of environment management of
the Environment Protection Act 1970 and provide supplementary guidance in the
consideration of options for waste management.
From a design perspective, the development shall support the policy by providing
an adequate waste system with ability to sort waste. This will enable the operator to implement the policy and consider
its various options. The operator shall promote the observance of the policy (where relevant and practicable) and
encourage users and staff to participate in minimising the impact of waste on the environment. For improved
sustainability, the operator shall consider the following:
Peruse the Sustainability Victoria Website: www.sustainability.vic.gov.au.
• Observe the Environment Protection Act 1970 and its waste hierarchy (in order of preference): a) waste avoidance, b)
reuse, c) recycle, d) recovery of energy, e) treatment, f) containment, and g) disposal.
• Participate in council and in-house programs for waste minimisation.
• Establish waste reduction and recycling targets; including periodic waste audits, keeping records, and monitoring of
the quantity of recyclables found in landfill bound bins (sharing results with users/staff).
k C° \i ‘,s13 ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected] (ICA
‘1 u
J p18 of 22
Urban Digestor, Level 8, 180 Russell St, Melbourne
UD - Farmer St, Richmond - Sustainability Management Plan v1
To facilitate source sorting of waste all kitchen joinery will incorporate 2 bins to allow for the
separation of general and recyclable waste.
Bins will be located on the basement floor to minimise noise and smells as well as, maintaining
visual amenity (access via lift/stairs)
Other Waste Streams
407
The disposal of hard/electronic/liquid waste, and home detox (paint/chemicals), etc. shall be
organised with the assistance of the private waste contractor /operator.
For further details please refer to the Waste report for further information regarding waste aspects of the development.
10.2 Construction & Demolition Waste Target
Summary
The development will ensure the tender documentation includes
requirements for contractor to prepare & implement a construction waste
management plan that will include the documenting of waste records,
quarterly updates to the owner and records of recycling figures.
A 60% demolition waste recycling target and construction waste recycling
target has been committed to.
11. Building & Construction Management To encourage a holistic and integrated design & construction process and ongoing high performance.
Key Initiatives
Supply of building user's guide to future occupants
Contractor shall be required to have or develop an Environmental Management Plan
(EMP) for the development.
11.1 Building User's Guide (BUG)
Summary
The developer has committed to either the contractor or developer developing a Building
User's Guide or BUG, so that future occupants can efficiently and sustainably operate their
dwelling & the services that supply their dwelling. Buildings are unique in that despite being a
very high cost item, do not come with an operating manual that even a cheap consumer good
would! As such, the user can potentially operate their dwelling inefficiently and eliminate any
benefit that designed systems should have delivered. A BUG can be useful tool in educating &
informing the final occupant of these aspects.
11.2 Environmental Management Plan (EMP)
\ C:° ABN: 84 151 437 348, 7: (03) 9639 4936, E: [email protected] 9nA.
p19 of 22
Urban Digestor, Level 8, 180 Russell St Melbourne
UD - Farmer St, Richmond - Sustainability Management Plan v1
Plan
prowling the orgeneshonal A Management gystent
Strur,lufa 8111 prouxf,es for
COnlmlundely Improving our
emit:Inner lei orrrforouvLa p
Summary
The developer has committed to ensuring that the contractor shall either have an
existing, or develop an Environmental Management Plan (EMP) for the development.
An EMP identifies the key environmental issues across the project and provides
strategies & plans for managing them effectively. Items may include EMP issues being
integrated into site inductions or training; strategies for high-environmental risk waste
materials & reporting. Check
12. Urban Ecology
To protect and enhance biodiversity and to encourage the planting of indigenous vegetation
Key Initiatives
No reduction and increase in ecological value on-site due to increased landscaping
Reuse of previously developed site
12.1 Reuse of Previously developed Land
Summary
The proposed development is being conducted on previously developed land, and as such does not contribute
significantly to the reduction of greenfield sites of ecological value.
Proposed landscaping will improve the ecological value of the site.
13. Innovation
To encourage innovative technology, design & processes in all development, so as to positively
influence the sustainability of buildings.
Key Initiatives
■ 'qv or
4••
• N/A
D\I
tn Ve: \ N.% .( 10
ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected] lNic,‘
p20 of 22
Urban Digestor, Level 8, 180 Russell St, Melbourne
UD - Farmer St, Richmond - Sustainability Management Plan vi
14. Appendix 1 - Energy Rating Review
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348,1: (03) 9639 4936, E: info©urbandigestor.com.2 ocl
UD - Farmer St, Richmond - Sustainability Management Plan v1 p21 of 22 C4
Preliminary Energy Rating Report Project Reference: 16001 -16 - 26 Farmer St Richmond
C/0
Architect/Designer: MA Architects
9/05/2016
V3
Urban Digestoc cs.\\) VA)
ABN 84 151 4379AP
V* Level 8 , 180 Russell Street c) QC\
Melbourne, VIC 3000
(03) 9639 4936
Introduction A preliminary energy rating assessment of the townhouses at Farmer St has been conducted to determine
specifications required to achieve a 6-star average and 5-star minimum energy-rating for NCC compliance.
Documentation The ratings have been conducted based on the following documents:
16.04.08 15003 Prelim CAD and PDF
Proposed Specifications The specifications below are based on the documents received. We have recommend specifications where appropriate
to meet 6-star average and 5-star minimum energy-rating for NCC compliance.
Building Element Current Specifications
Ground Floor
Floor above
carpark
Upper Floor
External Walls
External Walls
External Walls
Internal Walls
Roof / ceiling
under balconies
Glazing system
Skylights
Floor Coverings
Air-tightness
Slab on ground no insulation
Suspended slab with
CSR Xtratherm XtroLiner Std 40mm (R1.9) to the underside
Timber Framed floor with no insulation to the underside
Concrete Walls with
R2.5 insulation
Brick-cavity Walls with
CSR EzyCA\Pm Cavity Wall Blanket
Metal Clad Stud Walls with
R2.5 insulation
Plasterboard stud walls
Metal deck roofing with minimum R4.0 roof/ceiling insulation, product options:
Anticon 100 blanket with spacer (R2.3)
R2,0 ceiling insulation batt
Aluminium and Steel framed glazing with thermal performance of
U-value Max 4.5, SHGC 0.61 (Typically single low-e glazing in aluminium improved frames
or double clear glazing in standard aluminium frames)
Aluminium framed with thermal performance of
U-value 1.6, SHGC 0.33
Tiles, Carpet and Timber Floorboard as per plans
All windows & doors sealed & weather-stripped
All exhaust fans to be fitted with self-sealing dampers
All downlights fitted with downlight covers, insulated & sealed
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
160428 UD - Farmer St - Preliminary Energy Rating Report - v1 p2 of 3 ‘‘I
CV GQ
5 "\
Energy-rating Results
The specifications above result in the following:
Average Star Rating 6.0
(Average Minimum Star Rating required by NCC is 6.0)
5.2
(Minimum Star Rating by NCC is 5.0)
Lowest Star Rating
Individual Apartment Results:
Name
Area
(m2) Star Rating
Heating
(MJ/m2/yr)
Cooling
(DAYm2/Yr)
Total
(MJ/m2/yr)
Unit01 85.4 5.7 stars lit 176.6 MR49.2 8
Unit02 87.6 6.4 stars It 64.9 111./ 37.4 02.3 Unit03 86.5 6.8 stars 1111111 53.6 111111 35.5 ISM 89.1 Unit04 86.5 6.4 stars 61.5 38.1 99.6 Unit05 103.3 5.3 stars 8.2 60.• 138.:
Unit06 96.3 5.2 stars 98. 43.1 141.
Unit07 89.4 5.9 stars •. .111= 30.7 " 115.4
Unit08 89.4 6.0 stars 8:.5 IIM 29.9 3.4
Unit09 75.9 5.9 stars 72.3 1111M 43.5 1 [5.8
Next Steps
Selected specifications on the table below need to be amended on drawings for building permit. Once we receive the
amended drawings set we will check, certify the ratings and stamp them for the building permit submission.
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]
160428 UD - Farmer St - Preliminary Energy Rating Report - v1 p3 of 3 , ES) CON
15. Appendix 2 - STEPS Report
Urban Digestor, Level 8, 180 Russell St, Melbourne ABN: 84 151 437 348, T: (03) 9639 4936, E: [email protected]. te\\I
UD - Farmer St, Richmond - Sustainability Management Plan v1 p22 cik2 n0
'
Yarra City Council •
Project name
Assessor
Contact email address
Street number and name
Street type
Suburb
Postcode
Municipality
Permit number
Applicant
Street
16 - 26 Farmer St
Urban Digestor
16 - 26 Farmer
Richmond
3121
STEPS v5.0 Report Revision Timestamp: 2016-07-28 13:02:22
Base Project ID: 33736
Revision: 78db528dcc09efd08f45bf515e48b294
Project Details
Read the Guide to using STEPS before you begin an assessment
Land size
Type of residence
Number of bedrooms
Total number of apartments (multi-unit
developments only)
Disclaimer:
The Moreland City Council does not accept
any liability for loss or damages incurred as a
result of reliance placed upon STEPS.
STEPS is provided on the basis that all
persons using STEPS undertake
responsibility for assessing the relevance
and accuracy of its content. Council takes no
responsibility for any information or services
on external websites linked to from this
website.
671
m2
Townhouse
23
•
Gas Instantaneous 5 stars •
LED Downlights / Spotlights •
Inside fixed drying rack > 0.4 m2/bedroom •
•
STEPS predicts the environmental impacts of
the development based on assumed usage
patterns and long term climate. Actual
environmental impacts will depend on actual
building and appliance use patterns and
efficiency as well as future climate.
Information about environmental impacts
should therefore be taken as indicative only
and no guarantee is implied.
The Centre for Design at RMIT University
makes no claim as to the accuracy or
authenticity of the content of the materials
element of STEPS, and does not accept
liability to any person for the information or
advice provided in it or incorporated into it by
reference
Energy
For more information on products available for selection please see the Energy Appliances website.
Enter data and features of the average dwelling in the development.
Building Envelope Energy Rating
heating score
Building Envelope Energy Rating
cooling score
Building Envelope Energy Rating
conditioned area
Building Envelope Energy Rating
energy star rating
75
41
88.9
6
MJ per m2
MJ per m2
m2
stars
Heating system type
Heating system options
Cooling system type
Cooling system options
Water heater type
Lighting in living areas
Clothes-drying facility
Renewable Electricity Generation
Central Heating •
Whole house (central systems) •
Reverse Cycle heating 3 stars (minimum) •
Air-Conditioning, 3 stars (minimum required) •
Renewable System Size kW (kilowatt peak output)
Output
Energy
Score 52
Target 25
0
100
0 equals the estimated average performance of a conventional design
Required Score
Project Score
Benchmark Emissions
Target Emissions
Heating Greenhouse Gas Emissions
Cooling Greenhouse Gas Emissions
Water Heating Greenhouse Gas Emissions
Lighting Greenhouse Gas Emissions
Clothes Drying
Misc incl TV, cooking, refrigerator, computer
Minus Renewable Electricity Generation
Total Emissions
25
52
39977
29983
355
393
12696
161
554
4990
-0
19149
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 ! yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
kg CO2 / yr / dwelling
Peak Demand
Output
Peakdemand
Score 83.6
Target 10
0
100
0 equals the estimated average performance of a conventional design
Required Score 10
Project Score 83.6
Benchmark Peak Demand 13
kW
Target Peak Demand
12
kW
Calculated Peak Demand
2.1
kW
Water
For more information on products available for selection please see the WELS website.
Fittings (for the average dwelling)
Shower type
Toilet
Basin taps
Bath type
Re-use (for the whole building)
Rainfall area
Rainwater collection tank size
Area of roof draining to rainwater tank
Comments on rainwater tank
Alternative water supply other than rainwater tanks used
(e.g. greywater, third pipe connection or on-site wastewater
treatment and reuse)
Type of alternative water supply
Are toilets permanently connected to the rainwater
tank/alternative water source?
... and also, number of toilets connected to rainwater tank
Is the irrigation system permanently connected to the
rainwater tank/alternative water source?
Is the washing machine(s) permanently connected to the
rainwater tank?
Is the hotwater services(s) permanently connected to the
rainwater tank?
Irrigated garden area
T3 Star WELS (> 6.0 but <= 7.5)
4 Star WELS rating •
4 Star WELS rating •
Melbourne (Central/North) •
20000
497 m2
Yes
Yes
18
Yes
Yes
Yes
51 m2
Output
Water
Score 35
Target 25
100
0 equals the estimated average performance of a conventional design
Required Score 25
Project Score 35
Benchmark Mains Water Consumption 1796
Target Mains Water Consumption 1347
Shower 377.8
Bath 0.0
Misc hot water 453.3
Toilet flushing 138.5
Basins 94.4
Evaporative cooler 0.0
Irrigation 17.9
Misc other water use 218.3
Total water consumption 1300.2
Re-used toilet flushing 108.4
Re-used Irrigation 17.9
Re-used Laundry 0.0
Re-used Hot Water Service 0.0
Re-used Total 126.3
Toilet usage from mains 30.1
Irrigation usage from mains 0.0
Misc other usage from mains 218.3
Total hot water usage from mains 831.1
Total usage from mains 1173.9
Stormwater
Read the Guide to STORM before you begin an assessment
Please visit the STORM website to obtain your STORM Score.
Enter STORM Score From Website
110
Should MUSIC be used instead of STORM?
Yes
Output
Stormwater
kL / yr / dwelling
kL/yr /dwelling
kL / yr / dwelling
kL / yr /dwelling
kL /yr/dwelling
kL / yr / dwelling
kL / yr / dwelling
kL / yr / dwelling
kL / yr / dwelling
kL / yr / dwelling
kL /yr / dwelling
kL / yr /dwelling
kL / yr /dwelling
kL / yr / dwelling
kL / yr / dwelling
kL /yr /dwelling
kL /yr/dwelling
kL / yr / dwelling
kL / yr / dwelling
kL / yr / dwelling
kL /yr /dwelling
Standard Concrete Slab •
Timber Frame •
• I
3.0
3.2
3.1
Score 110 Target 100
0 200
0 is equivalent to the typical urban pollutant loads
Required Score
Project Score
Best-Practice On-Site Stormwater Treatment
Materials
Read the Moreland Greenlist before you begin an
assessment
100
110
100
Building Element Material
Points
Ground Floor
Material 1
Material 2
Material 3
Ground Floor Material average
Standard Concrete Slab • 10.8
•
•
10.8
Upper Floors
Material 1
Material 2
Material 3
Upper Floors Average
Wall Framing
Material 1
Material 2
Material 3
Wall Framing Average
Timber Frame 9.8
•
•
Interior Wall Framing
Timber Frame • Material 1
•
•
7.0
—•1 9.0
• 12.6
Material 2
Material 3
Interior Wall Framing Average
Brick
Steel sheet
Wall Cladding
Material 1
Material 2
Material 3
Wall Cladding Average
TOTALS:
11.1
3.0 •
•
•
3.0
• 3.5
•
•
3.5
• 3.5
•
•
3.5
• 2.2
•
54
Block
Windows
Material 1
Material 2
Material 3
Windows Average
Aluminium
Roof Framing
Material 1
Material 2
Material 3
Roof Framing Average
Timber frame
F
Roof Cladding
Material 1
Material 2
Material 3
Roof Cladding Average
Steel sheet
Outdoor Structures
Material 1
Steel
Material 2
Material 3
Outdoor Structures Average
Output
Materials
Score 14
0
100
0 equals the estimated average performance of a conventional design
Required Score
Project Score
Benchmark Materials Impact
Target Materials Impact
Project Materials Impact
Note:
Points are derived from materials' fate, embodied energy,
biodiversity, human health and toxicity. Target is dependant
on the specified building elements
11
14 (1/0
47.8 points
52.65 points
54 points
Report Project Details
Contact [email protected]
Project
16 - 26 Farmer Street
Richmond 3121
Municipality Yarra
Permit number
Land size 671 m2
Type of residence Townhouse
Total number of bedrooms 23
Total number of apartments (multi-unit developments only)
Name
Required Score Project Score
Greenhouse Emissions from Energy Use
Peak Energy Use
Mains (Drinking) Water Use
25% 52%
10% 83.6%
25% 35%
Stormwater Quality Impacts 100% 110%
Building Material Impacts 11% 14%
Waste Management - recyclables 0.75 m2
Waste Management - rubbish 0.25 m2
Waste Management - green waste 0.25 m2
Waste Management - TOTAL 1.25 m2
Transport: Secure bicycle parks required 8
Project sustainability score 294.6 / 500
Upon completion of a STEPS assessment, prior to submission for a planning permit: print all pages of the assessment
and ensure that the following are notated on the plans for endorsement (where applicable):
Energy
• fixed clothes drying racks; and
■ the location of hot water systems (including marking solar panels on roof.)
• specifications used to achieve a 5-star FirstRate rating eg insulation and aluminium improved window framing;
• air-conditioning system and heating system types; and
• specified lighting types.
Water
• the rainwater tank, sized, and showing plumbing from the roof and to the toilets and/or garden.
• specified shower, toilet and basin types.
Stormwater
■ the location, size and type of treatment systems;
• permeable paving areas;
• the proposed drainage to the treatment system; and
• section details, planting schedules and maintenance requirements of treatment types.
Materials
• material types.
Transport
• allocated bicycle parking spaces.
Waste
• allocated space for waste management.
Complete :
■ an operational waste management plan for the site.
Innovation
Local Government encourages developers to consider inclusion of innovative environmental design solutions that may not
be specified in STEPS. Should you wish to include additional environmentally sustainable design features in your proposed
development, please notate them appropriately on the plans and include relevant design details in the planning application
documentation.