15
EDITION 1 LOCATION OF LAND PARISH: SECTION: CROWN ALLOTMENT: TOWNSHIP: (at time of subdivision) E: 357 530 N: 5 782 200 GDA 94 TITLE REFERENCE: MGA CO-ORDINATES: ZONE: 55 POSTAL ADDRESS: VESTING OF ROADS AND/OR RESERVES NOTATIONS NOTATIONS DEPTH LIMITATION: DOES NOT APPLY EASEMENT INFORMATION LEGEND: A - Appurtenant Easement E - Encumbering Easement R - Encumbering Easement (Road) SURVEY: STAGING: LICENSED SURVEYOR: JAMES ARTHUR WIGGINS SHEET 1 OF 15 M5387/19 COUNCIL NAME: CITY OF CASEY CRANBOURNE 62 (PART) VOL. FOL. 1425 POUND ROAD VERSION 4, DATE: 21/08/2019 Melbourne ph : 03 9524 8888 PLAN OF SUBDIVISION ORIGINAL SHEET SIZE: A3 SURVEYORS FILE REF: This survey has been connected to permanent marks No(s). 12, 56, 66, 68, 77, 100, In Proclaimed Survey Area No. 71 This is not a staged subdivision. Planning Permit No. PlnA00901/14 This plan is based on survey. Land Benefited/In Favour Of Origin Width (Metres) Purpose Easement Reference (of approx centre of land in plan) COUNCIL/BODY/PERSON IDENTIFIER CITY OF CASEY ROAD R1 Beveridge Williams www.beveridgewilliams.com.au development & environment consultants M5387-19-PS-V4.DWG This is a SPEAR plan. Phase No.: 19 Estate: St Germain PHASE AREA: 3.450ha No. of Lots: 67 + Lot B LOTS 1 TO 1900 (BOTH INCLUSIVE) HAVE BEEN OMITTED FROM THIS PLAN. FOR RESTRICTIONS AFFECTING LOTS 1901 TO 1967 (BOTH INCLUSIVE) SEE CREATION OF RESTRICTION ON SHEETS 8, 9, 10 AND 11. LAST PLAN REFERENCE: PS823187R (LOT A) 176, DVA 69/92 & DVA 69/86 E-1, E-2 TRANSMISSION OF ELECTRICITY SEE DIAG. J927024 STATE ELECTRICITY COMMISSION OF VICTORIA E-2, E-4 TRANSMISSION OF ELECTRICITY SEE DIAG. SECTION 86 OF THE ELECTRICITY SPI ELECTRICITY PTY LTD (POWERLINE) INDUSTRY ACT 2000 VIDE AE262622T E-3, E-4 TRANSMISSION OF ELECTRICITY SEE DIAG. J241841 STATE ELECTRICITY COMMISSION OF VICTORIA CLYDE NORTH 3978 PS823188P E-5 SEWERAGE SOUTH EAST WATER CORPORATION PS820074W SEE DIAG. PS811540U E-15, E-18 SEE DIAG. SEWERAGE AUSNET ELECTRICITY SERVICES PTY LTD PS811540U E-15 SEE DIAG. POWERLINE SEC 88 ELECTRICITY INDUSTRY ACT 2000 SOUTH EAST WATER CORPORATION E-9 SEWERAGE SOUTH EAST WATER CORPORATION PS823187R SEE DIAG. OTHER PURPOSES OF PLAN: GROUNDS FOR REMOVAL OF EASEMENT: TO REMOVE THAT PART OF THE SEWERAGE EASEMENT CREATED AS E-6 ON PS820090Y CONTAINED WITHIN ROAD R1 ON THIS PLAN. AGREEMENT FROM ALL INTERESTED PARTIES (SECTION 6(1)K SUBDIVISION ACT 1988) RESERVE No. 1 AUSNET ELECTRICITY SERVICES PTY LTD TO REMOVE THAT PART OF THE SEWERAGE EASEMENT CREATED AS E-9 ON PS823187R CONTAINED WITHIN ROAD R1 ON THIS PLAN. SOUTH EAST WATER CORPORATION SEWERAGE PS820090Y E-6 SEE DIAG. DRAINAGE CITY OF CASEY THIS PLAN E-7, E-8 SEE DIAG. SEWERAGE SOUTH EAST WATER CORPORATION THIS PLAN E-7, E-10 SEE DIAG.

PLAN OF SUBDIVISION EDITION 1 PS823188P

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLAN OF SUBDIVISION EDITION 1 PS823188P

EDITION 1

LOCATION OF LANDPARISH:

SECTION:

CROWN ALLOTMENT:

TOWNSHIP:

(at time of subdivision)

E: 357 530N: 5 782 200 GDA 94

TITLE REFERENCE:

MGA CO-ORDINATES: ZONE: 55

POSTAL ADDRESS:

VESTING OF ROADS AND/OR RESERVES NOTATIONS

NOTATIONSDEPTH LIMITATION: DOES NOT APPLY

EASEMENT INFORMATIONLEGEND: A - Appurtenant Easement E - Encumbering Easement R - Encumbering Easement (Road)

SURVEY:

STAGING:

LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

SHEET 1 OF 15M5387/19

COUNCIL NAME: CITY OF CASEY

CRANBOURNE

62 (PART)

VOL. FOL.

1425 POUND ROAD

VERSION 4, DATE: 21/08/2019Melbourne ph : 03 9524 8888

PLAN OF SUBDIVISION

ORIGINAL SHEETSIZE: A3SURVEYORS FILE REF:

This survey has been connected to permanent marks No(s). 12, 56, 66, 68, 77, 100,

In Proclaimed Survey Area No. 71

This is not a staged subdivision.Planning Permit No. PlnA00901/14

This plan is based on survey.

Land Benefited/In Favour OfOriginWidth(Metres)PurposeEasement

Reference

(of approx centre of landin plan)

COUNCIL/BODY/PERSONIDENTIFIER

CITY OF CASEYROAD R1

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultantsM5387-19-PS-V4.DWG

This is a SPEAR plan.

Phase No.: 19Estate: St Germain

PHASE AREA: 3.450haNo. of Lots: 67 + Lot B

LOTS 1 TO 1900 (BOTH INCLUSIVE) HAVE BEEN OMITTED FROM THIS PLAN.

FOR RESTRICTIONS AFFECTING LOTS 1901 TO 1967 (BOTH INCLUSIVE) SEECREATION OF RESTRICTION ON SHEETS 8, 9, 10 AND 11.

LAST PLAN REFERENCE: PS823187R (LOT A)

176, DVA 69/92 & DVA 69/86

E-1, E-2 TRANSMISSION OF ELECTRICITY SEE DIAG. J927024 STATE ELECTRICITY COMMISSION OF VICTORIAE-2, E-4 TRANSMISSION OF ELECTRICITY SEE DIAG. SECTION 86 OF THE ELECTRICITY SPI ELECTRICITY PTY LTD

(POWERLINE) INDUSTRY ACT 2000 VIDE AE262622TE-3, E-4 TRANSMISSION OF ELECTRICITY SEE DIAG. J241841 STATE ELECTRICITY COMMISSION OF VICTORIA

CLYDE NORTH 3978

PS823188P

E-5 SEWERAGE SOUTH EAST WATER CORPORATIONPS820074WSEE DIAG.

PS811540UE-15, E-18 SEE DIAG.SEWERAGE

AUSNET ELECTRICITY SERVICES PTY LTDPS811540UE-15 SEE DIAG.POWERLINESEC 88 ELECTRICITY INDUSTRY ACT 2000

SOUTH EAST WATER CORPORATION

E-9 SEWERAGE SOUTH EAST WATER CORPORATIONPS823187RSEE DIAG.

OTHER PURPOSES OF PLAN:

GROUNDS FOR REMOVAL OF EASEMENT:

TO REMOVE THAT PART OF THE SEWERAGE EASEMENT CREATED AS E-6 ONPS820090Y CONTAINED WITHIN ROAD R1 ON THIS PLAN.

AGREEMENT FROM ALL INTERESTED PARTIES(SECTION 6(1)K SUBDIVISION ACT 1988)

RESERVE No. 1 AUSNET ELECTRICITY SERVICES PTY LTD

TO REMOVE THAT PART OF THE SEWERAGE EASEMENT CREATED AS E-9 ONPS823187R CONTAINED WITHIN ROAD R1 ON THIS PLAN.

SOUTH EAST WATER CORPORATIONSEWERAGE PS820090YE-6 SEE DIAG.DRAINAGE CITY OF CASEYTHIS PLANE-7, E-8 SEE DIAG.SEWERAGE SOUTH EAST WATER CORPORATIONTHIS PLANE-7, E-10 SEE DIAG.

Page 2: PLAN OF SUBDIVISION EDITION 1 PS823188P

SHEET 21 : 4000SCALE

PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

040 40 80 120 160M5387/19

SURVEYORS REFBeveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

ORIGINAL SHEETSIZE: A3

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 21/08/2019

Page 3: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 34 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 4: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 44 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 5: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 54 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 6: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 64 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 7: PLAN OF SUBDIVISION EDITION 1 PS823188P

SHEET 7

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

01 : 750SCALE

PS823188P

7.5 7.5 15 22.5 30M5387/19

SURVEYORS REFBeveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 24/06/2019

ORIGINAL SHEETSIZE: A3

Page 8: PLAN OF SUBDIVISION EDITION 1 PS823188P

SHEET 8

Melbourne ph : 03 9524 8888

M5387/19SURVEYORS REF

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

ORIGINAL SHEETSIZE: A3

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 21/08/2019

PS823188P

Page 9: PLAN OF SUBDIVISION EDITION 1 PS823188P

SHEET 9

Melbourne ph : 03 9524 8888

M5387/19SURVEYORS REF

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

ORIGINAL SHEETSIZE: A3

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 21/08/2019

PS823188P

Page 10: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

ORIGINAL SHEET SHEET 10M5387/19SURVEYORS REF

SIZE: A3Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 21/08/2019

PS823188P

“ ”

Page 11: PLAN OF SUBDIVISION EDITION 1 PS823188P

SHEET 11M5387/19

Melbourne ph : 03 9524 8888

SURVEYORS REFSIZE: A3Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

ORIGINAL SHEET

LICENSED SURVEYOR: JAMES ARTHUR WIGGINSVERSION 4, DATE: 21/08/2019

PS823188P

“ ”

Page 12: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 124 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 13: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 134 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 14: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 144 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3

Page 15: PLAN OF SUBDIVISION EDITION 1 PS823188P

Melbourne ph : 03 9524 8888

LENGTHS ARE IN METRES

0 SHEET 154 4 8 12 161 : 400SCALE

PS823188P

Beveridge Williams

www.beveridgewilliams.com.au

development & environment consultants

SURVEYORSREFERENCE

M5387/19LICENSED SURVEYOR: JAMES ARTHUR WIGGINS

VERSION 4, DATE: 21/08/2019

ORIGINAL SHEETSIZE: A3