The building has been designed as being under one title
Building to be installed with a Type 5 fire alarm system
Install emergency lighting in stairway
Illuminated exits at the bottom of the stairs and final exits from the restaurant and laundromat
Stairways to be constructed as Accessible stairs
lanceFireDesignsMedium
lanceText Box1500030
lanceDate Box29/01/2015
lanceSignature - Peter
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceText BoxOccupant Load Plan
lanceText BoxOccupant Loads
lanceText Box
Bulk store = 100sqm/ person
lanceText Box1
lanceText BoxOffice space = 10sqm/ person
lanceText Box1
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceText BoxOccupant Load Plan
lanceText BoxOccupant Loads
lanceText Box
Sleeping spaces = 2 people sleeping per room
lanceText Box14
lanceText BoxRestaurant = Fixed number of seatingKitchen = 10sqm/personLaundromat = 3.5sqm/person
lanceText Box14
lanceText Box2
lanceText Box34
lanceText Box9
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceText BoxOccupant Load Plan
lanceText BoxOccupant Loads
lanceText Box
Sleeping spaces = 2 people sleeping per room
lanceText Box30
lanceText Box30
lanceArea Measurement475.7 sq m
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText Box120/120/1200 FRR walls.
lanceLine
lanceText Box60/60/60 FRR walls.
lanceText Box120 minute fire rated walls.
60 minute fire rated walls are achieved by GBTL 60 (1 layer 13mm Fyreline Gib to each side of the framing)
Engineers calculations may be required to verify that the walls required to provide a fire rating are designed for stability under fire conditions for a minimum of 120 minutes for the external fire rated walls and 60 minutes for the internal fire rated walls
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceSnapshot
lanceDoors
lanceDoors
lanceArea Measurement1.1 sq m
lanceText Box60/60/60 FRR midfloor.
lanceDoors
lanceText Box-/60/30sm FRR
lanceCloud
lanceCalloutMaintain 1200mm wide safe path to the outside of the building
lanceArea Measurement476.2 sq m
lanceLine
lanceLine
lanceLine
lanceLine
lanceDoors
lancePolyLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText Box120/120/1200 FRR walls.
lanceLine
lanceText Box60/60/60 FRR walls.
lanceText Box120 minute fire rated walls.
60 minute fire rated walls are achieved by GBTL 60 (1 layer 13mm Fyreline Gib to each side of the framing)
Engineers calculations may be required to verify that the walls required to provide a fire rating are designed for stability under fire conditions for a minimum of 120 minutes for the external fire rated walls and 60 minutes for the internal fire rated walls
lanceArea Measurement1.1 sq m
lanceText Box60/60/60 FRR midfloor.
lanceDoors
lanceText Box-/60/30sm FRR midfloor.
lanceDoors
lanceText Box-/60/60sm FRR midfloor.
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText Box120/120/1200 FRR walls.
lanceLine
lanceText Box60/60/60 FRR walls.
lanceText Box120 minute fire rated walls.
60 minute fire rated walls are achieved by GBTL 60 (1 layer 13mm Fyreline Gib to each side of the framing)
Engineers calculations may be required to verify that the walls required to provide a fire rating are designed for stability under fire conditions for a minimum of 120 minutes for the external fire rated walls and 60 minutes for the internal fire rated walls
lanceDoors
lanceText Box-/60/30sm FRR midfloor.
lanceDoors
lanceText Box-/60/60sm FRR midfloor.
lancePolyLine
lancePolyLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceLine
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceDoors
lanceLine
lanceLine
lanceSnapshot
lanceDoors
lanceDoors
lanceCloud
lanceCalloutKitchenette area can not be in the safe path. 60 minute fire separation is to be maintained
lancePolyLine
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText BoxEscape route (DEOP)
lanceLine
lanceText BoxEscape route (TOP)
lanceEXIT
lanceText BoxExits Signs
lanceText BoxAll escape routes shall have signs complying with NZBC F8.Install illuminated EXIT signs to cover the escape routes and over the final exit doors.-Design and installation of the illuminated signs is to be in accordance with AS 2293.1:2005.
lanceText Box-Install an emergency lighting system to comply with NZBC F6 Visibility in Escape Routes as there are changes in level
lanceText Box-For routes not designated as accessible and used by
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText BoxEscape route (DEOP)
lanceLine
lanceText BoxEscape route (TOP)
lanceEXIT
lanceText BoxExits Signs
lanceText BoxAll escape routes shall have signs complying with NZBC F8.Install illuminated EXIT signs to cover the escape routes and over the final exit doors.-Design and installation of the illuminated signs is to be in accordance with AS 2293.1:2005.
lanceText Box-Install an emergency lighting system to comply with NZBC F6 Visibility in Escape Routes as there are changes in level
lanceText Box-For routes not designated as accessible and used by
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceLine
lanceText BoxEscape route (DEOP)
lanceLine
lanceText BoxEscape route (TOP)
lanceEXIT
lanceText BoxExits Signs
lanceText BoxAll escape routes shall have signs complying with NZBC F8.Install illuminated EXIT signs to cover the escape routes and over the final exit doors.-Design and installation of the illuminated signs is to be in accordance with AS 2293.1:2005.
lanceText Box-Install an emergency lighting system to comply with NZBC F6 Visibility in Escape Routes as there are changes in level
lanceText Box-For routes not designated as accessible and used by
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceArea Measurement1.8 sq m
lanceText BoxWall and ceiling linings = 1SCritical radiant flux (floor coverings) = 2.2 kW/sqm
lanceArea Measurement1.9 sq m
lanceText BoxWall and ceiling linings = 3Critical radiant flux (floor coverings) = 1.2 kW/sqm
lanceText BoxSurface finishes:
4.17.8 Suspended flexible fabricsWhen tested to AS 1530 Part 2:-Suspended flexible fabrics shall have a flammability index of no greater than 12.
-When used as underlay to roofing or exterior cladding that is exposed to view the flammability index shall be no greater than 5.
lanceArea Measurement204.1 sq m
lanceArea Measurement31.8 sq m
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceArea Measurement1.8 sq m
lanceText BoxWall and ceiling linings = 1SCritical radiant flux (floor coverings) = 2.2 kW/sqm
lanceArea Measurement1.9 sq m
lanceText BoxWall and ceiling linings = 2SCritical radiant flux (floor coverings) = 1.2 kW/sqm
lanceText BoxSurface finishes:
4.17.8 Suspended flexible fabricsWhen tested to AS 1530 Part 2:-Suspended flexible fabrics shall have a flammability index of no greater than 12.
-When used as underlay to roofing or exterior cladding that is exposed to view the flammability index shall be no greater than 5.
lanceArea Measurement138.6 sq m
lanceArea Measurement175.3 sq m
lanceArea Measurement32.1 sq m
lanceArea Measurement52.7 sq m
PeterPolygon
PeterPolygon
lanceFireDesignsLarge
lanceText Box1500030
lanceDate Box29/01/2015
lanceArea Measurement1.8 sq m
lanceText BoxWall and ceiling linings = 2SCritical radiant flux (floor coverings) = 2.2 kW/sqm
lanceArea Measurement1.9 sq m
lanceText BoxWall and ceiling linings = 1SCritical radiant flux (floor coverings) = 2.2 kW/sqm
lanceText BoxSurface finishes:
4.17.8 Suspended flexible fabricsWhen tested to AS 1530 Part 2:-Suspended flexible fabrics shall have a flammability index of no greater than 12.
-When used as underlay to roofing or exterior cladding that is exposed to view the flammability index shall be no greater than 5.