Upload
vodieu
View
217
Download
0
Embed Size (px)
Citation preview
30.0
m
12+000
13+000
0
5
10
15
20
25
30
35
40
45
50
55
60
-5
-10
-15
-20
0
5
10
15
20
25
30
35
40
45
50
55
60
-5
-10
-15
11+800
11+850
11+900
11+950
12+000
12+050
12+100
12+150
12+200
12+250
12+300
12+350
12+400
12+450
12+500
12+550
12+600
12+650
12+700
12+750
12+800
12+850
12+900
12+950
13+000
13+050
13+100
13+150
13+200
13+250
13+300
13+350
13+400
13+450
13+500
L=270.0L=270.4L=269.6
G=-0.59%
L=2934.7
R=35805.0
L=366.2G=0.43%
L=843.1
33.7
33.6
33.6
33.6
33.6
33.5
33.6
33.5
33.5
33.3
33.1
32.8
32.7
32.2
32.1
32.0
31.6
31.4
31.2
30.9
30.7
30.3
30.0
29.6
29.2
29.0
23.2
24.3
24.9
24.6
24.6
24.1
24.2
25.2
25.3
1.1
0.8
0.5
0.2
-0.1
-0.4
-0.7
-1.0
-1.3
-1.6
-1.9
-2.2
-2.5
-2.8
-3.1
-3.4
-3.7
-4.0
-4.3
-4.6
-4.9
-5.2
-5.5
-5.8
-6.1
-6.3
-6.4
-6.5
-6.5
-6.4
-6.3
-6.1
-5.9
-5.7
-5.5
-32.6
-32.8
-33.1
-33.4
-33.7
-33.9
-34.3
-34.5
-34.8
-34.9
-35.0
-35.0
-35.2
-35.0
-35.2
-35.4
-35.3
-35.4
-35.4
-35.4
-35.5
-35.4
-35.4
-35.3
-35.2
-35.2
-29.6
-30.7
-31.3
-31.0
-30.8
-30.1
-30.0
-30.8
-30.7
320km/h
-20
R=-6250.0 L=350.2R=6270.5 L=621.8
Design Speed:
Cut and Fill
Proposed Level
Existing Level
Vertical Alignment
Horizontal Alignment
Chainage
010 - L3 Northolt Tunnel Route Element ID
Drawn Checked Approved
Drawing No.
Date Scale Size
Rev.
DrawnRev Description
Project/Contract
Discipline/Function
Zone
Creator/Originator
Legends/Notes:
Drawing Title
Design Stage
HS2 AppCon AppChecked
Scale with caution as distortion can occur.
may be used for legal or other official purposes.
Only an official copy of a title plan or register obtained from the Land Registry
sold or published without the formal permission of Land Registry.
This material was last updated on 2015 and may not be copied, distributed,
Registry under delegated authority from the Controller of HMSO.
© Crown Copyright material is reproduced with the permission of Land
Ordnance Survey Licence number 100049190
© Crown Copyright and database right 2015. All rights reserved.
or if it is issued in part or issued incompletely in any way.
the reproduction of this document after alteration, amendment or abbreviation
HS2 accepts no responsibility for any circumstances which arise from
London, E14 5AB
One Canada Square,
Registered office:
Registration No. 06791686
Registered in England
Tunnel portalDitches - new
Tunnels external extentWoodland habitat creation
Wetland habitat creation
Grassland habitat creation
Ecological mitigation pond
HS2 Access road
Watercourse diversion
Electricity substation
Balancing pond
Noise fence barrier
Replacement floodplain storage
Land drainage area (scrub / woodland)
Landscape mitigation planting Main utility works
County boundary
Borough / District boundary
Community forum boundary
Rail alignment
Rail alignment formation
Landscape earthworks
Engineering earthworks
10+000
Stopped-up PRoW
Hedgerow habitat creation
Grassed areas
Sustainable placement
Public realm
(PRoW)
Existing public right of way
PRoW
New, diverted or realigned (e.g. 10+000)
Chainage
Existing watercourseor portal building
Depot, station, headhouse
development use
Returned to suitable
A107/01/2016
LH
AS SHOWN
London Metropolitan
Civil
Mott MacDonald
London Metropolitan Area Design
Profile
Scale 1:2500
Plan
Scale H 1:2500 V 1:500
Existing Ground Profile
HS2 Alignment
Cross p
assage
Cross p
assage
Cross p
assage
cross passage
Running tunnel
Vent Shaft
012-S4 Westgate
Cross p
assage
Cross p
assage
Vent Shaft
012-S
4 W
estg
ate
River Brent
Hanger Lane Gyratory
Ventilation a
dit
River
Bre
nt
Alperton L
ane U
nderbridge
Hanger
Lane Bridge W
est
Hanger
Lane Bridge E
ast
London U
ndergro
und
Piccadilly Line Bridge
Interv
ention a
dit
Hanger Lane Station
London Underground
Piccadilly Line bridge
London Underground
Main Line
Chainage 11+800 to 13+500
Alperton Lane Underbridge
C221-MMD-CV-DPP-010-202100-FPD
Sheet 11
Headhouse
Replacement Car Park
012-S5 Westec
FINAL PRELIMINARY DESIGN
09/03/16 09/03/16
KR MP
For continuation refer to C
221-M
MD-C
V-D
PP-0
10-2
02300-F
PD
For continuation refer to C
221-M
MD-C
V-D
PP-0
10-2
01900-F
PD
MF
MPDH
renumbered and changed for FPD. 08/01/16 08/01/1608/01/16
DHLH MPP01
Baseline HB Nov 2013. Copied,
08/03/16
P02
P02
Final issue
any error or omission which is due to an error or omission in data supplied to us by other parties.
consequences of this document being relied upon by any other party, or being used for any other purpose, or containing
only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project
© Mott MacDonald
0 105 5020
@ 1:500METRES
0 50 25010020
@ 1:2500METRES
Fit for Acceptance
Code 1
- Acc
epted