1
Fridge Lounge Utility Garage Hall Toilet Cloaks Living Room Study Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 4 5384mm Heating Plant En-suite Wardrobe Landing Wardrobe Wardrobe En-suite 1063mm 4900mm 763mm 1018mm 2480mm 1735mm 2480mm 1735mm 7317mm 5384mm 7725mm 5475mm 900mm 650mm 833mm 2860mm 833mm 1188mm 3000mm 1188mm 938mm 3000mm 5350mm 2300mm 3767mm 5350mm 1800mm 3204mm 3739mm 5350mm 1828mm 2021mm 4175mm 3767mm 5000mm 5000mm 3700mm 1867mm 1800mm 3204mm 1018mm 2480mm 2377mm 900mm 1475mm 900mm 2010mm 2480mm 1735mm 6255mm 800mm 7725mm 6725mm 7025mm 1260mm 2480mm 785mm 5375mm 960mm 2480mm 1735mm En-suite En-suite Wardrobe Dining Area 3884mm 3000mm 3375mm GROUND FLOOR PLAN FIRST FLOOR PLAN Kitchen Washer Dish Washer Coffee Micro Dryer Sink 6884mm 4500mm 2230mm 2300mm 2400mm 2500mm 3792mm Balcony FOUNDATIONS Foundations are to be concrete strip minimum 600mm wide x 150mm thick C25 concrete mix, foundations are to be a minimum depth of 1m in clay sub-soilto provide adequate frost protection in accordance with the British Standards. All foundations are to comply with the Approved Document A1 and A2 of the Building Regulations. INTERNAL PARTITIONING All non-load bearing partitions are to be constructed of 100 x 50mm s/w studding at 450mm centres on 100 x 75mm sole plate fixed to the floor. Partition to be insulated with Rockwool bats for sound insulation and covered with 12.5mm thick plasterboard with a density of 10kg/m2 and skim to both sides. INTERNAL PARTITIONING - SOLID FLOOR Partition walls constructed of concrete floor slab are to be 100mm thick lightweight blocks, any internal load bearing partition walls are to be constructed from 100mm solid concrete block and taken down to strip foundation or constructed on reinforced concrete slabs. GROUND FLOOR CONSTRUCTION (SOLID) New ground floor to be construction, clean stone well compacted to form levels with sand blinding, 1200 gauge polythene DPM to be turned up at the edges and linked in to the DPC. kinkspan Kooltherm K3 board 70mm thick with a top layer of 1000 gauage DPM membrane, slab 200mm concrete C25 with one layer of A142 anti clacking steel reinforcement to be place 50mm from the top of the slab. U value 0.22 SUSPENDED TIMBER FLOOR CONSTRUCTION Floor to be constructed of 18mm thick T&G floor boards with a density of 15kg/m2 on 244 x 72mm gauged s/w floor joists (grade SC3) at 400mm centers. Ceiling to be 12mm plasterboard nailed to underside of joists with plaster skim finish. Lateral support to be provided at 2m centers with galvanized m/s straps type L 30 x 5mm extended across 3 joists. Catnic m/s herring bone strutting ref: HRB6, is to be provided along mid-span of floor joist, last joist to be packed off the brick/blockwork. INSPECTION CHAMBERS New inspection chamber to be pre-cast or polyproplene inspection chamber if maximum depth does not exceed 1200mm. Chamber connections or for 100mm dia. pipes as indicated on the drainage drawing. Chamber to be encased with well compacted select back fill, or weak mix concrete, chamber to be fitted with medium duty cover and frame. Inspection chambers are to be provided at every change of direction on foul drains, maximum distance between inspection chambers to be 45m to comply with the Approved Document Part H, any branch drain must not exceed 22m in length. TOP WATER DRAINAGE All top water drainage are to be 100mm underground PVC-U or Supersleeve with flexible joints piping to be laid at a minimum fall of 1:40. Drains passing under the building are to be protected by surrounded with 100mm (min) granular material and where passing through a wall a suitably sized lintel is to be provided over the opening ensuring that a 50mm space is maintained around the pipe. Openings must be masked to prevent fill. All underground drainage to comply with BS 8301 (1985). new gullies to be provided with rodding access, separate drainage systems are to be combined at the last manhole depending on existing drainage systems. WASTE PIPES All waste pipes are to be a minimum of 38mm dia. to wash hand basins and sinks, pipes are to be fitted with 75mm deep seal traps or anti-vac traps if connected directly to a soil and vent pipe. 40mm waste pipes are to be provided to bath and showers. Soil and vent pipes are to be 100mm dia and terminated 1m above any opening windows adjacent to the stack, a suitable bird cage is to be fitted to the top of the stack. Alternativly an air admittance valve may be used above the last stack connection. All installations are to comply with the Approved Document Part H and BS 5572 (1978). WINDOWS The window frames are to be insulated aluminium powder coated Anthracite dark grey frames and be 1/10th of the floor and haveing 1/20th opening lights and trickle vents to achieve 8000m3 free air flow, windows are to be fitted with double glazed units having a minimum 28mm air gap with K glass and argon filled and low-E coating. All frames are to have vertical and horizontal DPC's to all openings. Seal-a-mastic seals are to be provided around all window and door frames to provide a water tight seal. All glazing must be carried out in accordance with BS 6262. See notes on glazing in critical locations i.e. safety glazing. EXTERNAL TIMBER FINISHES All external timber is to treated before fixing, fascia and soofit boards are to be external grade or marine ply. DOORS Fire doors are to be to the fire resistance indicated on the drawing. All fire resisting doors are to be fitted in a 25mm rebated door frame, doors/frame are to be fitted with intumescent strips and smoke seals. All doors are to be fitted with self closing devise capable of latching the door. Foul Drainage New foul drainage is to be taken to the existing septic tank. SMOKE ALARMS Smoke alarms are required to be fixed at ground and first floor levels and interconnected. The alarm must be wired to the main supply and connected to its own fused spur, alternatively the alarm may be connected to an intruder alarm if the system is specifically designed for this purpose. A smoke detector will cover an area of 7.5m radius and a heat dector 5.3m radius, they should be fitted in accordance with BS 5839 siting sensors within bedrooms, circulation area, head of stairways, lounge/dining rooms and roof voids. Alarms within roof voids should be fitted with a remote LED. STEELWORK Steelwork must comply with the relevant structural calculations and be supported on pad stones or spreader plates, sizes to be provided within the calculations. All steelwork must have a minimum of 30mins fire resistance provided by 12mm fireline plasterboard and skim. Steelwork used in external openings must be provided with a cavity tray. STAIRCASE The new staircase shall comply with Part K of the Approved Document. The maximum rise and going for a private stair shall be any rise between 155mm and 220mm used with any going between 245mm and 260mm or any rise between 165mm and 200mm used with any going between 223mm and 300mm. The pitch of the staircase shall be no greater than 42 degrees, with a minimum headroom of 2m. The handrail is to be a minimum of 900mm high. Balustrades are to be 1m high and capable of resisting a horizontal force of at least 0.36KN/m for each meter length. Maximum openings in the balustrades shall be no greater than 100mm and rails are to be vertical so as not to allow children to readily climb the guarding. Guarding to external balconies and roof edges to be a minimum of 1100mm high and resist a horizontal force of 0.74KN/m. DAMP PROOF COURSE Damp proof course is to be provided in both inner and outer leaf of Brick/blockwork the outer leaf DPC must be at least 150mm above the finished ground level, the inner DPC is to be linked with the floor damp proof membrane (solid floor construction) in the case of timber suspended floors directly under the joists. HEATING Heating to be provided by low pressure radiators with a fan assisted combi boiler. The installation is to be fitted in accordance with the Gas Regulations with a CORGI registered fitter. UNVENTED SYSTEMS All unvented systems are to have an expansion pipe piped to the external elevation and extended down to floor level. Part P All electrical work required to meet the requirements of Part P (electrical safety) will be designed, installed, inspected and tested by a person competent to do so. Prior to completion the L.A. must be satisfied that either:- An electrical installation certificate issued under a Competent Person Scheme has been issued; or Appropriate certificate and forms defined in BS 7671 (as ammended) have been submitted that confirms that the work has been inspected and tested by a competent person. A competent person will have a sound knowledge and experience relevent to the nature of the work undertaken and to the technical standards set down in BS 7671,be fully versed in the inspection and testing procedures contained in the regulations and employ adequate testing equipment. Partitions. Double joists are to be provided under partition walls and baths Sound Insulation (Partitions). 75mm glassfibre insulation to be placed into all partition walls, Floors Acoustilay 15 to be laid on all upper floors for impact noise to comply with Part E. 100mm fiberglass insulation to be placed between ceiling and floor on all suspended floors to comply with part E Sockets All electrical sockets are to be placed at a height of 450mm above floor level all light switches are to be 1200mm from floor level. lower energy light fitting are to be provided in all rooms Domestic Boilers All new and replacement natural gas and LPG boilers are required to have a minimum SEDBUK (Seasonal Efficiency of Domestic Boilers in the UK) rating of 86%. Oil Fired Boilers must have a minimum SEDBUK rating of 85% Exceptional Circumstances permitting the installation of a Non-Condensing boiler, The installer must complete an 'Assessment Form' using the procedure described in the document 'Guide to the Condensing Boiler Installation Procedure for dwellings' (ODPM 2005). The declaration should be retained by the householder as it my be needed when the property is offered for sale. ESCAPE WINDOWS Escape windows where required are to be at least 850mm high and 500mm wide, the bottom of the window is to be not more than 1100mm and not less than 900mm from floor level. VENTILATION Mechanical ventilation fans are required to be fixed to all kitchen areas, utility areas and sanitary accommodation. The kitchen fans are to extract 60 litres per second or if incorporated within a cooker hood 30 litres per second will be required. SANITARY ACCOMMODATION Mechanical ventilation is required to provide three air changes per hour with a 15 minute over run discharging to external air and controlled by the light switch or detecting sensor. An air inlet to the room should be provided i.e. a 10mm gap under the door. West Elevation South Elevation East Elevation ROOF CONSTRUCTION Welsh blue slates laid at a pitch of 25 degrees on 50 x 25mm s/w battens on nil vent felt over standard roof in a room trusses at 600mm centres. Rafters to be clipped to 75 x 100mm s/w wallplate using truss clips and strapped to blockwork with Catnic type L vertical m/s straps at least one meter in length at 2 meter centers. INSULATION Insulation of the roof space is to be 100mm Kingspan laid between rafters with 40mm insulated plaster board over rafters with plaster skim. The insulation is to be extended over the timber wall plates off the internal wall maintaining a minimum 50mm air gap between the insulation and the sarking felt to ensure through ventilation of the roof space. EXTERNAL WALL CONSTRUCTION New external cavity wall to be constructed of 102mm reclaimed sandstone walling pitch face with quoins, window sets to have stone cills, heads and jambs Kingspan Koolthern K8 cavity insulation bats within 100mm cavity, 100mm 7N concrete block with 40mm insulated plaster board dry-lining and skim. Catnic BB2 stainless steel cavity wall ties to be spaced 900mm horizontally and 450mm vertically to comply with BS 1243 (1978). Cavity to be closed along eaves and around all openings with Catnic CC50 insulated cavity closers positioned horizontally and vertically to all openings. All openings are to be provided with Catnic lintels with a minimum end bearing of 150mm at both ends. Brickwork used below DPC to be constructed in Class B engineering or trench block may be used, the cavity is to be filled within 200mm of the DPC with weak mix concrete. All new cavity walls are to be cut through to existing cavities and be continuous. U value 0.29 RAIN WATER GOODS 100mm dia. deep flow square section PVC-U gutters are to be fixed to falls on fascia boards, spitter outlets are to be 75mm dia., with 75mm square section rain water pipes with swan neck and anti-splash shoe. all pipes are to be secured with proprietary brackets and fixed with brass screws. SAFETY GLAZING Glazing in doors and windows must comply with safety regulations applicable to their locations. Information is contained in the Approved Documnet Part N and the Workplace ( Health, Safety and Welfare) Regulations 1992. SKIRTING BOARDS Timber skirting boards are to be provided to all rooms to match existing or if new 200mm x 25mm, all skirting boards are to be treated before fixing. CAVITY TRAYS A cavity tray must be provided above any lintel or ground floor roof, the tray must be fixed in to the wall, all cavuty try membranes must be installed directly above the lead flashings and also be provided with weep holes in at least two vertical joints. 201mm 2450mm 300mm 2450mm 8517mm 4840mm 4840mm Balustrade The balustrade to the balcony is to be laminated glass 1.1m in height with Stainless Steel supports and fastenings Balcony The balcony floor is to be 175x75mm timber joists at 400mm crs, with ferrings to provide a cross fall, 22mm external plywood decking screwed to joists ply to be covered with GRP fiberglass and then promenade stone tiles fixed with Buzon adjustable support system RAIN WATER GOODS 100mm dia. deep flow square section PVC-U gutters are to be fixed to falls on fascia boards, spitter outlets are to be 75mm dia., with 75mm square section rain water pipes with swan neck and anti-splash shoe. all pipes are to be secured with proprietary brackets and fixed with brass screws. Fridge Lounge Utility Garage Hall Toilet Cloaks Living Room Study Heating Plant DRAINAGE PLAN Kitchen Washer Coffee Micro Dryer Sink New Drainage All new underground foul drainage is to be 100mm diameter underground PVC-U piping, manufactured by Hepworth Ltd, to BS 85 with flexible joints. Pipes are to be laid on 100mm bed of granular material to BS 882 1983 e.g. pea gravel, (Class S). 100mm pipes are to be laid to a fall of 1:40. maximum capacity for 100mm pipes is 9.2 litres/sec. Drains passing under the building are to be surrounded with granular material and where passing through wall a suitably sized lintel shall be provided above the opening ensuring that a 50mm space is maintained all around the pipe. Openings must be masked to prevent fill. Pipes are to be fitted with a flexible joint at each side fo the wall. New gullies are to be provided with roding access. WC connections are to have rest bends and 100mm vent pipes at the head of the drain. Rest bends are to be provided to each soil vent pipe ans WC connection. Maximum direct connection between WC outlet and invert of drain to be 1.5m. Rest bends are to be supported on concrete or flag base. Rainwater gullies are to be 100mm trapped with roding access back inlet gullies are to be provided at each sink position. Waste pipes are to discharge below the grate level and above the water level. Surface Water Drainage New drainage for the surface water is to be taken to the existing field culvert. 15375mm 6725mm 5375mm MH 1 SW MH 1 MH 2 MH 3 SW MH 2 SW MH 3 SW MH 4 PP 8507mm 1269mm 262mm 2100mm 2692mm 1350mm 600mm Dotted lines indicate L/B walls on first floor. W/C Kitchen Music / hobby Room Loft Storage Loft Storage Loft Storage Loft Storage SECOND FLOOR ATTIC ROOM PLAN This drawing is provided for planning & Building Regulations consent only. The contractor must check all dimensions on site before works are commenced. The contarctor must comply with all requirements of the Health & Safety Regulations. DO NOT SCALE THIS DRAWING Scale Date Drawing No. Revision APB Consultant Building Surveyors 1 Maple Grove Ramsbottom BL0 0AN Telephone 01706 826300 Mobile 07976404449 Agent Drawing Project Location Client 1:100 & 1:1250 8th Febuary 2021 DWG/01 Mrs Anna Schofield ASHCROFT, Mill Lane, Waddington BB7 3JJ Demolition of the existing bungalow and the construction a Detached House & Garage with turning space Planning Consent

Plan and Elevation - ribblevalley.gov.uk

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Fridge

Lounge

Utility

Garage

Hall

Toilet

Cloaks

Living Room

Study

Bedroom 1Bedroom 2

Bedroom 3 Bedroom 4

5384

mm

Heating Plant

En-suiteWardrobe

Landing

Wardrobe

WardrobeEn-suite

1063mm 4900mm

763mm1018mm

2480mm 1735mm 2480mm 1735mm73

17m

m

5384

mm

7725

mm

5475mm900mm650mm833mm

2860mm833mm 1188mm

3000mm1188mm 938mm

3000mm

5350mm

2300

mm

3767

mm

5350mm

1800

mm

3204mm

3739

mm

5350mm

1828

mm

2021mm

4175mm

3767

mm

5000mm

5000mm

3700

mm

1867

mm

1800

mm

3204mm

1018mm2480mm 2377mm 900mm 1475mm 900mm 2010mm 2480mm 1735mm

6255

mm

800m

m

7725

mm

6725mm

7025mm 1260mm 2480mm

785mm5375mm

960mm

2480mm 1735mm

En-suiteEn-suite

Wardrobe

Dining Area

3884

mm

3000

mm

3375mm

GROUND FLOOR PLAN

FIRST FLOOR PLAN

Kitchen

Washer

DishWasher

CoffeeMicro

Dryer

Sink

6884

mm

4500

mm

2230

mm

2300

mm

2400mm

2500mm

3792

mm

Balcony

FOUNDATIONSFoundations are to be concrete strip minimum 600mm wide x 150mm thick C25concrete mix, foundations are to be a minimum depth of 1m in clay sub-soilto provideadequate frost protection in accordance with the British Standards. All foundations are tocomply with the Approved Document A1 and A2 of the Building Regulations.

INTERNAL PARTITIONINGAll non-load bearing partitions are to be constructed of 100 x 50mm s/w studding at450mm centres on 100 x 75mm sole plate fixed to the floor. Partition to be insulatedwith Rockwool bats for sound insulation and covered with 12.5mm thickplasterboard with a density of 10kg/m2 and skim to both sides.

INTERNAL PARTITIONING - SOLID FLOORPartition walls constructed of concrete floor slab are to be 100mm thicklightweight blocks, any internal load bearing partition walls are to beconstructed from 100mm solid concrete block and taken down to stripfoundation or constructed on reinforced concrete slabs.

GROUND FLOOR CONSTRUCTION (SOLID)New ground floor to be construction, clean stone well compacted to formlevels with sand blinding, 1200 gauge polythene DPM to be turned up at theedges and linked in to the DPC. kinkspan Kooltherm K3 board 70mm thickwith a top layer of 1000 gauage DPM membrane, slab 200mm concrete C25with one layer of A142 anti clacking steel reinforcement to be place 50mmfrom the top of the slab.U value 0.22

SUSPENDED TIMBER FLOOR CONSTRUCTIONFloor to be constructed of 18mm thick T&G floor boards with a density of15kg/m2 on 244 x 72mm gauged s/w floor joists (grade SC3) at 400mmcenters. Ceiling to be 12mm plasterboard nailed to underside of joists withplaster skim finish. Lateral support to be provided at 2m centers withgalvanized m/s straps type L 30 x 5mm extended across 3 joists. Catnic m/sherring bone strutting ref: HRB6, is to be provided along mid-span of floorjoist, last joist to be packed off the brick/blockwork.

INSPECTION CHAMBERSNew inspection chamber to be pre-cast or polyproplene inspection chamber if maximum depth does not exceed1200mm. Chamber connections or for 100mm dia. pipes as indicated on the drainage drawing. Chamber to beencased with well compacted select back fill, or weak mix concrete, chamber to be fitted with medium dutycover and frame. Inspection chambers are to be provided at every change of direction on foul drains, maximumdistance between inspection chambers to be 45m to comply with the Approved Document Part H, any branchdrain must not exceed 22m in length.

TOP WATER DRAINAGEAll top water drainage are to be 100mm underground PVC-U or Supersleeve with flexible jointspiping to be laid at a minimum fall of 1:40. Drains passing under the building are to be protected bysurrounded with 100mm (min) granular material and where passing through a wall a suitably sizedlintel is to be provided over the opening ensuring that a 50mm space is maintained around the pipe.Openings must be masked to prevent fill. All underground drainage to comply with BS 8301 (1985).new gullies to be provided with rodding access, separate drainage systems are to be combined at thelast manhole depending on existing drainage systems.

WASTE PIPESAll waste pipes are to be a minimum of 38mm dia. to washhand basins and sinks, pipes are to be fitted with 75mm deepseal traps or anti-vac traps if connected directly to a soil andvent pipe. 40mm waste pipes are to be provided to bath andshowers. Soil and vent pipes are to be 100mm dia andterminated 1m above any opening windows adjacent to thestack, a suitable bird cage is to be fitted to the top of the stack.Alternativly an air admittance valve may be used above thelast stack connection. All installations are to comply with theApproved Document Part H and BS 5572 (1978).

WINDOWSThe window frames are to be insulated aluminium powdercoated Anthracite dark grey frames and be 1/10th of the floorand haveing 1/20th opening lights and trickle vents toachieve 8000m3 free air flow, windows are to be fitted withdouble glazed units having a minimum 28mm air gap with Kglass and argon filled and low-E coating. All frames are tohave vertical and horizontal DPC's to all openings.Seal-a-mastic seals are to be provided around all window anddoor frames to provide a water tight seal. All glazing must becarried out in accordance with BS 6262. See notes on glazingin critical locations i.e. safety glazing.

EXTERNAL TIMBER FINISHESAll external timber is to treated before fixing, fascia andsoofit boards are to be external grade or marine ply.

DOORSFire doors are to be to the fire resistance indicated on thedrawing. All fire resisting doors are to be fitted in a 25mmrebated door frame, doors/frame are to be fitted withintumescent strips and smoke seals. All doors are to be fittedwith self closing devise capable of latching the door.

Foul DrainageNew foul drainage is to be takento the existing septic tank.

SMOKE ALARMSSmoke alarms are required to be fixed at ground and first floorlevels and interconnected. The alarm must be wired to the mainsupply and connected to its own fused spur, alternatively thealarm may be connected to an intruder alarm if the system isspecifically designed for this purpose. A smoke detector willcover an area of 7.5m radius and a heat dector 5.3m radius,they should be fitted in accordance with BS 5839 siting sensorswithin bedrooms, circulation area, head of stairways,lounge/dining rooms and roof voids. Alarms within roof voidsshould be fitted with a remote LED.

STEELWORKSteelwork must comply with the relevant structuralcalculations and be supported on pad stones or spreader plates,sizes to be provided within the calculations. All steelworkmust have a minimum of 30mins fire resistance provided by12mm fireline plasterboard and skim. Steelwork used inexternal openings must be provided with a cavity tray.

STAIRCASEThe new staircase shall comply with Part K of theApproved Document. The maximum rise and going fora private stair shall be any rise between 155mm and220mm used with any going between 245mm and260mm or any rise between 165mm and 200mm usedwith any going between 223mm and 300mm. The pitchof the staircase shall be no greater than 42 degrees,with a minimum headroom of 2m. The handrail is to bea minimum of 900mm high. Balustrades are to be 1mhigh and capable of resisting a horizontal force of atleast 0.36KN/m for each meter length. Maximumopenings in the balustrades shall be no greater than100mm and rails are to be vertical so as not to allowchildren to readily climb the guarding. Guarding toexternal balconies and roof edges to be a minimum of1100mm high and resist a horizontal force of0.74KN/m.

DAMP PROOF COURSEDamp proof course is to be provided in both inner and outer leaf ofBrick/blockwork the outer leaf DPC must be at least 150mm above thefinished ground level, the inner DPC is to be linked with the floor dampproof membrane (solid floor construction) in the case of timber suspendedfloors directly under the joists.

HEATINGHeating to be provided by low pressure radiators with afan assisted combi boiler. The installation is to be fittedin accordance with the Gas Regulations with a CORGIregistered fitter.

UNVENTED SYSTEMSAll unvented systems are to have an expansion pipepiped to the external elevation and extended down tofloor level.

Part PAll electrical work required to meet the requirements of Part P(electrical safety) will be designed, installed, inspected and tested by aperson competent to do so. Prior to completion the L.A. must besatisfied that either:-An electrical installation certificate issued under a Competent PersonScheme has been issued; orAppropriate certificate and forms defined in BS 7671 (as ammended)have been submitted that confirms that the work has been inspectedand tested by a competent person. A competent person will have asound knowledge and experience relevent to the nature of the workundertaken and to the technical standards set down in BS 7671,be fullyversed in the inspection and testing procedures contained in theregulations and employ adequate testing equipment.

Partitions.Double joists are to be provided underpartition walls and baths

Sound Insulation (Partitions).75mm glassfibre insulation to be placed into all partition walls,Floors Acoustilay 15 to be laid on all upper floors for impact noise to comply withPart E.100mm fiberglass insulation to be placed between ceiling and floor on all suspendedfloors to comply with part E

SocketsAll electrical sockets are to be placed at a height of 450mm above floorlevel all light switches are to be 1200mm from floor level.lower energy light fitting are to be provided in all roomsDomestic BoilersAll new and replacement natural gas and LPG boilers are required tohave a minimum SEDBUK (Seasonal Efficiency of Domestic Boilersin the UK) rating of 86%.Oil Fired Boilers must have a minimum SEDBUK rating of 85%Exceptional Circumstances permitting the installation of aNon-Condensing boiler, The installer must complete an 'AssessmentForm' using the procedure described in the document 'Guide to theCondensing Boiler Installation Procedure for dwellings' (ODPM 2005).The declaration should be retained by the householder as it my beneeded when the property is offered for sale.

ESCAPE WINDOWSEscape windows where required are to be at least 850mmhigh and 500mm wide, the bottom of the window is to be notmore than 1100mm and not less than 900mm from floor level.

VENTILATIONMechanical ventilation fans are required to be fixed to allkitchen areas, utility areas and sanitary accommodation. Thekitchen fans are to extract 60 litres per second or ifincorporated within a cooker hood 30 litres per second willbe required.

SANITARY ACCOMMODATIONMechanical ventilation is required to provide three airchanges per hour with a 15 minute over run discharging toexternal air and controlled by the light switch or detectingsensor. An air inlet to the room should be provided i.e. a10mm gap under the door.

West Elevation South Elevation

East Elevation

ROOF CONSTRUCTIONWelsh blue slates laid at a pitch of 25 degrees on 50 x 25mm s/w battenson nil vent felt over standard roof in a room trusses at 600mm centres.Rafters to be clipped to 75 x 100mm s/w wallplate using truss clips andstrapped to blockwork with Catnic type L vertical m/s straps at least onemeter in length at 2 meter centers.

INSULATIONInsulation of the roof space is to be 100mm Kingspan laid betweenrafters with 40mm insulated plaster board over rafters with plaster skim.The insulation is to be extended over the timber wall plates off theinternal wall maintaining a minimum 50mm air gap between theinsulation and the sarking felt to ensure through ventilation of the roofspace.

EXTERNAL WALL CONSTRUCTIONNew external cavity wall to be constructed of 102mm reclaimed sandstone walling pitch face with quoins,window sets to have stone cills, heads and jambs Kingspan Koolthern K8 cavity insulation bats within 100mmcavity, 100mm 7N concrete block with 40mm insulated plaster board dry-lining and skim. Catnic BB2 stainlesssteel cavity wall ties to be spaced 900mm horizontally and 450mm vertically to comply with BS 1243 (1978).Cavity to be closed along eaves and around all openings with Catnic CC50 insulated cavity closers positionedhorizontally and vertically to all openings. All openings are to be provided with Catnic lintels with a minimumend bearing of 150mm at both ends. Brickwork used below DPC to be constructed in Class B engineering ortrench block may be used, the cavity is to be filled within 200mm of the DPC with weak mix concrete. All newcavity walls are to be cut through to existing cavities and be continuous. U value 0.29

RAIN WATER GOODS100mm dia. deep flow square section PVC-U gutters are to be fixed to falls on fasciaboards, spitter outlets are to be 75mm dia., with 75mm square section rain water pipeswith swan neck and anti-splash shoe. all pipes are to be secured with proprietary bracketsand fixed with brass screws.

SAFETY GLAZINGGlazing in doors and windows must comply with safety regulations applicable to their locations. Informationis contained in the Approved Documnet Part N and the Workplace ( Health, Safety and Welfare) Regulations1992.

SKIRTING BOARDSTimber skirting boards are to be provided to all rooms to matchexisting or if new 200mm x 25mm, all skirting boards are to betreated before fixing.

CAVITY TRAYSA cavity tray must be provided above any lintelor ground floor roof, the tray must be fixed into the wall, all cavuty try membranes must beinstalled directly above the lead flashings andalso be provided with weep holes in at leasttwo vertical joints.

201m

m

2450

mm

300m

m 2450

mm

8517

mm

4840

mm

4840

mm

BalustradeThe balustrade to the balcony is to be laminated glass 1.1m in height withStainless Steel supports and fastenings

BalconyThe balcony floor is to be 175x75mm timber joists at 400mm crs, withferrings to provide a cross fall, 22mm external plywood decking screwedto joists ply to be covered with GRP fiberglass and then promenade stonetiles fixed with Buzon adjustable support system

RAIN WATER GOODS100mm dia. deep flow square section PVC-U gutters are to be fixed to falls on fasciaboards, spitter outlets are to be 75mm dia., with 75mm square section rain water pipeswith swan neck and anti-splash shoe. all pipes are to be secured with proprietary bracketsand fixed with brass screws.

Fridge

Lounge

Utility

Garage

Hall

Toilet

Cloaks

Living Room

Study

Heating Plant

DRAINAGE PLAN

Kitchen

Washer

CoffeeMicro

Dryer

Sink

New DrainageAll new underground foul drainage is to be 100mm diameter underground PVC-U piping, manufactured byHepworth Ltd, to BS 85 with flexible joints. Pipes are to be laid on 100mm bed of granular material to BS 8821983 e.g. pea gravel, (Class S). 100mm pipes are to be laid to a fall of 1:40. maximum capacity for 100mmpipes is 9.2 litres/sec. Drains passing under the building are to be surrounded with granular material and wherepassing through wall a suitably sized lintel shall be provided above the opening ensuring that a 50mm space ismaintained all around the pipe. Openings must be masked to prevent fill. Pipes are to be fitted with a flexiblejoint at each side fo the wall. New gullies are to be provided with roding access. WC connections are to haverest bends and 100mm vent pipes at the head of the drain.Rest bends are to be provided to each soil vent pipe ans WC connection. Maximum direct connection betweenWC outlet and invert of drain to be 1.5m. Rest bends are to be supported on concrete or flag base. Rainwatergullies are to be 100mm trapped with roding access back inlet gullies are to be provided at each sink position.Waste pipes are to discharge below the grate level and above the water level.

Surface Water DrainageNew drainage for the surface water is tobe taken to the existing field culvert.

15375mm

6725mm

5375mm

MH 1

SW MH 1

MH 2 MH 3

SW MH 2

SW MH 3

SW MH 4

25Ámm

8507

mm

1269

mm

262m

m

2100

mm

2692

mm

1350

mm

600mm

Dotted lines indicate L/B walls onfirst floor.

W/C

Kitchen

Music / hobby Room

Loft StorageLoft Storage

Loft Storage Loft Storage

SECOND FLOOR ATTIC ROOM PLAN

This drawing is provided for planning & Building Regulations consent only.The contractor must check all dimensions on site before works are commenced. Thecontarctor must comply with all requirements of the Health & Safety Regulations.

DO NOT SCALE THIS DRAWINGÉ È

Scale Date

Drawing No. Revision

APBConsultant Building Surveyors

1 Maple GroveRamsbottom BL0 0ANTelephone 01706 826300Mobile 07976404449

Agent

Drawing

Project

Location

Client

1:100 & 1:1250 8th Febuary 2021

DWG/01

Mrs Anna Schofield

ASHCROFT, Mill Lane,Waddington BB7 3JJ

Demolition of the existing bungalow and the constructiona Detached House & Garage with turning space

Planning Consent