PJM©2015www.pjm.com
PJM Operator Displays
Jack ThomasLead Reliability Engineer, Reliability Engineering
John R. Baranowski, P.E.Sr, Consultant – EMS and Model Management
PJM©2015www.pjm.com 2
PJM as Part of the Eastern Interconnection
KEY STATISTICSPJM member companies 940+millions of people served 61 peak load in megawatts 165,492MWs of generating capacity 183,604miles of transmission lines 62,5562013 GWh of annual energy 791,089generation sources 1,376square miles of territory 243,417area served 13 states + DCexternally facing tie lines 191
• 27% of generation in Eastern Interconnection
• 28% of load in Eastern Interconnection• 20% of transmission assets in
Eastern Interconnection
21% of U.S. GDP produced in PJM
As of 5/29/2015
www.pjm.com
PJM©2015www.pjm.com
Visualization Challenges
• Situation Awareness for large geographical area• Tracking of 1300 generators: unit status, MW and
MVAR output, unit reserves• Tracking system voltages throughout 13 state territory• Viewing transmission zone overviews for a large grid• Keeping track of wind generation output and forecast• Track MW transfers into PJM and across the
transmission system• Consistent displays in each control room
3
PJM©2015www.pjm.com 4
Real-time Data Collected
• Real-time SCADA data – voltages, MW, MVAR, loads, Circuit Breaker Status, MW reserves
• State Estimator data• Market data – Generator bid information, Dispatch rates,
LMPs (Locational Marginal Pricing)• PMU data (synchrophasor)• Line and transformer outage data • Nodal Prices
PJM©2015www.pjm.com 5
Generation Dispatcher Wall
ACE Compare
Tie Flow
s
PJM©2015www.pjm.com 6
Picture Tour – Left side
Gen Unit Status
PJM©2015www.pjm.com 7
Picture Tour – Right side
InterfaceLimits
PJM©2015www.pjm.com
765kv and 500kv Overview and Voltage
8
PJM©2015www.pjm.com 9
ACE Deltas between Site EMS’s
PJM©2015www.pjm.com 10
Balancing Authority ACE Limit (Area Control Error)
PJM©2015www.pjm.com
Scheduled and Actual MW flows
PJM©2015www.pjm.com 12
Hydro Generation Display
PJM©2015www.pjm.com
Renewable Integration into OperationsWind Display
13
PJM©2015www.pjm.com 14
Actual & Forecasted Loads
PJM©2015www.pjm.com 15 15
Load Forecast and Historical Load Curves
PJM©2015www.pjm.com 16
Interconnection Reliability Operations Limits Early Warning System
PJM©2015www.pjm.com 17
SynchroPhasor Visualization
PJM©2015www.pjm.com
System Overview(Radar Data)
18
PJM©2015www.pjm.com
System Overview (Temperatures and Clouds)
19
PJM©2015www.pjm.com
Temperature, Radar, Line Outages
20
PJM©2015www.pjm.com
Demand Response Locations
21
PJM©2015www.pjm.com
Outage Tracker
PJM©2015www.pjm.com 23
IEP Real-Time UI
Single UI Shows Operators, Correlated Data, Priority, and Operating Procedures in single interface.Supervisors can see which Operators are actively working or monitoring events. The application also shows updates to events after they have triggered.
PJM©2015www.pjm.com 24
IEP Rule Builder Form• Simple, form-driven UI
allows Operations users to create and update rules themselves.
• All approval workflow, rule activation/deactivation is controlled by Operations Staff. No programming knowledge is needed.
• Training on the rule builder is less than 1 hour.
• Rich-Text Alarm action box allows for charts, external links, and data formatting to provide the Operator with the data he needs to work the event at hand.
PJM©2015www.pjm.com 25
Questions?