PIXEL Detector Integration mechanical requirements. H. Wieman Christie Integration meeting 16-May-2008. topics. Introduction – parameters and requirements cooling system space power heat load to wide angle hall. Pixel detector function. Topological D meson reconstruction - PowerPoint PPT Presentation
Citation preview
1
PIXEL Detector Integration mechanical requirements
H. WiemanChristie Integration meeting16-May-2008
2
topics
Introduction – parameters and requirements cooling system
space power heat load to wide angle hall
3
Pixel detector function
Topological D meson reconstruction
Requires high precision vertex pointing
Critical parameters: very thin, low X/X0 very close to the
interaction point
4
Pixel geometry
2.5 cm radius
8 cm radius
Inner layer
Outer layer
End view
One of two half cylinders
20 cm
coverage +-1
total 40 ladders
5
Some pixel features and specifications
Pointing resolution (13 19GeV/pc) mLayers Layer 1 at 2.5 cm radius
Layer 2 at 8 cm radiusPixel size 18.4 m X 18.4 m Hit resolution 10 m rmsPosition stability 6 m (20 m envelope)Radiation thickness per layer
X/X0 = 0.28%
Number of pixels 436 M
Integration time (affects pileup) 0.2 msRadiation tolerance 300 kRadRapid installation and replacement to cover rad damage and other detector failure
Installation and reproducible positioning in a shift
criticalanddifficult
(ALICE Pixels 0.9%)
6
Pixel air cooling system
Internal duct 2 in diameter X 5 ft
Internal duct 2 in diameter X 5 ft
external duct 6 in diameter X 50 ft
external duct 6 in diameter X 50 ft
chiller
pump
Wide angle hall ISC
Air flow: 400 SCFM
Total pressure drop: 22 inches water
Temperature: 75 deg F/34 deg C or maybe -10 deg C
7
Pixel heat load break down
Heat source Power (watts)
detector silicon 160
on ladder signal drivers 80
voltage regulators in ISC 24
heat influx through ducting and ISC if 35 deg C below ambient
600 - 2000
pumping 1000
Total load on chiller 1900 - 3300
8
Pump
5 HP motor
11 in 18 in
25 in
Air flow: 400 SCFM (300 SCFM maybe sufficient)
Total pressure drop: 22 inches water
9
Chiller
Unit to be investigated Requirements:
2 – 3 kW Temperature: 75 deg F/24 deg C or -10 deg C ? flow 300-400 SCFM
10
Infrastructure power load
Heat load to the hall: Up to 2-6 kW if all dumped to air Much less if chiller is cooled by chilled water or has compressor
and radiator outside
AC power: 2-6kW Chilled water: 2-6kW if used