Page 1: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

NORTH SHORE CONNECTORNORTH SHORE CONNECTOR

TUNNELS AND STATION SHELLTUNNELS AND STATION SHELLTUNNELS AND STATION SHELLTUNNELS AND STATION SHELLLIGHT RAIL PROJECTLIGHT RAIL PROJECT

PAUL ZICK, PE

NORTH SHORE CONSTRUCTORS JV

Page 2: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Shore Connector Alignment

•• 7300 lf 7300 lf Extension to existing 25 mile systemExtension to existing 25 mile system

•• 18 Contracts18 Contracts

• $435 Million$435 Million

Page 3: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Funding – $ 435 Million

80%

17%17%3%

Page 4: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Project Location006006007007

Future- to Airport North ShoreNorth Shore

003003

006006007007

Airport North Shore North Shore Connector Connector Light Rail Light Rail E iE iExpansionExpansion

004 New Gateway Station004 New Gateway Station

Existing

EXISTING GATEWAY EXISTING GATEWAY STATIONSTATION

Existing Light Rail System

Page 5: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Project Team• Owner

–– Port Authority of Allegheny CountyPort Authority of Allegheny County

• Construction ManagerTriGoldTriGold–– TriGoldTriGold

• Jacobs Civil

• HDR

• Kwame

Page 6: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Project Team• Design Engineer

–– DMJMDMJM

• ContractorNorth Shore Constructors JVNorth Shore Constructors JV–– North Shore Constructors JVNorth Shore Constructors JV

• Obayashi Corp.

• Trumbull Corp.

Page 7: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

What we are building

• Two Contracts

• Combined Contract Value - $156 500 000Combined Contract Value $156,500,000

• Time ––– NTPNTP Oct 2, 2006Oct 2, 2006

–– 003 Tunnels 003 Tunnels 1243 days1243 days Feb 26, 2010Feb 26, 2010

–– 006 Station / C&C006 Station / C&C 870 days870 days Feb 18, 2009Feb 18, 2009

Page 8: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Four Major Structure Types

• Boat Section – 340 lf–– SOE SOE -- Steel Soldier Piles and Wood LaggingSteel Soldier Piles and Wood LaggingSOSO Stee So d e es a d ood agg gStee So d e es a d ood agg g

• Cut and Cover – 1200 lfSOESOE C t D S il Mi i W ll (CDSM)C t D S il Mi i W ll (CDSM)–– SOE SOE -- Cement Deep Soil Mixing Wall (CDSM)Cement Deep Soil Mixing Wall (CDSM)

–– SOE SOE –– Cement Bentonite Wall (CB)Cement Bentonite Wall (CB)

• Top Down Construction - Station–– SOE SOE -- Slurry WallSlurry Wallyy

• Bored Tunnel – 2240 lfSOESOE P t C t S t l Li iP t C t S t l Li i–– SOE SOE -- Precast Concrete Segmental LiningPrecast Concrete Segmental Lining

Page 9: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Boat Section – Soldier pile and lagging• Excavation – 0 to 35 feet

• Soldier Piles and Wood Lagging

• Above or at the water table

• Deep Wells

Walls and Waterproofing

EXISTING SOILSEXISTING SOILS

Page 10: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Boat Section - SOE - Soldier Piles & Lagging

Soldier Piles andSoldier Piles andSoldier Piles and Soldier Piles and LaggingLagging

Page 11: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cut & Cover – SOE CDSM Walls

BACKFILLCDSM Walls

60’ +/60’ +/-

Cut off ground water

ROCK

Page 12: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cut & Cover / Launch Pit – CDSM Walls

Page 13: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cut & Cover / Launch Pit - CDSM WALLSI l il i d ithIn place soils mixed with Bentonite Slurry going down

Cement Slurry mixed going up

Insert Steel Soldier Piles

Page 14: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

CDSM –SOE – Drill Rock Socket

Page 15: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

CDSM WALLS – Temporary Bridge

Page 16: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Excavation / Mud Slab / WP/ Base Slab

ROCK

Page 17: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Structural Concrete

Waterproofing

ROCK

Page 18: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Structural Concrete – Cut and Cover

Page 19: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Backfill

BACKFILL

ROCK

Page 20: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Bridge to hold the Bridge

Support two Bents

Page 21: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cut & Cover – InstrumentationInstruments

Stain gauges

Weather

Tilt MetersTilt Meters

MotorizedMotorized Total Station

Page 22: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Underpinning – SR-65

Drilled PierDrilled PierDrilled PierDrilled Pier

Drilled PierDrilled Pier

Page 23: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Underpinning – SR-65

ROCK

Page 24: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Underpinning – SR-65

Drilled PierDrilled Pier

Page 25: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Underpinning – SR-65

ROCK

Page 26: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Underpinning – SR-65

ROCK

Page 27: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Side Station Shell

Page 28: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Shore Station - Slurry Walls

SEA PARKING GARAGE

Concourse

Page 29: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Shore Station - Slurry Walls

Page 30: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Shore Station – Slurry WallsDESANDING

P iP iP i

DESANDING

Excavate Slot Primary Panel

Primary Panel

Primary Panel

SecondarySecondary Panel

Page 31: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Side Station – Slurry walls

Concrete P iP iP iConcrete Primary Panel

Primary Panel

Primary Panel

Secondary Secondary

Rebar

Tremie pipeSecondary

PanelSecondary

Panel

Rebar

Page 32: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Slurry Walls - Rebar Cage

Page 33: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Side Station – Top Down

ROCK

Page 34: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

North Side Station – Pour Roof Slab

Roof SlabRoof Slab

ROCK

Page 35: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Excavate to Concourse

BackfillRoof Slab

CONCOURSE

Roof Slab

ROCK

Page 36: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Excavate to Concourse

BackfillRoof Slab

Soldier Piles installed by building Soldier Piles installed by building contractorcontractor

CONCOURSE

Roof Slabcontractorcontractor

ROCK

Page 37: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Excavate to first row of struts

BackfillRoof Slab

CONCOURSE

Roof Slab

ROCK

Page 38: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Station Roof Slab Excavation

60 ft

40 ft40 ft

Page 39: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Excavate to Invert – Pour Base Slab

BackfillRoof Slab

CONCOURSE

Roof Slab

SLAB ANCHORS

ROCK

Page 40: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Station Ground Anchors

Ground Anchors

Page 41: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Construct Platform & Deck

BackfillRoof Slab

CONCOURSE

Roof Slab

ROCK

Page 42: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Launch Pit - SOE

CDSM WALL

Page 43: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Launch Pit - SOE – Tie Backs

Page 44: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Launch Pit - SOE – Tie Backs

TIE BACKS

TIE BACKS

TBM

ROCK

Page 45: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Ground Improvement - Jet Grouting

Page 46: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Launch Pit - Jet Grout

Jet Grout column construction

Drill Down

Grout bottom up

Page 47: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Launch Pit – Entrance Packing

Soft Eye

Page 48: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – Move to Launch Pit

Page 49: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – Move to Launch Pit

150 feet fully assembled150 feet fully assembled

Page 50: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Launch Pit – TBM Launch

JET

GROUTJET

GROUT

21

GROUT

3 21 3

Page 51: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Launch Pit – Structure Work

JET

GROUT

Page 52: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Stanwix St. Receiving Pit Location

GATEWAY II

HORNE BUILDING

RECEIVING PIT

Page 53: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Ground Improvement - Jet Grout

75% COVERAGE

Receiving Pit

100%

100% Coverage

6’ Around Tunnel6 Around Tunnel

Page 54: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Ground Improvement - Jet Grout – 75%HORNE BLGHORNE BLG.

MinimizeMinimize Angular Distortion due t dto ground loss

Page 55: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Jet Grouting Stanwix Street

Page 56: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Stanwix Street Receiving Pit – CB Wall

Page 57: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Bored Tunnels

Tunnel Tunnel Boring Boring M hiM hiMachine Machine Launch PitLaunch Pit

TBM Tunnels – 2200 lfNORTH SHORENORTH SHORE

Receiving Pit

SOUTH SHORESOUTH SHORE

Page 58: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Bored Tunnel SectionPRECASTPRECAST SEGMENTLININGLINING

Segment Lining 20’ inside diameter

CAST IN PLACEPLACE INVERT

Page 59: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM TunnelsSl P B l TBM (SPBTBM)• Slurry Pressure Balance TBM (SPBTBM)

–– Mixed Shield (Soft Ground and Rock)Mixed Shield (Soft Ground and Rock)

–– Working Pressure 3 barWorking Pressure 3 bar

Page 60: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Mining Cycle – Mine 4’ & Grout

Mine 4’Mine 4’

GROUT MAINTAINEDGROUT MAINTAINED BEHIND SHIELD

Page 61: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Mining Cycle – Install 4’ Segment Ring

Build 4’ RingBuild 4 Ring

Page 62: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Mining Cycle – Ring Complete - Mine

Mine 4’Mine 4’

GROUT MAINTAINEDGROUT MAINTAINED BEHIND SHIELD

Page 63: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Grouting

Segments Grout Nozzle

Grout

Page 64: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – SLURRY – MIX SHIELD

22’-9”

Page 65: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

SPTBM Mixed Shield

Page 66: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Slurry TBM – 22’- 9” dia (6.92 m)24 17 i h t i• 24 -17 inch twin disk cutters

• 20 - Scrapers20 Scrapers

• Bucket lips

• 3 - Wear• 3 - Wear detection devices

• 0-2.7 rpm

• Left or Right

Page 67: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cutting Tools – After first tunnelDi k C tt• Disk Cutters

• Scrappers• Bucket Lips

Page 68: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Rock Crusher

Page 69: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Assembly – Man Locks – 3 Bar (45 psi)

Material Lock

Page 70: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Cutter Head Drive

• Motors - 8 – 101 hp

• Total - 808 hp18

2Total 808 hp

• Variable Frequency Drive (VFD)

7

Drive (VFD)

• 480 v AC 4

3

5

6

• 0-2.7 rpm (l or r)

• Main bearing 8 5 ft

45

• Main bearing – 8.5 ft

Page 71: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – Rear of Middle Shield5 Cylinders 4 Steering Groups

6 Cylinders

7 Cylinders

Page 72: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – Rear of Middle Shield• Propel Cylinders - 24

• Piston Diameter - 260 mm

• Rod Diameter - 220 mm

• Max Stroke - 1750 mmMax Stroke 1750 mm

• Advance force - 38227 kN (4,296 tn)

Page 73: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Operation

Excavation Chamber

Working Chamber

Hydrostatic and Soil

Slurry In

and Soil Pressure

Slurry OutSlurry Out

Page 74: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – Operation Plan

455 hp PUMP

SLURRY IN

2 EA 455 h PUMPSSLURRY OUT2 EA - 455 hp PUMPS

Page 75: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Slurry Separation Plant

Plant Capacity Plant Capacity 1000 m1000 m33/hr/hr1000 m1000 m /hr/hr

Page 76: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment ErectorH d li l iH d li l i•• Hydraulic telescopic arm type Hydraulic telescopic arm type

•• 6 ranges of movement6 ranges of movement

•• TelescopeTelescope

R t tiR t ti•• RotationRotation

•• TravelTravel

•• Independent Independent Roll & YawRoll & Yaw–– Roll & YawRoll & Yaw

•• Controlled by joy stickControlled by joy stick

Page 77: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Erector

• Thrust rams retracted 4’- 6”

Page 78: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Installation

BOLTBOLT

Segment ErectorSegment ErectorSegment ErectorSegment Erector

Page 79: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Key Segment Installation

TBM Shield

Page 80: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Key Segment Installation

MOVE OUT

KEY SEGMENT MOVE FORWARD

Page 81: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Mining – Start North SideNORTH SHORESOUTH SHORE

Equitable

NORTH SHORESOUTH SHORE

Equitable Resources

Building

Soft Ground

Page 82: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Fluvioglacial Material• Gravel 40% - 57%

• Sand 50% - 38%

• Fines 10% - 5%

• Cobbles - up to 2’Cobbles up to 2

Page 83: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Mining - River CrossingNORTH SHORESOUTH SHORE

Equitable

NORTH SHORESOUTH SHORE

Equitable Resources

Building

Mixed Face

Page 84: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM – North River Wall

Alluvium

Claystone

Fluvioglacial

Siltstone

Page 85: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM North River Wall - Grouting

Alluvium

Claystone

Fluvioglacial

Siltstone

Page 86: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

River CrossingNORTH SHORESOUTH SHORE

Equitable

NORTH SHORESOUTH SHORE

Equitable Resources

Building

Rock

Page 87: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

River Crossing

25 feet ALLEGHENY RIVER

RIVER SILTS (ALLUVIAL)22 feet

Top of Rock FLUVIOGLACIAL

( )22 feet

SILTY SHALE (5,400 SILTY SHALE (5,400 –– 11,800 psi)11,800 psi)

CLAYSTONE (200CLAYSTONE (200 4 400 psi)4 400 psi)COALCOAL

10 feet

CLAYSTONE (200CLAYSTONE (200-- 4,400 psi)4,400 psi)

SILTSTONE (3 400SILTSTONE (3 400--11 000 psi)11 000 psi)SILTSTONE (3,400SILTSTONE (3,400--11,000 psi)11,000 psi)

Page 88: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

River CrossingNORTH SHORESOUTH SHORE

Equitable

NORTH SHORESOUTH SHORE

Equitable Resources

Building

Well Horne Blg.

Soft GroundJet Grout

Mixed Face

Page 89: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM Guidance System – VMT

Total StationTotal Station Operator’s DisplayOperator’s Display

80 mm

TargetTarget

Page 90: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Precast Segments – Universal RingSix pieces + Key4’ – Long

20’ ID

4 Long

Bolted

Two tapers 2-3/8 & 1-5/8

Page 91: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Rebar Cages

Page 92: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Seg Plant – cycle 4 rings X 2/ day

Page 93: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Finishing Line•• Rotate Segments Rotate Segments ––

curve upcurve up

•• Repair SurfacesRepair Surfaces

•• Add GasketAdd Gasket

•• Add Joint PackingAdd Joint Packing

•• Stack in reverse order Stack in reverse order of installationof installation

Page 94: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Secondary Steam Curing

• 5 day Secondary Cure

• 8000 psi8000 psi

Page 95: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Multi Purpose Vehicle (MVP)

Page 96: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Multi Purpose Vehicle (MVP)

Page 97: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Heading Segment Unloading

Page 98: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Heading Segment Unloading

Page 99: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Segment Erection

Page 100: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Tunnel Infrastructure

50,000 CFM Ventilation50,000 CFM VentilationTemporary Temporary LightingLighting

2 - 4” water

8” Discharge

Walkwayy

Page 101: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

First Tunnel to Receiving Pit - July 10, 2008

Soft eye Soft eye ––Fiberglass pilesFiberglass piles

Page 102: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

First Tunnel to Receiving Pit - July 10, 2008

Containment Wall

Page 103: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM U-Turn

Page 104: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM U-Turn- Rotate 180 deg

Page 105: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM U-Turn- Rotate 180 deg

Page 106: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM U-Turn- Rotate 180 deg

Page 107: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

TBM U-Turn- Rotate 180 deg

Page 108: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Invert Clean Up

Page 109: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Invert Placement

Page 110: Pittsburgh Light Rail Project, North Shore Connector, Tunnels and Station Shell

Thank YouThank You

Questions?Questions?