WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-101 Pipework from: D-0101
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1.5-HC-01019-D3; 1.5-HC-01026-A2 ; 12-HC-01004-C3; 12-HC-01018-D3; 24-HC-01001-D3; 24-HC-01005-C3; 2-V-01020-D3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: D-0102
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study.
01/01/1995 29/12/2004 Online
External
Deterioration
9 VI-EXT 60100% Coverage 04/02/2009 04/02/2014 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
13/11/2008 13/11/2013 OnLine UT/01
11 July 2011 Page 1 of 176
7/28/2019 Piping Exam Spec
2/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-101-1 Pipework from: D-0102
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HW-01022-C3; 3-HC-01036-C3
Nace:
Inspection plan
Line list:
Material: SA-106 B
Pipework to: PL-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
2 VI-EXT 30100% Coverage 04/02/2009 05/08/2011 OnLine DVI/01
Internal Corrosion 2 UT 0Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 50% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 01/01/1995 OnLine UT/01
11 July 2011 Page 2 of 176
7/28/2019 Piping Exam Spec
3/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-102 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
6-V-01013-C3; 6-V-01100-C3; 16-HC-1049-C3; 3-HC-1034-C3; 16-HC-01006-C3; 16-HC-03001-C3; 16-HC-03149-C3; 16-HC-03759-C3; 4-HC-22063-HC3; 3-V-03191-C3; 2-HC-03144-C3; 2-HC-
03143-C3; 2-V-03147-C3; 2-HC-03145-B3; 1-HC-01048-C3; 16-HC-03760-C3; 3-V-03761-C3; 2-HC-03762-C3; 2-HC-03763-B3; 2-HC-03764-C3; 2-PG-03836-C3; 2-HC-03146-B3; 2-HC-03757-B3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: D-0301
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
6 VI-EXT 60100% Coverage 13/02/2009 13/02/2014 OnLine DVI/01
Internal Corrosion 6 UT 10Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
28/11/2008 28/09/2009 OnLine UT/01
11 July 2011 Page 3 of 176
7/28/2019 Piping Exam Spec
4/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-103 Pipework from: D-0102
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
4-HC-01048-C3; 3-V-02073-C3; 3-HC-01003-C3; 3-HC-02008-B3; 3-HC-02009-B3; 3-HC-02070-C3; 4-LN-02310-D2
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: D-0201
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study.
01/01/1995 29/12/2004 Online
External
Deterioration
2 VI-EXT 30100% Coverage 25/03/2009 25/03/2009 OnLine DVI/01
Internal Corrosion 2 UT 6Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 50% of Potential locations by Location
Category.
10/11/2008 10/11/2008 OnLine UT/01
11 July 2011 Page 4 of 176
7/28/2019 Piping Exam Spec
5/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1801 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
8-V-06045-A1; 8-V-03643-A1; 6-V-22056-A1; 6-HC-07252-A1; 3-V-05065-A1; 3-V-02039-A1; 3-AG-04815-A1; 2-V-06081-A1; 2-V-06049-A1; 1-V-07313-A1; 1-V-01031-A1; 16-HC-18100-A1; 8-
V-07302-A1; 6-V-07328-A1; 1-V-07329-B1; 6-V-07331-A1; 1-V-07332-B1; 3-V-07334-A1; 1-V-07335-A5A; 8-V-07350-A5A; 1-V-07316-B1; 1-V-07354-B1; 1-V-08008-C1; 1.5-HC-01026-A2 ; 1.5-
HC-01019-A1; 0.75-V-02205-A1; 10-HC-07356-A1; 10-V-07255-A1; 10-V-07265-A1; 10-V-07266-A1; 10-V-18027-A1; 12-HC-07092-A1; 12-V-01101-A1; 12-V-03419-A1; 12-V-03501-A1; 12-V-
03604-HA1; 12-V-03609-HA1; 12-V-03660-HA1; 12-V-03661-HA1; 12-V-03700-HA1; 12-V-03702-HA1; 12-V-18080-A1; 14-HC-18100-A1; 14-V-02101-A1; 14-V-18063-A1; 14-V-18090-A1; 16-
HC-07095-A1; 16-V-03546-A1; 16-V-03662-HA1; 1-HC-02071-A1; 1-HC-02072-A1; 1-HC-07352-A1; 1-V-03203-A1; 1-V-03205-A1; 1-V-03207-A1; 1-V-03514-B3; 1-V-03516-C3; 1-V-03635-C3;
1-V-03671-A1; 1-V-03754-B3; 1-V-03756-C3; 1-V-05095-C1; 1-V-18051-A1; 1-V-18058-A1; 20-NI-07017-A1; 20-V-18001-A1; 20-V-18065-A1; 24-V-18007-A1; 2-HC-02062-A1; 2-HC-02068-A1;
2-HC-03543HA3; 2-HW-01010-A2; 2-HW-02017-A2; 2-HW-07243-A2; 2-HW-22004-A2; 2-V-01030-A1; 2-V-02093-A1; 2-V-03148-A1; 2-V-03195-A1; 2-V-03197-A1; 2-V-03755-A1; 2-V-03758-
A1; 2-V-05054-A1; 2-V-05056-A2; 2-V-06007-A1; 2-V-06011-A1; 2-V-06037-A1; 2-V-06039-A1; 2-V-06047-A1; 2-V-06249-A1; 2-V-18029-A1; 2-V-18049-A1; 2-V-22145-HA1; 2-V-22147-HA1; 3-
V-01021-A1; 3-V-03193-A1; 3-V-03679-A1; 3-V-03822-A1; 8-V-05066-A1; 3-V-05068-A1; 3-V-18062-HA1; 3-V-18073-HA1; 3-V-22146-HA1; 4-AM-03606-A5A; 4-V-02043-A1; 4-V-02055-A1; 4-
V-02095-A1; 4-V-02099-A1; 4-V-02112-A1; 4-V-03199-A1; 4-V-03201-A1; 4-V-03217-A1; 4-V-03417-A1; 4-V-03510-A1; 4-V-03611-HA1; 4-V-03617-HA1; 4-V-03675-HA1; 4-V-03677-HA1; 4-V-03817-A1; 4-V-05090-A1; 4-V-05111-A1; 4-V-06061-HA1; 4-V-06067-HA1; 4-V-06077-A1; 4-V-07252-A1; 4-V-18021-A1; 4-V-18058-A1; 4-V-18081-A1; 4-V-22142-HA1; 6-HC-07252-A1; 6-V-
01025-A1; 6-V-02041-A1; 6-V-02097-A1; 6-V-03156-A1; 6-V-03209-A1; 6-V-03606-HA1; 6-V-03643-A1; 6-V-03659-HA1; 6-V-03684-HA1; 6-V-03685-HA1; 6-V-05064-A1; 6-V-07602-HA1; 6-V-
22005-A1; 6-V-22040-A1; 6-V-22073-HA1; 6-V-22074-HA1; 6-V-22078-HA1; 6-V-22079-HA1; 8-HC-06058-A1; 8-V-01014-A1; 8-V-01015-A1; 8-V-03674-A1; 8-V-05058-A1; 8-V-06041-A1; 8-V-
06043-A1; 8-V-06066-HA1; 8-V-07263-A1; 8-V-07264-A1; 8-V-07315-A1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PK-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
18 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
18 VI-EXT 60100% Coverage 04/03/2009 04/03/2019 OnLine DVI/01
Internal Corrosion 22 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
25/11/2008 25/11/2018 OnLine UT/01
11 July 2011 Page 5 of 176
7/28/2019 Piping Exam Spec
6/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1801-1 Pipework from: D-0401
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-V-04026-DO
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PL-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
14 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
14 VI-EXT 60100% Coverage 01/01/1995 31/12/1999 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 6 of 176
7/28/2019 Piping Exam Spec
7/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1802 Pipework from: D-1802
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
4-HC-18009-A2; 2-HC-18011-A2; 3-HC-18010-A2; 4-HC-18008-A2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-210
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
4 VI-EXT 30100% Coverage 28/10/2009 28/10/2019 OnLine DVI/01
Internal Corrosion 4 UT 30Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/09/2004 01/09/2014 OnLine UT/01
11 July 2011 Page 7 of 176
7/28/2019 Piping Exam Spec
8/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1803 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1-V-07180-A1; 1-V-07181-A1; 1-V-07182-A1; 1-V-07183-A1; 1-V-07184-A1; 1-V-07185-A1; 1-V-07199-A1; 1-V-07308-A1; 2-HC-05028-A2; 4-HC-02100-A1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PK-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
19 VI-EXT 60100% Coverage 04/08/2009 04/08/2014 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
15/09/2008 15/09/2013 OnLine UT/01
11 July 2011 Page 8 of 176
7/28/2019 Piping Exam Spec
9/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1803-1 Pipework from: Analyser AH-1
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HC-18041-DO
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PL-1803
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
18 VI-EXT 60100% Coverage 01/01/1995 31/12/1999 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 9 of 176
7/28/2019 Piping Exam Spec
10/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-1805 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
6-HC-07619-A30D; 4-V-07659-A30D; 4-V-07661-A30D; 2-V-07279-N0; 4-V-07596-HN0; 4-V-07108-N0; 4-V-07594-HN0; 4-V-07150-N0; 4-V-07592-HN0; 4-V-07106-N0; 1-V-07273-N0; 3-V-
07277-N0; 1-HC-18068-N0; 1-HC-18054-N0; 1-V-18067-N0; 1-V-18071-N0; 2-V-07144-N0; 1-V-18074-N0; 4-V-18039-N0; 1-V-07203-N0; 1-V-07204-N0; 0.75-HC-07720-A1; 0.75-HC-18061-
N0; 0.75-V-18072-N0; 0.75-V-18073-N0; 1.5-HC-07018-N0; 1.5-HC-07019-N0; 1.5-V-07492-HN0; 1.5-V-07493-HN0; 1.5-V-07512-HN0; 10-V-07140-N0; 10-V-18035-N0; 10-V-18037-N0; 16-V-
07257-N0; 1-NI-18033-N0; 1-NI-18057-N0; 1-V-07145-N0; 1-V-07202-N0; 2-HC-07146-N0; 2-HC-07205-N0; 2-HC-07558-HN0; 2-HC-07573-HN0; 2-HC-07574-HN0; 2-HC-07575-HN0; 2-HC-
18053-N0; 2-V-07033-N0; 2-V-07125-N0; 2-V-07126-N0; 2-V-07201-N0; 2-V-18002-N0; 2-V-18070-N0; 30-V-18028-N0; 3-V-07247-N0; 3-V-07563-HN0; 3-V-07565-HN0; 3-V-07584-HN0; 3-V-
18038-N0; 4-HC-18046-N0; 4-V-07598-N0; 4-V-07600-HN0; 4-V-18004-N0; 4-V-18036-N0; 4-V-18044-N0; 6-V-07107-N0; 6-V-07120-N0; 6-V-18012-N0; 8-V-07132-N0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
18 VI-EXT 60100% Coverage 04/08/2009 04/08/2014 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/01/1995 01/01/2000 OnLine UT/01
11 July 2011 Page 10 of 176
7/28/2019 Piping Exam Spec
11/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2003 Pipework from: PK-2001A/B
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
2-PA-21004-B1; 2-PA-21011-B1; 2-PA-21012-B1; 3-PA-21005-B1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-2003-1
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
CUI 16 CUI
Inspection-
Visual
6010% of potential CUI Locations by category. 01/06/2009 31/05/2014 Shutdown DVI/01
External
Deterioration
11 VI-EXT 60100% Coverage 04/10/2009 03/10/2014 OnLine DVI/01
Internal Corrosion 11 UT 12Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 01/01/1996 OnLine UT/01 Frequency changed by
the ICP. the interval can
be increase after 3
inspections.
11 July 2011 Page 11 of 176
7/28/2019 Piping Exam Spec
12/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2003-1 Pipework from: PL-2003
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
2-PA-20013-E0; 2-PA-20014-E0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E2101
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
11 Remove ins
and dye pen
120Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 29/12/2004 Shutdown DP/01
External
Deterioration
11 VI-EXT 60100% Coverage 01/01/1995 31/12/1999 OnLine DVI/01
Internal Corrosion 25 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 29/12/2004 OnLine UT/01
11 July 2011 Page 12 of 176
7/28/2019 Piping Exam Spec
13/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-201-1 Pipework from: PL-103
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
6-LN-02311-D2
Nace:
Inspection plan
Line list:
Material: SA-106 B
Pipework to: D-0207
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
15 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study.
01/06/2009 30/05/2019 Online
External
Deterioration
15 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 13 of 176
7/28/2019 Piping Exam Spec
14/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-202 Pipework from: D-0207
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
4-GN-02312-B2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-212
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
15 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study.
01/06/2009 30/05/2019 Online
External
Deterioration
15 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 14 of 176
7/28/2019 Piping Exam Spec
15/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-203 Pipework from: D-0207
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
6-LN-02341-B2; 6-LN-02344-B2; 6-LN-02346-B2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: F-0201
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
15 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/06/2009 30/05/2019 Online
External
Deterioration
15 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 15 of 176
7/28/2019 Piping Exam Spec
16/176
7/28/2019 Piping Exam Spec
17/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-206 Pipework from: D-0208
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HC-02365-B1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-206-1
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
19 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 17 of 176
7/28/2019 Piping Exam Spec
18/176
7/28/2019 Piping Exam Spec
19/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-207-1 Pipework from: PL-203
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
8-LN-02347-B2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: T-0202
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
18 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study.
01/06/2009 30/05/2019 Online
External
Deterioration
18 VI-EXT 60100% Coverage 01/03/2010 01/03/2020 OnLine DVI/01
Internal Corrosion 22 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/03/2010 01/03/2020 OnLine UT/01
11 July 2011 Page 19 of 176
7/28/2019 Piping Exam Spec
20/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-208 Pipework from: T-0202
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
4-HC-02023-A3; 6-HC-02354-A1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: E-0205
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
CUI 19 CUI
Inspection-
Visual
6010% of potential CUI Locations by category. 01/06/2009 31/05/2014 OnLine DVI/01
External
Deterioration
19 VI-EXT 60100% Coverage 01/06/2009 31/05/2014 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/06/2009 31/05/2014 OnLine UT/01
11 July 2011 Page 20 of 176
7/28/2019 Piping Exam Spec
21/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-208-1 Pipework from: E-0205
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
6-HC-02355-A1; 6-HC-02356-A1; 6-HC-02357-A1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: E-0204
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
CUI 15 Profile RT 12010% of potential CUI Locations by category.
External
Deterioration
19 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 21 of 176
7/28/2019 Piping Exam Spec
22/176
7/28/2019 Piping Exam Spec
23/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-210 Pipework from: T-0202
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
10-HC-02353-A1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: H-0203
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
CUI 19 CUI
Inspection-
Visual
60Strip 10% of potential CUI Locations by
category.
DVI/01
External
Deterioration
19 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 19 UT - Offline 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/06/2009 31/05/2014 OnLine UT/01
11 July 2011 Page 23 of 176
7/28/2019 Piping Exam Spec
24/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2101 Pipework from: PK-2103
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-IA-21276-SO; 2-IA-21103-SO; 1-IA-21179-SO; 1.5-HW-21050-SO; 1.5-IA-07535-HSO; 1.5-IA-07538-HSO; 1.5-IA-21139-SO; 1.5-IA-21140-SO; 1-IA-01040-SO; 1-IA-20001-SO; 1-IA-20009-SO; 1-
IA-20024-SO; 1-IA-21043-SO; 1-IA-21044-SO; 1-IA-21090-SO; 1-IA-21095-SO; 1-IA-21138-SO; 1-IA-21148-SO; 1-IA-21158-SO; 1-IA-21159-SO; 1-IA-21162-SO; 1-IA-21189-SO; 1-IA-21190-SO; 1-
IA-21191-SO; 1-IA-21192-SO; 1-IA-21193-SO; 1-IA-21194-SO; 1-IA-21196-SO; 1-IA-21206-SO; 1-IA-21210-SO; 1-IA-21211-SO; 1-IA-21212-SO; 1-IA-21213-SO; 1-IA-21214-SO; 1-IA-21222-HSO;
1-IA-21248-SO; 1-IA-21249-SO; 1-IA-21250-SO; 1-IA-21251-SO; 2-IA-21300-SO; 1-IA-21311-SO; 2-IA-07546-HSO; 2-IA-21048-SO; 2-IA-21049-SO; 2-IA-21079-SO; 2-IA-21080-SO; 2-IA-21081-
SO; 2-IA-21089-SO; 2-IA-21091-SO; 2-IA-21092-SO; 2-IA-21093-SO; 2-IA-21094-SO; 2-IA-21098-SO; 2-IA-21099-SO; 2-IA-21125-SO; 2-IA-21126-SO; 2-IA-21128-SO; 2-IA-21146-SO; 2-IA-21147-
SO; 2-IA-21163-SO; 2-IA-21179-SO; 2-IA-21185-SO; 2-IA-21186-SO; 2-IA-21197-SO; 2-IA-21229-HSO; 2-IA-21230-SO; 2-IA-21235-A023; 2-IA-21243-SO; 2-IA-21244-SO; 2-IA-21260-SO; 2-IA-
21266-SO; 2-IA-21267-SO; 2-IA-21268-SO; 2-IA-21275-SO; 2-IA-21310-SO; 3-IA-21009-SO; 3-IA-21010-SO; 3-IA-21164-SO; 3-IA-21218-S0
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: Plant air to dist header
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
25 VI-EXT 120100% Coverage 22/10/2009 22/10/2019 OnLine DVI/01
Internal Corrosion 25 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/2005 OnLine UT/01
11 July 2011 Page 24 of 176
7/28/2019 Piping Exam Spec
25/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2102 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1-PA-21058-L1; 1-PA-21063-L1; 1-PA-21174-L1; 1-PA-21221-L1; 1.5-HW-21013-L1; 1.5-PA-21117-L1; 1.5-PA-21118-L1; 1-PA-21055-L1; 1-PA-21057-L1; 1-PA-21059-L1; 1-PA-21062-L1; 1-PA-
21065-L1; 1-PA-21068-L1; 1-PA-21069-L1; 1-PA-21070-L1; 1-PA-21073-L1; 1-PA-21075-L1; 1-PA-21076-L1; 1-PA-21078-L1; 1-PA-21096-L1; 1-PA-21097-L1; 1-PA-21110-L1; 1-PA-21112-L1; 1-
PA-21113-L1; 1-PA-21115-L1; 1-PA-21116-L1; 1-PA-21121-L1; 1-PA-21122-L1; 2-PA-21123-L1; 1-PA-21145-L1; 1-PA-21157-L1; 1-PA-21161-L1; 1-PA-21166-L1; 1-PA-21168-L1; 1-PA-21169-L1;
1-PA-21171-L1; 1-PA-21172-L1; 1-PA-21175-L1; 1-PA-21176-L1; 1-PA-21177-L1; 1-PA-21178-L1; 1-PA-21183-L1; 1-PA-21209-L1; 1-PA-21239-L1; 1-PA-21240-L1; 1-PA-21253-L1; 1-PA-21254-
L1; 1-PA-21255-L1; 1-PA-21304-L1; 2-PA-21001-L1; 2-PA-21052-L1; 2-PA-21053-L1; 2-PA-21056-L1; 2-PA-21060-L1; 2-PA-21061-L1; 2-PA-21064-L1; 2-PA-21067-L1; 2-PA-21074-L1; 2-PA-
21106-L1; 2-PA-21107-L1; 2-PA-21108-L1; 2-PA-21111-L1; 2-PA-21114-L1; 2-PA-21119-L1; 2-PA-21120-L1; 2-PA-21137-L1; 2-PA-21144-L1; 2-PA-21165-L1; 2-PA-21167-L1; 2-PA-21173-L1; 2-
PA-21228-HL1; 2-PA-21242-L1; 2-PA-21252-L1; 2-PA-21259-L1; 2-PA-21262-L1; 2-PA-21263-L1; 2-PA-21264-L1; 2-PA-21265-L1; 2-PA-21269-L1; 2-PA-21270-L1; 2-V-21002-L1; 3-PA-21006-L1;
3-PA-21007-L1; 3-PA-21051-L1; 3-PA-21066-L1; 3-PA-21070-L1; 3-PA-21071-L1; 3-PA-21182-L1; 3-V-21003-L1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: Plant air to dist header
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
25 VI-EXT 120100% Coverage 13/04/2009 13/04/2019 OnLine DVI/01
Internal Corrosion 25 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/2005 OnLine UT/01
11 July 2011 Page 25 of 176
7/28/2019 Piping Exam Spec
26/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2103 Pipework from: PK-2103
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1.5-NI-07533-HA1; 1.5-NI-07576-HA1; 1-NI-07534-HA1; 8-NI-07607-HA1; 8-NI-07608-HA1; 8-NI-07609-HA1; 3-V-07603-HA1; 1.5-NI-07536-HA1; 1-NI-07537-HA1; 1.5-NI-07577-HA1; 3-V-
07604-HA1; 1.5-NI-07539-HA1; 1-NI-07540-HA1; 1.5-NI-07578-HA1; 3-V-07605-HA1; 1-NI-18055-A1; 2-NI-03260-A1; 2-NI-03336-A1; 3-NI-03329-A1; 4-NI-03337-A1; 4-NI-03104-A2; 1.5-NI-
03101-A2; 1.5-NI-03102-A2; 1-NI-05037-A2; 1-NI-21305-A1; 2-NI-21306-A1; 1-NI-23167-A1; 1-NI-23168-A1; 1-NI-23169-A1; 1-NI-23170-A1; 1-NI-23171-A1; 1-V-23180-A1; 2-V-23181-A1; 1-
NI-01037-A1 ; 0.5-HW-21207-A1; 0.75-HW-21215-A1; 1.5-HW-21136-A1; 1.5-NI-21025-A1; 1.5-NI-21026-A1; 12-NI-03158-A1; 12-NI-03358-A1; 16-NI-07115-A1; 16-NI-07116-A1; 1-NI-
07533-HA1; 1-NI-07536-HA1; 1-NI-07539-HA1; 1-NI-18043-A1; 1-NI-18054-A1; 1-NI-18056-A1; 1-NI-18091-A1; 1-NI-21014-A1; 1-NI-21017-A1; 1-NI-21019-A1; 1-NI-21022-A1; 1-NI-21023-
A1; 1-NI-21024-A1; 1-NI-21030-A1; 1-NI-21031-A1; 1-NI-21032-A1; 1-NI-21033-A1; 1-NI-21034-A1; 1-NI-21035-A1; 1-NI-21045-A1; 1-NI-21134-A1; 1-NI-21141-A1; 1-NI-21150-A1; 1-NI-
21151-A1; 1-NI-21152-A1; 1-NI-21153-A1; 1-NI-21154-A1; 1-NI-21155-A1; 1-NI-21180-A1; 1-NI-21181-A1; 1-NI-21188-A1; 1-NI-21198-A1; 1-NI-21199-A1; 1-NI-21200-A1; 1-NI-21201-A1; 1-
NI-21202-A1; 1-NI-21203-A1; 1-NI-21205-A1; 1-NI-21220-A1; 1-NI-21256-A1; 1-NI-21257-A1; 1-NI-21258-A1; 1-NI-21301-A1; 1-NI-21303-A1; 20-NI-07013-A1; 20-NI-07510-HA1; 2-NI--03060-
A1; 2-NI-03136-A1; 2-NI-07562-HA1; 2-NI-21015-A1; 2-NI-21016-A1; 2-NI-21028-A1; 2-NI-21042-A1; 2-NI-21100-A1; 2-NI-21127-A1; 2-NI-21128-A1; 2-NI-21129-A1; 2-NI-21130-A1; 2-NI-
21131-A1; 2-NI-21132-A1; 2-NI-21133-A1; 2-NI-21135-A1; 2-NI-21143-A1; 2-NI-21149-A1; 2-NI-21160-A1; 2-NI-21195-A1; 2-NI-21217-A1; 2-NI-21245-A1; 2-NI-21246-A1; 2-NI-21247-A1; 2-
NI-21261-A1; 2-NI-21305-A1; 2-NI-27010-A1; 2-V-21208-A1; 3-NI-03129-A1; 3-NI-03816-A1; 3-NI-03817-A1; 3-NI-03891-A1; 3-NI-21020-A1; 3-V-25016-A2; 3-V-25017-A2; 4-NI-07014-A1; 4-
NI-21014-A1; 4-NI-21021-A1; 4-NI-21027-A1; 4-NI-21039-A1; 2-UT-35116-CS-; 0.5-UT-35330-SST-; 10-UT-35331-SST-; 10-UT-35332-SST-; 2-UT-35333-CS-
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: H P nitrogene to dist header
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
25 VI-EXT 120100% Coverage 14/04/2009 14/04/2019 OnLine DVI/01
Internal Corrosion 25 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/2005 OnLine UT/01
11 July 2011 Page 26 of 176
7/28/2019 Piping Exam Spec
27/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-211 Pipework from: T-0202
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
6-GN-02359-A2; 6-GN-02360-A2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-2204
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
18 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study.
01/06/2009 30/05/2019 Online
External
Deterioration
18 VI-EXT 60100% Coverage 01/03/2010 01/03/2020 OnLine DVI/01
Internal Corrosion 22 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/03/2010 01/03/2020 OnLine UT/01
11 July 2011 Page 27 of 176
7/28/2019 Piping Exam Spec
28/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-212 Pipework from: PL-205/PL202
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
4-GN-02370-B1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-2213
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
15 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study.
01/06/2009 30/05/2019 Online
External
Deterioration
15 VI-EXT 60100% Coverage 01/03/2010 01/03/2015 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/03/2010 01/03/2015 OnLine UT/01
11 July 2011 Page 28 of 176
7/28/2019 Piping Exam Spec
29/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2204 Pipework from: PL 207
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-V-22148-HA3; 1-V-03111-A3; 1-V-03311-A3; 2-FG-22024-A3; 2-FG-22027-A3; 2-FG-22047-A3; 2-FG-22048-A3; 2-FG-22151-A3; 2-FG-22052-A3; 2-FG-22084-A3; 2-FG-22143-HA3; 2-FG-
35161-CS 150-; 2-FG-35164-CS 150-; 2-HC-22042-A3; 3-FG-22026-A3; 3-FG-22029-A3; 3-FG-22031-A3; 3-FG-22053-A3; 3-FG-22087-A3; 3-FG-22088-A3; 3-FG-22089-A3; 3-FG-22090-A3; 4-FG-
22019-A3; 4-FG-22021-A3; 4-FG-22025-A3; 4-FG-22049-A3; 6-FG-22068-A3; 4-FG-22069-A3; 4-FG-22085-A3; 4-FG-22086-A3; 4-FG-35161-CS 150-; 4-HC-22043-A3; 4-HC-22062-HA3; 4-HC-
22081-HA3; 6-FG-22014-A3; 6-FG-22023-A3; 6-FG-22071-HA3; 6-FG-22072-HA3; 6-FG-22076-HA3; 6-FG-22077-HA3; 6-FG-22083-HA3; 8-FG-22003-A3; 8-FG-22017-A3; 8-FG-22041-A3; 8-HC-
22001-A3; Unkn0wn size--35163--
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: D-1804
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
14 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
4 VI-EXT 30100% Coverage 15/06/2009 14/12/2011 OnLine DVI/01
Internal Corrosion 4 UT 12Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
14/01/2009 14/01/2010 OnLine UT/01 Inspect annually for 3
years. Then detemine
corrosion rate based on
the 3 inspections.
11 July 2011 Page 29 of 176
7/28/2019 Piping Exam Spec
30/176
7/28/2019 Piping Exam Spec
31/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2213A Pipework from: D-2202
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HC-22010-B3; 2-HC-22153-B3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: PL-203
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
4 VI-EXT 30100% Coverage 15/06/2009 14/12/2011 OnLine DVI/01
Internal Corrosion 4 UT 30Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
14/01/2009 15/07/2011 OnLine UT/01
11 July 2011 Page 31 of 176
7/28/2019 Piping Exam Spec
32/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2221 Pipework from: H-2203
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
3-HC-22140-HB3-1"-H; 4-HC-22064-HC3-1"-H; 4-HC-22065-HB3-1"-H; 3-HC-22141-HB3; 3-HC-22082-HB3
Nace:
Inspection plan
Line list:
Material: SA-106 B
Pipework to: PK-1803
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
CUI 15 CUI
Inspection-
Visual
6010% of potential CUI Locations by category. 01/06/2009 31/05/2014 OnLine DVI/01
Environmental
Cracking
15 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/2007 29/12/2016 Online
External
Deterioration
15 VI-EXT 60100% Coverage 01/01/2007 31/12/2011 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/06/2009 31/05/2014 OnLine UT/01
11 July 2011 Page 32 of 176
7/28/2019 Piping Exam Spec
33/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2301 Pipework from: Water treating pakage
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
4-TW-23024-G1; 4-TW-23016-G1; 3-TW-23110-HDPE; 2-TW-23252-G1; 2-TW-23200-G1; 2-TW-23131-G1; 2-TW-23091-G1; 2-TW-23060-G1; 1-V-23070-S0; 1-V-23068-S0; 1-TW-23165-G1; 1-
TW-23069-S0; 1-TW-23067-S0; 1-TW-23030-S0; 1-TW-23031-S0; 1-TW-23085-G1; 1-TW-23090-G1; 1-TW-23092-G1; 1-TW-23093-G1; 1-TW-23094-G1; 1-TW-23095-G1; 1-TW-23098-G1; 1-
TW-23099-G1; 1-TW-23101-G1; 1-TW-23105-G1; 1-TW-23106-G1; 1-TW-23107-G1; 1-TW-23109-G1; 1-TW-23117-HDPE; 1-TW-23118-HDPE; 1-TW-23126-G1; 1-TW-23127-G1; 1-TW-23189-
HDPE; 1-TW-23191-HDPE; 1-TW-23194-G1; 1-TW-23196-G1; 1-TW-23197-G1; 1-TW-23198-G1; 1-TW-23199-G1; 1-TW-23201-G1; 1-TW-23202-G1; 1-TW-23203-G1; 1-TW-23204-G1; 1-TW-
23205-G1; 1-TW-23220-G1; 1-TW-23221-G1; 1-TW-23222-G1; 1-TW-23223-G1; 1-TW-23229-G1; 1-TW-23230-G1; 1-TW-23235-G1; 1-TW-23273-HDPE; 1-TW-23279-S0; 1-TW-23280-S0; 1-
TW-23281-S0; 1-TW-23300-G1; 2-TW-23022-AL0; 2-TW-23029-HDPE; 2-TW-23033-HDPE; 2-TW-23050-D0; 2-TW-23064-G1; 2-TW-23084-G1; 2-TW-23097-G1; 2-TW-23100-G1; 2-TW-23102-
G1; 2-TW-23104-G1; 2-TW-23115-HDPE; 2-TW-23116-HDPE; 2-TW-23121-HDPE; 2-TW-23122-HDPE; 2-TW-23147-HDPE; 2-TW-23156-G1; 2-TW-23157-HDPE; 2-TW-23164-G1; 2-TW-23166-
G1; 2-TW-23195-G1; 2-TW-23209-H2; 2-TW-23219-G1; 2-TW-23226-HDPE; 2-TW-23236-HDPE; 2-TW-23239-G1; 2-TW-23251-HDPE; 2-TW-23253-G1; 2-TW-23275-HDPE; 2-TW-23278-S0; 2-
TW-23284-S0; 2-TW-23287-G1; 2-TW-23287-S0; 2-TW-23288-S0; 2-TW-23289-S0; 2-TW-23290-S0; 3-TW-23002-AL0; 3-TW-23015-HDPE; 3-TW-23016-HDPE; 3-TW-23021-G1; 3-TW-23021-
HDPE; 3-TW-23022-HDPE; 3-TW-23023-HDPE; 3-TW-23025-HDPE; 3-TW-23026-HDPE; 3-TW-23027-HDPE; 3-TW-23028-HDPE; 3-TW-23032-HDPE; 3-TW-23033-HDPE; 3-TW-23034-HDPE; 3-
TW-23087-HDPE; 3-TW-23103-HDPE; 3-TW-23110-HDPE; 3-TW-23111-HDPE; 3-TW-23112-HDPE; 3-TW-23113-HDPE; 3-TW-23185-HDPE; 3-TW-23228-HDPE; 3-TW-23247-HDPE; 4-TW-
23017-H2PE; 4-TW-23018-G1; 4-TW-23019-HDPE; 4-TW-23020-HDPE; 4-TW-23057-G1; 4-TW-23151-HDPE
Nace:
Inspection plan
Line list:
Material: PP PP
Pipework to: TK-2302
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
16 VI-EXT 120100% Coverage 04/06/2009 04/06/2019 OnLine DVI/01
Internal Corrosion 16 UT 0Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 01/01/1995 OnLine UT/01
11 July 2011 Page 33 of 176
7/28/2019 Piping Exam Spec
34/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2302 Pipework from: TK-2304
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
0.75-TW-23193-D0; 1-TW-23231-D0; 1-TW-23232-D0; 1-TW-23233-D0; 1-TW-23234-D0; 1-TW-23240-D0; 1-TW-23255-D0; 2-TW-03513-HF0; 2-TW-03633-HF0; 2-TW-03634-HF0; 2-TW-
03678-HF0; 2-TW-03693-HD0; 2-TW-03694-HD0; 2-TW-03695-HD0; 2-TW-03696-HD0; 3-TW-23051-D0; 2-TW-23054-D0; 2-TW-23055-D0; 2-TW-23063-D0; 2-TW-23075-D0; 2-TW-23076-D0;
2-TW-23077-D0; 2-TW-23079-D0; 2-TW-23096-D0; 2-TW-23108-D0; 2-TW-23125-D0; 2-TW-23150-D0; 2-TW-23210-D0; 2-TW-23254-HD0; 2-TW-23256-D0; 2-TW-23261-A023; 2-TW-23262-
A023; 2-TW-23277-ND0; 3-TW-23052-D0; 3-V-03680-HD0; 3-V-03681-HD0; 3-V-03682-HD0; 3-V-03683-HD0; 2-TW-03054-D0; 2-TW-23159-D0; 2-TW-23001-D0; 1-TW-03897-D0; 1-TW-
20002-D0; 1-TW-20010-D0; 1-TW-23124-D0; 1-TW-23192-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: Distribution
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
23 VI-EXT 120100% Coverage 04/06/2009 04/06/2019 OnLine DVI/01
Internal Corrosion 23 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/2005 OnLine UT/01
11 July 2011 Page 34 of 176
7/28/2019 Piping Exam Spec
35/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2303 Pipework from: SEA
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
10-SW-23132-H2PE; 10-SW-23133-H2; 12-SW-23011-H2; 1-SW-23013-H2; 1-SW-23272-H2; 4-SW-23128-H2; 4-SW-23238-H2; 4-SW-23248-G1; 6-SW-23007-H2; 6-SW-23008-H2; 6-SW-
23009-H2; 6-SW-23010-H2; 8-SW-23006-H2; 8-SW-23134-HDPE; 8-SW-23237-H2; 8-SW-23241-H2; 8-SW-23242-H2; 8-SW-23243-H2; 8-SW-23135-HDPE; 8-SW-23016-H2; 2-SW-23208-H2; 2-
SW-23245-H2; 3-SW-23246-H2; 1-SW-23271-H2
Nace:
Inspection plan
Line list:
Material: HDPE PE3408
Pipework to: Water treating pakage / TK
2301
Damagemechanisms
Insp.Priority
Insp. Method Freq.(months)
Extent of Inspection Last insp.date
Next insp.Due date
Availability Guideline Comments
External
Deterioration
23 VI-EXT 120100% Coverage 04/06/2009 04/06/2009 OnLine DVI/01
Internal Corrosion 23 UT 0Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/1995 OnLine UT/01
11 July 2011 Page 35 of 176
7/28/2019 Piping Exam Spec
36/176
7/28/2019 Piping Exam Spec
37/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2501-1 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
1-AM-03528-HD0; 1-AM-03685-HD0; 0.75-AM-03523-HD0; 0.75-AM-03520-HD0; 0.75-AM-03524-HD0; 1.5-AM-03076-HD0; 1.5-AM-03157-D0; 1.5-AM-03547-HD0; 1.5-AM-03576-HD0; 1-
AM-03139-D0; 1-AM-03141-D0; 1-AM-03183-D0; 1-AM-03184-D0; 1-AM-03185-D0; 1-AM-03188-D0; 1-AM-03189-D0; 1-AM-03341-D0; 1-AM-03383-D0; 1-AM-03384-D0; 1-AM-03385-D0; 1-
AM-03388-D0; 1-AM-03389-D0; 1-AM-03533-HD0; 1-AM-03620-HD0; 1-AM-03624-HD0; 2-AM-03063-D0; 2-AM-03072-D0; 2-AM-03114-D0; 2-AM-03115-D0; 2-AM-03116-D0; 2-AM-03127-
D0; 2-AM-03140-D0; 2-AM-03142-D0; 2-AM-03186-D0; 2-AM-03187-D0; 2-AM-03190-D0; 2-AM-03263-D0; 2-AM-03272-D0; 2-AM-03327-D0; 2-AM-03340-D0; 2-AM-03342-D0; 2-AM-03386-
D0; 2-AM-03387-D0; 2-AM-03390-D0; 4-AM-03182-D0; 4-AM-03382-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: D-2501
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
24 VI-EXT 120100% Coverage 04/07/2009 02/07/2019 OnLine DVI/01
Internal Corrosion 24 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 29/12/2004 OnLine UT/01
11 July 2011 Page 37 of 176
7/28/2019 Piping Exam Spec
38/176
7/28/2019 Piping Exam Spec
39/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2501U Pipework from: Amine sumps
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
6-AM-25036-A2; 6-AM-25018-A2; 6-AM-25009-A2; 6-AM-25007-A2; 6-AM-25003-A2; 6-AM-25001-A2; 6-AM-20624-A2; 4-AM-25046-HA2; 4-AM-25040-A2; 4-AM-25037-A2; 4-AM-25035-
A2; 4-AM-25034-A2; 4-AM-25010-A2; 4-AM-25004-A2; 3-AM-25011-A2; 2-AM-25043-A2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to:
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
17 VI-EXT 60100% Coverage 01/01/1995 31/12/1999 DVI/01
Internal Corrosion 17 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01 ICP recommends that
BGT should ensure the
external condition of the
wrapping is effective,
otherwise a CP system
should be installed."
11 July 2011 Page 39 of 176
7/28/2019 Piping Exam Spec
40/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2502A Pipework from: glycol sumps
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
0.5-V-05086-A1; 0.5-V-05087-A1; 0.75-GL-05101-A2; 0.75-GL-05102-A1; 1-HC-05063-A1; 1-HC-05077-A1; 1-HC-05078-A1; 1-HC-05083-A1; 1-HC-05084-A1; 1-V-05060-A2; 1-V-05062-A2; 1-V-
05074-A2; 1-V-05075-A2; 1-V-05097-HA1; 6-GL-05069-A2; 2-GL-05089-A2; 2-HW-25023-A2; 2-HW-25041-A2; 2-V-05096-HA1; 4-V-25027-A2; 4-V-25028-A2; 4-V-25033-A2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: TK-2501
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
11 VI-EXT 60100% Coverage 08/04/2009 07/04/2014 OnLine DVI/01
Internal Corrosion 11 UT 0Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category.
25/12/2008 25/12/2008 OnLine UT/01
11 July 2011 Page 40 of 176
7/28/2019 Piping Exam Spec
41/176
7/28/2019 Piping Exam Spec
42/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2701 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HW-06009-C1; 1-HW-05026-A2; 1-HW-27015-A2; 2-AM-25038-A2; 2-HC-03118-A2; 2-HC-03318-A2; 2-HW-06010-A1; 2-HW-06054-A1; 2-HW-06055-A1; 2-HW-27014-A2; 3-HC-18031-A2
Nace:
Inspection plan
Line list:
Material: SA-106 B
Pipework to: PL-2702
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
11 VI-EXT 60100% Coverage 21/05/2009 20/05/2014 OnLine DVI/01
Internal Corrosion 11 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
14/11/2008 13/11/2013 OnLine UT/01
11 July 2011 Page 42 of 176
7/28/2019 Piping Exam Spec
43/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-2702 Pipework from: waste water drains
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1-HW-23158-D0; 1-CD-35114-SST-; 1-CD-35115-SST-; 1-CD-35119-SST-; 1-CD-35120-SST-; 1-HW-23254-D0; 1-HW-27003-D0; 1-HW-27004-D0; 1-HW-27005-D0; 2-HW-03734-D0; 2-HW-
04011-D0; 2-HW-23149-D0; 2-HW-27001-D0; 2-HW-27002-D0; 2-HW-27006-D0; 2-HW-27007-D0; 3-HW-27008-D0; 3-HW-27009-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: TK-2701
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
23 VI-EXT 120100% Coverage 21/05/2009 21/05/2019 OnLine DVI/01
Internal Corrosion 23 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
01/01/1995 01/01/2005 OnLine UT/01
11 July 2011 Page 43 of 176
7/28/2019 Piping Exam Spec
44/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-301A Pipework from: D-0301
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HC-03003-C3; 2-HC03004-B3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: PL-0103
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
14 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 4 UT 12Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 50% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 01/01/1996 OnLine UT/01 Frequency changed by
the ICP. the interval can
be increase after 3
inspections.
11 July 2011 Page 44 of 176
7/28/2019 Piping Exam Spec
45/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-302 Pipework from: E-0301
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-HC-03006-C3; 4-V-03155-C3; 2-V-03196-C3; 16-HC-03751-C3; 3-V-03824-C3; 2-PG-03838-C3; 16-HC-03752-C3; 2-HC-03765-B3; 2-HC-03753-B3; 2-HC-03152-B3; 2-HC-03153-B3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: F-0301
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
6 VI-EXT 60100% Coverage 02/02/2009 01/02/2014 OnLine DVI/01
Internal Corrosion 6 UT 12Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
03/10/2008 03/10/2009 OnLine UT/01 Frequency changed by
the ICP. the interval can
be increase after 3
inspections.
11 July 2011 Page 45 of 176
7/28/2019 Piping Exam Spec
46/176
7/28/2019 Piping Exam Spec
47/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-302B Pipework from: HC-03025
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
12-HC-03027-C3; 16-HC-03025-C3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: T-301B
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
2 VI-EXT 30100% Coverage 02/04/2009 02/04/2009 OnLine DVI/01
Internal Corrosion 2 UT 12Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
25/10/2008 25/10/2008 OnLine UT/01 Original frq is 0. it 's
recommended from the
ICP to Inspect annually
for 3 years. Then
detemine corrosion rate
based on the 3
inspections.
11 July 2011 Page 47 of 176
7/28/2019 Piping Exam Spec
48/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-303 Pipework from: HC-03019
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-HC-03007-C1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: E-0301
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
6 VI-EXT 60100% Coverage 02/08/2009 01/08/2014 OnLine DVI/01
Internal Corrosion 6 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
21/10/2008 20/10/2013 OnLine UT/01
11 July 2011 Page 48 of 176
7/28/2019 Piping Exam Spec
49/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-303-1 Pipework from: E-0301 shell
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-HC-03008-C1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: D-0302
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
9 VI-EXT 60100% Coverage 02/08/2009 01/08/2014 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
10/10/2008 09/10/2013 OnLine UT/01
11 July 2011 Page 49 of 176
7/28/2019 Piping Exam Spec
50/176
7/28/2019 Piping Exam Spec
51/176
7/28/2019 Piping Exam Spec
52/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-304 Pipework from:
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-HC-03009-C1; 1.5-V-03194-C1; 16-HC-05001-C1; 1-V-05053-C1; 2-AM-05002-C2; 2-AM-05003-C2; 12-HC-05049-C1
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: F-0501
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
9 VI-EXT 60100% Coverage 16/02/2009 15/02/2014 OnLine DVI/01
Internal Corrosion 15 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
11/09/2008 10/09/2013 OnLine UT/01
11 July 2011 Page 52 of 176
7/28/2019 Piping Exam Spec
53/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-304-1 Pipework from: F-0501
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-AM-HC-05005-A2; 2-AM-HC-05004-A2; 2-AM-03575-HA2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-306A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
14 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 OnLine
External
Deterioration
8 VI-EXT 60100% Coverage 01/01/1995 31/12/1999 OnLine DVI/01
Internal Corrosion 14 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/08/2008 31/07/2013 OnLine UT/01
11 July 2011 Page 53 of 176
7/28/2019 Piping Exam Spec
54/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-306A Pipework from: T-0301A
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
12-AM-03028-F0; 12-AM-03030-D0; 12-AM-03541-HD0; 6-HC-03655-HDO; 16-V-03656-HDO; 6-V-03658-HDO; 2-AM-03597-HDO; 2-AM-03697-HDO; 12-V-03699-HDO; 12-V-03663-HDO
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: D-0303A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Remove ins
and dye pen
120Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/2003 29/12/2012 Shutdown DP/01
External
Deterioration
6 VI-EXT 60100% Coverage 01/06/2009 31/05/2014 OnLine DVI/01
Internal Corrosion 6 UT 47Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/2003 12/12/2006 OnLine UT/01
11 July 2011 Page 54 of 176
7/28/2019 Piping Exam Spec
55/176
7/28/2019 Piping Exam Spec
56/176
7/28/2019 Piping Exam Spec
57/176
7/28/2019 Piping Exam Spec
58/176
7/28/2019 Piping Exam Spec
59/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-308B Pipework from: D-0303A/B
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
0.75-AM-03523-HD0; 0.75-AM-03671-HD0; 12-AM-03244-D0; 12-AM-03534-HD0; 1-AM-03335-A2; 1-AM-03411-A2; 1-AM-03392-D0; 4-AM-03616-HD0; 1-AM-03685-HD0; 4-AM-03676-
HD0; 0.75-AM-03523-HD0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E-0302B/D
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Remove ins
and dye pen
120Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/2003 29/12/2012 Shutdown DP/01
External
Deterioration
6 VI-EXT 60100% Coverage OnLine DVI/01
Internal Corrosion 9 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/2003 31/12/2007 OnLine UT/01
11 July 2011 Page 59 of 176
7/28/2019 Piping Exam Spec
60/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-309 Pipework from: TK-0302
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
1.5-AM-03896-A2; 10-AM-03123-A2; 16-AM-03074-A2; 16-AM-03075-A2; 16-AM-03076-A2; 16-AM-03120-A2; 16-AM-03517-HA2; 16-AM-03601-A2; 16-AM-03605-A2; 18-AM-03073-A2; 1-
AM-03132-A2; 1-AM-03133-A2; 1-AM-03511-A2; 1-AM-03512-A2; 3-AM-03099-A2; 2-AM-03700-A2; 1-AM-03614-HA2; 1-V-03222-A2; 1-V-03223-A2; 1-V-03224-A2; 1-V-03225-A2; 1-V-
03226-A2; 1-V-03227-A2; 1-V-03613-A2; 1-V-03615-HA2; 2-AM-03126-A2; 2-AM-03151-A2; 2-AM-03296-D0; 2-AM-03676-A2; 2-AM-03708-A023; 2-AM-03709-A023; 2-AM-03710-A023; 2-
AM-03711-A023; 2-AM-03712-A023; 2-AM-03713-A023; 2-AM-O3699-A2; 3-AM-03083-A2; 3-AM-03084-A2; 3-AM-03085-A2; 3-AM-03089-A2; 3-AM-03090-A2; 3-AM-03091-A2; 3-AM-
03100-A2; 3-AM-03231-A2; 3-AM-03628-A2; 3-AM-03673-A2; 3-AM-03686-HA2; 3-AM-03687-HA2; 3-AM-03688-HA2; 3-AM-03703-HA2; 4-AM-03097-A2; 4-AM-03098-A2; 4-AM-03131-A2;
6-AM-03081-A2; 6-AM-03082-A2; 6-AM-03095-A2; 6-AM-03096-A2; 6-AM-03121-A2; 6-AM-03122-A2; 6-AM-03154-A2; 6-AM-03516-HA2; 6-AM-03544-HA2; 6-AM-03651-HA2; 6-AM-03652-
HA2; 6-AM-03665-HA2; 6-AM-03666-HA2; 6-AM-03667-HA2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: P-0303A/B/C/D
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Shear Wave
UT
60Scan 100% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 31/12/1999 Online
External
Deterioration
4 VI-EXT 30100% Coverage 26/10/2009 25/04/2012 OnLine DVI/01
Internal Corrosion 8 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category.
01/09/2008 31/08/2013 OnLine UT/01
11 July 2011 Page 60 of 176
7/28/2019 Piping Exam Spec
61/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-309-1 Pipework from: P-0303A/B/C/D
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
10-AM-03077-HD0; 10-AM-03078-HD0; 10-AM-03079-HD0; 10-AM-03518-HD0; 12-AM-03068-HD0; 12-AM-03069-HD0; 12-AM-03070-HD0; 12-AM-03514-HD0; 16-AM-03071-HD0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: P-0304A/B/C/D
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
18 VI-EXT 60100% Coverage 26/10/2009 26/10/2014 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
02/09/2008 02/09/2013 OnLine UT/01
11 July 2011 Page 61 of 176
7/28/2019 Piping Exam Spec
62/176
7/28/2019 Piping Exam Spec
63/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-310A Pipework from: AM-03022
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
12-AM-03023-C2
Nace:
Inspection plan
Line list:
Material: SA-106 B
Pipework to: T-0301A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
14 Shear Wave
UT
120Scan 25% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
14 VI-EXT 60100% Coverage 19/05/2009 18/05/2014 OnLine DVI/01
Internal Corrosion 22 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category.
09/10/2008 07/10/2018 OnLine UT/01
11 July 2011 Page 63 of 176
7/28/2019 Piping Exam Spec
64/176
( )
7/28/2019 Piping Exam Spec
65/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-311 Pipework from: E-0305
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
16-HC-03002-C3
Nace: Y
Inspection plan
Line list:
Material: SA-106 B
Pipework to: E-0301
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
9 Shear Wave
UT
120Scan 50% of potential locations defined in
the corrosion study. (Date In Service was
used as last inspection date.)
01/01/1995 29/12/2004 Online
External
Deterioration
6 VI-EXT 60100% Coverage 13/02/2009 12/02/2014 OnLine DVI/01
Internal Corrosion 9 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 50% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
04/09/2008 03/09/2013 OnLine UT/01
11 July 2011 Page 65 of 176
7/28/2019 Piping Exam Spec
66/176
7/28/2019 Piping Exam Spec
67/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
68/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-313A Pipework from: AM-03059
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
12-AM-03892-NDO; 18-AM-03059-D0; 12-AM-03056-D0; 12-AM-03057-D0; 12-AM-03619-HD0; 12-AM-03058-D0; 12-AM-03061-D0; 12-AM-03106-D0; 14-AM-03783-ND0; 2-AM-03840-
ND0; 12-AM-03531-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: H-0301A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 68 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
69/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-313B Pipework from: P-0301D/E/F/H
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
6"-AM-03794-ND0; 6"-AM-03795-ND0; 12-AM-03256-D0; 12-AM-03257-D0; 12-AM-03258-D0; 12-AM-03261-D0; 12-AM-03306-D0; 12-AM-03536-HD0; 12-AM-03623-HD0; 12-AM-03893-
ND0; 14-AM-03785-ND0; 18-AM-03259-D0; 2-AM-03841-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: H-0301B
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 69 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
70/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-317A Pipework from: E-0302A/C
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
12-AM-03062-HD0; 12-AM-03530-HD0; 1-AM-03134-HD0; 1-AM-03210-HD0; 8-AM-03086-D0; 8-AM-03087-D0; 8-AM-03088-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E-0304A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
14 VI-EXT 60100% Coverage 18/02/2009 17/02/2014 OnLine DVI/01
External Stress
Corrosion Cracking
14 Remove ins
and dye pen
60External Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 70 of 176
7/28/2019 Piping Exam Spec
71/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
72/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-318A Pipework from: D-0304A
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
12-AG-03506-D0; 16-AG-03125-D0; 4-V-03214-D0; 4-V-03215-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PK-1801
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
21 VI-EXT 120100% Coverage 02/03/2009 28/02/2019 OnLine DVI/01
Internal Corrosion 21 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/01/1995 29/12/2004 OnLine UT/01
11 July 2011 Page 72 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
73/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-318B Pipework from: D-0304B
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
12-AG-03506-D0; 16-AG-03325-D0; 4-V-03414-D0; 4-V-03415-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PL-318A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
21 VI-EXT 120100% Coverage 02/02/2009 31/01/2019 OnLine DVI/01
Internal Corrosion 21 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/01/1995 29/12/2004 OnLine UT/01
11 July 2011 Page 73 of 176
7/28/2019 Piping Exam Spec
74/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
75/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-319A-1 Pipework from: E-0304A
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
8-AM-03092-D0; 8-AM-03093-D0; 8-AM-03094-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PL-319A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
18 VI-EXT 60100% Coverage 20/02/2009 20/02/2014 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/01/1995 01/01/2000 OnLine UT/01
11 July 2011 Page 75 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
76/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-319B Pipework from: PL-319B-1
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-AM-03381-A2; 12-AM-03319-A2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-309
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Shear Wave
UT
60Scan 50% of potential locations defined in
the corrosion study.
01/01/1995 31/12/1999 Online
External
Deterioration
4 VI-EXT 30100% Coverage 20/02/2009 21/08/2011 OnLine DVI/01
Internal Corrosion 14 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
09/05/2008 08/05/2013 OnLine UT/01
11 July 2011 Page 76 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
77/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-319B-1 Pipework from: E-0304B
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
8-AM-03292-D0; 8-AM-03293-D0; 8-AM-03294-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: PL-319B
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
18 VI-EXT 60100% Coverage 20/02/2009 20/02/2014 OnLine DVI/01
Internal Corrosion 18 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category.
01/01/1995 01/01/2000 OnLine UT/01
11 July 2011 Page 77 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
78/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
Equiment ID: PL-320 Pipework from: D-0302
Const Code : ASME B31.3 Insulated (Y/N): NExam Spec:
2-HW-03014-A2; 2-HC-03631-C2; 2-HW-03015-A2; 2-HW-03657-HA2
Nace:
Inspection plan
Line list:
Material: SA-53 B
Pipework to: PL-306A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
11 VI-EXT 60100% Coverage 19/10/2009 18/10/2014 OnLine DVI/01
Internal Corrosion 11 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
05/09/2008 04/09/2013 OnLine UT/01
11 July 2011 Page 78 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
79/176
SC O O ( S C C O )
Equiment ID: PL-321A Pipework from: T-0302A
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
24-AG-03046-D0; 16-AG-03160-D0; 16-AG-03159-D0; 16-AG-03161-D0; 24-AG-03769-D0; 14-V-03767-ND0; 12-V-03818-ND0; 10-V-03819-NDO; 12-V-03768-NDO; 10-V-03213-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E-0303A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
External
Deterioration
8 VI-EXT 60100% Coverage 02/03/2009 01/03/2014 OnLine DVI/01
External Stress
Corrosion Cracking
14 Remove ins
and dye pen
60External Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
Internal Corrosion 14 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 79 of 176
7/28/2019 Piping Exam Spec
80/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
81/176
( )
Equiment ID: PL-321B Pipework from: T-0302B
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
10-V-03413-DO; 10-V-03821-NDO; 12-V-03776-NDO; 12-V-03820-ND0; 14-V-03775-ND0; 16-AG-03359-D0; 16-AG-03360-D0; 16-AG-03361-D0; 20-AG-03247-D0; 24-AG-03246-D0; 24-AG-
03777-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: E-0303B
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 22 UT 120Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 5% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 29/12/2004 OnLine UT/01
11 July 2011 Page 81 of 176
7/28/2019 Piping Exam Spec
82/176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
83/176
Equiment ID: PL-324A Pipework from: T-0302A
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
20-AM-03052-D0; 20-AM-03773-ND0; 4-AM-031772-ND0; 16-AM-03053-D0; 16-AM-03054-D0; 16-AM-03618-HD0; 16-AM-03055-D0; 1-V-03228-D0; 1-V-03229-D0; 1-V-03230-D0; 1-V-
03621-HD0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: AM-03056
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 4 UT 0Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 50% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 01/01/1995 OnLine UT/01
11 July 2011 Page 83 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
84/176
Equiment ID: PL-324B Pipework from: P-0301D/E/F/H
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
16-AM-03253-D0; 16-AM-03254-D0; 16-AM-03255-D0; 16-AM-03622-HD0; 1-V-03428-D0; 1-V-03429-D0; 1-V-03430-D0; 1-V-03627-HD0; 20-AM-03252-D0; 20-AM-03781-ND0; 4-AM-
033780-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: T-0302B
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
4 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
4 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 8 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 25% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 84 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
85/176
Equiment ID: PL-330A Pipework from: H-0301A
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
24-AM-03108-D0; 3-V-03216-D0; 36-AM-03064-D0; 24-AM-03782-ND0; 10-AM-03790-ND0; 10-AM-03791-ND0; 36-AM-03771-ND0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: T-0302A
Damage
mechanisms
Insp.
Priorit
Insp. Method Freq.
months
Extent of Inspection Last insp.
date
Next insp.
Due date
Availability Guideline Comments
Environmental
Cracking
2 Remove ins
and dye pen
60Chloride Stress Corrosion Cracking expected
on Circuit - consult with Materials Engineer.
01/01/1995 31/12/1999 Shutdown DP/01
External
Deterioration
2 VI-EXT 30100% Coverage 01/01/1995 01/07/1997 OnLine DVI/01
Internal Corrosion 19 UT 60Random Corrosion - consult with Materials
Engineer. As a minimum take the following
UT's: 10% of Potential locations by Location
Category. (Date In Service was used as last
inspection date.)
01/01/1995 31/12/1999 OnLine UT/01
11 July 2011 Page 85 of 176
WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)
7/28/2019 Piping Exam Spec
86/176
Equiment ID: PL-330B Pipework from: H-0301B
Const Code : ASME B31.3 Insulated (Y/N): YExam Spec:
10-AM-03792-ND0; 10-AM-03793-ND0; 24-AM-03308-D0; 24-AM-03784-ND0; 36-AM-03266-ND0; 36-AM-03779-ND0; 3-V-03416-D0
Nace:
Inspection plan
Line list:
Material: SA-312 TP304L
Pipework to: T-0302B
Dam