Maintenance & Inspection of Piping in Hydrocarbon Industry Igniting Minds... Energizing Lives… Haldia Refinery

Piping

Embed Size (px)

DESCRIPTION

Piping

Citation preview

Page 1: Piping

Maintenance & Inspection of Piping in Hydrocarbon Industry

Igniting Minds... Energizing Lives…Haldia Refinery

Page 2: Piping

PIPING SYSTEM

Igniting Minds... Energizing Lives…Haldia Refinery

Page 3: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING TYPES

PIPING

UNDER GROUND ABOVE GROUND

INSULATED BARE

Page 4: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING MATERIALS

CS - SR AS PER SERVICE, THICK. > 19mm

AS - POOR WELDABILITY, SR REQD.

SS - NO PRE-HEAT, SR

RUBBER LINED

CEMENT LINED

SS LINED

HDPE

Page 5: Piping

PIPING MATERIALS

CARBON STEEL ALLOY STEELS STAINLESS STEELS

Page 6: Piping

PIPE SCHEDULES

Page 7: Piping

PIPE SCHEDULES

Page 8: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING DESIGN/ LAYOUT

OVERALL PLOT PLAN

P&ID’s

GENERAL ARRANGEMENT DRAWINGS (GAD’s)

PIPING MATERIAL SPECIFICATION (PMS)

Page 9: Piping

PIPING DESIGN/ LAYOUT

PLOT PLAN

Page 10: Piping

PIPING DESIGN/ LAYOUT

PIPING & INSTRUMENT DIAGRAM

Page 11: Piping

PIPING DESIGN/ LAYOUT

GENERAL ARRANGEMENT DRAWINGS (GAD’s)

Page 12: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING COMPONENTS

PIPEFLANGES / VALVESEXPANSION BELLOWSFITTINGS

HALF COUPLINGSMITRE BENDSREDUCERELBOWSGASKETS

Page 13: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING COMPONENTS

SUPPORTSGUIDE

FREE IN TWO DIRECTION

CROSS-GUIDEFREE IN ONE DIRECTION

ANCHORSNOT FREE FOR MOVEMENT

SPRING SUPPORTS

Page 14: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING WALL THICKNESS

BARLOW’S FORMULA

t = PiD/ 2SA

tn = t + allowance(s)

t= Minimum Wall Thickness (M)Pi= Maximum Allowable Operating Pr. (MPa)

D= Outside Diameter (M)SA= Allowable Stress (MPa)

tn = Nominal Wall Thickness(M)

Page 15: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING TEST PRESSURE

PT = 1.5P x ST/S

PT= Minimum Test Gage Pressure

P=Maximum Allowable Working Pressure

ST=Stress Value at Test Temperature

S=Stress Value at Design Temperature

Page 16: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FABRICATION

WELDINGSMAWGTAW

PRE/ POST-WELD HEAT TREATMENT

HOT TAPPINGBRANCH CONNECTION WITHOUT

INTERRUPTION TO THE FLOW OF FLUID

PIPE BENDING

Page 17: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

HOT TAPPING

Page 18: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPE BENDING

Page 19: Piping

GENERAL GUIDELINES

Igniting Minds... Energizing Lives…Haldia Refinery

Page 20: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

• All small bore pipings and tracer lines, size ¾” and below should be welded by TIG process for all types of joints, e.g. butt, socket, tee, etc. to ensure proper quality of welding. Use of half coupling may be considered to increase reliability of small-bore connections.

• Minimum thickness of pipe for sizes up to 1½” should be Sch.80 for CS and AS.

• Reinforcement pad shall be provided at support location.

• Steam drain points should be routed to a drain header and taken out of the unit area.

GENERAL GUIDELINES FOR PIPING

Page 21: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

• Stiffener should be provided in small bore bleeder/ drain point connection welded to immediate upstream or downstream of safety valves.

• As far as possible, stub-in type branch connection are to be provided when branch size is less than one size than the main pipe.

•  All the reinforcement pad telltale holes should be drilled and tapped properly. Gas cut holes should not be accepted.

• Wherever two phase flow in piping is expected, piping design including its support system should be checked w.r.t. most adverse conditions/ ratio of both the phases (slug flow) to avoid line vibration during operation.

GENERAL GUIDELINES FOR PIPING

Page 22: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

• All the fittings like valves, flanges etc. in high temperature service (> = 300 0C) should also be fully insulated if they are in open area or the localized cooling can cause operational problems like coking etc.

• All SS piping should have chloride free insulation or preferably

should have SS foil wrapped between pipe and insulation.

• Branch connections for fire hydrants along the roads should be totally above grounds. Hydrant connections also should remain above ground.

• Firewater and cooling water lines emerging from underground should be wrapped coated beyond the ground level up to a length of 500mm.

GENERAL GUIDELINES FOR PIPING

Page 23: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

• Hard surfacing with a proper slope towards open drain system is to be provided beneath the offsite pipe rack area with a clear space of 500mm from bottom of the pipe.

• Interspacing between the offsite piping on the support pedestal should be such that the lines should not touch each other even after insulation (at least 3” gap after insulation).

• Identification marks for location/ visibility of drain points of offsite piping should be provided. All drain points should be approachable and clearly visible.

GENERAL GUIDELINES FOR PIPING

Page 24: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

 • Piping insulation ends should be properly sealed to avoid water

ingress.

• Hard surfacing under the piping bay in offsite areas should be done with proper slope & drainage facility.

• Proper slope and gap should be provided in piping culverts to avoid water logging.

• In fire water lines, the hydrant tapping should not be taken from the bottom side of pipe. Tapping should be taken from the top or from side.

GENERAL GUIDELINES FOR PIPING

Page 25: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

•  Any piping circuit if idle for more than six month shall be inspected or hydrotested before taking into service

• Ensure adequate wrapping & coating and at least 0.5mtr wrapping & coating shall be visible externally at both ends on above ground portion of pipe.

• All piping route in off-site area shall be made grass & debris free.

• In Hydrocarbon service dia. 2” pipe shall be of minimum Schedule 80.

• Low point drain (LDP) shall be offset by 1 meter from the supports and shall not be embedded into soil.

GENERAL GUIDELINES FOR PIPING

Page 26: Piping

PIPING FABRICATION

Igniting Minds... Energizing Lives…Haldia Refinery

Page 27: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FABRICATION

FIT UPS

Page 28: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FABRICATION

BRANCH CONNECTIONS

Page 29: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FABRICATION

BRANCH CONNECTIONS

Page 30: Piping

PIPING FABRICATION

PREHEAT TEMPERATURES

Page 31: Piping

PIPING FABRICATION

POST WELD HEAT TREATMENT

Page 32: Piping

PIPING FABRICATION

TYPICAL WELD DEFECTS

Page 33: Piping

DEGRADATION MECHANISMS IN

PIPING SYSTEM

Igniting Minds... Energizing Lives…Haldia Refinery

Page 34: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION•UNIFORM CORROSION DUE TO LOW/ HIGH pH

Page 35: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION•LOCALIZED CORROSION- IN CREVICES, BENDS ETC.

Page 36: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION•CONDENSATION/ TWO PHASE SYSTEMS

Page 37: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION•STAGNANT AREAS - IN DEAD ENDS ETC

Page 38: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• STRESS CORROSION CRACKING

Page 39: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• HYDROGEN ATTACK

Page 40: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• AREAS D/STREAM OF INJECTION POINTS

Page 41: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• IMPINGEMENT AREAS

Page 42: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• NAPHTHENIC ACID/ POLYTHIONIC ACID CORROSION

Page 43: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• FIRE WATER CORROSION

Page 44: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

INTERNAL CORROSION• COOLING WATER CORROSION

Page 45: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

EXTERNAL CORROSION• CORROSION UNDER INSULATION

Page 46: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

EXTERNAL CORROSION• SOIL SIDE CORROSION OF UNDER-GROUND LINES

Page 47: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

EXTERNAL CORROSION• EXTERNAL CORROSION DUE TO SOIL/ WEEDS

Page 48: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

EXTERNAL CORROSION• ATMOSPHERIC CORROSION - SULFUROUS /

ACIDIC ENVIRONMENT

Page 49: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

WELD CORROSION• PREFERENTIAL ATTACK ON WELD

Page 50: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

EXTERNAL CORROSION• CORROSION AT SOIL / AIR INTERFACE

Page 51: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

STRESS RELATED• OVERPRESSURIZATION

Page 52: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

STRESS RELATED• VIBRATION- AS IN PUMP CONNECTED PIPING

Page 53: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

STRESS RELATED• FAILURE OF WELD SEAM

Page 54: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DETERIORATION IN PIPING SYSTEM

STRESS RELATED• THERMAL STRESSES

Page 55: Piping

INSPECTION OF PIPING SYSTEM

Igniting Minds... Energizing Lives…Haldia Refinery

Page 56: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

ROLE OF INSPECTION

To evaluate present physical condition of the pipeline.

To keep the concerned operating and maintenance personal fully informed about the the condition of the lines.

To determine causes of deterioration and advise suitable economical solution to the problem.

To initiate procurement action of materials.

To co-relate deterioration rate with design life for further run.

Page 57: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

FREQUENCY OF INSPECTION

The interval between inspections depend upon :

• Degree of corrosiveness/ erosiveness of the fluid.

• Remaining corrosion allowance.

• Type of protective coating.

• Atmosphere prevailing around the piping.

• Potentially of fire /explosion in case of a leak or failure.

• Statutory requirements.

• Importance of operations.

Page 58: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

FREQUENCY OF INSPECTION

Service External Comprehensive

Crude (sour) 3 6

LP/Natural gas 2 4

Gasoline / naphtha 2 4

ATF/ HSD/ LDO/ SKO 3 5

FO/RCO/Bitumen/ VBO 3 5

Fuel gas/ Flare gas 3 5

Lube oil 5 10

Frequency of inspection for offsite piping (hydrocarbon):

Page 59: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

FREQUENCY OF INSPECTION

Frequency of inspection for offsite piping (Utilities): Service External Comprehensive

Fresh water 2 4

Fire water 3 (lined) / 1 (unlined) 5 (lined) / 2 (unlined)

Air / steam 3 6

Ammonia / caustic 2 4

DEA/ MEA 3 5

Furfural/ phenol 2 3

Benzene/ toluene 2 4

Page 60: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

Visual Inspection: For determining leaks, misalignment, supports, vibration, external corrosion, cracks, insulation damage.

Ultrasonic Inspection: For ascertaining wall thickness, by scanning at least four spots (12 o’ clock, 3 o’ clock, 6 o’ clock and 09 o’ clock positions) on each circumferences for every 30 m of straight length and all bend locations.

Page 61: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

Radiographic Inspection: Critical spots which cannot be inspected by UT may be radio graphed during operation to determine internal fouling, pitting, scaling etc.

Shutdown Inspection: All piping which cannot be inspected during operation has to be inspected during shutdown.

Page 62: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

Hydrostatic Testing:

Along with all NDTs hydro test has to be carried out to evaluate strength of existing and new joints of the line in addition to establishing overall integrity of the line.

For new lines hydro test is to be done at 1.5 times design pressure.

For old lines or partially repaired or replaced line it is carried out at 1.5 times operating pressure.

Coated or insulated lines are hydro tested before coating operation.

Before using any line which has been idle for long time, hydro test is to be carried out.

Portable water is to be used for CS or AS pipes and DM water is to be used for SS pipes. Water must be drained after the test.

Page 63: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

• In the presence of certain corrodants, corrosion rates are normally increased at areas of increased velocity and/or turbulence.

• Elbows, reducers, mixing tees, control valves, and orifices are examples of piping components where accelerated corrosion may occur because of increased velocity and/or turbulence.

• In the areas of no flow, such as dead legs, accelerated corrosion may occur.

• Such components are normally areas where an inspector would locate additional TMLs in a piping circuit.

AREAS SUSCEPTABLE TO ACCELERATED CORROSION

Page 64: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

INSPECTION POINTS

Page 65: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

INSPECTION PROCEDURE

INSPECTION POINTS

Page 66: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

ON-LINE MONITORING OF PIPING

• pH MONITORING

• CORROSION PROBES

• CORROSION COUPONS IN WATER LINES

Page 67: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

• ULTRASONIC THICKNESS SURVEY

• DCVG / PEARSON SERVEY

• SPARK / HARDNESS TEST OF RUBBER LINED PIPES

• RADIOGRAPHY

Page 68: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

• DCVG SURVEYThe Direct Current Voltage Gradient (DCVG) technique is a "newer" technique for coating surveys on buried pipelines.

It has been used for not only locating but also sizing coating defects.

The technique is fundamentally based on measuring the voltage gradients in the soil above a cathodically protected pipeline.

Page 69: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

CRACK DYE APPLIED

TRAPPED DYE ON CLEANED SURFACE

CRACK VISIBLEON APPLYINGDEVELOPER

DYE PENETRANT TESTING

Page 70: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DISCONTINUITY

METAL

RADIATION SOURCE

FILM

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Page 71: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

Sample Films :

Lack Of

Penetration

ClusterOf

Porosity

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Page 72: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

Sample Films :

TungstenInclusion

TransverseCrack

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Page 73: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

Slag inclusions

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Lack of fusion

Page 74: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

Suck back

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Root undercut

Page 75: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

External undercut

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Mismatch

Page 76: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

Poor reinforcement

NDT IN PIPING SYSTEM

RADIOGRAPHY TESTING

Excess reinforcement

Page 77: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

LONG RANGE ULTRASONIC TESTING

This technique uses low

frequency guided ultrasonic

waves to detect a length of

piping. It locates the affected

area in terms of distance from

transducer and serves as a

screening tool to inspect large

lengths of piping especially at

difficult to access locations.

Page 78: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

LONG RANGE ULTRASONIC TESTING

Page 79: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

NDT IN PIPING SYSTEM

LONG RANGE ULTRASONIC TESTING

Page 80: Piping

ELECTRONIC SCANNING

ELECTRONIC COMBINED WITH STEERING AND FOCUSING

PHASED ARRAY ULTRASONICS

Page 81: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

DOCUMENTATION OF TMLs

Page 82: Piping

CORROSION PREVENTION IN

PIPING SYSTEM

Igniting Minds... Energizing Lives…Haldia Refinery

Page 83: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

CORROSION PREVENTION

PAINTING

• ENAMEL, EPOXY, COAL TAR, CLORINATED RUBBER, BITUMENOUS

• HIGH TEMPERATURE PAINTS

• TEMPERATURE INDICATIVE PAINTS

• TAPE COATING

Page 84: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

CORROSION PREVENTION

CATHODIC PROTECTIONPRINCIPLE OF CP

MOST NEGATIVE REGIONS ACTS AS ANODE

PRE-REQUISITE FOR CP COATING / WRAPPING EFFECTIVENESS

PIPE TO SOIL POTENTIAL SURVEYSOIL RESISTIVITY SURVEY

INTERFERENCE WITH FOREIGN LINES

Page 85: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

CORROSION PREVENTION

CATHODIC PROTECTIONSACRIFICAIL ANODE TECHNIQUE

Page 86: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

CORROSION PREVENTION

CATHODIC PROTECTIONIMPRESSED CURRENT TECHNIQUE

Page 87: Piping

CAUSES OF PIPING FAILURES

Igniting Minds... Energizing Lives…Haldia Refinery

Page 88: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

MATERIAL NOT SUITABLE / MATERIAL MIX-UP

5 Cr-1/2 MoCarbon steel

Page 89: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

VIBRATION

Page 90: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

FLOW ACCLERATED CORROSION

Page 91: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

CATALYST EROSION

Page 92: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

THERMAL STRESSES

Page 93: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

COATING DAMAGE

Page 94: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

PROBLEMS WITH LOW POINT DRAINS

Page 95: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURESGMAJOR REASONS OF PIPING FAILURES

SEAM OPENING

Page 96: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

GRASS / WEED GROWTH & SOIL CONTAMINATION

Page 97: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

INTERNAL UNDER DEPOSIT / MICROBIAL CORROSION

Page 98: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

CORROSION AT SUPPORT LOCATIONS

Page 99: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

CORROSION UNDER INSULATION

Page 100: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES

IMPROPER FABRICATION

Page 101: Piping

Igniting Minds... Energizing Lives…Haldia Refinery

PIPING FAILURES

MAJOR REASONS OF PIPING FAILURES