Pipeworks

Embed Size (px)

Citation preview

  • 7/23/2019 Pipeworks

    1/6

  • 7/23/2019 Pipeworks

    2/6

    The Pipe works started in 1887 this businessThe Pipe works started in 1887 this business

    has been a big business for the Southlandhas been a big business for the Southland

    area because Southlands so muddy. Lots ofarea because Southlands so muddy. Lots of

    the pipes travelled away from rowns to bethe pipes travelled away from rowns to be

    used in lots of areas like !ore "nvercargillused in lots of areas like !ore "nvercargill

    and all around Southland.and all around Southland.

  • 7/23/2019 Pipeworks

    3/6

    The Pipe works started in 1887 and wasThe Pipe works started in 1887 and was

    a successful business until they rana successful business until they ran

    out of decent clay. This business madeout of decent clay. This business made

    clay pipes instead of metal pipes. Theyclay pipes instead of metal pipes. They

    got most of their clay from Hokonuigot most of their clay from Hokonui

    and Limehills . Before the companyand Limehills . Before the company

    was closed it was sold to r Brownwas closed it was sold to r Brownthen Peter !ampbell.then Peter !ampbell.

  • 7/23/2019 Pipeworks

    4/6

    The pipe works had a lot of old machines that weThe pipe works had a lot of old machines that wedon#t have now. They first started with one mandon#t have now. They first started with one man

    $ust digging from a hole. %fter that they then got a$ust digging from a hole. %fter that they then got a

    tiny scoop. Then they got a tractor and they finallytiny scoop. Then they got a tractor and they finallymoved up to a big e&cavator that transported themoved up to a big e&cavator that transported theclay from the hole to a cart on the tracks. Theyclay from the hole to a cart on the tracks. Theytransported the clay by a trolley that rested ontransported the clay by a trolley that rested on

    tracks. The trolley got pulled back down to thetracks. The trolley got pulled back down to thesheds for the clay to be used to make the claysheds for the clay to be used to make the claypipes. To make the clay pipes hard they put thempipes. To make the clay pipes hard they put themin a very hot furnace fired wood and then coal.in a very hot furnace fired wood and then coal.

  • 7/23/2019 Pipeworks

    5/6

    'obody is (uite sure when the'obody is (uite sure when thepipe workspipe works

    ended but we are estimating around theended but we are estimating around the

    early 1)*+s. 'ow the pipe works is used forearly 1)*+s. 'ow the pipe works is used for

    ,r -een#s contracting. is contracting,r -een#s contracting. is contracting

    business is very helpful to the rownsbusiness is very helpful to the rowns

    community to help with ploughing paddockscommunity to help with ploughing paddocks

    and cutting grass.and cutting grass.

  • 7/23/2019 Pipeworks

    6/6

    Proudly made by /Proudly made by /

    %idan%idan

    0essica0essica

    0osh0osh