Pipeline Maintenance International
a division of Hydra Valve World WideGroup LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Advanced Pressure Testing (APT)
Tight Fit Lining
Polyethylene (PE) Pipe Installations
Large Diameter Electrofusion Branch Saddles for Gas / Water
Hot Tap & Stopple
PRS - Supply, Installation, Commissioning & Maintenance ofGas Control Equipment
Pipeline Repair and Maintenance Products:
Leading Edge CCTV Inspection
Pipeline Monitoring, Inspection and Repair
Epoxy Repair System
For more information on any of the above or for details about other services we can provide, please contact PMI directly using the contact details below.
CONTENTS
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Advanced Pressure Testing (APT) with Acoustic Temperature Measurement
It is difficult to accurately measure leakage on large pipe volumes during pre-commissioning pressure testing. For polyethylene pipe, a period of time must elapse to avoid creep (pipe expansion due to pressure) affecting the measured pressure. Small fluctuations in temperature can also mask pressure changes resulting from leakage.
The pressure test software has built-in creep compensation algorithms, based on sound knowledge of polyethylene behaviour.
Benefits:
Fast accurate testing
User friendly laptop based operation
Simple hardware installation
Automatic test certificate generation
Up to 95% saving on test time
Earlier leak discrimination
The advanced pressure test system operated by PMI measures the temperature change of all the air in the pipe using acoustics. A loudspeaker and microphone is placed inside the pipe and a pulse echo technique is used to measure the sound speed. The speed of sound varies with temperature, which is used very effectively to determine average changes down to 0.001c. This data is then used to compensate for pressure readings.
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: British GasCommissioning of 3km of a 250mm diameter polyethylene gas main
Project:
A new 250mm (10”) gas main, length 3km (2 miles) required a pre-commissioning air pressure test.
Equipment Utilised:
Advanced Pressure Testing (APT) with Acoustic Temperature Measurement
Purpose:
The standard pressure test for this installation indicated a conditioning time (to allow for creep) that was close to 100 hours and a test time of 186 hours, giving a total test time of around twelve days. In contrast, the APT system could provide a radically more time efficient alternative.
Process:
The acoustic system compensated temperature from the start of the period and also logged the pressure during the pressurisation process.
A leak of 0.28 scmh (10scfh) was identified after one day and repaired by the second day. The third day showed a continual pressure drop, but when corrected for the falling temperature the curve was flat, indicating no further leakage.
Results:
Current UK standards demanded conditioning time plus test time – 288 hours
Temperature compensated test completed – 72 hours
During the test one leak was found and repaired
Conventional testing would require the test to becompleted then repeated
Over 200 hours of saved time
Improved reliability over conventional tests
Resource effort per test reduced typically by 75%
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Tight Fit Lining System
Rapid, cost effective installation of tight fit lining systems
Market Potential:
The process has been used to protect and extend the useful life of pipes in a wide range of industries including gas, mining, oil fields, potable water, municipal sewer sys-tems (force mains), and many other types of industrial applications.
Liner pipe being pulled through the die
Liner pipe being pulled through the die
Cutting Edge Technology:
This type of technology has been used around the world to extend the working life of new and existing pipeline systems by inserting a polymer liner into the host pipe. The lining process was originally devel-oped in the late 1980’s and has been improved upon ever since. No other tight fitting polymer lining system has been so thoroughly tested or so widely proven by actual use. In fact well over 1000km of pressure pipe in sizes up to 60” have been lined by this process.
Tight Lining is an outstanding trenchless technology, particularly in crowded, or environmentally
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Tight fit liner
Why choose a Tight Fit Lining System ?
Pipelines are coming under increasing pressure to meet the needs of today’s society and the developing environmental challenge. The tightening of budgets increases the need for cost effective solutions, whether this the rehabilitation of an existing pipeline or the increasing the design life of a new pipeline.
Cost effective
Minimal impact on environment
Proven technology
Long term solution
Structural or non structural liner
PMI technicians have over 20 yearsexperience of Lining Systems
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Equipment Utilised:
A ground-breaking replacement project to rehabilitate approx. 240km of 39” to 42” Potable Large Diameter Trunk Mains with 1030mm SDR51 PE 100 Polyethylene Pipe, utilising a Tight Fit Lining technique. The existing water pipes feed the vast majority of United Utilities customers in the North West of England.
Since the pipes were installed up to 130 years ago deposits of iron, which occur naturally in raw water from their upland reservoirs, have built up on the inside of the pipes. Although these deposits are not harmful to health, they can result in discolouration of the drinking water, hence the need to clean and refurbish the insides of the pipes.
Objective:
Case Study: Largest Diameter Tight Fit Lining Project in UK
18 Kilometres of 39” Cast Iron Potable Water PipeOswestry Water Treatment Works, ShropshireBalfour Beatty Civil EngineeringUnited Utilities
Project:
Location:
Main Contractor:
Pipeline Owner:
Rotrex 100 Tonne Winch 1200mm Lining Rig 2no. 10 Tonne Winches 3 Tonne Winch McElroy 1648 Butt Fusion Machine CCTV Inspection Diamond Wire Cold Cutting System
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Largest Diameter Project in UK
Results Thus Far:
To successfully plan and manage thelargest diameter project ever attemptedin the United Kingdom.
To overcome the operationaldifficulties associated with largediameter pipes and fittings, includingthe development of a prototype all-terrain, self-propelled 100 tonne winch.
To build an effective workingrelationship with the main contractorBalfour Beatty.
The Challenge:
Approximately 8km, or nearly half of thepipe to be swaged in the first phase, hasnow been successfully completed, includingmeeting initial operational challenges to theprocess.
Individual pulls in excess of 800m have beenachieved.
Despite the urban location of some sectionsof the pipeline, the work has been carriedout with minimal disruption to the localcommunity.
We have built an effective workingrelationship with Balfour Beatty, whichaugurs well for the future.
The magnitude of this project required PMIto successfully develop safe and efficient op-erations for the re-lining of the existing largediameter pipelines. This goal has now beenaccomplished.
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Tight Fit Lining of a Cast Iron Water Main
Tight Fit Lining of 12” Cast iron water main with 315mm SDR 17.6 Blue PE Weymouth, Dorset Wessex Water Wessex Water
Project:
Location:
Main Contractor:
Pipeline Owner:
Pipe Cruiser Inspection System withFTR 80CX camera
40 Tonne Grundotug Twin CapstanCable Winch
315mm Lining Rig Scraper, Pull Thro’ & Gauge Pigs 315 Auto Butt Fusion Machine
Equipment Utilised:
The existing main had burst on two previous occasions causing local flooding and inconvenience to the public and Wessex Water customers.
Purpose of Project:
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Tight Fit Lining of a Cast Iron Water Main
The Process:
The Tight Fit Lining process uses PE pipe which has an outside diameter slightly larger than the inside diameter of the pipe to be lined. The PE pipe is pulled through a die to temporarily reduce its out-side diameter. The reduction allows the PE to be easily pulled through the host pipe by a winch. When the pulling force has been disconnected the PE pipe begins to return to its original diameter. However, just before the PE pipe relaxes complete-ly it presses tightly against the inside of the host pipe, eliminating the annular space to form a tight fit liner.
The cast iron host main was lined using a structural liner. The new PE pipe provides a main that can withstand full line pressure irrespective of the host pipe condition.
Results:
“Tight Fit Lining the 12” CI water main was a great suc-cess......we worked closely with the team and managed to quickly eliminate the risk of further costly bursts on this main. The technique allowed us to excavate three reception pits which minimised disruption and let traffic on a very busy road flow in both directions.”
“The project took just five weeks to complete.....but for this technique....the road would have been open cut, greatly causing traffic congestion and would have taken at least six or seven weeks.......and additionally we had very minimal amounts of muck away to landfill.”
Iain Dickie, Contracts Manager - Wessex Water
Client Comments:
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Polyethylene (PE) Pipe Installations
PMI is the specialist pipeline services company and offers a wide range of services for the installation and testing of polyethylene pipe, including PE80 (MDPE) and PE100 (HDPE/HPPE).
PMI’s highly skilled technicians have vast experience of working in both the gas and water industries. As a highly experienced installer of polyethylene pipe, specialities available include Butt Fusion and Electrofusion installation welding, catering for large diameter pipes up to 1200mm.
Services include:
Pipelaying:
Butt Fusion Welding - Up to 1200mmm
Electrofusion Welding - Up to 1000mm
PE Flowstopping Techniques:
Squeeze-Off - Up to 400mm
- Including Slow Release Squeeze-Off for HDPE (Mandatory for large diameter 7 bar connections)
Bag Stop
Underpressure Connections- Up to 630mm x 250mm (branch saddles)
Testing
Pneumatic Testing
Hydrostatic Testing
Advanced Acoustic Pressure Testing (AAPT)
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Butt Fusion Welding PMI operate a wide range of Butt Fusion Machines (up to 1200mm) including McElroy Tracstar (All Terrain) and Fusion Provida Automatic BFMs. PMI expertise in handling the pipe and successful jointing using Butt Fusion methods provides complete peace of mind.
Proven welding technique for polyethylene piping
Long established method, spanning over 40 years of use
Downloadable jointing data provides evidence thatjointing has been correct and successful
Cost-effective method of laying long stretches of pipe
Electrofusion Welding Also available is the installation of large diameter electrofusion couplers and branch saddles. PMI technicians are highly skilled and have a proven track record of installing large diameter couplers.
Ideal for hard to access locations.
Downloadable jointing data provides evidence thatjointing has been correct and successful
Cost-effective method of laying shorter and morecomplex sections of pipe
PE Flowstopping Techniques:
- Squeeze-Offs Squeezing-off pipes is a long established technique and is a fast, effective method for PE flowstopping operations.
Equipment for squeezing-off up to 400mm including 7 bar slowrelease equipment
Quick to stop gas flow - ideal for emergency situations
- Bag Stop Newly developed Bag Stopping techniques to provide an alternative to PE squeeze-off are also available.
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Tight Fit Lining of a Cast Iron Water Main
Tight Fit Lining of 1.2 Km of 24” Cast iron water main with 560mm SDR 17.6 Blue PE Seven Sisters Road , Tottenham Barhale Thames Water
Project:
Location: Main Contractor: Pipeline Owner:
Pipe Cruiser Inspection System withFTR 80CX camera
40 Tonne Grundotug Twin CapstanCable Winch
600mm Lining Rig Scraper, Pull Through & Gauge Pigs 630 Tracstar Auto Butt Fusion Machine
Equipment Utilised:
The existing main needed to be replaced or rehabil-itated at minimum cost & inconvenience to the public. Due to the urban location and road network this was always going to be a challenging project.
Purpose of Project:
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
The Process:
The Tight Fit Lining process uses PE pipe which has an outside diameter slightly larger than the inside diameter of the pipe to be lined. The PE pipe is pulled through a die to temporarily reduce its outside diameter.
The reduction allows the PE to be easily pulled through the host pipe by a winch. When the pulling force is released the PE pipe begins to naturally re-vert to its original diameter.
However, just before the PE pipe completely reverts it presses tightly against the inside of the host pipe, eliminating the annular space to form a tight fit liner and allow the maximum flow.
The cast iron host main was lined using the Tight Fit Lin-ing process, inserting a structural liner. The new PE pipe provides a main that can withstand full line pressure irre-spective of the host pipe condition.
Results:
“Barhale is a partner company in the Optimise joint venture delivering part of the AMP5 capital programme on behalf of Thames Water. PMI were the lining subcontractor for Barhale Optimise on the recently complet-ed the relining of a 24” water main on the Seven Sisters Road, Tottenham, North London. The project commenced on the 25th July 2011 when trial holes and open cutting through a park section took place. PMI had a technician on site from the beginning of September and the butt fusion of the 560mm PE Pipe commenced in Mid September. The Lining of the 24” cast iron main commenced on the 28th September and was completed on the 27th October with 1.250km achieved within that time frame. The lining was achieved in 4 “pulls” with the longest approx 460m. By using this technique it allowed for a larger diameter PE pipe to be used and to line under St Ann’s road railway bridge were the 24”main was made up of cranked joints. This method also allowed for the lining of the 24” main over the highroad junction and through two 11 1/4 degree bends. The technicians on site were very committed and worked tirelessly to get the job completed on time” - Enda Murphy, Site Agent - Barhale
Client Comments:
Case Study: Tight Fit Lining of a Cast Iron Water Main
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Large Diameter Electrofusion Branch Saddles for Water
Large Diameter Electrofusion Branch Saddles
The Fusion range of large diameter electrofusion branch saddles provides the installer with a long await-ed simple alternative to the high cost of by-pass systems or the inconvenience and associated costs of supply interruptions. Under-pressure drilling provides the operator with a simple, safe and cost effective method of branch installation.
Electrofusion branch saddle features:
Minimal pressure drop due to a large bore through fitting.
Double security under-strap retained in place after installation.
Large electrofusion area enhances weld integrity.
Tested and assured fit for purpose after extensive test programme.
Fusamatic system provides data printout records of joint status.
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
FASTCUT LARGE DIAMETER BRANCH SADDLES FOR WATER
Flanged Branch Saddles
Pipe Systems Product Code
Size Material SDR Pressure Rating
FBBKM225X100 250mm x 100 np16PE80PE80PE100PE100
17.6111117.6
8 BAR12.5/12 BAR16 BAR10 BAR
FBBKM250X100 250mm x 100 np16PE80PE80PE100PE100
17.61117.611
8 BAR12.5/12 BAR10 BAR16 BAR
FBHM250X200 250mm x 200 np16PE80PE80PE100PE100
17.61117.611
8 BAR12.5/12 BAR10 BAR16 BAR
FBBKM315X250 315mm x 250 np16 PE80PE100
17.617.6
8 BAR10 BAR
FBBKM355X250 355mm x 250 np16 PE80PE100
17.617.6
8 BAR10 BAR
FBBKM400X250 400mm x 250 np16 PE80 17.6 / 17 8 BAR
Flanged Branch Saddles
Pipe Systems Product Code
Size Material SDR Pressure Rating
FBBKM450X250 450mm x 250 np16 PE80 17.7 / 17 8 BAR
FBBKM500X250 500mm x 250 np16 PE80 17.7 / 17 8 BAR
NEW SIZES AVAILABLE
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Large Diameter Electrofusion Branch Saddles for Gas
Large Diameter Electrofusion Branch Saddles
The Fusion range of large diameter electrofusion branch saddles provides the installer with a long await-ed simple alternative to the high cost of by-pass systems or the inconvenience and associated costs of supply interruptions. Under-pressure drilling provides the operator with a simple, safe and cost effective method of branch installation.
Electrofusion branch saddle features:
Minimal pressure drop due to a large bore through fitting.
Double security under-strap retained in place after installation.
Large electrofusion area enhances weld integrity.
Tested and assured fit for purpose after extensive test programme.
Fusamatic system provides data printout records of joint status.
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
FASTCUT LARGE DIAMETER BRANCH SADDLES FOR GAS
Flanged Branch Saddles
Pipe Systems Product Code
Size Material SDR Pressure Rating
FBBKM250X100 250mm x 100 np16
PE80PE80PE100PE-APE-A
17.6111117.611
3 BAR5.5 BAR7 BAR2 BAR4 BAR
FBYM250X200 250mm x 200 np16PE80PE80PE-APE-A
17.61117.611
3 BAR5.5 BAR2 BAR4 BAR
FBYM315X250 315mm x 250 np16PE80PE80PE-A
2117.617.6
2 BAR3 BAR2 BAR
FBBKM355X250 355mm x 250 np16PE80PE80PE-A
2117.617.6
2 BAR3 BAR2 BAR
FBBKM400X250 400mm x 250 np16 PE80 17.6 / 17 3 BAR
FBBKM450X250 450mm x 250 np16 PE80 17.6 / 17 3 BAR
FBBKM500X250 500mm x 250 np16 PE80 17.6 / 17 3 BAR
Flanged Branch Saddles
Pipe Systems Product Code
Size Material SDR Pressure Rating
FBBKM630X250 650mm x 250 np16 Under Development
UNDERGOING PRODUCT APPROVAL
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Hot Tap, Stopple and By-Pass
Hot Tap, Stopple and By-Pass of 65 Bar Natural Gas Line Growhow Fertilizer Industrial Plant, Teesside Amec (Fabrication of 500 Metre By-Pass) Growhow (Formally Terra Nitrogen)
Project:
Location:
Main Contractor:
Pipeline Owner:
All valves, tees and special connection fittings All pressure testing equipment Vent Stack All high pressure Hot Tap Drills and Stoppling
equipment (rated to 100 Bar for Hot Tap, 70 Barfor Stopples)
All experienced personnel (Welders, Technicians)
Scope of Supply:
The Challenge:
To replace a 500 metre section of 20 inch buried pipe with a newly installed above ground 16 inch pipe without interrupting the gas flow that feeds a number of different plants. The pipeline working pressures fluctuated between 57 and 62 Bar.
Sequence of Operations:
Supply and positioning of 20 inch Stoppling Tees and20 x 16 inch Hot Tap Tee
Welding and inspection of fittings Pressure test newly installed above ground pipeline at
105 Bar for 24 hours Drill and Tap all connections and install temporary
Sandwich Valves for the Stopple Tees Carry out upstream and downstream stoppling operations 20 inch Tee being fitted onto a “live” 65 Bar
Gas pipeline
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Hot Tap, Stopple and By-Pass
Client Comments:
Sequence of Operations (continued):
Carry out venting of decommissionedpipeline by utilising vent stack
Install secondary inflatable bags(double block and bleed) to allowpurging
Once all drillings, venting andcommissioning of lines has beencarried out, all Tees and vent fittingsare blanked off
20 inch Tees and vent con-nections being welded onto a “live” 65 Bar Gas Pipeline
Final Location of Hot Tap Drill on to flange face of welded on 20 inch Tee
Results:
The pipeline replacement work was carried out withoutdecommissioning the existing pipeline
No need to wait for major shutdowns The work was carried out with no disruption to gas flow First Hot Tap project at this pressure to be carried out in the
chemical sector within the Teesside region
Completion plug is lowered into position through valve into the throat of the flange
Down Stream Stopple in position
“We had a problem with a section of gas main feeding our site which was in need of replacement. The line is a 20” sched 40 line with a design pressure of 70 barg. To cut out the line and tie in a new section in the conventional manner by shutting down, depressuring, and purging the line would have involved a total site outage which commercially was not feasible. By carrying out two hot taps the new section could be tied in to the existing system with no interruption to production. The site had done some hot taps before but never at this pressure so there was considerable nervousness about doing the job this way. PMI professionalism in providing technical re-assurance and in the way they organised and executed the work ensured that a potentially hazardous job was done safely and to the appropriate engineering standard.”
John Mahony, Pipeline Integrity Engineer - Growhow
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Connection was made using afabricated steel under-pressure teewhich was welded onto the existingpipeline
A Donkin 555 12” steel valve
A Peart 450 drill was used to makethe final connection.
Equipment Utilised:
Contracted to provide the specialist connection that will provide the gas supply to all the associated facilities at Olympic park, including both stadia and accommodation.
This connection involved a 600mm x 300mm 7 bar welded steel fabrication, and an ‘under-pressure’ drilling which would allow the 1900m of 300mm steel feeder pipe to be commissioned.
Purpose of Project:
Case Study: Connecting the Olympics
12” under-pressure connection at Olympic Park Olympic Park, London McNicholas National Grid
Project:
Location:
Main Contractor:
Pipeline Owner:
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Connecting the Olympics
Client Comments:
The project was won in competitive tender and the workhad to comply with a raft of construction, design andsafety regulations and legislation.
The work was carried out to the high standards required and to the satisfaction of the main contractor McNich-olas, who were highly impressed by the expertise of the our technical team.
As a direct result of the excellent service provided, wesecured additional valuable hydrostatic testing and com-missioning work.
The project also enabled the company to further qualifymembers of their technical team, under their GIRS (GasIndustry Registration Scheme) accreditation.
Results:
“The works undertaken by yourselves have been carried out to a very high standard, with excellent emphasis on H&S.
The team has also shown a vast amount of knowledge in the works carried out, and have been most helpful with technical issues that have arisen during the project.”
Kevin Moran - Senior Contracts Manager McNicholas Construction
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
PRS – Supply, Installation, Commissioning & Maintenance of Gas Control Equipment
HP – MP – LP Distribution Networks Industrial & Commercial Networks
PMI’s range of services include; Supply, Installation, Commissioning and Maintenance of Pressure Reduc-ing Stations, Metering Stations, Data/Pressure Logging Systems and Automatic Meter Reading Systems.
Services Include:
Supply, Install, Commission, Maintain, Meter Exchanges,Meter Isolation and PRS Modifications.
Application: Industrial & Commercial Distribution Transmission
Pressure Regimes:
High Pressure Up to 85 Barg Intermediate Pressure 7 Barg Medium Pressure 2 Barg Low Pressure 75 mbarg
Installations:
Above & Belowground Single Stream / Twin Stream / Multi Stream
Data Systems:
Pressure Logging and Profiling Systems PRS Fault & Condition Monitoring Systems Automated Meter Reading Systems Energy Management Systems
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Systems/Arrangements:
Active LP Slam-Active MP Monitor-Active MP
Regulator Control Systems:
Direct Acting Auxiliary Control Pilot Operated Clock Control
Metering Systems:
Diaphragm Rotary Displacement-RPD Turbine Orifice
Options on:
Volume Correctors Isolation Relays Pressure Logging Data Logging Automated Meter Reading
Maintenance Programmes: Designed to meet customer requirements and industry standards
Programmes based on: Breakdown Planned Schedule Condition
And could include: Visual Inspection Function Diagnostic Major Overhaul
Slam-Slam-Active IP Slam-Monitor-Active IP Slam-Two Stage-Monitor Override IP / HP
Typical Schedules: 3 monthly 6 monthly 12 monthly 5 years
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Pipeline Repair and Maintenance Products
Available from PMI:
Skinner Repair Products: The Skinner product range includes various repair clamps and saddle tees designed to safely repair pipelines at a minimum cost. The Emergency Repair Clamps are ideal for quick instalment under pressure avoiding the interruption of service.
Skinner Emergency Repair Clamps
Skinner Band Clamps
Skinner Pipe Line Clamps and Pipe Joint Clamps
Skinner Saddle Tees
Skinner PS Economy Narrow and PS Economy Wide
Skinner Service Saddles
AVK-Syddal Repair Products: The AVK-Syddal product range includes an assortment of light-weight clamps that provide an economic and permanent method of repairing damaged pipes. Both clamps are corrosion proof and feature the patented Waffle Gasket which ensures a reliable repair.
AVK-Syddal Wraparound Clamps
AVK-Syddal Engineering Maxi Clamps
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Pipeline Repair and Maintenance Products
WELD-SLEEVES (Formerly known as PREMABERG) REPAIR AND REINFORCING SLEEVES
FOR DAMAGED OR CORRODED PIPELINES PMI provide a product which has been developed from over 30 years experience in supplying equipment and services to the Pipeline Industry. The Weld-Sleeves are designed and manufactured to suit a particular application. They are designed to reinforce non-leaking, weakened or damaged pipe. During repairs, the line may remain on stream but pressure must be reduced to a safe level.
PMI now supply an extensive range of high quality pipeline repair and maintenance products designed for use in the Oil, Gas, Chemical and Water industries.
Pipeline
Backing Strips
Repair Sleeve
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Pipeline Repair and Maintenance Products
TYPE PCS TYPE RS REPAIR SLEEVE REINFORCING SLEEVE
TYPE PCSTO DETERMINE THE ALLOWABLE WORKING PRESSURE (P)
Intended to contain the working pressure of the pipeline. The Type PCS Weld-Sleeves are assembled around the damaged section of the pipeline and then butt welded. Backing strips are supplied for the longitudinal welds. The pipeline pressure may need to be reduced prior to welding.
Intended to be used for reinforcing pipelines and is not welded onto the pipe. It is essential that water is not allowed to penetrate between the Weld-Sleeve and the pipe. The Type RS Weld-Sleeve can be lap-joint welded whilst the pipeline is in operation.
TYPE PCS - REPAIR SLEEVE
TYPE RS - REINFORCING SLEEVE
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Leading Edge CCTV Inspection - Hazardous Environments
CCTV inspections on depressurised mains where gas or petro-chemical fumes could be present.
The latest in camera technology with image processing, recording and camera location.
Benefits:
360 degrees continuous pan and high resolution survey images.
Pan and rotate optics provide excellent colour results directly ontothe integral digital video recorder.
Over 200 metres of reach at mains sizes between 100mm (4”)and 450mm (18”) in diameter.
The system is explosion proof – EE xd IIB T3 suitable for allhazardous environments.
Operates underwater at pressures up to 11 bar (IP rating 65).
200 metres of pulling power:
360 degree rotating camera head
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Leading Edge CCTV Inspection
CCTV inspections on depressurised, or live mains operating at low pressure.
The latest in camera technology with image processing, recording and camera location. This top quality pipe cruiser system is ideal for pipeline inspections and measurement, especially in hazardous environments.
Benefits:
Allows the inspection of pipelines with diameters ranging from 150-1200mm Up to 500 metres of reach and high load capacity of up to 300kg High resolution survey images Pan and rotate optics provide excellent colour results directly onto
the integral digital video recorder. Can be fitted with different cameras to meet a variety of requirements:
FTR80CX TV Zoom Camera:
360o rotating camera head Highly compact camera Optical zoom 10x digital zoom, 4x remote controlled focus Stainless steel housing Depth rating: 0.5m
VSCE150X Multidirectional Electrical Trolley:
6 wheel skid steerable Backwards black and white TV camera with infrared lights Can be used with the SIMCO module (real-time deflection measurement) Bronze and stainless steel housing Depth rating in water: 5m
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Pipeline Monitoring, Inspection and Repair Front End Inspection With Back End Repair Solutions
Applications of Long Range Ultrasonics using the GUL G3 (Focus Software) System
PMI now offer Front End Inspection Services as part of our continued commitment to offer a complete solution to pipeline monitoring and maintenance.
Rapid, full coverage screening of pipes
Especially cost effective in difficult to access locations:
Sleeved road crossings Corrosion under insulation Wall penetrations Pipe racks Rope access
Sectors:
Oil and Gas Petrochemical Offshore - Topside and Subsea Deserts & Tropics Colder regions - Alaska
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Pipeline Inspection using GUL
Long Range Ultrasonic Inspection of Refinery Oil Feed Line Petreco Oil Refinery, Red Sea, Egypt Marinetech / Belayim Petroleum Petrobel
Project:
Location:
Main Contractor:
Pipeline Owner:
GUL G3 with Focus Software. Inflatable Ring ; 12 inch diameter Configuration; 9.0FR, T(0,1) Calibration: Automatic (2135.78 mV) Version: 3.94, Wavemaker G3-83
Equipment Utilised:
A number of test areas along the length of the pipeline were tested to check for corrosion and / or erosion. Any areas of concern as identified with the GUL equipment were followed up by carrying out thickness checks using standard UT thickness measuring equipment.
Purpose of Inspection:
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
“Regular monitoring can drive Intelligent pigging programmes”
Defect at 150° (close to bottom) Defect at 50°
(close to top)
PIMS: Permanently Installed Monitoring System Special rings can be bonded onto the pipe permanently for use on any pipe including buried pipe.
Reporting: Best used as a screening tool that is part of a more comprehensive testing strategy. Good at quickly determining which out of a series of inaccessible pipelines are most heavily corroded. Good at quickly locating areas of probable concern. All reports are submitted after careful analysis with full details of areas of concern.
Back End Repair Solutions Pipeline Damage Assessment & Repair 3x Reinforce kits 3x Stopkits for emergency leak repairs Epoxy Shells Composite Repairs Full stopple & Bypass operation
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: Pipeline Inspection using GUL
Client Comments:
In total ten GUL shots were carriedout at strategic points with anapproximate coverage being achievedof over 1km.
Areas of concern were highlighted andfurther investigated using standard UTequipment.
An excellent overall picture of thecondition of the pipeline was achievedand follow up inspection andmaintenance programs were put inplace as a result.
Results:
“The professionalism of the team gave us great confidence in the way this project was carried out and the results achieved. We were sceptical about introducing new technology onto this program but it has in fact saved us a great deal of time and ef-fort..”
Hassan Ahmadein; Director of Marinetech
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: GUL Inspection of Refinery Pipelines
Long Range Ultrasonic Inspection of Refinery Pipelines Petreco Oil Refinery, Red Sea, Egypt Marinetech / Belayim Petroleum Petrobel
Project:
Location:
Main Contractor:
Pipeline Owner:
GUL G3 with Focus Software. Inflatable Rings; from 4 to 32 inch Configuration; 9.0FR, T(0,1) Calibration: Automatic (2135.78 mV) Version: 3.94, Wavemaker G3-83
Equipment Utilised:
To carry out as much inspection and testing in an eight day period of different types and diameters of pipelines such as road crossings, insulated pipes and those pipelines deemed inaccessible; to determine the general condition of the pipelines and to advise where follow up UT surveys should take place.
In total, almost 3kms of varied diameter pipelines were tested in different and difficult to access locations around the refinery.
Purpose of Inspection:
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Case Study: GUL Inspection of Refinery Pipelines
Client Comments:
Approximately 80 GUL shots were carried out on anumber of different sized pipelines at strategic pointswithin the refinery. In total around 3kms of pipelineswere tested. Areas of concern were highlighted andfurther investigated using standard UT equipment.
An excellent overall picture of the condition of thepipelines within the refinery was achieved and follow upinspection and maintenance programs were put in placeas a result.
Results:
“What amazed us was the amount of pipeline that was inspected in a relatively short period of time. We could never have inspected almost 3 km’s of pipeline in this period using just standard Ultrasonic techniques. At least this way we were pointed to those areas of concern which was key in maximising our resources.”
Amr Gamal; Engineering Manager of Marinetech
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Epoxy Repair System For Repairing High Pressure Mains by the Safest, Best and Cheapest Method
The Epoxy shell repair system comprises two half shells which are joined to encircle the damage, leaving a large annular gap. This gap ensures that even severely distorted pipelines can be repaired.
The shells have the same thickness and grade as the pipeline and are at least one diameter longer than the damage.
The ends of the shell are sealed with a putty material and the cavity injected with a high stiffness epoxy grout.
The repair prevents radical bulging associated with damage failure.
It also sheds stress into the shell, which reduces both cyclic stresses near the damage and hence locally increases the pipeline’s strength and fatigue life.
Benefits:
It is a simple, rapid, proven and safe repair method.
The damage is fully restrained.
No welding is required on the live pipeline.
The annular gap between the pipeline and shell is large, which simplifiesthe manufacture and eliminates fit-up problems during installation.
Technique has a sound track record.
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Our range of capabilities include:
Hot Taps, Specialist Connections
Tight Fit Lining
Intervention, Flow Stopping
Corrosion Inspection & Repair Solutions
HDPE, MDPE & Steel Pipe Works
Pipeline Damage Response
Pressure Testing, Hydro, Acoustic & APT
Governor Maintenance & PRS
Large Diameter PE Pipework
For more information on any of the above or for details about other services we can provide, please contact PMI directly using the contact details below.
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
Pipeline Maintenance International a division of Hydra-Valve WWG LLC
PMI a division of Hydra-Valve World Wide Group LLCWorld Head Quarters UAE Tel: +971 4 277 4566 - M: +971 52 795 1548 - Fax: +971 4 277 4566 email: [email protected]
CONTACTS
Steve Foster M: +971 52 795 1548 - E: [email protected]. UK: +44 7517 316 516