41
PIONEER OVERVIEW General 1.8 million net acres Average daily production ~ 25,000 BOEPD 120 MMBOE net proved reserves Neuquen Basin Pioneer-operated 426 active wells 4 gas plants Several hundred development locations Continue to expand field limits Low cost operator at $2.80/BOE Austral Basin BP-operated 178 active wells 3 gas plants One block Pioneer operated Significant exploration potential San Jorge Basin One block Pioneer operated

PIONEER OVERVIEW - IAPGbiblioteca.iapg.org.ar/ArchivosAdjuntos/Jornadas... · Dew Point PlantInlet Comp. Fractionation Plant. Cryogenic Plant Gasoline 40 m3/d Gas to Sales Ethane

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • PIONEER OVERVIEW• General• 1.8 million net acres• Average daily production ~ 25,000 BOEPD• 120 MMBOE net proved reserves

    • Neuquen Basin• Pioneer-operated• 426 active wells• 4 gas plants• Several hundred development locations• Continue to expand field limits• Low cost operator at $2.80/BOE

    • Austral Basin• BP-operated• 178 active wells• 3 gas plants• One block Pioneer operated• Significant exploration potential

    • San Jorge Basin• One block Pioneer operated

  • PIONEER PROPERTIES

    Reversion EL SAUCE

    FORTIN DE PIEDRA

    EL SANTIAGUEÑO JAGÜEL DE

    LINDERO ATRAVESADO

    RINCONADA

    LOMA LA LATA

    CN-X

    BAJADA DEL PALO

    AGUA SALADAGUADALOSA

    BAJO DEL PICHE

    LOS BASTOS

    LA CALERA

    EL PORVENIRSENILLOSA ESTE

    EL SAUCE

    NEUQUEN

    AGUADA PICHANA

    MANGRULLO

    TOUQUET

    CENTENARIO

    AL SUR DE LA DORSAL

    AGUA DEL CAJON

    PUESTO

    LOMA NEGRA

    LOS MACHOS

    Pto. MORALES

    DOS HERMANAS

    BANDURRIA

    BLANCO DE LOSMANGRULLO

    LOMA

    PIEDRA CHENQUE

    la ARENA

    RINCON DEL

    Pto. GALDAME

    LA YESERA

    CERRO BANDERA

    CNQ-16/A

    ANTICLINAL CAMPAMENTO

    ZAPALACNQ-14

    ASD

    TOTORAL

    PASO AGUERRE

    BAJO BAGUALES

    ASD

    AGUADA BAGUALESAL NORTE DE LA DORSAL

    MESETA BUENA ESPERANZA

    AGUADA VILLANUEVA

    PASO

    ASD

    OCTOGONO

    ASD DOS HERMANAS

    AGUERRE

    DADIN

    ASD

    SIERRAS BLANCAS

    LOS CALDENES

    ESTACION CERVANTES

    LOMA CAMPANA

    del MEDIO

    AGUADA de

    SUR

    DE MINASPORTEZUELO Est.FERNANDEZ ORO

    PUESTO GONZALEZ

    CNQ-27 RNN

    CERRO MANRIQUE

    VILLA REGINA

    LAGUNA EL LORO

    BAJO

    L.del MOJON

    LAS TACANAS

    EL CORTE

    CN-XI

    GENERAL ROCA

    GENERAL ROCAREVERSION

    LA PENDIENTE

    CERRO VAGON

    ASD

    CUTRAL CO

    COIRON AMARGO

    PUESTO SILVA OESTE

    LOMA JARILLOSA ESTE

    LOMA DEL MOJON

    MATA MORA

    SIERRAS BLANCAS

    Pto. ZUÑIGA

    Pto. ZUÑIGA

    Pto. ZUÑIGA

    SENILLOSAOESTE

    SIERRAS BLANCAS

    OJO DE AGUA

    COLLON CURA

    CHASQUIVIL

    CHASQUIVIL

    COLLON CURA

    LOMA NEGRA - N I

    CNQ-38a

    Pto. ZUÑIGA

    HUACALERA

    OLIVOS ORIENTAL

    CNQ-27 RNN

    BLOQUE I

    BLOQUE II

    CNQ-31 PUESTO GALDAMEREVERSION

    CNQ-16/AReversion

    Pto. PRADO

    Pto.PRADO

    PUESTO FLORES

    ESTANCIA VIEJA

    Ea. VIEJA

    LAGO PELLEGRINI ESTE

    LAS BASES

    Pto. SURVELIN

    LOS OLIVOSBLANCO DE

    CNQ-Reve

    CNQ-16/AReversion

    COVUNCO NORTE - SURRIO NEUQUEN

    1993 1994 1998 1999 2001 2003

  • Inlet Comp.Gas from

    Wells.

    LOMA NEGRA PROCESS BLOCK DIAGRAM

    Residue Gas

    Compressors.

    Inlet Comp.Dew Point Plant

    Fractionation Plant.

    CryogenicPlant

    Gasoline40 m3/d

    Gas toSales

    Ethane – 100 Tn/d

    Propane – 70 Tn/d

    Butane – 50 Tn/d

    Gasoline – 70 m3/d

    Existing

    New

    2,1 MM m3/d

    2,0 MM m3/d 1,98 MM m3/d

    1,93 MM m3/d

    3,9 MM m3/d10000 HP

    6000 HP

    Prep. by Eduardo Bosio

  • TYPICAL GAS COMPOSITIONS

    0.886 mmcmd0.956 mmcmd1.08 mmcmdVolume @ 9300 Kcal/m30.919 mmcmd0.960 mmcmd1.00 mmcmdActual Volume

    8972 Kcal/m39263 Kcal/m310031 Kcal/m3Heat Content

    100.00%100.00%100.00%

    0.00%0.00%0.06%Octane & Sup C8+

    0.00%0.00%0.11%Heptane C7

    0.00%0.00%0.32%Hexane C6

    0.00%0.00%0.27%Normal-Pentane nC5

    0.00%0.00%0.20%Iso-Pentane iC5

    0.02%0.02%0.78%Normal-Butane nC4

    0.01%0.01%0.29%Iso-Butane iC4

    0.09%0.09%2.05%Propane C3

    0.24%4.53%4.35%Ethane C2

    98.47%94.23%90.49%Methane C1

    0.83%0.79%0.76%Nitrogen N2

    0.35%0.33%0.32%Carbon Dioxide CO2

    Ethane Recovery ModePropane Recovery ModeComposition

    Outlet Gas CompositionAverage Inlet GasComponent

    Prep. by Eduardo Bosio

  • 70 bar

    LPG PROCESS FLOW DIAGRAM

    Inlet

    Comp

    InletSeparator

    Water / Oilto SlopTank

    Dehydrator

    Hot Oil Heater

    Cold Separator

    Turbo-Expander

    Reboiler

    C3+ Mix toFractionation Train

    Plate Fin Heat Exchangers

    Turbo-ExpanderTurbo-Expander

    32000 rpm

    J-T Valve

    BoosterCompressor

    Residue GasCompressor

    Gas AirCooler

    Residue Gasto Sales

    Gas AirCooler

    -75 °C

    -100 °C

    50 °C

    69 bar

    20 bar27 bar

    70 bar

    Surge Tank

    Pipeline Pump

    21 bar

    95 °C

    Dem

    ethanizer Tower

    -95°C

    1400 HP

    2 mmcmd8 bar

    C2+ Mix to LiquidPipeline (Future)

    Transfer Pump

    50 °C

    -25 °C

    GasfromWells

    Prep. by Eduardo Bosio

  • FRACTIONATION TRAIN

    Depropanizer

    Debutanizer

    C3+ fromDemethanizer

    Propane

    Butane

    GasolineReboiler Reboiler

    Hot Oil Heater

    Accumulator

    Air Cooler

    C4 Reflux Pump

    Accumulator

    C3 Reflux Pump

    20 bar

    50 °C

    145 °C

    50 °C

    100°C

    7 bar

    125°C

    Air Cooler

    Air Cooler

    Air CoolerHot Oil Pump

    Prep. by Eduardo Bosio

  • LOMA NEGRA: LPG & FRACTIONATION PLANTS

    Capacity: 2.1 MMcmd (75 MMscfd)

    Prep. by Eduardo Bosio

  • DEW POINT PLANT

    Capacity: 2 MMcmd of gas / 40 cmd of Gasoline

    Prep. by Eduardo Bosio

  • INLET COMPRESSORS 2.0 MMCMD – 10000 HP

    Prep. by Eduardo Bosio

  • PLANT INLET SEPARATOR

    Prep. by Eduardo Bosio

  • FILTERS & DEHYDRATORS

    Prep. by Eduardo Bosio

  • HEAT EXCHANGERS (HTX)

    Prep. by Eduardo Bosio

  • BOOSTER COMPRESSOR & EXPANDER

    Prep. by Eduardo Bosio

  • DEMETHANIZER TOWER•Height: 44,5 m

    •Db: 1,4 m / 1,1 m / 1,8 m

    •Material: CS / SS

    •Wall Thickness: 2 in / 1,5 in

    •Weight (empty): 73 Tn

    •Wind Speed Design: 160 Km/h

    •Free Standing Design

    Prep. by Eduardo Bosio

  • AIR COOLERS

    Prep. by Eduardo Bosio

  • J-T VALVE

    Prep. by Eduardo Bosio

  • 150 m3 SURGE TANK – Liquids fromDemethanizer

    Prep. by Eduardo Bosio

  • Pipeline & Transfer Pumps

    Prep. by Eduardo Bosio

  • Residue Gas Compressors – 2.0 MMcmd – 6000 HP

    Prep. by Eduardo Bosio

  • STORAGE TANKS – 1200 m3

    BUTANEBULLETS

    450 m3PROPANEBULLETS

    750 m3

    Prep. by Eduardo Bosio

  • Gasoline Tank, Transfer Pump & Mass Meter

    Prep. by Eduardo Bosio

  • Demethanizer & Fractionation Towers

    Prep. by Eduardo Bosio

  • De-Propanizer & De-Butanizer Towers

    Depropanizer

    •Height: 26 m

    •Diameter: 0,85 m

    •Material: CS

    •Wall Thick.: 16 mm

    •Weight: 25 Tn

    Debutanizer

    •Height: 18 m

    •Diameter: 1,35 m

    •Material: CS

    •Wall Thick.: 9,5 mm

    •Weight: 10 Tn

    Prep. by Eduardo Bosio

  • HOT OIL PUMPS & SURGE TANK

    Prep. by Eduardo Bosio

  • REFLUX PUMPS

    Prep. by Eduardo Bosio

  • REBOILERS & ACCUMULATORS

    Prep. by Eduardo Bosio

  • AIR COOLERS & HOT OIL HEATER

    Prep. by Eduardo BosioPrep. by Eduardo Bosio

  • Auxiliary Equipment• Control Room & Plant Office• Delta V Control System Operators• Fuel Gas System• Fire Fighting Facilities• Truck Scale• Flaring System• Truck Loading Rack• Odorization Control Panel• Gas & Liquid Chromatograph

    Prep. by Eduardo Bosio

  • CONTROL ROOM & PLANT OFFICE

    Prep. by Eduardo Bosio

  • DELTA V – OPERATOR WORKSTATIONS

    Prep. by Eduardo Bosio

  • REGENERATION GAS HEATER & HOT OIL HEATERS

    Prep. by Eduardo Bosio

  • FUEL GAS SYSTEM & OFF SKID PIPING

    Prep. by Eduardo Bosio

  • FIRE WATER TANK & PUMPS – TRUCK SCALE

    Prep. by Eduardo Bosio

  • TRUCK LOADING RACKS

    Prep. by Eduardo Bosio

  • Gas Meter Runs & Shut Down Valves

    Prep. by Eduardo Bosio

  • LPG TRUCK on TRUCK SCALE

    Prep. by Eduardo Bosio

  • FLARING SYSTEM

    Prep. by Eduardo Bosio

  • ODORIZATION PANEL

    Prep. by Eduardo Bosio

  • GAS & LIQUID CHROMATOGRAPH

    Prep. by Eduardo Bosio

  • Construction Facts

    • People: 200• Man-hours: 180.000• # of Accidents / Incidents ZERO• Contractors & Subs. 30• Investment US$ 14.000.000• Soil Movement: 104.000 m3• Concrete: 600 m3• Equipment & Piping: 4000 Tn• Insulation: 2200 m2• Paint: 1200 lt

    Prep. by Eduardo Bosio

  • MAIN CONTRACTORS

    • CRYOGENIC PLANT– Minor Equipment & Management: CBI (Arg)– Know How & Main Equipment: Howe Baker

    Engineers (USA)– Construction: SIMA S.A. (Arg)

    • FRACTIONATION PLANT– Management: Pioneer (Arg)– Know How: Hytech S.A. (Arg)– All Equipment: Argentine Suppliers– Construction: SIMA S.A. (Arg)

    Prep. by Eduardo Bosio

    PIONEER OVERVIEWPIONEER PROPERTIESAuxiliary EquipmentConstruction FactsMAIN CONTRACTORS