PIONEER OVERVIEW• General• 1.8 million net acres• Average daily production ~ 25,000 BOEPD• 120 MMBOE net proved reserves
• Neuquen Basin• Pioneer-operated• 426 active wells• 4 gas plants• Several hundred development locations• Continue to expand field limits• Low cost operator at $2.80/BOE
• Austral Basin• BP-operated• 178 active wells• 3 gas plants• One block Pioneer operated• Significant exploration potential
• San Jorge Basin• One block Pioneer operated
PIONEER PROPERTIES
Reversion EL SAUCE
FORTIN DE PIEDRA
EL SANTIAGUEÑO JAGÜEL DE
LINDERO ATRAVESADO
RINCONADA
LOMA LA LATA
CN-X
BAJADA DEL PALO
AGUA SALADAGUADALOSA
BAJO DEL PICHE
LOS BASTOS
LA CALERA
EL PORVENIRSENILLOSA ESTE
EL SAUCE
NEUQUEN
AGUADA PICHANA
MANGRULLO
TOUQUET
CENTENARIO
AL SUR DE LA DORSAL
AGUA DEL CAJON
PUESTO
LOMA NEGRA
LOS MACHOS
Pto. MORALES
DOS HERMANAS
BANDURRIA
BLANCO DE LOSMANGRULLO
LOMA
PIEDRA CHENQUE
la ARENA
RINCON DEL
Pto. GALDAME
LA YESERA
CERRO BANDERA
CNQ-16/A
ANTICLINAL CAMPAMENTO
ZAPALACNQ-14
ASD
TOTORAL
PASO AGUERRE
BAJO BAGUALES
ASD
AGUADA BAGUALESAL NORTE DE LA DORSAL
MESETA BUENA ESPERANZA
AGUADA VILLANUEVA
PASO
ASD
OCTOGONO
ASD DOS HERMANAS
AGUERRE
DADIN
ASD
SIERRAS BLANCAS
LOS CALDENES
ESTACION CERVANTES
LOMA CAMPANA
del MEDIO
AGUADA de
SUR
DE MINASPORTEZUELO Est.FERNANDEZ ORO
PUESTO GONZALEZ
CNQ-27 RNN
CERRO MANRIQUE
VILLA REGINA
LAGUNA EL LORO
BAJO
L.del MOJON
LAS TACANAS
EL CORTE
CN-XI
GENERAL ROCA
GENERAL ROCAREVERSION
LA PENDIENTE
CERRO VAGON
ASD
CUTRAL CO
COIRON AMARGO
PUESTO SILVA OESTE
LOMA JARILLOSA ESTE
LOMA DEL MOJON
MATA MORA
SIERRAS BLANCAS
Pto. ZUÑIGA
Pto. ZUÑIGA
Pto. ZUÑIGA
SENILLOSAOESTE
SIERRAS BLANCAS
OJO DE AGUA
COLLON CURA
CHASQUIVIL
CHASQUIVIL
COLLON CURA
LOMA NEGRA - N I
CNQ-38a
Pto. ZUÑIGA
HUACALERA
OLIVOS ORIENTAL
CNQ-27 RNN
BLOQUE I
BLOQUE II
CNQ-31 PUESTO GALDAMEREVERSION
CNQ-16/AReversion
Pto. PRADO
Pto.PRADO
PUESTO FLORES
ESTANCIA VIEJA
Ea. VIEJA
LAGO PELLEGRINI ESTE
LAS BASES
Pto. SURVELIN
LOS OLIVOSBLANCO DE
CNQ-Reve
CNQ-16/AReversion
COVUNCO NORTE - SURRIO NEUQUEN
1993 1994 1998 1999 2001 2003
Inlet Comp.Gas from
Wells.
LOMA NEGRA PROCESS BLOCK DIAGRAM
Residue Gas
Compressors.
Inlet Comp.Dew Point Plant
Fractionation Plant.
CryogenicPlant
Gasoline40 m3/d
Gas toSales
Ethane – 100 Tn/d
Propane – 70 Tn/d
Butane – 50 Tn/d
Gasoline – 70 m3/d
Existing
New
2,1 MM m3/d
2,0 MM m3/d 1,98 MM m3/d
1,93 MM m3/d
3,9 MM m3/d10000 HP
6000 HP
Prep. by Eduardo Bosio
TYPICAL GAS COMPOSITIONS
0.886 mmcmd0.956 mmcmd1.08 mmcmdVolume @ 9300 Kcal/m30.919 mmcmd0.960 mmcmd1.00 mmcmdActual Volume
8972 Kcal/m39263 Kcal/m310031 Kcal/m3Heat Content
100.00%100.00%100.00%
0.00%0.00%0.06%Octane & Sup C8+
0.00%0.00%0.11%Heptane C7
0.00%0.00%0.32%Hexane C6
0.00%0.00%0.27%Normal-Pentane nC5
0.00%0.00%0.20%Iso-Pentane iC5
0.02%0.02%0.78%Normal-Butane nC4
0.01%0.01%0.29%Iso-Butane iC4
0.09%0.09%2.05%Propane C3
0.24%4.53%4.35%Ethane C2
98.47%94.23%90.49%Methane C1
0.83%0.79%0.76%Nitrogen N2
0.35%0.33%0.32%Carbon Dioxide CO2
Ethane Recovery ModePropane Recovery ModeComposition
Outlet Gas CompositionAverage Inlet GasComponent
Prep. by Eduardo Bosio
70 bar
LPG PROCESS FLOW DIAGRAM
Inlet
Comp
InletSeparator
Water / Oilto SlopTank
Dehydrator
Hot Oil Heater
Cold Separator
Turbo-Expander
Reboiler
C3+ Mix toFractionation Train
Plate Fin Heat Exchangers
Turbo-ExpanderTurbo-Expander
32000 rpm
J-T Valve
BoosterCompressor
Residue GasCompressor
Gas AirCooler
Residue Gasto Sales
Gas AirCooler
-75 °C
-100 °C
50 °C
69 bar
20 bar27 bar
70 bar
Surge Tank
Pipeline Pump
21 bar
95 °C
Dem
ethanizer Tower
-95°C
1400 HP
2 mmcmd8 bar
C2+ Mix to LiquidPipeline (Future)
Transfer Pump
50 °C
-25 °C
GasfromWells
Prep. by Eduardo Bosio
FRACTIONATION TRAIN
Depropanizer
Debutanizer
C3+ fromDemethanizer
Propane
Butane
GasolineReboiler Reboiler
Hot Oil Heater
Accumulator
Air Cooler
C4 Reflux Pump
Accumulator
C3 Reflux Pump
20 bar
50 °C
145 °C
50 °C
100°C
7 bar
125°C
Air Cooler
Air Cooler
Air CoolerHot Oil Pump
Prep. by Eduardo Bosio
LOMA NEGRA: LPG & FRACTIONATION PLANTS
Capacity: 2.1 MMcmd (75 MMscfd)
Prep. by Eduardo Bosio
DEW POINT PLANT
Capacity: 2 MMcmd of gas / 40 cmd of Gasoline
Prep. by Eduardo Bosio
INLET COMPRESSORS 2.0 MMCMD – 10000 HP
Prep. by Eduardo Bosio
PLANT INLET SEPARATOR
Prep. by Eduardo Bosio
FILTERS & DEHYDRATORS
Prep. by Eduardo Bosio
HEAT EXCHANGERS (HTX)
Prep. by Eduardo Bosio
BOOSTER COMPRESSOR & EXPANDER
Prep. by Eduardo Bosio
DEMETHANIZER TOWER•Height: 44,5 m
•Db: 1,4 m / 1,1 m / 1,8 m
•Material: CS / SS
•Wall Thickness: 2 in / 1,5 in
•Weight (empty): 73 Tn
•Wind Speed Design: 160 Km/h
•Free Standing Design
Prep. by Eduardo Bosio
AIR COOLERS
Prep. by Eduardo Bosio
J-T VALVE
Prep. by Eduardo Bosio
150 m3 SURGE TANK – Liquids fromDemethanizer
Prep. by Eduardo Bosio
Pipeline & Transfer Pumps
Prep. by Eduardo Bosio
Residue Gas Compressors – 2.0 MMcmd – 6000 HP
Prep. by Eduardo Bosio
STORAGE TANKS – 1200 m3
BUTANEBULLETS
450 m3PROPANEBULLETS
750 m3
Prep. by Eduardo Bosio
Gasoline Tank, Transfer Pump & Mass Meter
Prep. by Eduardo Bosio
Demethanizer & Fractionation Towers
Prep. by Eduardo Bosio
De-Propanizer & De-Butanizer Towers
Depropanizer
•Height: 26 m
•Diameter: 0,85 m
•Material: CS
•Wall Thick.: 16 mm
•Weight: 25 Tn
Debutanizer
•Height: 18 m
•Diameter: 1,35 m
•Material: CS
•Wall Thick.: 9,5 mm
•Weight: 10 Tn
Prep. by Eduardo Bosio
HOT OIL PUMPS & SURGE TANK
Prep. by Eduardo Bosio
REFLUX PUMPS
Prep. by Eduardo Bosio
REBOILERS & ACCUMULATORS
Prep. by Eduardo Bosio
AIR COOLERS & HOT OIL HEATER
Prep. by Eduardo BosioPrep. by Eduardo Bosio
Auxiliary Equipment• Control Room & Plant Office• Delta V Control System Operators• Fuel Gas System• Fire Fighting Facilities• Truck Scale• Flaring System• Truck Loading Rack• Odorization Control Panel• Gas & Liquid Chromatograph
Prep. by Eduardo Bosio
CONTROL ROOM & PLANT OFFICE
Prep. by Eduardo Bosio
DELTA V – OPERATOR WORKSTATIONS
Prep. by Eduardo Bosio
REGENERATION GAS HEATER & HOT OIL HEATERS
Prep. by Eduardo Bosio
FUEL GAS SYSTEM & OFF SKID PIPING
Prep. by Eduardo Bosio
FIRE WATER TANK & PUMPS – TRUCK SCALE
Prep. by Eduardo Bosio
TRUCK LOADING RACKS
Prep. by Eduardo Bosio
Gas Meter Runs & Shut Down Valves
Prep. by Eduardo Bosio
LPG TRUCK on TRUCK SCALE
Prep. by Eduardo Bosio
FLARING SYSTEM
Prep. by Eduardo Bosio
ODORIZATION PANEL
Prep. by Eduardo Bosio
GAS & LIQUID CHROMATOGRAPH
Prep. by Eduardo Bosio
Construction Facts
• People: 200• Man-hours: 180.000• # of Accidents / Incidents ZERO• Contractors & Subs. 30• Investment US$ 14.000.000• Soil Movement: 104.000 m3• Concrete: 600 m3• Equipment & Piping: 4000 Tn• Insulation: 2200 m2• Paint: 1200 lt
Prep. by Eduardo Bosio
MAIN CONTRACTORS
• CRYOGENIC PLANT– Minor Equipment & Management: CBI (Arg)– Know How & Main Equipment: Howe Baker
Engineers (USA)– Construction: SIMA S.A. (Arg)
• FRACTIONATION PLANT– Management: Pioneer (Arg)– Know How: Hytech S.A. (Arg)– All Equipment: Argentine Suppliers– Construction: SIMA S.A. (Arg)
Prep. by Eduardo Bosio
PIONEER OVERVIEWPIONEER PROPERTIESAuxiliary EquipmentConstruction FactsMAIN CONTRACTORS