pinellas gateway / mid-county area master plan KICK-OFF SESSIONS March 7th + 8th, 2018 DRAFT 03/19/18

pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

pinellas gateway / mid-county area master plan

KICK-OFF SESSIONS March 7th + 8th, 2018

DRAFT03/19/18

Page 2: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

2 // kick-off sessions summary

master planning team

Our team includes local and national partners to support WRT’s planning and urban design expertise.

WRT | Prime Consultant Leading Planning, Urban Design, Architecture, Landscape Architecture » Yogesh Saoji, Professional in Charge, Planner + Urban Designer

» Garlen Capita, Project Manager, Senior Associate, Urban Designer

» Mary Morton, Associate, Planner + Urban Designer

SB Freidman Development Advisors | Market Analysis/Fiscal Impact » Geoff Dickinson, Senior Vice President

» Caitlin Amos, Associate Project Manager

Kimley-Horn | Multi-Modal Planning & Design Support » Jared Schneider, Project Manager, Senior Planner

» Keith Greminger, Associate, Senior Urban Designer and Planner

Vrana Consulting, Inc | Local Liaison/ Public Outreach + Engagement » Tammy Vrana, President

Calvin, Giordano & Associates, Inc. | Regulatory Framework/Engagement Support » Silvia E. Vargas, Principal Planner

George F. Young, Inc. | Civil Engineering » Jerry Dabkowski, Engineer

DRAFT03/19/18

Page 3: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

3 // pinellas gateway / mid-county area master plan

CONTENTS

DAY 1: AGENDA + PRESENTATION 06

DAY 1: LISTENING SESSION 1 32

DAY 1: LISTENING SESSION 2 38

DAY 2: AGENDA + PRESENTATION 40

DAY 2: IDEA SHARING CHARRETTE 54

DAY 2: BRANDING EXERCISE 60

APPENDIX 62

DRAFT03/19/18

Page 4: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

4 // kick-off sessions summary

PLAN

NING

ARE

A CO

NTEX

T MAP DRAFT

03/19/18

Page 5: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

5 // pinellas gateway / mid-county area master plan

Project Kick-Off + Study Area Issues & Opportunities CharretteThe WRT led planning and design team held a two day project Kick-Off and Study Area Issues and Opportunities Charrette with Forward Pinellas and agency partners with the goal of confirming the goals and parameters of the project, and understanding the challenges and aspirations for the master plan. The following is a summary of what was discussed over those two days.

DRAFT03/19/18

◀ The general boundary of the study area is Bel leair Road to the nor th , Starkey Road and 66th N. St on the west , 62nd Avenue N. and W. Gandy Blvd to the south , and Tampa Bay to the nor theast .

Page 6: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

6 // kick-off sessions summary

1march 7, 2018

DAY 1:

agenda + presentation

Day 1 of the project kick-off included an overview of the project goals and objectives, planning process, and an interactive listening session with stakeholders.

AGENDA1. Welcome & Introductions (WRT)

2. Project Goals & Objectives (Whit Blanton, Forward Pinellas)

3. Goals for the Next Two Days (WRT)

4. General Overview of Pinellas Gateway Master Plan Process (WRT)

5. Gateway Intermodal Center (WSP)

6. Listening Session Part 1: (1 hour) | Hear from Key Stakeholders - Goals and Expectations

7. Listening Session Part 2: (1 hour) | Hear from Key Stakeholders - Perspectives and Observations, Common Drivers

8. Site Tours and Next Steps

DRAFT03/19/18

Page 7: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

7 // pinellas gateway / mid-county area master plan

PRESENTATION

1 2

3 4

DRAFT03/19/18

Page 8: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

8 // kick-off sessions summary

5 6

7 8

DRAFT03/19/18

Page 9: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

9 // pinellas gateway / mid-county area master plan

9 10

11 12

DRAFT03/19/18

Page 10: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

10 // kick-off sessions summary

STUDY AREA EXISTING CONDITIONS ANALYSIS

PUBLIC ENGAGEMENT PLAN + BRANDING STRATEGY

COORDINATION W/ STAKEHOLDERS AND OTHER EFFORTS

ALTERNATIVES DEVELOPMENT AND EVALUATION

MASTER PLAN DEVELOPMENT

IMPLEMENTATION STRATEGY

13 14

15 16

DRAFT03/19/18

Page 11: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

11 // pinellas gateway / mid-county area master plan

FINAL DOCUMENTATION

PLAN ADOPTION/ ENDORSEMENT

ADVANCING RECCOMENDATIONS

17 18

19 20

DRAFT03/19/18

Page 12: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

12 // kick-off sessions summary

•••••••

21 22

23 24

DRAFT03/19/18

Page 13: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

13 // pinellas gateway / mid-county area master plan

Consultant Team Pre K ick-Off Meeting - March 6 , 2018

DRAFT03/19/18

Page 14: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

14 // kick-off sessions summary

ST. PETERSBURGGoals

» Business retention and recruitment – this area is one of the 6 designated activity centers (Raymond James, employment centers, expansion)

» Transportation and connectivity – pivot point (regional and local); place where the grid breaks

» Utilities and infrastructure

» Resiliency and sea level rise

Initiatives

» Grow Smarter by the City and Chamber – 5 industry sectors, 3 are in the Gateway Area: Specialized Manufacturing, Finance, and Data Analytics

» Housing Needs – workforce, affordable, and executive » 2007 city-wide rezoning – neighborhood corridors / mixed use concepts

» Seeing need for even higher density – current zoning allows for max density of 21-30 units/acre with workforce and other bonuses

» Education / School Quality – perception that the quality is worse than it actually is, current graduation rate is about 82%

» Coastal High Hazard Area – map recently changed and the impacts are huge (inlcude in analysis)

» Integrated Sustainability Action Plan (ISAP) – on-going

» Public Works Integrated Water Resources Master Plan ( just kicked off)

» Affordable / Workforce Housing• Initiatives for this topic• Density, FAR, parking (evaluating min/max parking – too high/low?), land use

» Complete Streets Policy (2015) – focuses on ages / abilities not just modes; currently working on an implementation plan; the Gateway is a key target / issue area

» How do you grow this area without too much congestion?

• Multimodal trail facilities, grade separation, crossings • Safety – huge roadways / crossings (sometimes you can’t even see the crosswalk

countdown across the road)

2march 7, 2018

DAY 1:

Listening Session 1

Stakeholders Goals & Expectations: What are your goals for this project? What are your current initiatives?

DRAFT03/19/18

Page 15: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

15 // pinellas gateway / mid-county area master plan

» Connectivity with this area – extend trail network and connect with other regional trails E-W and N-S

» Gateway Express Project – potential to alleviate some traffic

» Roosevelt Boulevard – opportunity to redesign and make it more pedestrian friendly

» Gandy – express lanes that extend to downtown • FDOT – lane improvements • Make it a true expressway to Tampa – use as evacuation route• Reduce need for traffic on other roads

» US 19 – more improvements

» Gateway Multimodal Study (10 years ago) – was never implemented, look at the strategies

» 102nd – looked at an overpass, but it was too expensive

» High employment, underserved area = Carillon – no major routes in this area

» Tampa Bay Intermodal Study – high speed rail line; site was selected, but it was deemed historic

» Look for new sites for intermodal – a more central location

» US 19 express bus plan (on-going) – they have been studying this since 1973; demand for that service

» Safety – pedestrian crashes on US 19 » Think about ways to get people across major roadways

» TB NEXT and Gandy Boulevard – trail facilities alongside major bridges – across all challenged crossings

» Complete streets plan will have modal hierarchy to link economic development and transportation

» Passenger Ferry (study 2003) – could be an opportunity in this area near the airport for that facility to connect counties

» Downtown Bike Share – potential to expand, operated by Coast Bike Share (also in Tampa)

DRAFT03/19/18

Page 16: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

16 // kick-off sessions summary

PINELLAS PARK Goals

» Transit and land use – land uses that contribute to economic and residential growth in a coordinated way

» Redevelop along US 19 – major artery, turnaround the negative impact

» Policies to address aging commercial

Initiatives

» Comprehensive Plan update process

» Micro focus on economic goals with city council, department heads, chamber

» Desire to expand study area boundary to 62nd Ave. (southern boundary)

» 34th St – 49th St – 62nd Ave upgrade project; multi-jurisdictional

LARGOGoals

» Economic development and jobs – some of the regulatory issues to allow existing industry to intensify

» Affordable / Workforce / Executive housing – high tech, medical

» Recreation and open space east of US 19, Duke Energy Trail development – open space opportunities

» Connectivity – E-W corridor, trail or community street to connect to Duke Energy Trail

Initiatives

» Strategic Plan – viewing through that lens

» Largo Town Center Specific Plan – one of the 3 main activity centers (completed FY 2019)

» US 19 Study (on-going)

» Sewer system extends beyond Largo City limits – implications of land use on sewer system

» Annexation strategy – attempting to consolidate planning area boundaries

DRAFT03/19/18

Page 17: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

17 // pinellas gateway / mid-county area master plan

PINELLAS COUNTY Goals

» Leverage work and housing with jobs / job creation

» Industrial / office space

» Regional stormwater retention strategy (industrial park), utilities (sewer)

» Reestablish street grid – no grid within the industrial area

» Infrastructure / environmental issues

» Impact of the Gateway Express

» Sea level rise – adaptation of existing roads for resiliency

» County deserves something better

» Tools for streets / wastewater / infrastructure

» Pedestrian / bike safety

Initiatives

» County owns property within the study area – 117+ acres (45 aviation related)• Maximize site potential; can’t go vertical• Sewer issues are ongoing - one story flex space now

» PIE Airport Master Plan coordination - sites / land available

» Carillon Park could be more developed - area around Publix has a master plan

» Private property – contamination not known; FAA approved up to 250’

» Former landfill redevelopment – costs? Environmental assessment ongoing

» 126th Ave N - 118th Ave N – Gateway Express Connect; 66th St - 28th St connection through local street linkages – review area and sites around

» Mixed-use below end of ‘runway’ Gateway Express

» Workforce demographics studies available

» Network constraints – transit is also impacted

» Ulmerton Road / Honeywell, Park Boulevard, Bellaire Ave project / trail, 126th Ave N

» Public Works storwmater strategies

Cari l lon Business Park

Residential development near Cari l lon

DRAFT03/19/18

Page 18: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

18 // kick-off sessions summary

TRANSIT AGENCIES: Goals

» Safety

» Access and connections

» Serving employment areas with transit

» Focus on corridors and sub areas • Belleair Rd, trails, and Starkey Road

» Gateway as a place; highlight unique aspects

» Waterfront to be attractive for the region

Initiatives

» Operational analysis focus on transit

» National trends – same here

» First/Last mile initiatives

» Survey available

» Expanding BRT in St. Pete

» Bus shelters / amenities

» Transit sustainability analysis - MPO

» 126th Avenue design

» Ulmerton Road area tidal influence

» Regional stormwater management approaches – joint use ponds, maintenance responsibility?

» Public works stormwater manual – pilot projects, test sites?

» Cross Bayou

» Regional stormwater opportunities?

We can’t just pay lip service to resiliency in this area

– Caroline

DRAFT03/19/18

Page 19: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

19 // pinellas gateway / mid-county area master plan

Listening Session with Stakeholders during K ick-Off Session Day 1

DRAFT03/19/18

Page 20: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

20 // kick-off sessions summary

CREATING MEANINGFUL CHANGE » Position the Gateway to capture investments

» Partners are willing to make changes / set priorities based on outcomes / recommendations

» Create a list of priority transportation projects

» Leverage the plan for funding (grants, etc.)

» Potential to create overarching, non-governmental organizations (BIDs, Economic Development Alliances, EDCs, non-profits, etc.)

» Create the social infrastructure to collaborate and implement

» Potential impact of the Federal Infrastructure Bill – opportunities to leverage value capture and use those funds for community benefit projects

» Equity – the Highpoint Neighborhood

» Regional transit with a robust local network buy-in

» Potential for local service / circulator / other last mile connections (employers, neighborhoods, shopping, etc.)

• Feeder shuttles example from Fort Lauderdale

• Goes back to the potential to leverage value capture funds

ASPIRATIONAL PROJECTS » Change from suburban to more urban mixed use centers

» Reestablish the grid (eastern portion)

» Create a truly multi-modal area

» Accommodate all modes

» Local network made up of community streets to accommodate shorter trips

» Improve service – more frequent transit

3march 7 2018

DAY 1:

Listening Session 2

Perspectives, Observations, Common Drivers.

Listening Session with Stakeholders

DRAFT03/19/18

Page 21: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

21 // pinellas gateway / mid-county area master plan

» Highpoint Neighborhood – potential for transformational project; neighborhood could benefit from this effort

» Maximize water for recreational opportunities (living on water)

» We have to deal with water, how do we maximize its potential?

» Opportunity for businesses to see the Gateway as an opportunity area, not just Westshore (business retention and recruitment)

» Land assembly utilizing Penny for Pinellas

» Higher density residential uses

» Utilizing PIE to support / leverage growth TIA transit connection

LOW HANGING FRUIT / EARLY ACTIONS » Amend the Countywide Plan to support density

» Regional stormwater plan

» Funding for implementation

» Leverage FDOT investments for catalyst projects

» Utilize funding from Gateway for more multimodal projects

» Give the Gateway area a brand and identity

» Branding for targeted areas

» First set of priority Penny Projects (use this effort to identify)

Listening Session with Stakeholders

Listening Session with Stakeholders

DRAFT03/19/18

Page 22: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

22 // kick-off sessions summary

4march 8, 2018

DAY 2:

agenda + Presentation

Day 2 of the project kick-off included an overview of items discussed during the day 1 listening sessions and an interactive issues and opportunities charrette.

AGENDA1. Welcome

2. Brief Summary of Day 1 Themes

3. Overview of Charette Goals and Format

4. Idea Sharing Breakout Sessions (1.5 hour) » Transportation and Mobility

» Land Use and Economic Vitality

» Quality of Life

» Building Resiliency by Addressing Environmental, Economic, and Social Vulnerabilities

10 minute Break

5. Report Back and Group Discussion (10 mins. per group)

6. Next Steps and Closing Remarks » Communication - Website; Basecamp

» Outreach and Engagement Strategy

» Conduct Stakeholder Interviews

» Study Area Existing Conditions Analysis (includes documentation and mapping, eco-nomic profile, Infrastructure)

» Adopted Plans and Funded Project Review

» Community Open House

DRAFT03/19/18

Page 23: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

23 // pinellas gateway / mid-county area master plan

PRESENTATION

W E L C O M E S U M M A R Y O F K E Y T H E M E S + D R I V E R S

Opportunities and Constraints Housing Needs • Affordable, Workforce, Executive • Workplace and housing relationship to reduce commute distances Mobility and Transportation • Lack of connectivity on local streets • Connectivity and safety for bikes and pedestrians • Connecting transit with land use • First and last mile connections Infrastructure • To support existing and future development needs (sewer, water) • Coordinating needs; Lack of regional and coordinated stormwater planning and

implementation • Resiliency of existing infrastructure (flooding roadways)

Opportunities and Constraints Sustainability • Environmental • Landfill cleanup and reuse • Available vacant land may have challenges Resiliency • All issues need to be addressed through a resiliency lens • Street network • Infrastructure • Neighborhood development • Coastal Flood hazards

1 2

3 4

DRAFT03/19/18

Page 24: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

24 // kick-off sessions summary

Opportunities and Constraints Economic Development • We want to keep and attract new businesses • Balancing redevelopment of existing areas without losing jobs • Attracting a wider range of employers (look here not just the West Shore) • Equity • Land assembly

Challenge • Significant previous and ongoing planning efforts • Funding • Multi-jurisdictions • Partnerships (Public + Public; Public + Private)

This master planning effort can make • Improvements in quality of life • Extend trail connections • Increase density and connect land use with transit • Leverage County owned land near the airport (PIE) - • Amend countywide plan to support density • Coordinate and manage storm water regionally • Identify a mechanism for facilitating, funding implementation • Leverage FDOT investment for catalyst projects • Branding + Identity – What is the Gateway? • Utilize Penny for Pinellas for Land Assembly to support County-wide priorities • Leverage MP for Grant funding and being ready for new investment • Value capture to fund projects with community benefits • Equity – transit dependent, work force training, work force housing • Regional transit and a robust local networks (connections between employers and

residential) • Resiliency strategies

Aspirations

• From suburban character to urban mixed use center (increase density) • Establish the grid (increase connectivity) • Local network to accommodate shorter trips • Improve service, transit frequency • Equity benefits for High Point (lower income areas) • Water is an inherent part of our Pinellas environmental - how do we design and

build a sustainable future that addresses this. • Branding for business attraction and placemaking • Critically important to utilize the PIE to support and leverage growth (potential

connection from TIA to PIE)

Charette Instructions

1. We will breakout into 3 groups (Sit in a pod based on your group color) 2. We will have a facilitated discussion led by consultant team members

• Garlen and Jared/Keith (Kimley Horn) • Geoff and Mary, Tammy, • Yogesh and Chris, Caitlin

3. All groups to identify a non-consultant team member to report back 4. All groups will discuss a number of questions in these four themes

• Transportation and Mobility • Land Use and Economic Vitality • Promoting Enhanced Quality Of Life • Resiliency – Addressing Environmental, Economic, and Social

Vulnerabilities

5 6

7 8

DRAFT03/19/18

Page 25: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

25 // pinellas gateway / mid-county area master plan

Idea Sharing Charrette

DRAFT03/19/18

Page 26: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

26 // kick-off sessions summary

5march 8, 2018

DAY 2:

idea sharing charrette

Transportation + Mobility; Land Use + Economic Vitality; Quality of Life; and Building Resiliency by Addressing Environmental, Economic + Social Vulnerabilities.

BLUE TEAM - PRIORITY AREAS » Connectivity

» Connecting work, home, and play for cars, pedestrians, and bikes

» Creating these connections will allow for better and more efficient transit opportunities

» Gandy Gateway Area » Prime redevelopment opportunities

» Key transportation connections (102nd Ave, Gateway Express, trails)

» Affordable place to live - creative class moving in

» Resiliency » Need to make tough choices about what areas will remain after sea level rise

» Opportunity to reconnect ecosystems

» Focus on underutilized areas that are “high & dry”

» Prepare power grid, water, and sewer infrastructure

» Greater Carillon Area » Post Gateway areawide DRI

» Key transportation connections (Gateway Express)

» “Gateway” viewshed from I-275

» Opportunity to create a more mixed use area (most people at Carillon live in Tampa)

» Prime redevelopment opportunities (vacant golf course)

» Industrial Opportunity Zones » Prime redevelopment opportunities (historic track area/drag strip; area near rail road -

some existing neighborhood fabric) + job creation nodesBlue Team

DRAFT03/19/18

Page 27: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

27 // pinellas gateway / mid-county area master plan

Blue Team Participants » Barry Westmark » Brent Hall » Caroline Lanford » Chelsea Favaro » Chris Niforatos

» Geoffrey Dickinson » Lindsay Morgan » Mary Morton » Richard Perez » Tom Whalen

DRAFT03/19/18

Page 28: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

28 // kick-off sessions summary

GREEN TEAM - PRIORITY AREAS » Local Grid Network

» Access via local roads to jobs, groceries, services

» Opportunities to extend the grid (142nd Ave N, 102nd Ave N)

» Designate truck routes

» Implication of elevated expressway on land use (US 19)

» Mixed Income Residential » Urban walkable mixed-income housing

» » Business Growth and Expansion

» Not a destination, rather a place you go through

» Attract new businesses

» Amenities and Services » Leverage major employer opportunities to increase residential and amenities: Valpak, Tech

Data, Raymond James

» Opportunity to create a rail trail

» Lack of recreational opportunities and amenities

» Economic and Environmental Resilience » Opportunities for gray and green infrastructure

» Social equity; Open space investments

» Oportunity to attract more specialized manufacturing and green businesses

» Resilience of elctric grid (undergrounding opportunities)

Green Team

Green Team

DRAFT03/19/18

Page 29: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

29 // pinellas gateway / mid-county area master plan

Green Team Participants » Carol Stricklin » Cheryl Stacks » Cindy Margiotta » Danny Taylor » Garlen Capita

» Jared Schneider » Jeff Diemer » Joan Rice » Linda Fisher » Rodney Chatman

DRAFT03/19/18

Page 30: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

30 // kick-off sessions summary

RED TEAM - PRIORITY AREAS » Solve Multi-jurisdictional Infrastructure

» Stormwater / sewer

» Implication of elevated expressway on land use (US 19)

» Connect Residential Areas to Employment Centers » E-W connectivity, transit and grid

» First / last mile / circulator

» Historically focused on commuters moving faster, more efficiently; future - residential and density to support transit

» Focus density at intermodal location and Carillon

» Strong access to jobs

» Penny for Pinellas Strategy

» Value Capture Strategies

» Redevelopment and Reuse to Support Jobs » Businesses want to be in Gateway

» Largo Town Center - target employment center with higher FAR and residential

» Housing is mainly infill / built out!

» Tough to assemble land for executive housing

» Infill in St. Pete outside of historic preservation concerns

Red Team

Red Team

DRAFT03/19/18

Page 31: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

31 // pinellas gateway / mid-county area master plan

Red Team Participants » Caitlin Amos » Claire Apaliski » Derek Kilborn » Heather Sobush » Isabella Nunez

» Katrina Lunan-Gordon » Mike Meidel » Ming Gao » Yogesh Saoji

DRAFT03/19/18

Page 32: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

32 // kick-off sessions summary

6march 8, 2018

DAY 2:

branding exercise

What are the words that come to mind when you think of the Gateway area?What would the aspirational brand for the area be?

BRANDING » Grand entrance

» Meeting point (old / new mix)

» Nexus

» Economic Engine

» Going to vs. going through

» Right now it’s work - needs to be live/work/play

» It’s a destination you pass through

» Business

» Gateway to the beach

» Gateway circa 1980s

» Pivot point

» Hub/wheel - funnels people around

» Center of the Tri-City Area

» Gateway to the County (people understand this geography)

» West Bay Place (like California’s Bay Area)

» Regional center

» The Center

» Office / employment center along with Westside

» “All Roads Lead to Gateway”

» Ecological resources

» Beauty

» How things are made (manufacturing / industry)

» Compass rose

» Rising above / overcoming constraints

» Water is largely inaccessible

This area is the heart – when it’s doing well, the areas nearby do well...it’s the center of the circulation system

DRAFT03/19/18

Page 33: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

33 // pinellas gateway / mid-county area master plan

DRAFT03/19/18

Page 34: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

34 // kick-off sessions summary

7march 7-8, 2018

appendix

Photographs of notes and maps created during the two-day session.

Listening Session 1 - St . Pete

DRAFT03/19/18

Page 35: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

35 // pinellas gateway / mid-county area master plan

Listening Session 1 - St . Pete Listening Session 1 - St . Pete

DRAFT03/19/18

Page 36: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

36 // kick-off sessions summary

Listening Session 1 - St . Pete Listening Session 1 - St . Pete

DRAFT03/19/18

Page 37: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

37 // pinellas gateway / mid-county area master plan

Listening Session 1 - Pinel las Park Listening Session 1 - Pinel las Park

DRAFT03/19/18

Page 38: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

38 // kick-off sessions summary

Listening Session 1 - Largo Listening Session 1 - Largo

DRAFT03/19/18

Page 39: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

39 // pinellas gateway / mid-county area master plan

Listening Session 1 - Pinel las County Listening Session 1 - Pinel las County

DRAFT03/19/18

Page 40: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

40 // kick-off sessions summary

Listening Session 1 - Pinel las County Listening Session 1 - Transpor tation Agencies

DRAFT03/19/18

Page 41: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

41 // pinellas gateway / mid-county area master plan

Listening Session 1 - Transpor tation Agencies Listening Session 1 - Transpor tation Agencies

DRAFT03/19/18

Page 42: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

42 // kick-off sessions summary

Listening Session 1 - Transpor tation Agencies Listening Session 1 - Transpor tation Agencies

DRAFT03/19/18

Page 43: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

43 // pinellas gateway / mid-county area master plan

Listening Session 2 Listening Session 2

DRAFT03/19/18

Page 44: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

44 // kick-off sessions summary

Listening Session 2 Listening Session 2

DRAFT03/19/18

Page 45: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

45 // pinellas gateway / mid-county area master plan

Listening Session 2 Listening Session 2

DRAFT03/19/18

Page 46: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

46 // kick-off sessions summary

Listening Session 2

DRAFT03/19/18

Page 47: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

47 // pinellas gateway / mid-county area master plan

Charrette - Blue team Charrette - Blue team

DRAFT03/19/18

Page 48: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

48 // kick-off sessions summary

Charrette - Blue team Charrette - Blue team

DRAFT03/19/18

Page 49: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

49 // pinellas gateway / mid-county area master plan

Charrette - Blue team

DRAFT03/19/18

Page 50: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

50 // kick-off sessions summary

Charrette - Blue team

DRAFT03/19/18

Page 51: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

51 // pinellas gateway / mid-county area master plan

Charrette - Green team Charrette - Green team

DRAFT03/19/18

Page 52: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

52 // kick-off sessions summary

Charrette - Green team

Charrette - Green team

Charrette - Green team

DRAFT03/19/18

Page 53: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

53 // pinellas gateway / mid-county area master plan

Charrette - Green team

DRAFT03/19/18

Page 54: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

54 // kick-off sessions summary

Charrette - Green team

DRAFT03/19/18

Page 55: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

55 // pinellas gateway / mid-county area master plan

Charrette - Red team Charrette - Red team

DRAFT03/19/18

Page 56: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

56 // kick-off sessions summary

Charrette - Red team Charrette - Red team

DRAFT03/19/18

Page 57: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

57 // pinellas gateway / mid-county area master plan

Charrette - Red team

DRAFT03/19/18

Page 58: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

58 // kick-off sessions summary

Charrette - Red team

DRAFT03/19/18

Page 59: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

59 // pinellas gateway / mid-county area master plan

Branding Exercise Branding Exercise

DRAFT03/19/18

Page 60: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

60 // kick-off sessions summary

Branding Exercise Branding Exercise

DRAFT03/19/18

Page 61: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

61 // pinellas gateway / mid-county area master plan

acknowledgements

We would like to thank all of the stakeholders who participated in the kick-off sessions for your time and enthusiasm! We would also like to extend a special thanks to PSTA for hosting our two-day event.

Danny Taylor, City of Pinellas Park

Heather Sobush, PSTA

Ming Gao, FDOT

Brian Beaty, FDOT

Joan Rice, Pinellas County

Caroline Lanford, Pinellas County

Cindy Margiotta, Pinellas County

Brent Hall, Pinellas County

Mike Meidel, Pinellas County

Jeffrey Diemer, WSP

Lindsay Morgan, WSP

Robert Clifford, WSP

Christina Kopp, WSP

Lee Beasley, LRB Consulting Group

Barry Westmark, City of Largo

Richard Perez, City of Largo

Carol Stricklin, City of Largo

Isabella Nunez, City of Largo

Katrina Lunan-Gordon, City of Largo

Chelsea Favaro, Forward Pinellas

Whit Blanton, Forward Pinellas

Rodney Chatman, Forward Pinellas

Linda Fisher, Forward Pinellas

Tom Whalen, City of St. Petersburg

Cheryl Stacks, City of St. Petersburg

Derek Kilborn, Planners Advisory Committee

Claire Apaliski, HNTB

DRAFT03/19/18

Page 62: pinellas gateway / mid-county area master plan KICK-OFF ... · 3 // pinellas gateway / mid-county area master plan contents day 1: agenda + presentation 06 day 1: listening session

62 // kick-off sessions summary

DRAFT03/19/18