MEETING CÓRDOBA PILOT EXPERIENCES WP5 Pilot experiences: design, implementation and validation Optional Solutions - 1st. Solution: container veneering (aesthetic covering) - 2nd. Solution: underground containers. - 3rd. Solution: waste storage in public use room. - 4th. Solution: waste storage in private use room -Great producers (business with >300 sq meters that produce > 1 cubic meters of waste) - 5th. Solution: doorstep collection in difficult spaces. How many pilot experiences we perform? At least 10 PILOT EXPERIENCES expected to be implemented
Citation preview
PILOT EXPERIENCES
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
WP5 Pilot experiences: design, implementation and validation
WP5 Coordinator: P1
PPs involved: all
WP5 is engaged in the exact design, implementation and validation of 5 pilot solutions concerning waste deposit and collection for their applicability in medinas/city centres
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
WP5 Pilot experiences: design, implementation and validation
Optional Solutions
- 1st. Solution: container veneering (aesthetic covering)- 2nd. Solution: underground containers. - 3rd. Solution: waste storage in public use room. - 4th. Solution: waste storage in private use room
- Great producers (business with >300 sq meters that produce > 1 cubic meters of waste)
- 5th. Solution: doorstep collection in difficult spaces.
How many pilot experiences we perform? At least 10 PILOT EXPERIENCES expected to be implemented
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
Year 2014 2015Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
5.1 BD.5.3 VS5.4 AD5.6 Imp5(2,5,7,8) M.5.9 Val
WP5 Process phases5.1 Basic Design (Basic project) SADECO5.(2,5,7,8) Meeting (Córdoba,Sfax,Ragusa, Alejandria) P1, P4, P2,P65.3 Virtual Simulation of the 5 solutions P15.4 Adaptation of the model of general applicability to their local reality
Licenses, permissions and administrative pre-requisites Partners, Associates 5.6 Pilot experiences Contracting and Implementation Partners, Associates 5.9 Validation of pilot experiences Partners, Associates
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
Year 2014 2015Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
5.1 BD.5.3 VS5.4 AD5.6 Imp5(2,5,7,8) M.5.9 Val
WP5 Process phases5.1 Basic Design (Basic project) SADECO5.(2,5,7,8) Meeting (Córdoba,Sfax,Ragusa, Alejandria) P1, P4, P2,P65.3 Virtual Simulation of the 5 solutions P15.4 Adaptation of the model of general applicability to their local reality
Licenses, permissions and administrative pre-requisites Partners, Associates 5.6 Pilot experiences Contracting and Implementation Partners, Associates 5.9 Validation of pilot experiences Partners, Associates
MEETING CÓRDOBAMEETING CÓRDOBA
BASIC PROYECT
MEETING CÓRDOBAMEETING CÓRDOBA
-Dimensions: vary according to container model and size-Material: galvanized Steel and/or stainless Steel-Parts: front part, front folding doors or cam system with hydraulic damper,fixed sides and rear parts, opening lid through a frontal pedal-Support: height adjustable feet with rubber cushion
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBAHeight: 1,84 mLength(2/3/4 containers):2,94/4,14/5,35 mOccupied area (2/3/4 containers): 5,41/7,62/9,84 squared mArea/container (2/3/4 containers):2,7/2,5/2,5 squared m/containerUnderground height: 2,17 mStructure height: 1,70 mEntrance height: 0.96 mEntrance width: 0,73 m
Steel structure: St 37Machined Steel: F-114Corrosion protection: 60-200 micron hot galvanizedProfiles: structural tube y LFloor plate: folded 4 mm, hot dip galvanizedCover plate: flat plate 3 mm, hot dip galvanizedMovement stabilizer: simple scissor
Hydraulic circuit: guided hoses and fittings galvanized fairingsPressure high / work at break: 200/330/1320 barNumber of heads/bore/stroke: 2 / 40-55mm / 1700 mmQuality used oil: ISO-46
Pending: <15%Lid pavement: 60 mmProtection to water: board EPDMCrosswalk between containers: 500 mm
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
INSTALATION BUDGET (€) CAPACITY (m3) €/m3
DOOR TO DOOR COLLECTION
35 l 16 0,035 457
120 l 50 0,12 417
700 l 125 0,70 179
1100 l 200 1,10 182CONTAINER VENEERING
(INDIVIDUAL) 1100 l 2.575 1,10 2.341
CONTAINER VENEERING (GROUP)
INSTALACIÓN TIPO 1 3.792 1,90 1.996
INSTALACIÓN TIPO 2 5.307 3,00 1.769
INSTALACIÓN TIPO 3 12.309 9,87 1.247
UNDERGROUND CONTAINERS
2 UD 15.948 2,20 7.249
3 UD 17.527 3,30 5.311
4 UD 21.265 4,40 4.833WASTE STORAGE FOR PRIVATE
USE 6 UD 1000 l 9.940 6,00 1.657
WASTE STORAGE FOR PUBLIC USE
WITH EXTERNAL ENTRANCE
40.227 6,00 6.705
WITH INTERNAL ENTRANCE 57.478 6,00 9.580
ACTIVITY BUDGET
MEETING CÓRDOBAMEETING CÓRDOBA
BUDGET
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
MEETING CÓRDOBAMEETING CÓRDOBA
VIRTUAL SIMULATION
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SocialEnvironmentalFunctionalEconomical
User centered design methodology
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SocialEnvironmentalFunctionalEconomical
User centered design methodology
Prior to the presentation of the project
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SocialEnvironmentalFunctionalEconomical
User centered design methodology
From Jordan to Córdoba Meeting
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SocialEnvironmentalFunctionalEconomical
User centered design methodology
NOW – First Iteration
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SocialEnvironmentalFunctionalEconomical
User centered design methodologyFrom NOW to mid JULY – Second Iteration
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
Deliverables
Virtual Simulation UCO
• VR Simulation of solutions
•Experts poll
•VR Simulation of solutions Rev. 2
•Experts and public poll
•…. Rev. 3 to final revision.
•Conclusions and recommendations. Update of functional specifications
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
FIRST ITERATION
Virtual Simulation in Usability Laboratory UCO
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
GADGETS
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
GADGETS
Action Movement
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
What does the test consist in?
Using the OCULUS VR Headset and the Wiimote to control movement, each solution will be tested by each participant, while being recorded withHD cameras. All the information will be processed lately by UCO.
After the VR test, each participant will answer a cuestionaire.
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
WHERE?
MEETING CÓRDOBAMEETING CÓRDOBA
Time
P6 MOMA
2 person
RV
Ass Alt-Sat2
peopleRV
P7 UJO2 people RV
+1
P2 Ragussa2 people
RV
P3 SVIMED
2 peopleRV
P5 ARDES+Ass M
Alex
P8 ALEX UNI2 people
Rv+1
14:30
Bus Rectorate to CITEC Bus CITEC a CMC
15:00
RV aid coffee VISIT CMC
15:20
T RV aid
15:40
coffee T RV
16:00
aid coffee T BUS CMC a CITEC
16:30
BUS CITEC CMC RV aid
16:40
VISIT CMC T RV coffee coffee
17:00
coffee T RV aid
17:20
aid coffee T RV
17:40
aid T
18:00
BUS CMC to CITEC BUS CITEC to Town Hall
18:30
VISIT TO THE COLLECTION AND DEPOSIT SYSTEMS
19:30
PILOT EXPERIENCES
SCHEDULETime to:-VR Simulation.-Fulfill the cuestionaire.
MEETING CÓRDOBAMEETING CÓRDOBA
Time
P6 MOMA
2 person
RV
Ass Alt-Sat2
peopleRV
P7 UJO2 people RV
+1
P2 Ragussa2 people
RV
P3 SVIMED
2 peopleRV
P5 ARDES+Ass M
Alex
P8 ALEX UNI2 people
Rv+1
14:30
Bus Rectorate to CITEC Bus CITEC a CMC
15:00
RV aid coffee VISIT CMC
15:20
T RV aid
15:40
coffee T RV
16:00
aid coffee T BUS CMC a CITEC
16:30
BUS CITEC CMC RV aid
16:40
VISIT CMC T RV coffee coffee
17:00
coffee T RV aid
17:20
aid coffee T RV
17:40
aid T
18:00
BUS CMC to CITEC BUS CITEC to Town Hall
18:30
VISIT TO THE COLLECTION AND DEPOSIT SYSTEMS
19:30
PILOT EXPERIENCES
SCHEDULETime to:-Talk to Marisa and Gema
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
SECOND ITERATIONVirtual Simulation in each country using a PC UCO with the aid of will be available at www.smotproject.eu in each PARTNER the next weeks.
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
FURTHER STEPS (After the end of July to Sfax Meeting)
Constructive project (Adaptation of the solutions) PARTNERS
• Dense documentation containing exhaustive engeneering and architectural
Specifications (Including updated functional specifications).- Executive briefing
- Descriptive memory
- Technical prescriptions
- Measurements and budget
- Plans
• The constructive project shall have to be certified by a competent authority in
terms of compliance of technical and constructive regulations.
MEETING CÓRDOBAMEETING CÓRDOBA
PILOT EXPERIENCES
FURTHER STEPS (After the end of July to Sfax Meeting)
Constructive project PARTNERS
PILOT EXPERIENCES
PILOT EXPERIENCES
Thank for your attention.
Any questions?