Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

11

Page 2: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Pillars of Ramco Group

The Ramco Cements Limited, Govindapuram Works Page 2

Shri P.R. RamasubrahmaneyaRajha

Chairman & Managing Director

Shri P.R. Venketrama RajaVice Chairman

Shri P.A.C.Ramasamy RajaFounder

Page 3: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Environment Management SystemIMS POLICYIMS POLICY

We, at The Ramco Cements Limited, Ariyalur, arecommitted to achieve customer satisfaction by:-

• Meeting the customer requirements throughconsistent quality.

• Preventing pollution and providing safe andhealthy environment

• People development• Technology upgradation• Continually improve the effectiveness of the IMS.

We shall strive to achieve these by:-1. Manufacturing quality products with suitable

packaging.2. Safe & on-time delivery to our customers.3. Optimizing resources and increasing profitability

to the organization, while providing value to ourstakeholders.

4. Providing safe and healthy environment to ouremployees, associates, visitors, neighbourhoodand customers.

5. Complying with applicable legal and otherrequirements.

6. Conservation of natural resources throughefficient operation; and utilization of alternatefuels, flyash and other industrial waste.

7. Enhancing the socio-economic standards of ourneighbours, through corporate socialresponsibility.

8. Periodic setting and reviewing of IMS objectives.

We shall make this policy available to the public, onrequest.The Ramco Cements Limited, Govindapuram Works Page 3

We, at The Ramco Cements Limited, Ariyalur, arecommitted to achieve customer satisfaction by:-

• Meeting the customer requirements throughconsistent quality.

• Preventing pollution and providing safe andhealthy environment

• People development• Technology upgradation• Continually improve the effectiveness of the IMS.

We shall strive to achieve these by:-1. Manufacturing quality products with suitable

packaging.2. Safe & on-time delivery to our customers.3. Optimizing resources and increasing profitability

to the organization, while providing value to ourstakeholders.

4. Providing safe and healthy environment to ouremployees, associates, visitors, neighbourhoodand customers.

5. Complying with applicable legal and otherrequirements.

6. Conservation of natural resources throughefficient operation; and utilization of alternatefuels, flyash and other industrial waste.

7. Enhancing the socio-economic standards of ourneighbours, through corporate socialresponsibility.

8. Periodic setting and reviewing of IMS objectives.

We shall make this policy available to the public, onrequest.

Page 4: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

ISO CertificationsIS/ISO 9001:2008 IS/ISO 14001:2004 IS 18001:2007

The Ramco Cements Limited, Govindapuram Works Page 4

Page 5: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Other Certifications

The Ramco Cements Limited, Govindapuram Works Page 5

Page 6: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Environment Projects 2015-16S.No Projects Cost (Rs. In

Lakhs)

1 Introduced automatic truck loading machine for loading cement bags 400

2 Replaced fibre glass bags with PTFE member bags which efficientlycontrols the dust.

300.71

3 Rainwater outlet channel work at rain water harvest pond andconstruction of additional storm water drain

37.15

4 Installed dry fog system for dust Suppression at the coal conveyors 32.00

The Ramco Cements Limited, Govindapuram Works

4 Installed dry fog system for dust Suppression at the coal conveyors 32.00

5 Erected bag filters at Raw Material Hopper top for both line 1 & 2 30

6 Installed bag filters at coal tunnel 25

7 Erected bag filter for coal transport conveyor 10

8 Erected bag filter for coal transport conveyor near Limestone StackerReclaimer

10

9 Limestone crusher line-2 venting line modification 2.50

10 5S certified unit along with OHC, School and Homes

11 E-approval system for our internal sanctions in order to save theconsumption of paper was implemented

Page 6

Page 7: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Air Pollution Control MeasuresRABHs Closed Conveyors

The Ramco Cements Limited, Govindapuram Works Page 7

CPP - ESPs Covered Shed

Page 8: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Covered Storage Infrastructure

India’s 1st AluminumDome

The Ramco Cements Limited, Govindapuram Works Page 8

Page 9: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Infrastructure FacilitySmall Road SweeperHeavy Duty Road Sweeper

The Ramco Cements Limited, Govindapuram Works Page 9

TPS Vacuum MachineWater Sprinkling Tanker

Page 10: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Housekeeping Visuals

The Ramco Cements Limited, Govindapuram Works Page 10

Page 11: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Afforestation inside the PlantLimestone Unloading Area Cement Silo

AreaPeriphery

Page 11

Conveyors Power Plant Western Side

Page 12: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Afforestation inside the QuarryReddipalayam Mines Reddipalayam Mines Periyanagalur Mines

Page 12

Kattupringium Mines Pudupalayam Mines Pudupalayam Mines

Page 13: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Green Belt Development

Number of Trees :-

Cement Plant – 77620

Reddipalayam Mines – 77500

Periyanagalur Mines – 45100

Kattupringium Mines – 23000

Pudupalayam Mines – 15000

Survival Rate – 90%

Page 13

Number of Trees :-

Cement Plant – 77620

Reddipalayam Mines – 77500

Periyanagalur Mines – 45100

Kattupringium Mines – 23000

Pudupalayam Mines – 15000

Survival Rate – 90%

Page 14: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Environmental Awards

YEAR GROUP PRIZE Category of Prize MINE

Awards and Accolades

The Ramco Cements Limited, Govindapuram Works Page 14

YEAR GROUP PRIZE Category of Prize MINE

2015-16 MINESENVIRONMENT

& MINERALCONSERVATIONWEEK AWARDS

Non -Conventio

nal

1st Waste Dump Management Pudupalyam North Limestone Mine

1st Water Pollution Control Pudupalyam North Limestone Mine

1st Publicity & Propaganda Pudupalyam North Limestone Mine

2nd Reclamation, Rehabilitation & Restoration Pudupalyam North Limestone Mine

2nd Air Pollution Control Reddipalayam Limestone Mine

1st Over All Performance Pudupalyam North Limestone Mine

Conventional

1st Water Pollution Control Periyanagalur Limestone Mine

1st Publicity & Propaganda Periyanagalur Limestone Mine

2nd Management of Sub Grade Mineral Periyanagalur Limestone Mine

2nd Over All Performance Periyanagalur Limestone Mine

Page 15: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

YEAR GROUP PRIZE Category of Prize MINE1st Face Working Condition & Face machinary Reddipalayam Limestone Mine

Awards and Accolades

The Ramco Cements Limited, Govindapuram Works Page 15

2015-16 MINESTAMILNADU

SAFETYWEEK AWARDS

Conventional

1st Face Working Condition & Face machinary Reddipalayam Limestone Mine

1st Ore Handling Plants & Workshop Facilities Periyanagalur Limestone Mine

1st Environmental and Pollution Control Periyanagalur Limestone Mine

1st Personnel Protective Equipments Reddipalayam Limestone Mine

1st Standard of Supervision Kattupiringium Limestone Mine

2nd Transport and Workshop Facilities Reddipalayam Limestone Mine

2nd Vocational Training & Training Centre Kattupiringium Limestone Mine

2nd Welfare Amenities & Medical Facilities Kattupiringium Limestone Mine

2nd Workers Participation in SafetyManagement Reddipalayam Limestone Mine

2nd Electrical Installations Periyanagalur Limestone Mine

2nd Over All Performance Reddipalayam Limestone Mine

Page 16: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

S. No Details Compliance

SPM

1 Kiln 1 & 2 Complied

2 Coal Mill 1 & 2 Complied

3 Cooler 1 & 2 Complied

Stacks

S. No Details Compliance

1 PM 2.5 & 10 Complied

2 SO2 & NOx Complied

Ambient Monitoring Station

Compliance of stack emissionstandards

The Ramco Cements Limited, Govindapuram Works Page 16

3 Cooler 1 & 2 Complied

4 Cement Mill 1 & 2 Complied

5 Power Plant (2 nos) Complied

SO2 & NOx

1 Kiln Complied

2 Power Plant Complied

S. No Details Compliance

1 pH Complied

2 TSS Complied

3 Temperature Complied

Effluent Monitoring

Page 17: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

17

Page 18: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Providing Rain Water Harvesting

Pond -1 Pond -2

Page 18

Pond -3 Pond -4

Page 19: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Water Conservation for VillagesDevelopment of Thurai Lake for the Villagers

Page 19

Page 20: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Cleaning & Desilting of feederchannel to Chetti Lake at Ariyalur

Page 20

Page 21: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Energy Management SystemEnergy Management SystemEnMS POLICYEnMS POLICY

We, at The Ramco Cements Limited, producingcement and generating captive power atGovindapuram Works, are committed to achieveexcellence in energy management practices in all ouractivities.We shall fulfil this commitment through: Close and continuous monitoring of energy

consumption at every point of use. Adoption of energy efficient technologies and

continual improvement in ourmanufacturing and support processes to reduceenergy consumption. Compliance with legal and other requirements

applicable to energy use, consumptionand efficiency. Setting objectives, targets and monitoring most

appropriate energy performanceIndicators and periodically reviewingenergy performance through audits andbenchmarking. Ensuring availability of information and resources

to achieve set objectives and targets. Creating awareness and imparting training at

various levels of management tofacilitate identification and implementation ofsound energy managementmethodologies. Considering energy performance improvements in

design and modification of our facilities,equipment,

systems and processes. Encouraging utilization of renewable energy and

utilising industrial waste whereverfeasible. Recognizing and rewarding innovative energy

conservation ideas & initiatives taken byour employees.

The Ramco Cements Limited, Govindapuram Works Page 21

We, at The Ramco Cements Limited, producingcement and generating captive power atGovindapuram Works, are committed to achieveexcellence in energy management practices in all ouractivities.We shall fulfil this commitment through: Close and continuous monitoring of energy

consumption at every point of use. Adoption of energy efficient technologies and

continual improvement in ourmanufacturing and support processes to reduceenergy consumption. Compliance with legal and other requirements

applicable to energy use, consumptionand efficiency. Setting objectives, targets and monitoring most

appropriate energy performanceIndicators and periodically reviewingenergy performance through audits andbenchmarking. Ensuring availability of information and resources

to achieve set objectives and targets. Creating awareness and imparting training at

various levels of management tofacilitate identification and implementation ofsound energy managementmethodologies. Considering energy performance improvements in

design and modification of our facilities,equipment,

systems and processes. Encouraging utilization of renewable energy and

utilising industrial waste whereverfeasible. Recognizing and rewarding innovative energy

conservation ideas & initiatives taken byour employees.

Page 22: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Road Map To Achieve Benchmark

Page 22

Page 23: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

S No Description Units 2014-15 2015-16

1 MTOE reduction MTOE 7690.5 10616.6

2 Kiln Thermal SEC kCal/kg cli 734 688

3 Specific Electrical Energy - clinkering kWh/T of clinker 54.97 52.92

4 Specific Electrical Energy – Grinding kWh/T of cement 31.49 30.41

Energy Performance

Page 23

4 Specific Electrical Energy – Grinding kWh/T of cement 31.49 30.41

5 CPP Heat rate kCal/kWh 3200 3443

6 CPP auxiliary consumption % 9.11 9.88

7 Thermal Substitution Rate % - 2.1

8 Clinker factor % 0.6 0.6

9 Blended cement *%) of total cement % 64.92 48.15

10 Specific CO2 emission Kg CO2/ kg cement 0.795 0.809

Page 24: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Energy Projects 2015-16

Sl.No. Title of Project Year

Estimated AnnualElectrical Savings

(kWh/year)

1 Cement mill-II with Finished Mode Operation 2015-16 1565586

2 Stopping Coal firing blowers by interconnecting coal firingPipeline 2015-16 356400

3 Speed reduction for Cement mill-II Unit Bag filters 2015-16 316800

Page 24

4 SPRS installation for Cement mill-II fan 2015-16 1980000

5 Belt Conveyor idle run hrs reduction by providing interlock 2015-16 99000

6 Airslide Blower Optimization in cement mill-II 2015-16 63360

7 Compressors Optimization by installing VFD to Reduce theUnloading Hrs 2015-16 522720

8 MFR Removed in the last 2 compartments to reduce Sp.Power Consumption of cooler fans 2015-16 175000

Total Savings 5078866

Page 25: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Out of our innovative projects done so far , We are happyto present some of our Projects in detail as listed bellow

Page 25

feed gate(air lock)

mill casing

waterinjection

dam ring

louvre ringnozzle of

material scraper

mill outlet duct

speed reducer withtable bearingand motor

clutch

grinding table

hot gas inlet

hydraulic cylinder

table liner

roller with tyreor segments

roller axlerocker arm

discharge flapseparator

tailings cone

separatorguide vanes

cage rotorseparator

product dischargemill exhaust

Page 26: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Stopping airslide blowers based on air to cloth ratio (1.75- 2.25m3/min m2) & interconnection of headers on trail basis.

Ensured pressure at air chamber around 600 mm wc on product side& 800 mm wc on intermediate side was maintained .

Same practice was followed on various sections & savings achievedby 40 kw – cost savings about Rs. 7.27 lakhs / year.

Project Description:

Benefits Achieved:

1. Airslide Blower Optimization

Page 26

Stopping airslide blowers based on air to cloth ratio (1.75- 2.25m3/min m2) & interconnection of headers on trail basis.

Ensured pressure at air chamber around 600 mm wc on product side& 800 mm wc on intermediate side was maintained .

Same practice was followed on various sections & savings achievedby 40 kw – cost savings about Rs. 7.27 lakhs / year.

Stand By

CLOSEOPENO

N

ON

OFF

OFF

OFF

Page 27: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

2. Rocker Arm Seal Modification

The original seal for Rocker arm (Belt Covered) was frequently gettingdamaged, which leads to false air entryThe belt covered seal is replaced with graphite rope sealReduction of false air Across the Mill is reduced by 5% to 7%

Tangible benefit – 50 Kw Savings in Mill Fan Power & Cost Savings9.75 Lacs/AnnumIntangible benefit – Arresting the Leakage in the Running itself &

Ensure it by Observing the Sound.

Project Description:

Benefits Achieved:

Page 27

The original seal for Rocker arm (Belt Covered) was frequently gettingdamaged, which leads to false air entryThe belt covered seal is replaced with graphite rope sealReduction of false air Across the Mill is reduced by 5% to 7%

Tangible benefit – 50 Kw Savings in Mill Fan Power & Cost Savings9.75 Lacs/AnnumIntangible benefit – Arresting the Leakage in the Running itself &

Ensure it by Observing the Sound.

Original Seal with Belt. Modified Graphite Rope Sealwith adjustable bolts.

BEFORE: AFTER:

Page 28: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Tangible benefit – ElectricalSavings Upto 4 kwh/T of Cement– No budgetary cost for grindingmedia.

Intangible benefit – Since the ballmill has been stopped there is nomaintenance required for the ballmill section.

Project Description: We have Roller Press with

Ball mill Combi-GrindingCircuit for Clinker Grindingin original.

We have taken a trial onrunning OPC withFinished mode i.e. we runonly roller press circuitand ball mill not inoperation. In finishedmode, the Sp. Power iscomparatively lower thanthe Combi-mode grindingbut the Output Rate isLess than the Combimode Grinding.

3. Finished Mode Grindingin Cement Mill - II

Page 28

Tangible benefit – ElectricalSavings Upto 4 kwh/T of Cement– No budgetary cost for grindingmedia.

Intangible benefit – Since the ballmill has been stopped there is nomaintenance required for the ballmill section.

We have Roller Press withBall mill Combi-GrindingCircuit for Clinker Grindingin original.

We have taken a trial onrunning OPC withFinished mode i.e. we runonly roller press circuitand ball mill not inoperation. In finishedmode, the Sp. Power iscomparatively lower thanthe Combi-mode grindingbut the Output Rate isLess than the Combimode Grinding.

Page 29: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Thermal Specific Energy Consumption

650

660

670

680

690

700

710

720

2012-13 2013-14 2014-15 2015-16

694

710714

688

Kca

l / K

g C

linke

r

Reduced By 4% compared toprevious year

Page 29

650

660

670

680

690

700

710

720

2012-13 2013-14 2014-15 2015-16

694

710714

688

Kca

l / K

g C

linke

r

Page 30: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Electrical Specific Energy Consumption

72

73

74

75

76

77

78

79

80

81

2012-13 2013-14 2014-15 2015-16

80.6380.74

75.9575.18

Kw

h / M

T o

f C

emen

t

0

25

50

75

100

2014-15 2015-16

3551

OPC SHARE (%)

%

Page 30

72

73

74

75

76

77

78

79

80

81

2012-13 2013-14 2014-15 2015-16

80.6380.74

75.9575.18

Kw

h / M

T o

f C

emen

t

Inspite of increase in OPC production there is reduction in power

Page 31: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Electrical Specific Energy Consumption

96.15 90.66 88.582.44

72.25 76.61 73.88 72.09

0

35

70

2012-13 2013-14 2014-15 2015-16

OPC PPC

Kw

h / M

T o

f Cem

ent

Reduction of 6.8% in OPC Reduction of 2.4% in PPC

Page 31

96.15 90.66 88.582.44

72.25 76.61 73.88 72.09

0

35

70

2012-13 2013-14 2014-15 2015-16

OPC PPC

Kw

h / M

T o

f Cem

ent

Page 32: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Emergency PreparednessFire Hydrant System has been installed in the plant withrings around all blocks to achieve maximum coverage.Following are the details of the system.Water Reservoir- 7.5 lacks m3 for plant and 13 lacksliters for TPPDesign Code-TAC”s Fire Protection Manual.Total no. of Fire Hydrant including landingValves, Watermonitor-158 Nos.Automatic Operation-Jockey pump of 25.1 m3/hrs at88 M head capacity with pressure switches for plant and11800 liters/hr @ 91M head capacity with pressureswitches for TPP.Standby arrangement -Jockey pump of 25.1 m3/hrs at88 M head capacity with pressure switches for plant and11800 liters/hr @ 91M head capacity with pressureswitches for TPP.Standby arrangement-Diesel Generator with AMFcontrol panel for plant and for TPPTwo Electric Driven main pump - 88 M head 200 3/hour-for Plant and One Electric driven main pump -88 M head273000 liters / hr for TPPAuto changeover switch operated DG set Systemensures that the hydrant pump is kept working

OHC

Fire Tender

Page 32

Fire Hydrant System has been installed in the plant withrings around all blocks to achieve maximum coverage.Following are the details of the system.Water Reservoir- 7.5 lacks m3 for plant and 13 lacksliters for TPPDesign Code-TAC”s Fire Protection Manual.Total no. of Fire Hydrant including landingValves, Watermonitor-158 Nos.Automatic Operation-Jockey pump of 25.1 m3/hrs at88 M head capacity with pressure switches for plant and11800 liters/hr @ 91M head capacity with pressureswitches for TPP.Standby arrangement -Jockey pump of 25.1 m3/hrs at88 M head capacity with pressure switches for plant and11800 liters/hr @ 91M head capacity with pressureswitches for TPP.Standby arrangement-Diesel Generator with AMFcontrol panel for plant and for TPPTwo Electric Driven main pump - 88 M head 200 3/hour-for Plant and One Electric driven main pump -88 M head273000 liters / hr for TPPAuto changeover switch operated DG set Systemensures that the hydrant pump is kept working

Ambulance

Page 33: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Safety MeasuresSafety Room

Page 33

Environment Laboratory Safety Mock Drills

Visitors and new employees are trained in this room before entering the plant

Page 34: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Safety ActivitiesS.No

Audits 2014-15 2015-16

1 InternalNo ofObservation

343 366

Compliance % 100% 100%Variance Nil Nil

2 External Nil Cholamandalam MS riskNo ofObservation

Nil 80

Compliance % Nil 81 %Variance Nil 19%

Safety Audits Safety Job Analysis

Standard Operating Procedure

Page 34

Variance Nil 19%Standard Operating ProcedureAccident Investigation Report

Page 35: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Productivity Best Practices

S.No. Parameters UoM Values1 Capacity Utilization % 55.6 %

2

Conservation of Raw Materials & Fuels % Alternative raw material used % Alternative fuel used Amount of Waste Heat recovery power generated

%TPP Coal Ash 0.16 % on

Raw meal

3Approach to the Implementation of Best PracticesIf Yes, Please Specify.

Y/N Y

Page 35

3Approach to the Implementation of Best PracticesIf Yes, Please Specify.

Y/N Y

4DC in PAT CycleIf Yes , Specific Energy Consumption(Target & Achievement)

Y/N

TOE/T ofProduct

Target – 77.08/KWH/TAchieved -

78.09/KWH/T

5

Do you have RPO obligationIf Yes, Specify the obligation and measures taken to fulfill(Certificates procured or renewable energy used bypurchase or by self generation)

Y/N N

6 Blended Cement Produced out of total production % 65 %

7Low grade/sub grade limestone used out of the totallimestone consumption

% 26.82 %

Page 36: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Productivity Best PracticesS.No. Parameters UoM Values

8

% of Synthetic gypsum used out of totalgypsum.% of Flyash used in cement.% of slag used in cement

%Gypsum 4.96 %Fly Ash 24.87 %

9 Spares Consumption Rs/T of ProductSpares Upto Clinker 53/T

And Cement 23 /T

10Man Power Utilization(Permanent & Contract)

T of Product/ManPower

399626 Mandays

Page 36

10Man Power Utilization(Permanent & Contract)

T of Product/ManPower

399626 Mandays

11Compliances with Environmental Norms(Dust, SOx & NOx Emission)

mg/Nm3Dust < 30 mg/Nm3SOx < 100 mg/Nm3NOx < 800 mg/Nm3

12 Industrial Relations Issues, Please Specify -- None

13Management System Implementation, Pleasespecify the name of System (ISO/IS/IMS Systemsetc)

NosIS/ISO 9001:2008

IS/ISO 14001:2004IS 18001: 2007

14Maintenance Practice(Preventive/Proactive/Condition Monitoring)

--We have a maintenance

module system (MMS) forMaintenance practice

Page 37: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Alternate Feeding System

Page 37

Page 38: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Utilization Of Waste As Fuel &Renewable Energy

S.No

Type of WasteFuel used

Waste fuel as% of total

energy1 Pet coke reject 2.092 DNTB Reside 0.39

Alternate Fuel system

was installed at Line-1 for

feeding the Material at

Pre-Calciner.

We have Wind-Mill with

the capacity Of 160 MW

Page 38

2 DNTB Reside 0.393 saw dust 0.184 cashew shell 11.545 fire wood 0.106 coco shell 0.367 coke dust 0.448 Tyre Oil 0.03

Alternate Fuel system

was installed at Line-1 for

feeding the Material at

Pre-Calciner.

We have Wind-Mill with

the capacity Of 160 MW

Page 39: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Green Gas – (Bio Gas)Capacity – 400 kg/day

39

Page 40: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Reduce Environmental Impact duringQuarrying

More than 80% of captive mines operationsare carried out by non-conventional methodof mining (To eliminate the impact of Drillingand Blasting, we use Xcentric Ripper andRipper Dozers).

Over Burden rejects are being dumpedwithin the lease area to avoid the additionalland degradation. After exhausting themineral, over burden dumps are used torefill the mine pits.

Page 40

Where Blasting is practicedonly Bottom hole initiationsystem is being practiced.

Over Burden rejects are being dumpedwithin the lease area to avoid the additionalland degradation. After exhausting themineral, over burden dumps are used torefill the mine pits.

Water collected during mining isstored in settling pond to rechargethe ground. This water is alsopumped to lakes in nearbyvillages.

Page 41: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Pudupalayam North Mines – Only Mines inTamil Nadu with 5 Star Rating awarded by

Ministry of Mines Out 21 awardees

Page 41

A ‘Star Rating’ awarded to the mining leases for their efforts and initiativestaken for implementation of the Sustainable Development Framework (SDF)

Page 42: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Mining Details

S.No Particulars Details

1 Name of the Mining Lease / ML No.Pudupalayam North Limestone Mine,G.O.4 (D) No.1 Industries (MMA2)Department Dated: 02.01.2007.

2 Mine code (for ML) IBM 638/38TMN38010

3IBM Registration Number (under rule 45 ofMCDR, 1988)

IBM/638/2011

4 Mineral(s) Limestone

Page 42

4 Mineral(s) Limestone

5

Total Lease Area (ha)Break up of area:(i) Private Land (ha)(ii) Revenue land (ha) (Govt. Land)

26.07.5 Ha

Pudupalayam – 16.10.5 Ha

Periyanagalur – 9.91.5 Ha

Pudupalayam – 0.05.5 Ha

6 Lease period (valid up to) 20 Years (24.03.2009 to 23.03.2029)

7Resources as on 01.04.2015 (beginning of theyear under report)

12.83 Million Tons

8 Method of Mining(Opencast/ Underground) Opencast

Page 43: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Sustainable Development Unit

S.No Head Person In charge Designation1. Committee head Sri.N.R.Ramanathan Mines Agent/Vice President

(Manufacturing)

A Mine level Team, Comprising heads in Technical, Financial, CSR, HRDand Environment head has been formed for Constitution of SDU(Sustainable Development Unit).

Page 43

1. Committee head Sri.N.R.Ramanathan Mines Agent/Vice President(Manufacturing)

2. Technical Sri. G.R.MageshSri. I. Lakshmi Narayanan

Dy.General Manager(Mines)Manager - Mines

3. Financial Sri. K. Nadimuthu DGM(Accounts)

4. CSR Sri. K. Nagendaran AGM(Mines)

5. HRD Sri. C. Manoharan Officer - HR

6. Environment Sri. L. Bobby Pravin Manager- ManagementServices

Page 44: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Lease Area Utilisation

S.No Type of land use (inha)

As perapproved

Mining plan

Area utilisationat the beginning

of RY

Additional areaoperated during

the year

Cumulativeat the end of

RY

1 Mining 15.81.0 8.96.0 0.84.0 9.80.0

2 OB/waste dump - 3.71.0 0.60.0 4.31.0

Page 44

2 OB/waste dump - 3.71.0 0.60.0 4.31.0

3 Top soil preservation - 0.80.0 - 0.80.0

4 Area reclaimed 6.51.5 5.20.0 0.57.0 5.77.0

5 Others (Greenbelt) 2.50.0 4.49.5 - 4.49.5

Page 45: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Statutory Compliances

S.No Details Status

1Date of Approval ofMining Plan/ Valid upto/valid Quantity

Mining Plan - TN/PBR/MP/ LST -1653-SZ Dt: 07.08.2006, Validity – 01.04.2009 to31.03.2014.Quantity Approved - 0.5 MTPA.

Modified Mining Plan - TN/PBR/MP/LST/1653 – SZ Dt:11.08.2011, Validity –11.08.2011 to 31.03.2014.Quantity Approved- 1.5 MTPA.

TN/ALR/LST/MS – 1048 MDS Dt:09.04.2014, Validity 01.04.2014 to 31.03.2019

Quantity Approved- 0.70 MTPA

SPCB Approvals(i)Consent to Establish(ii)Consent to Operate

4106 (Air) & 4162 (Water) Dated: 02/11/2007 (0.5 MTPA)

T9/ TNPCB/ F.0131ARY/ RM/ ARY/ W/ 2015, dt 29.12.2015

T9/ TNPCB/ F.0131ARY/ RM/ ARY/ A/ 2015, dt 29.12.2015

Validity : 30.09.2016 (Applied for Renewal)

Page 45

2.SPCB Approvals(i)Consent to Establish(ii)Consent to Operate

4106 (Air) & 4162 (Water) Dated: 02/11/2007 (0.5 MTPA)

T9/ TNPCB/ F.0131ARY/ RM/ ARY/ W/ 2015, dt 29.12.2015

T9/ TNPCB/ F.0131ARY/ RM/ ARY/ A/ 2015, dt 29.12.2015

Validity : 30.09.2016 (Applied for Renewal)

3.Forest Clearance, LetterNo. and details

Not Applicable

4 Violations pointed out byIBM

1. We propose to engage a consultant Auroville Botanical Services fromPondicherry for planting fruit bearing trees on the Backfilled Area.

2. We have collected the Overburden samples and forwarded to our RamcoResearch Development Centre, located at Chennai for the study

alternate use of Overburden.

5Violations pointed out byDMG, DGMS, MoEFCC& CPCB/SCPB.

Nil

Page 46: Pillars of Ramco Groupqcfihyderabad.com/cc2016/tech-presentations... · Pillars of Ramco Group The Ramco Cements Limited, Govindapuram Works Page 2 Shri P.R. Ramasubrahmaneya Rajha

Thank You

Page 46