2.9MW biomass boiler, design and build
Citation preview
Information Technology Solutions
BESPOKE DESIGN
Each installation is
designed to meet specific client
requirements with full computer
simulation used to prove all
designs.
ENERGY EFFICIENCY
As approved Carbon Trust
Consultants, we will ensure that
the system energy performance is
optimised to produce lower
operational costs.
PROJECT CDM AND
MANAGE MENT
Our engineers and consultants will
ensure that all aspects of the
design and installation are fully
compliant and all relevant
permissions and safety
requirements are fully adhered to.
MCS ACCREDITED
ESP is an accredited installer,
approved under the Government’s
Micro-generation Certification
Scheme.
CARBON TRUST
ESP are approved Carbon Trust
Energy and Biomass Consultants.
The Engineering Support Partnership Ltd, 13 Quay Level, St Peters Basin, Newcastle upon Tyne, NE6 1TZ. Tel: 0845 519 5912 www.espprojects.com
CASE STUDY PILGRIMS HOSPITAL – 2.9MW BIOMASS STEAM BOILER DESIGN AND BUILD
A 2.9MW steam-raising woodchip boiler was installed at Pilgrims Hospital in Lincolnshire. Firing on woodchip, which is stored in newly constructed storage sheds, the boiler meets the heating and hot water requirements of the main hospital building. Working on a sub-contract agreement, ESP undertook design work associated with the steam and condensate installation, as well providing consultancy support on boiler specification. ESP ’ s steam specialist, Derek Short, advised the client on performance and statutory compliance issues whilst also overseeing elements of the steam and condensate fabrication. Woodchip boilers can deliver substantial cost savings, as well as reducing carbon emissions by around 90% compared to natural gas heating. It is estimated that carbon emissions at Pilgrims Hospital have been reduced by around 50% since the commissioning of the biomass system.
• Part design, install and project management
• 2.9MW steam-raising woodchip boiler serving main hospital heating and hot water systems
• Purpose-built woodchip storage sheds
• Estimated reduction in hospital's carbon emissions of around 50%, a saving of 5,700 tonnes per annum