1CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Lecture 2Lecture 2
Pile capacity
Associate Professor C F LeungDepartment of Civil Engineering, NUSE-mail : [email protected]
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Load Transfer Mechanism
1
2
33 1. Structural load (e.g. column)2. Pile cap
3. Pile (material)
4. Soil (geotechnical)
4
2CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.1 Structural Capacity(allowable material stress)
Bored Cast In-Situ PilesQa = 0.2 fcu A or 0.25 fcu A
(depending on specifications and limited to Grade 35 concrete for design)
Precast Reinforced Concrete PilesQa = 0.25 fcu A
Prestressed Concrete Spun Piles:Qa = 0.25 (fcu - prestress after losses) A
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Steel PilesQa = 0.3 fy A (driven piles)Qa = 0.5 fy A (jacked-in piles)
Timber PilesQa = 0.25 fc A
where Qa = allowable working loadA = cross-sectional area of pilefcu = concrete strength fy = yield stress of steel
(Grade 43A: 275 N/mm2; Grade 50A: 355 N/mm2)fc = compressive strength of timber
3CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Partially embedded piles (e.g. piles for jetties)
For the portion of pile above ground, it should be designed as column in accordance with BS8110 which recommends the following effective length and fixity:
In firm ground, the lower point of contraflexure is taken at 1 m below the ground surface. In soft soils, the point may be taken as one-half of the depth of penetration into the stratum or 3 m, whichever is lower.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.2 Reinforcement
Pile subject to axial loading only
0.5% nominal reinforcement for the first 6 m of pile (first 12 m is preferred in some cases).
[Appropriate reinforcement needs to be provided to resist the bending moment for piles subject to lateral loads, eccentric loads, uplift or tension loads.]
4CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Pile Cap Appropriate depth of pile cap over piles
- transmission of vertical load- to resist high shear forces and to avoid punching shear
Adequately reinforced against - bending due to eccentric loading- high stress induced by differential settlement between piles
Adequate attachment of pile head to pile cap - transmission of lateral loads
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Pile Cap (cont.)
Method of attachment
- Square top, treated with preservative and embedded in concrete pile cap.
Timber pile
- Adequate length of pile embedment, otherwise fitted with cleats
Steel Pile- Project into cap for bondingRC pile
MethodType of pile
Refer to BS8110 and see also Tomlinson
5CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.3 Geotechnical capacity
Ultimate bearing capacity of pile (Qu):Qu = Qs + Qb
where Qs = shaft capacity = (fsi Asi)Qb = end bearing capacity = qb Abfsi = unit shaft resistance for soil layer iAsi = total shaft area of pile in soil layer iqb = unit base resistanceAb = base area of pile
Load
Pile base, Qb
Pile shaft Qs
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Geotechnical capacity (cont.)Allowable working load
All pile types: Qa = Qu/Fwhere F = overall factor of safety (usually 2 to 3)
Alternative for bored piles: Qa = Qs/Fs + Qb/Fbwhere Fs = factor of safety for shaft (usually 1.5)
Fb = factor of safety for pile toe (usually 3)
6CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.4 Cohesive soils (clay) Unit base resistance
qb = Nc cbwhere Nc = bearing capacity factor (= 9) ;
may be conservative for local soilscb = undrained cohesion of clay at pile base
Unit shaft friction (total stress approach)fs = cu
where cu = undrained shear strength = adhesion factor (generally correlated with cu)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Limiting fs value for clayfs < 100kPa (or 200kPa to be confirmed by load test)
Driven piles: from the work of Tomlinson (1986) [refer to Fig. 2.1]
Bored piles: = 0.3 to 0.6 (overconsolidated clays) = 0.8 to 1.0 (normally consolidated clays) = 0.45 (if no previous data available)
7CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.1 Values of adhesion factor (after Tomlinson)
Piles driven through overlying or sandy gravels
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.1 (cont.)
Pile driven through overlying weak clay
Piles without different overlying strata
8CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Cohesive soils (cont.) Unit shaft friction (effective stress approach)
Burland proposed that fs = v
where = dimensionless parameter depending on soil type= OCR (1 sin ) tan
= drained friction angle of clay,OCR = overconsolidation ratio of clay
(= 1 for normally consolidated clay)(>> 1 for heavily overconsolidated clay)
and v = average effective vertical stress for given pile segment
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Cohesive soils (cont.) Preliminary design --
take = 0.3 for soft clay and = 0.8 for stiff clay
For long piles with pile length / width ratio ( L/B) >15, a reduction factor of ( 1 log L/15B) may be applied to .
v at a given elevation is the effective overburden pressure at thegiven elevation
= (Hi i)where Hi = thickness of soil layer i and
i = effective unit weight of soil layer i = i - w(w = unit weight of water; use full for soils above water table)
9CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.5 Cohesionless soils (Sand)
Unit base resistanceqb = Nq b
where Nq = bearing capacity factor for sand, see Fig. 2.2and subjected to limiting value of(a) Driven piles, see Fig. 2.3(b) Bored piles : 2 to 11 MPa
b = Effective overburden pressure at pile base
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.2
10
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.3 Limiting static cone resistance versus for sand (Meyerhof 1976)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Unit shaft friction (sand)
fs = Ks v tan (limiting value 100 kPa; higher value to be verified by load tests)
Values of Ks tan Sand Driven piles Bored pilesLoose ( < 33o) 0.8 0.3Medium (33o < < 38o) 1.0 0.5Dense ( > 38o) 1.5 0.8
11
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.6 Design based on in-situ tests
(a)Standard penetration resistance N value (blow count) Clay -- Use cu = 5N (for conservative design) Sand Use Fig. 1.3 to determine or
Bored piles:fs = 2N (local data)fs = 13 N (Db/d) kPa (Meyerhof)Driven pilesfs = 3N (local data)qb = 40 N (Db/d) kPa (Meyerhof)where Db is the pile penetration in bearing stratum (stiff soil) & d is pile diameter.[Need to verify limit values for qb as before]
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
SPTFor clay,Undrained apparent
cohesion (kPa)cu = 5N to 6N
Friction angle,
Fig. 1.3 Relationship between N value and (for sand)
Sand
12
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Design based on in-situ tests (cont.)(b) Cone penetration test
Use Fig. 1.1 to determine for sand orQ = 2Cs As + qcb Ab
where qcb = cone resistance at base of pile,Cs = average shaft friction along pile
as measured on friction jacket= 0.005 qc for driven concrete and timber piles= 0.0025 qc for driven steel H-piles,
and qc = cone resistance at given elevation.
(c) Pressuremeter TestRefer to Lecture 1 for the determination of soil
parameters from pressuremeter test results.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Friction angle, Fig. 1.1 Correlation between static cone resistance qcand friction angle of sand
13
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.1 : Piles in clay
Given: Working column load = 6000 kN
Soil condition
Determine the number of piles and penetration required to support the column.
500100Hard silty clay25 - 3510020Stiff silty clay5 255010Firm silty clay0 -5
Av. cu (kPa)Av. N valueSoilDepth (m)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Solution
(A) Try precast RC pilefcu = 40 N/mm2 , X-section 320 mm x 320 mm, Desired factor of safety, F = 2.5
(1) Structural material strengthQa = allowable load = 0.25 fcu Ap
= 0.25 x 40 x 0.322 x 103 kN= 1024 kN
6 number of piles required for working load of 6000kNWorking load on each pile = 1000 kN
14
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(2) Geotechnical considerationsTry penetration depth of 25m (Consider Why?!)(a) Total stress () approachBase resistance at 25 m (cu = 500 kPa & Nc = 9), Qb = 9 x 0.32 x 0.32 x 500 = 460 kN (conservative)
Qs = 320 + 2176 = 2496 kN see next slideThis is a friction pile with most resistance from the shaft!Qa = Q/F = (2496 + 460)/ 2.5 = 1182 kN > 1000 kN Okay!!
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2176850.851005 -25 m
320501.0500 5 m
Shaft friction, Qs (kN)
Unit shaft friction,fs (kPa)
Fig. 2.1
cu(kPa)
Shaft friction
Calculation of shaft friction
15
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(b) Effective stress () approachAssume water table is at ground level for the worst scenario (one can use the actual water table elevation for a less conservative design)
Firm silty clay (0 to 5 m)Assume effective unit weight, = w = 9 kN/m3
Overconsolidation ratio OCR = 3Friction angle = 27 = OCR ( 1 sin ) tan = 0.482
At 0 m , v (effective overburden) = 0At 5 m, v = 9 x 5 = 45 kPa
(v)av = 22.5 kPa
Tests should be carried out to determine these values
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
fs = (v )av = 0.482 x 22.5 = 10.84 kPawhich is lower than 50 kPa for the approach. This is due to the small v values.
Qs = 10.84 x 0.32 x 4 x 5 = 69.4 kN
Stiff silty clay (5 to 25 m)Assume = 10.5 kN/m3 , OCR = 5, = 29
= OCR ( 1 sin ) tan = 0.639A reduction factor may need to be applied for long pile, see lecture note.
At 25 m , v = 45 + 10.5 x (25-5) = 255 kPa(v)av = (45 + 255)/2 = 150 kPa
16
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
fs = 0.639 x 150 = 96 kPaQs = 96 x 0.32 x 4 x (25-5) = 2454 kN
This value may be lower if one has applied a reduction factor to for long piles.
Base resistance is the same as before. Qa can hence be determined using the same procedure described earlier.
Notes: Qa will increase (or verse versa) considerably for method if
(i) water table is lower (ii) is higher
Both imply higher v
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(B) Try bored pilefcu = 25 N/mm2 , Diameter = 0.8 m,
(1) Structural material strengthQa = 0.25 fcu Ap
= 0.25 x 25 x x 0.42 x 103 kN= 3142 kN
2 number of 800-mm diameter bored piles are required for working load of 6000 kN
Working load on each pile = 3000 kN
17
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(2) Geotechnical considerationsFor a desired factor of safety of 2.5,Ultimate load = 2.5 x 3000 kN = 7500 kN
Base resistance = Nc cb Ab = 9 x 500 x x 0.42 kN= 2262 kN
Shaft resistance from 0 to 5 m = cu As = 0.45 x 50 x x 0.8 x 5= 283 kN
Shaft resistance from 5 to 25 m = 0.45 x 100 x x 0.8 x 20= 2262 kN
For bored piles, one can try to achieve an optimum design by penetrating deeper to arrive at the same geotechnical and structural capacities.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Shaft resistance required from below 25 m= 7500 2262 283 2262 = 2693 kNUnit shaft friction fs for hard silty clay = cu = 0.45 x 500
= 225 kPa
A maximum fs = 200 kPa may be used but such value needs to be confirmed by pile load test. Say use fs = 200 kPa
Contact length required = 2693 kN / (200 kPa x x 0.8 m)= 5.357 5.4 m
Total penetration required = 25 + 5.4 m = 30.4 m (say 31 m)
Poser: Why bored piles is usually lower than driven pile?
18
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.2 : Piles in sand (from Tomlinson)
An isolated 350 mm x 350 mm reinforced concrete pile (fcu = 35) in a jetty structure is required to carry a maximum compression load of 400 kN and a net uplift load of 320 kN. The soil consists of a loose to medium-dense saturated fine sand (average N = 12) extending to a depth of 9 m below sea bed followed by dense sand and gravel (average N = 40). Determine the required depth of penetration of the pile to resist the compression load. No erosion is expected.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Solution
Seabed to 9 m (N = 12) = 31 from Fig. 1.3; = 7.36 kN/m3 (estimated)Ks tan = 0.8 for driven piles(v)av = [ 0 + 7.36 x 9] / 2 = 33.1 kPaShaft friction = 0.8 x 33.1 x 4 x 0.35 x 9 = 334 kN
Try penetration of 4 m into dense sand and gravel N = 40 = 38.5o Ks tan = 1.5 (Fig. 1.3 & table) = 11.77 kN/m3 (estimated)(v)av = [ 7.36 x 9] + [ 11.77 x 4] /2 = 89.74 kPaUnit shaft friction = Ks tan (v)av > 100 kPa (use limiting value 100 kPa)
Shaft friction = 100 x 4 x 0.35 x 4 = 560 kN
19
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Base resistance For = 38.5o, Fig. 2.2 gives Nq = 120b = 7.36 x 9 + 11.77 x 4 = 113.2 kPa
Unit base resistance = b Nq = 113.2 x 120 = 13.6 MPaFig. 2.3 gives limiting qc = 15 MPa and thus use 13.6 MPaBase resistance = 13.6 x 0.352 = 1.666 MN = 1666 kNTotal geotechnical capacity = 334 + 560 + 1666 = 2560 kN
F = 2560/400 = 6.4 >> 2.5
This indicates that the pile penetration may be reduced from geotechnical capacity viewpoint. You are encouraged to tryshorter pile penetrations until you reach F = 2.5.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Based on loading, select pile type and material.
Work out number of piles and cross-sectional area of pile required based on allowable material stress (structural capacity).
Determine pile penetration required based on geotechnical considerations. If geotechnical capacity is a problem, (a) increase the number of piles for driven piles, or (b) increase the penetration depth for bored piles such that structural capacity = geotechnical capacity.
Pile selection and design
20
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.7 Pile Driving Formula Monitoring of pile penetration for every 10 hammer blows.
Each hammer blow causes (i) permanent pile penetration (set) and (ii) temporary pile penetration during pile driving, see Fig. 2.4 (a). Typical record of blow counts for pile penetration with depth is shown in Fig. 2.4 (b). Pile is deemed to be driven to set (refusal) if the set is < 2 mm per blow or 20 mm per 10 blows.
Estimated required set can be determined using Hiley formula (1925).
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.4(a)
10 hammer blowsPermanent set10 mm for 10 blows
TemporaryCompression (T/C)
HydraulicHammer1.10 m drop
21
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.4(b)
Soft soilEasy pile penetration
Stiff soilDifficult pile penetration
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Hiley formula (1925)Assume Energy in = Work + Impact loss + losses in (driving assemble + pile + soil) The ultimate pile capacity Qu is given as
where ef = hammer efficiency (Table 2.1)W = hammer weightH = hammer drop heightn = coefficient of restitution (Table 2.2)Wp= weight of pileS = set (pile penetration in mm/hammer blow)
C1, C2, C3 = temporary compression due to pile head and cap, pile and soil compression, respectively (Table 2.3)
22
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Pile driving assembly
Hammer Energy = weight x drop height
Cushion and helmet
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Table 2.1 Values of Hammer Efficiency, ef, (from Chellis 1969)
23
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Table 2.2 Values of Coefficient of Restitution, n, (after Whitaker 1970)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Table 2.3 Values of C1, C2, C3 for Hiley Formula (after Chellis 1961)
24
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(1) Limitations of Hiley and other pile driving formula {Important!!}
(2) Although Qu can be determined by trial and error using Hiley formula. Pile capacity Qu so obtained needs to be re-checked based on geotechnical capacity for the given pile penetration.
(3) The use of actual measured temporary compression at a given site may be used to recalculate the required set.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.3 Pile Driving Formula
Precast RC pile 320 mm x 320 mmQa = Working Load = 1000kNTry Kobe K 35 diesel hammer W = 3500 kg 35 kNDrop height H = 3 mF >> 3 preferred Pile capacity Q = 3000 kN
where ef = 1 (Table 2.1) n = 0.4 (Table 2.2)Wp = conc x Ap x length
= 25 kN/m3 x 0.322 m2 x 27 m = 69.1 kN
As example 2.1
Depending on helmet
L = 25 m in Example 2.1. Add 2 m for driving
25
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
C1 = 0.05 in = 1.27 mm (Table 2.3 for medium driving)
C2 = QL / AEp = (3000 x 27) / (0.322 x 32 x 106 )= 0.0247 m = 24.7 mm [This is the major component!]
C3 = 0.1 in = 2.54 mm
Temporary compression C = C1 + C2 + C3 = 28.51 mm
After calculation, set s = 1.23 mm for last blow.or 12.3 mm for last 10 blows
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.8 Pile groupsFailure mechanism Capacity of pile group may not be equal to the sum of capacities of individual piles. The ratio of the two capacity is termed the efficiency of a pile group. Pressure bulbs of neighbouring piles tend to overlap, creating greater stress concentration on the surrounding soil. This leads to greater settlement of the pile group and is termed as group interaction. Soil will fail in shear (local failure) or the pile group will settle excessively (block failure)
26
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
BS 8004 recommends that Friction piles -- pile centre to centre spacing > perimeter of square piles; or > 3 times pile diameter for circular piles End bearing piles -- distance between surface of shafts of adjacent piles > least width of the pile.
Local Failure Block Failure
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(1) Pile group in clay(a) Local failure
Capacity of pile group = QG = m n Qwhere = pile group efficiency (Fig. 2.5, after Whitaker),
=
(after Converse Labarre)m = number of rows of piles,n = number of piles in a row,d = diameter of piles,s = centre-to-centre spacing between piles = tan-1 (d/s), in degrees,
and Q = ultimate capacity of single pile.
27
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig. 2.5 Bearing capacity of pile group in cohesive soils
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(b) Block failureThe ultimate bearing capacity of the whole block
QG = cbNcBgLg + cu [ 2 D (Bg + Lg)]where D = depth of pile in bearing stratum
Bg = width of pile groupand Lg = length of pile group
Choose the lower QG from (a) local or (b) block failure for design.
28
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(2) Pile group in sand Pile driving compacts the sand to a radius of at least three times the pile width.
For loose sands, efficiency > 1 due to sand densification between piles.
For dense sand, pile driving causes loosening and efficiency less than 1 may result.
Block failure to be considered if centre-to-centre pile spacing < 7 pile diameters.
Capacity of pile group is the lesser of (a) sum of capacity of individual piles, and (b) load capacity of pile group block.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.4 Pile Group
Using the same data as Example 2.1. That is:Column load 6000 kN6 Precast RC piles 320 mm by 320 mm each of allowable working load of 1000 kN and ultimate geotechnical capacity Qu of 2956 kN are chosen and arranged in a pattern of n = 2 by m = 3 as shown above with pile centre-to-centre arbitrarily taken to be 0.72 m. The piles are assumed to rest on the very stiff soils at 25 m below ground surface.
29
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(a) Check against local failureEquivalent pile diameter d for the precast pile
= [(0.32 x 0.32)/] x 2 = 0.361 mPile centre-to-centre spacing is hence 2 pile diameters.
Refer to Fig. 2.5 -- If pile number is less than 9, use 3 x 3pile group lines as this would be conservative. If pile length isshorter than 24 pile diameters, use 24 diameter lines as this would also be conservative. If pile number is greater than 81, use 9 x 9 pile group lines as the pile group efficiency for larger pile groups does not decrease much. If pile length is longer than 48 diameters, use 48 diameter lines for similar reason.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
In the present case, pile number is 6 (48). Therefore use the 48 pile diameter 3x3 pile group line and
pile group efficiency = 0.7 for pile spacing of 2 diameters from Fig. 2.5
Pile group geotechnical capacity = m n Qu= 0.7 x 3 x 2 x 2956 kN = 12415 kN
Factor of safety against local failure = 12415/6000 > 2 OKAY
30
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(b) Check against block failureAssume failure as a single block comprising all 6 piles.
Length of block Lg (consisting of 3 piles) = 0.32/2 + 2 x 0.72 + 0.32/2 = 1.76 m
Width of block Bg (consisting of 2 piles)= 0.32/2 + 0.72 + 0.32/2 = 1.04 m
Geotechnical capacity of single block= block shaft resistance + block base resistance= cu[2D(Bg + Lg)] + cb Nc Bg Lg= 1 x 50 x 2 x 5 (1.04 + 1.76) + 0.85 x 100 x 2 x
(25 5) (1.04 + 1.76) + 500 x 9 x 1.04 x 1.76 = 1400 + 9520 + 8237 = 19157 kN (1st component may be ignored for crude estimation)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Note: For , cu, pile contact length for each soil layer, refer to Example 2.1
Factor of safety against block failure = 19157/6000 >> 2 OKAY
Posers: (1) Under what pile group configuration and soil conditions
that block failure would be a concern in pile design.(2) If the factor of safety of either local or block failure falls
below 2, suggest means to improve the situation!
31
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
2.9 Uplift Capacity
Piles may be required to resist uplift forces structure foundation subjected to large overturning moments.
Examples : tall chimneys, transmission towers, or jetty structure.
If uplift load is temporary (e.g. wind load) engineers may use a lower safety factor.
If uplift load is permanent higher safety factor is desired.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Fig 2.6 Lateral Load on Raked Piles
.
Lateral Load
Tension Compression
Lateral Load
Pile in Tension (Uplift)
Pile in Compression
32
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Single Pile Ultimate uplift resistance = pile weight + mobilized negative shaft resistance. Actual shaft resistance in uplift may be < resistance in compression uplift resistance = x calculated shaft resistance for downward loading (this can be a conservative estimation)
Best to design piles subjected to uplift loading by uplift testing Structural capacity should be checked to ensure sufficient reinforcement in concrete piles. Additional resistance through underreaming or enlarging pile base. In such case, uplift capacity produced by pile shaft can be ignored.
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Approximate approach to determine the uplift capacity of pile with underream (Meyerhof & Adams)
(1)Short term stability (soil parameter cu)
Uplift capacity of pile in clay is given by the lesser of(a) S x k + W
where S = Shear resistance of a vertical cylinder above the base,k = 1 to 1.25 for soft clays
0.7 for medium stiff clays0.5 for stiff clays0.25 for stiff fissured clays (low value due to
premature tension failure of clay) W = weight of soil and pile above the base.
33
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(b) The uplift capacity of the base plus W, i.e. Qu = (/ 4) (db2 d2) cu Nc + W
where db = diameter of underream,d = diameter of pile shaft,
and Nc = bearing capacity factor (as for downward load)
Underream diameter db
Pile shaft diameter d
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(2) Long term stability (Soil parameters c and )The ultimate uplift capacity is given by the lesser of (a) The sum of net base bearing capacity, side adhesion of shaft and pile weight. i.e.
Qu = (/4) (db2 d2) (c Nc + vb Nq) + As qs + Wwhere Nq = bearing capacity factor (as in downward loading), and
vb = effective vertical stress at level of pile base.
34
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(b) By assuming underream behave as an anchor, for shallow underream (pile length, L < db )
Qu = c db L + s (/2) db L2 Ku tan + Wfor L > limiting height of failure surface above base, H
Qu = c db H + s (/2) db (2L H) H Ku tan + Wwhere s = shape factor = 1 + mL/db
with a maximum value of 1+ mH/db , = soil unit weight (use for soil below water table),m = coefficient depending on (Table 2.4), andKu = earth pressure coefficient (approximately 0.9 to 0.95 for value between 25 and 40)
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Table 2.4 Factors for uplift analysis (from Meyerhof and Adams, 1968)
35
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Pile GroupUltimate uplift capacity of pile group is the lesser of(Meyerhof & Adams)
(1) Sum of uplift capacity of individual piles.(2) Uplift capacity of an equivalent pier foundation
consisting of piles and enclosed soil mass
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.2 (continued)
An isolated 350 mm x 350 mm reinforced concrete pile (fcu = 35) in a jetty structure is required to carry a net uplift load of 320 kN. Using the same soil properties and pile penetration depth, evaluate the factor of safety against uplift failure of the pile.
Taking the uplift resistance as half of the compressive shaft resistance (may be conservative) -- Qu = 0.5 (334 + 560) = 447 kNFactor of safety against uplift failure = 447/320 = 1.40This is not acceptable. (a) Either increase the number of piles to enhance uplift resistance, or (b) Further evaluate the uplift shaft resistance which may be more than half of the compressive resistance.
36
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
.
Slender Pile
Very soft soil
Stiff soil
Need to check buckling of Pile
Slender Column
Beam
Beam
2.10 Buckling of Piles
May be experienced by long and slender piles driven in soft soils
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
(a) Single piles (Whitaker)Minimum buckling load, Qcr = 2 (kEI)where k = coefficient of soil lateral reaction
= 67 cu (Davisson, 1970)E = modulus of elasticity of pile materialI = second moment of area of pile section
(b) Pile GroupIf piles are closely spaced, critical buckling load is reduced. The value of k can be arbitrarily reduced (Poulos & Davis) by 2 times for 2-pile group,
by 3 times for 3pile & 4pile groups, andby 4 times for 5 or more piles in a group.
37
CE5107 Pile foundation Lecture 2 : Pile capacityCE5107 Pile foundation Lecture 2 : Pile capacity
Example 2.5 Buckling of pile
Using the same data as Example 1, evaluate the buckling resistance of the pile.
Minimum buckling load, Qcr = 2 (kEI)Where k = 67 cu = 67 x 50 = 3350 kPa
Econc = 30 x 106 kPaI = 0.32 x 0.323/12 = 8.74 x 10-4 m4
Thus Qcr = 18742 kN which >> 1000 kN working load OKAY!
Take note that even if Qcr is smaller than the working load, the pile may not buckle but further checks are warranted, refer to Poulosand Davis for more details.