DRAWING INDEX PIPING & INSTRUMENT DIA Last Update : 10 April 2013 No. Discipline Drawing Title Rev. 1 L0601-00-04-001 Drawing Index 0 1 Nov.28.'12 2 L0601-00-04-002 Equipment Index 0 3 L0601-00-04-003 Legend & Symbols 0 4 L0601-00-04-004 Equipment Symbols Legend 0 5 L0601-00-04-005 Wash Oil Detail 0 6 L0601-00-04-006 Pump Seal Plan 0 1 Jan.13.'10 2 Feb.4.'10 7 L0601-00-04-007 Air Cooled Heat Exchangers & Analyzer Shelter Details 0 8 L0601-00-04-008A Sample Station I 0 9 L0601-00-04-008B Sample Station II 0 10 L0601-00-04-009 Traps, LG Drain, And Air Bottle 0 1 Jan.12.'10 2 Feb.2.'10 11 VDU L0601-VD-04-001 Feed Surge Drum 0 1 Jan.31.'11 2 Dec. 27.'11 3 Nov.28.'12 12 L0601-VD-04-002 Preheat Train (1) 0 13 L0601-VD-04-003 Preheat Train (2) 0 14 L0601-VD-04-004 Reboiler Heater 0 15 L0601-VD-04-004A Air Preheater 0 16 L0601-VD-04-004B Soot Blower 0 1 Feb.2.'10 17 L0601-VD-04-005 Vacuum Column 0 1 Dec.23.'11 18 L0601-VD-04-006 UCO Steam Generator 0 1 Dec.23.'11 19 L0601-VD-04-007 150 Distillate Stripper 0 0 1 Feb.2.'10 Drawing No. Date of Rev. AUX. for VDU

P&ID, PFD, Plot PLant List Drawing.xlsx

Embed Size (px)

Citation preview

P&IDDRAWING INDEX PIPING & INSTRUMENT DIAGRAM Last Update : 10 April 2013No.DisciplineDrawing No. Drawing TitleRev.Date of Rev.Issue For Rev.MOC No1AUX. for VDUL0601-00-04-001Drawing Index0As-Built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-0082L0601-00-04-002Equipment Index0As-Built3L0601-00-04-003Legend & Symbols0As-Built4L0601-00-04-004Equipment Symbols Legend0As-Built5L0601-00-04-005Wash Oil Detail0As-Built6L0601-00-04-006Pump Seal Plan0As-Built1Jan.13.'10Install Additional Service Water Line to P0108BMOC : 01-09-0072Feb.4.'10Additional block valve in seal flushing lineMOC : 04-09-0017L0601-00-04-007Air Cooled Heat Exchangers & Analyzer Shelter Details0As-Built8L0601-00-04-008ASample Station I0As-Built9L0601-00-04-008BSample Station II0As-Built10L0601-00-04-009Traps, LG Drain, And Air Bottle0As-Built1Jan.12.'10Install stem trap in MPS line for ejector process sump (MM-105)MOC : 01-09-0032Feb.2.'10Install drip leg in IBL steam line (UT-P11)MOC : 03-09-00611VDUL0601-VD-04-001Feed Surge Drum0As-Built1Jan.31.'11Temporary Line BPP UCO 2Dec. 27.'11Install jumper Line From UCOS to WOR at Battery LimitsMOC : 01-10-0033Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00812L0601-VD-04-002Preheat Train (1)0As-Built13L0601-VD-04-003Preheat Train (2)0As-Built14L0601-VD-04-004Reboiler Heater0As-Built15L0601-VD-04-004AAir Preheater0As-Built16L0601-VD-04-004BSoot Blower0As-Built1Feb.2.'10Install drip leg in IBL steam line (UT-P11)MOC : 03-09-00617L0601-VD-04-005Vacuum Column0As-Built1Dec.23.'11Install Fill up Line to Vacuum Tower (V0101) Pump AroundMOC : 01-11-00118L0601-VD-04-006UCO Steam Generator0As-Built1Dec.23.'11Install Fill up Line to Vacuum Tower (V0101) Pump AroundMOC : 01-11-00119L0601-VD-04-007150 Distillate Stripper0As-Built20L0601-VD-04-008150 Distillate LP Steam Generator / Air Cooler0As-Built1Feb.2.'10Size-Up line to heavy slop from bottom V0101MOC : 01-09-0052Jan.14.'10Size-up the sensing line of 150D analyzer (A-1003)MOC : 01-09-0083Feb.2.'10Additional jump over line from lube R/D to CDW feed tank (distillate tank)MOC : 02-09-0044Dec.12.'11Install New Coriolis Meter for Custody TransferMOC : 01-10-00221L0601-VD-04-009100 Distillate Stripper0As-Built1Feb.2.'10Inst. Add. Gate Valve at LPS to CDW & VDU22L0601-VD-04-010100 Distillate LP Steam Generator / Air Cooler0As-Built1Jan.8.'10Install additional spillback line for diesel pump (P0113)MOC : 01-09-0022Jan.14.'10Additional jump over line from lube R/D to CDW feed tank (distillate tank)MOC : 02-09-0043Dec.12.'11Install New Coriolis Meter for Custody TransferMOC : 01-10-00223L0601-VD-04-011Vacuum System Package0As-Built1Feb.2.'10Inst. Vent at CWS/CWR line of ejector cond.2Jun.1.'10Inst. Line 3" for cooler /cond. Pass.3Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-00324L0601-VD-04-012Overhead Cond. Drum / Offgas KO Drum0As-Built25L0601-VD-04-013UCO Return Surge Drum0As-Built26L0601-VD-04-014Light Lube Pumparound Train0As-Built1Jan.11.'10Install additional spillback line for diesel pump (P0113)MOC : 01-09-0022Jan.11.'10Tie-in VDU diesel line to WOS headerMOC : 01-09-0063Jan.12.'10Install Block Valve in LPS Line to Seaside Tank (UT-P18)MOC : 01-09-0124Dec.12.'11Install New Coriolis Meter for Custody Transfer MOC : 01-10-0025Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-0036Dec.23.'11Install Fill up Line to Vacuum Tower (V0101) Pump AroundMOC : 01-11-00127L0601-VD-04-015Reboiler Header Burner Piping0As-Built28L0601-VD-04-016Process Sewer Sump0As-Built1Oct. 19.'09MOC (01-09-001)MOC : 01-09-0012Jan.12.'10Install stem trap in MPS line for ejector process sump (MM-105)MOC : 01-09-0033Apr. 28.'12Change LI-1073 to LIC-1073MOC : 01-11-00229L0601-VD-04-019Interlock Matrices0As-Built30L0601-VD-04-020Analyzer Shelter0As-Built1Feb.2.'10Size-up the sensing line of 150D analyzer (A-1003)MOC : 01-09-0082Feb.2.'10Modif. Of Analyzer Shelt. Cooling Water LineMOC : 01-09-01331AUX. for CDWL0601-10-04-001Drawing Index0As-Built32L0601-10-04-002Equipment Index0As-Built33L0601-10-04-003Legend & Symbol0As-Built34L0601-10-04-004Equipment Symbol Legend0As-Built35L0601-10-04-005Wash Oil And Steam Ring Detail0As-Built36L0601-10-04-006Pump Seal Plan0As-Built1Feb.4.'10Additional block valve in seal flushing lineMOC : 04-09-00137L0601-10-04-007Air Cooled Heat Exchangers Details0As-Built38L0601-10-04-008ASample Station I0As-Built39L0601-10-04-008BSample Station II0As-Built40L0601-10-04-009Traps, LG Drain, And Air Bottle0As-Built41CDWL0601-CD-04-001Waxy Lube Feed Filter And Exchanger0As-Built42L0601-CD-04-002Reactor Feed Surge Drum And Pump0As-Built1Dec.27.'11Install Manifold to Process Sewer Line at P0201 suctionMOC : 02-10-00843L0601-CD-04-003Reactor Feed / Effluent Exchangers0As-Built44L0601-CD-04-004Reactor Feed Charge Heater0As-Built45L0601-CD-04-005HDW Reactor0As-Built46L0601-CD-04-006HDF Reactor0As-Built47L0601-CD-04-007Hot Separators0As-Built48L0601-CD-04-008Reactor Effluent Coolers0As-Built49L0601-CD-04-009Cold Separators0As-Built1Jan.14.'10Relocate the ATM line from CLPS (D0205)MOC : 02-09-0032Dec.19.'11Install Permanent Line (1.5" #300) to D0205 O/H to FlareMOC : 02-09-00350L0601-CD-04-010Sour Water Degasser0As-Built51L0601-CD-04-011Recycle Gas Compressor CD-C0201A0As-Built1Jan.25.'11Additional CSO and CSC MOC : 02-10-00152L0601-CD-04-012Recycle Gas Compressor CD-C0201B0As-Built1Jan.25.'11Additional CSO and CSC MOC : 02-10-00153L0601-CD-04-013Wash Water Injection0As-Built54L0601-CD-04-014Product Stripper Feed Exchangers0As-Built55L0601-CD-04-015Product Stripper0As-Built56L0601-CD-04-016Product Stripper Overhead0As-Built1Jan.14.'10Additional Wet Slop Line from D0253 to Flare KO drumMOC : 02-09-0022Jan.15.'10Size-up Control Valve PV-2035 From 1" to 1.5"MOC : 02-09-0053Dec.16.'11install Fill up Line (1.5" #300) to D0251 With Lube ProductMOC : 02-10-00757L0601-CD-04-017Vacuum Tower Feed Heater0As-Built58L0601-CD-04-018Vacuum Tower0As-Built59L0601-CD-04-019Vacuum Tower Bottoms Coolers0As-Built1Jan.15.'10Additional jump over line from lube R/D to CDW feed tank (distillate tank)MOC : 02-09-0042Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-0033Dec.16.'11install Fill up Line (1.5" #300) to D0251 With Lube ProductMOC : 02-10-00760L0601-CD-04-020External Reflux Pumps0As-Built61L0601-CD-04-021Diesel Pumparound0As-Built1Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-00362L0601-CD-04-022Vacuum System0As-Built1Feb.2.'10Inst. Vent at CWS/CWR line of ejector cond.2Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-00363L0601-CD-04-023Reactor Feed Charge Heater Burner Piping0As-Built64L0601-CD-04-024Vacuum Tower Feed Heater Burner Piping0As-Built1Jan.25.'11Additional CSO and CSC MOC : 02-10-00165L0601-CD-04-025Interlock Matrices0As-Built66L0601-CD-04-026Interlock Matrices0As-Built67L0601-CD-04-027HDW Reactor CD-R0201 Skin Te's0As-Built68L0601-CD-04-028HDF Reactor CD-R0202 Skin Te's0As-Built69L0601-CD-04-029Recycle Gas Compressor CD-C0201A Details (Lube Oil)0As-Built70L0601-CD-04-030Recycle Gas Compressor CD-C0201B Details (Lube Oil)0As-Built71L0601-CD-04-031Recycle Gas Compressor CD-C0201A Details (Cyl. Lube, CW)0As-Built1Jan.13.'10Install Strainer by pass for C0201 Seal CoolerMOC : 02-09-00172L0601-CD-04-032Recycle Gas Compressor CD-C0201B Details (Cyl. Lube, CW)0As-Built1Jan.13.'10Install Strainer by pass for C0201 Seal CoolerMOC : 02-09-00173L0601-CD-04-033Recycle Gas Compressor CD-C0201A Details (Inst. Air)0As-Built74L0601-CD-04-034Recycle Gas Compressor CD-C0201A Details (Inst. Air)0As-Built75L0601-CD-04-035Reactor Feed Charge Pump CD-P0201A Details I0As-Built76L0601-CD-04-036Reactor Feed Charge Pump CD-P0201A Details II0As-Built77L0601-CD-04-037Reactor Feed Charge Pump CD-P0201B Details I0As-Built1Feb.08.'09Install Blind in E2 By pass78L0601-CD-04-038Reactor Feed Charge Pump CD-P0201B Details II0As-Built79AUX. for UTOSL0601-20-04-001Drawing Index0As-Built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00880L0601-20-04-002Equipment Index0As-Built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00881L0601-20-04-003Legend & Symbol0As-Built

82L0601-20-04-004Equipment Symbol Legend0As-Built83L0601-20-04-005Flushing Oil Detail0As-Built84L0601-20-04-006Pump Seal Plan0As-Built1Feb.3.'10Install Control Valve for Drain Control of D0301 (UT-P20)MOC : 01-09-0132Feb.4.'10Additional block valve in seal flushing lineMOC : 04-09-0013Dec.27.'11Change The Seal Plan of P0306 to 11/62MOC : 04-09-0014Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00885L0601-20-04-007Sample Station, Trap and LG Drain0As-Built1Feb.2.'10Install Desuperheater from MPS to LPS and Install LPS Venting System (UT-P09)MOC : 03-09-0052Feb.11.'10Install Steam Trap in LPS to LPG Vaporizer (UT-P14)MOC : 03-09-0103Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00886L0601-20-04-008Sample Station 0As-Built87L0601-Y-04-001Process Interconnection0As-BuiltUTOS1Mar.21.'11Temporary Line BPP UCO2Dec.12.'11Install Flushing line to fuel oil transfer line MOC : 03-10-0133Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00888L0601-Y-04-002Utility Interconnection0As-Built1Feb.2.'10Install Desuperheater from MPS to LPS and Install LPS Venting System (UT-P09)MOC : 03-09-0052Feb.11.'10Install Block Valve in LPS Line to Seaside Tank (UT-P19)MOC : 03-09-0123May.25.'10Install Line 4" Service Water Header to Fire Water Line in Cooling Tower AreaMOC : 03-10-0044Mar.21.'11Temporary Line BPP UCO MOC : 04-10-0055Apr.18.'11Install new facilities for transfer UCO BPPMOC : 03-11-0036Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00889L0601-Y-04-003100D Tanks0As-Built1Feb.17.'12Install new Line For Utilization of T0303 For NBFMOC : 03-11-0112Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00890L0601-Y-04-004150D Tank/Pumps0As-Built1Mar.21.'11Temporary Line BPP UCO MOC : 04-10-0052Feb.17.'12Install new Line For Utilization of T0303 For NBFMOC : 03-11-0113Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00891L0601-Y-04-005100N Tanks (Process)0As-Built92L0601-Y-04-006150N Tank / Pumps (Process)0As-Built93L0601-Y-04-007100N Tanks (Seaside)0As-Built1Feb.22.'11Switch 100 N loading pipeline to 150 N MOC : 03-10-0172Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00894L0601-Y-04-008150N Tank / Pumps (Seaside)0As-Built1Feb.22.'11Switch 100 N loading pipeline to 150 N MOC : 03-10-0172Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00895L0601-Y-04-008A100N Tanks (Process)0Nov.28.'12As-Built (New Tank In Sea Side Area)MOC : 03-12-00896L0601-Y-04-008BUCO Tanks/Pumps (Process)0Nov.28.'12As-Built (New Tank In Sea Side Area)MOC : 03-12-00897L0601-Y-04-009Marine Loading Arms0As-Built1Feb.22.'11Switch 100 N loading pipeline to 150 N MOC : 03-10-0172Mar.21.'11Temporary Line BPP UCO MOC : 04-10-0053Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00898L0601-Y-04-010Heavy Slop Tank / Pumps0As-Built1Mar.21.'11Temporary Line BPP UCO MOC : 04-10-0052Feb.17.'12Install new Line For Utilization of T0303 For NBFMOC : 03-11-0113Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00899L0601-Y-04-011Wet Slop Tank / Pumps0As-Built100L0601-Y-04-012Fuel Oil Tank / Pumps0As-Built101L0601-Y-04-013LP Condensate Drum0As-Built1Feb.3.'10Tie-in Y-E0301 Vapor Line to Y-DA0301 Overhead to Silencer (UT-P18)MOC : 03-09-0112Feb.3.'10Install Control Valve for Drain Control of D0301 (UT-P20)MOC : 03-09-0133Feb.3.'10Make Permanent Line for Condensate Line in BLMOC : 03-09-014102L0601-Y-04-014Deaerator And BFW Pumps0As-Built1Feb.3.'10Inst. Add. Block Valve for PK0305 & PK03062Feb.3.'10Tie-in Y-E0301 Vapor Line to Y-DA0301 Overhead to Silencer (UT-P18)MOC : 03-09-0113Jun.1.'10Install line 3" for cooler/condenser pass MOC : 04-10-0014Dec.19.'11Inst. Demin Line For Hydrostatic Test At High Press Exchanger Area MOC : 03-10-011103L0601-Y-04-015BD Flash Drum0As-Built104L0601-Y-04-016Water Treatment Plant (1/2)0As-Built105L0601-Y-04-017Water Treatment Plant (2/2)0As-Built106L0601-Y-04-018LPG Vaporizer / Fuel Oil Heater0As-Built1Feb.2.'10Install Steam Trap in LPS to LPG Vaporizer (UT-P14)MOC : 03-09-0102Jan.25.'11Additional CSO and CSC MOC : 03-10-002107L0601-Y-04-019Fuel Gas Balance Drum0As-Built108L0601-Y-04-020AN2 Generation Unit (PSA System 1 of 2)0As-Built109L0601-Y-04-020BN2 Generation Unit (PSA System 2 of 2)0As-Built110L0601-Y-04-020CN2 Generation Unit (Vaporization System)0As-Built1Feb.2.'10Install N2 Line and Manifold at reactor Area (Ut-P13)MOC : 03-09-009111L0601-Y-04-020DN2 Generation Unit (Air Compressor)0As-Built112L0601-Y-04-021AAir Compressor (1/2)0As-Built1Feb.2.'10Inst. Line from CWR to open ditch for s/w2Feb.3.'10Install Presure Gauge at C0301A/B Discharge Line (UT-P11)MOC : 03-09-0073Feb.3.'10Install Permanent Line for Vent of C0301 Discharge (UT-P12)MOC : 03-09-0084Apr.19.'11Connected Air CompessorMOC : 03-11-004113L0601-Y-04-021BAir Compressor (2/2)0As-Built1Feb.2.'10Inst. Line from CWR to open ditch for s/w2Feb.3.'10Install Presure Gauge at C0301A/B Discharge Line (UT-P11)MOC : 03-09-0073Feb.3.'10Install Permanent Line for Vent of C0301 Discharge (UT-P12)MOC : 03-09-008114L0601-Y-04-022Air Dryer0As-Built1Feb.3.'10Install Permanent Line for Vent of C0301 Discharge (UT-P12)MOC : 03-09-0082Feb. 17.'12Modif. Pipe Inlet/Outlet of Air Receiver Tank (00303)MOC : 03-11-007115L0601-Y-04-025Flare Process Knockout Drum0As-Built116L0601-Y-04-026Flare Offsite Knockout Drum0As-Built117L0601-Y-04-027Flare Stack0As-Built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-008118L0601-Y-04-028Uco Export Tank And Pump0As-Built1Apr.18.'11Install new facilities for transfer UCO BPPMOC : 03-11-003119L0601-Y-04-030Cooling Water Make-up System0As-Built1201Jun.05.'12Install Pressure Gauge to P0316 SuctionMOC : 03-10-012121L0601-Y-04-031Cooling Tower0As-Built1Feb.2.'10Install Drainage Line form CWR to Open Ditch (UT-P03)MOC : 03-09-001122L0601-Y-04-032Cooling Water Pumps0As-Built123L0601-Y-04-032ADetails Y-P0315-TPA0As-Built124L0601-Y-04-033Cooling Water Chemical Injection0As-Built125L0601-Y-04-034Process Area Only Water Sump & Pumps0As-BuiltWWTU1Dec.12.'11Switch Caustic injection facility with alum facility in WWTU MOC : 04-10-003126L0601-Y-04-035Stormwater Holding Basins & pumps0As-Built1Feb.8.'10Make Permanent Line for Condensate Line in BLMOC : 03-09-0142Feb.16.'12Utilization of Stormwater Holding Basin For Press Up Hydrant Line MOC : 03-11-002127L0601-Y-04-035AC/T And Flare Area Oily Water Sumps & Pumps0As-Built128L0601-Y-04-036Seaside & WWT Area Oily Water Sumps & Pumps0As-Built129L0601-Y-04-036AWWT Sea Side Tank Area Oily W.W Sump0Nov.28.'12As-Built (New Tank In Sea Side Area)MOC : 03-12-008130L0601-Y-04-037Equalization Tank0As-Built131L0601-Y-04-038Primary Clarifier Package0As-Built132L0601-Y-04-039Daf Package (1/2)0As-Built133L0601-Y-04-040Daf Package (2/2)0As-Built134L0601-Y-04-041Skimmed Oil Tank & Sludge Holding Sump 0As-Built135L0601-Y-04-042Aeration Tanks0As-Built136L0601-Y-04-043Clarifier Package & Final Effluent Basin0As-Built137L0601-Y-04-043AAir Compressor / Receiver Tank0As-Built1Nov.09.'11PSV Setting Press MOC : 03-11-014138L0601-Y-04-044Thickener Package0As-Built139L0601-Y-04-045Belt Press Filter Package0As-Built140L0601-Y-04-046Chemical Injection (1/2)0As-Built1Dec.28.'11Make Polymer Injection Pot (WWTU)MOC : 03-10-003141L0601-Y-04-047Chemical Injection (2/2)0As-Built1Dec.28.'11Switch Caustic injection facility with alum facility in WWTU MOC : 03-10-016142L0601-Y-04-048Interlock Matrices0As-Built143L0601-Y-04-048AInterlock Matrices0As-Built

PFDDRAWING INDEX PROCESS FLOW DIAGRAM

Last Update : 10 April 2013NoDisciplineDrawing No. Drawing TitleRev.Date Of Rev.Issue For Rev.MOC No1VDUL-0601-VD-02-001Drawing Index0Aug.27. 2008As built2L-0601-VD-02-001AVacuum Distillation Unit (Case : LA1)0Aug.27. 2008As built3L-0601-VD-02-001BVacuum Distillation Unit (Case : NA1)0Aug.27. 2008As built4L-0601-VD-02-001CVacuum Distillation Unit (Case : LB)0Aug.27. 2008As built5L-0601-VD-02-001DVacuum Distillation Unit (Case : MB)0Aug.27. 2008As built6L-0601-VD-02-001EVacuum Distillation Unit (Case : NB)0Aug.27. 2008As built7L-0601-VD-02-001FVacuum Distillation Unit (Case : LA2)0Aug.27. 2008As built8L-0601-VD-02-001GVacuum Distillation Unit (Case : MA2)0Aug.27. 2008As built9L-0601-VD-02-001HVacuum Distillation Unit (Case : NA2)0Aug.27. 2008As built10L-0601-VD-02-001IVacuum Distillation Unit Stream Data0Aug.27. 2008As built11L-0601-VD-02-001JVacuum Distillation Unit Stream Data0Aug.27. 2008As built12CDWL0601-CD-02-000Drawing Index0Aug.27. 2008As built13L0601-CD-02-001Catalytic Dewaxing Unit (Reaction Section, 100N SOR/EOR)0Aug.27. 2008As built14L0601-CD-02-001ACatalytic Dewaxing Unit (Reaction Section, 150N SOR/EOR)0Aug.27. 2008As built15L0601-CD-02-002Catalytic Dewaxing Unit (Fractionation Section, 100N SOR/EOR)0Aug.27. 2008As built16L0601-CD-02-002ACatalytic Dewaxing Unit (Fractionation Section, 150N SOR/EOR)0Aug.27. 2008As built17L0601-CD-02-011CDW Material Balance (100N SOR)0Aug.27. 2008As built18L0601-CD-02-012CDW Material Balance (100N EOR)0Aug.27. 2008As built19L0601-CD-02-013CDW Material Balance (150N SOR)0Aug.27. 2008As built20L0601-CD-02-014CDW Material Balance (150N EOR)0Aug.27. 2008As built21L0601-CD-02-015CDW Material Balance (100N EOR_Pilot)0Aug.27. 2008As built22PFD & UFD UTOSL0601-00-02-001Drawing Index0Aug.27. 2008As built23L0601-Y-02-001100D & 150D Process Tanks0Aug.27. 2008As built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00824L0601-Y-02-002100N & 150N Process Tanks0Aug.27. 2008As built25L0601-Y-02-003100N & 150N Seaside Tanks0Aug.27. 2008As built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00826L0601-Y-02-003ANBF Sea Side Tanks0Nov.28.'12As Built (New Tank In Sea Side Area)MOC : 03-12-00827L0601-Y-02-004Heavy Slop/Wet Slop/Fuel Oil Tanks0Aug.27. 2008As built28L0601-Y-02-005Eq. Tank, Primary Clarifier And Daf Package0Aug.27. 2008As built29L0601-Y-02-006Biotreatment And Sludge Treatment0Aug.27. 2008As built30L0601-Y-03-001Steam, Condensate And BFW (1/2)0Aug.27. 2008As built31L0601-Y-03-002Steam, Condensate And BFW (2/2)0Aug.27. 2008As built32L0601-Y-03-003IA/PA0Aug.27. 2008As built33L0601-Y-03-004N20Aug.27. 2008As built34L0601-Y-03-005Fuel Gas & Fuel Oil (1/2)0Aug.27. 2008As built35L0601-Y-03-006Fuel Gas & Fuel Oil (2/2)0Aug.27. 2008As built36L0601-Y-03-007Flare0Aug.27. 2008As built37L0601-Y-03-008Cooling Water0Aug.27. 2008As built38L0601-Y-03-009Potable Plant Water And Cooling Water0Aug.27. 2008As built39L0601-Y-03-010Oily Water0Aug.27. 2008As built40L0601-Y-03-011Refinery Water Balance0Aug.27. 2008As built41WWTL0601-Y-02-005Eq. Tank, Primary Clarifier And Daf Package0Aug.27. 2008As built42L0601-Y-02-006Biotreatment And Sludge Treatment0Aug.27. 2008As built

UFDDRAWING INDEX UTILITY FLOW DIAGRAMLast Update : 10 April 2013NoDrawing No. Drawing TitleRev.Date of Rev.Issue For Rev.Remark

1L-0601-Y-04-101Utilities Distribution BFW/Blowdown System2L-0601-Y-04-102Utilities Distribution Cooling Water (1/2)3L-0601-Y-04-103Utilities Distribution Cooling Water (2/2)4L-0601-Y-04-104Utilities Distribution LP Steam / LP Cond.0As-Built1Jan.25.'11MOC : 02-09-0032Feb.2.'10MOC : 03-09-0063Feb.2.'10MOC : 03-09-0104Feb.8.'10MOC : 03-09-0145Jan.25.'11Additional of Flare Line From D0205 OverheadMOC : 02-10-0025L-0601-Y-04-105Utilities Distribution MP Steam / IP Steam6L-0601-Y-04-106Utilities Distribution HP Steam7L-0601-Y-04-107Utilities Distribution Nitrogen/Plant Air/Instrument Air8L-0601-Y-04-108Utilities Distribution Plant Water/Potable water01Jan.13.'10MOC : 01-09-0079L-0601-Y-04-109Utilities Distribution Process Sewer10L-0601-Y-04-110Utilities Distribution Oily Water Sewer System11L-0601-Y-04-111Utilities Distribution Flare Collection12L-0601-Y-04-112Utilities Distribution Flushing Oil01Jan.12.'10MOC : 01-09-0052Jan.12.'10MOC : 01-09-0063Dec, 27.'11Install Jumper Line form UCOS to WOR at Battery LimitsMOC : 01-10-003L-0601-Y-04-113Utilities Station For Onsite13L-0601-Y-04-113AUtilities Station For Offsite14L-0601-Y-04-114Utilities / Offsite Oily Water Sewer for Offsite0As-Built1Nov.28.'12New Tank In Sea Side AreaMOC : 03-12-00815L-0601-Y-04-116Utilities Distribution IA/PA/LPS/PW/OWS For WWT Area

PLOT PLANDRAWING INDEX

NoDisciplineDrawing No. Drawing TitleRev.Remark195002Overall Plot Plant2L-0601-LBO-50-001Plot Plan For LBO Plant3L-0601-LBO-50-002Equipment Location Plan For LBO Plant (1/5)4L-0601-LBO-50-003Equipment Location Plan For LBO Plant (2/5)5L-0601-LBO-50-004Equipment Location Plan For LBO Plant (3/5)6L-0601-LBO-50-005Equipment Location Plan For LBO Plant (4/5)7L-0601-LBO-50-006Equipment Location Plan For LBO Plant (5/5)8L-0601-LBO-50-007Location Plan For Safety Shower & Utility Station9ONSITE TANKAGE AREAL0601-Y-50-100Plot Plant For Onsite Tankage Area10L0601-Y-50-101Equipment Location Dwg. For Onsite Tankage Area (1/4)11L0601-Y-50-102Equipment Location Dwg. For Onsite Tankage Area (2/4)12L0601-Y-50-103Equipment Location Dwg. For Onsite Tankage Area (3/4)13L0601-Y-50-104Equipment Location Dwg. For Onsite Tankage Area (4/4)14SEASIDE TANKAGE AREAL0601-Y-50-200Plot Plant For Seasite Tankage Area15L0601-Y-50-201Equipment Location Plan For Seaside Tankage Area16UTOSA0-2193-510Coke Calcining Unit Plot Plan17A0-2203-10DFlare System Plot Plan18A0-2203-10ETank Area 140-T4, 925-T1 & T2, 945-T1 & T2, T24 & T25 Plot Plan19A0-2203-10HTank Area 945-T11, T12, T13, T14 & T15 Plot Plan20A0-2203-10ISpheres In Tank Area 945-T27, T-30, T-31, &T-32 Plot Plan21A0-2203-10L (1/3)Jetty Facilities Plot Plan22A0-2203-10L (2/3)-23A0-2203-10NSea Water System Plot Plan24A0-2204-10Interconnecting Area Plot Plan25L0601-Y-50-001Plot Plan For Cooling Tower Area26L0601-Y-50-300Plot Plan For Jetty Facilities27L0601-Y-50-400Plot Plan For Water Treatment Process Area

Fire Fighting (P&ID)DRAWING INDEX P&ID and Drawing For Fire FightingLast Update : 10 April 2013No.Drawing No. Drawing TitleEquipmentRev.Date of Rev.Issue For Rev.MOC No1L0601-LBO-04-501P&ID For Fire Fighting Distribution System (Process Area)0As-Built123 Dec 2012Install Control Valve to Fire Hydrant LineMOC : 03-11-006202 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-0052L0601-LBO-04-502P&ID For Fire Fighting Distribution System Onsite-Tankage Area (1)0As-Built3L0601-LBO-04-503P&ID For Fire Fighting Distribution System Onsite-Tankage Area (2)0As-Built4L0601-LBO-04-504P&ID Water Spray System (1) (Process Area)0As-Built5L0601-LBO-04-505P&ID Water Spray System (2) (Process Area)0As-Built6L0601-LBO-04-507P&ID Fire Fighting Distribution System Seaside-Tankage Area0As-Built126 Dec 2012New Tank in Sea Side AreaMOC : 03-12-0087L0601-LBO-04-508P&ID Air Foam System (1) (Onsite-Tankage Area) Y-T0314 & Y-T03150As-Built8L0601-LBO-04-509P&ID Air Foam System (2) (Onsite-Tankage Area) Y-T0316 & Y-T03170As-Built9L0601-LBO-04-510P&ID For FM200 System (Substation & Control Building)0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00510L0601-LBO-04-512P&ID For Fire Fighting Distribution System Admin. Building Area0As-Built11L0601-LBO-04-513P&ID For Fire Water Distribution System (Flare Stack Area)0As-Built12L0601-LBO-08-501Fire Fighting Conceptual Layout For Process Area0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00513L0601-LBO-08-502Fire Fighting Conceptual Layout For Onsite Tankage Area (1)0As-Built14L0601-LBO-08-503Fire Fighting Conceptual Layout For Onsite Tankage Area (2)0As-Built15L0601-LBO-08-504Fire Fighting Conceptual Layout For Seaside Tankage Area0As-Built126 Dec 2012New Tank in Sea Side AreaMOC : 03-12-00816L0601-LBO-08-505Fire Extinguisher Location Plan For Process Area0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00517L0601-LBO-08-506Fire Extinguisher Location Plan For Onsite Tankage Area (1)0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00518L0601-LBO-08-507Fire Extinguisher Location Plan For Onsite Tankage Area (2)0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00519L0601-LBO-08-508Fire Extinguisher Location Plan For Seaside Tankage Area 0As-Built126 Dec 2012New Tank in Sea Side AreaMOC : 03-12-00820L0601-LBO-08-509Fire Extinguisher Location Plan For Substation & Control Building0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00521L0601-LBO-08-509AFire Fighting Conseptual Layout For Admin. Building Area0As-Built22L0601-LBO-08-509BFire Fighting Conseptual Layout For Flare Stack Area0As-Built23L0601-LBO-08-509CFire Fighting Plan For Administration Building0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00524L0601-LBO-08-509IFire Fighting Conceptual Layout For Cooling Tower Area0As-Built102 Apr 2013Revise F/F P&ID and Drawing as per Actual ConditionMOC : 04-12-00525L0601-LBO-08-510Gas Detector Location Plan For Process Area0As-Built26L0601-LBO-08-510AGas Detector Location Plan For Onsite Tankage Area0As-Built27L0601-LBO-08-510BGas Detector Location Plan For Flare Stack Area0As-Built28L0601-LBO-08-511Fire Proofing Layout For Process Area0As-Built29L0601-LBO-08-512Fire Proofing Layout For Onsite Tankage Area (1)0As-Built30L0601-LBO-08-513Fire Proofing Layout For Onsite Tankage Area (2)0As-Built31L0601-LBO-08-514Fire Proofing Layout For Seaside Tankage Area0As-Built126 Dec 2012New Tank in Sea Side AreaMOC : 03-12-00832L0601-LBO-08-515Fire Proofing Layout For Waste Water Treatment Area0As-Built33L0601-LBO-08-516Fire Proofing Layout For Cooling Tower Area0As-Built34L0601-LBO-08-603Information Drawing For Water Spray System (CD-E0204/E0206/E0253/E0256)0As-Built35L0601-LBO-08-604Information Drawing For Water Spray System (CD-E0204/E0253/E0256)0As-Built