5

Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 2: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 3: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 4: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on
Page 5: Phyto83n02 153 · 2018-12-16 · chloride pipe fitting was placed in each jar to support the plastic mesh at a height about 1.3 cm above the glycerol solution. Lids were placed on