Oct 19, 2018 Fremont Avenue Bridge, Minneapolis, MN Hennepin County Photograph of Existing Conditions - Looking West from Greenway Figure 1

Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Photograph of Existing Conditions - Looking West from Greenway Figure 1

Page 2: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Perspective Rendering of Proposed Bridge Reconstruction - Looking West from Greenway Figure 2

FREMONT AVENUE

Page 3: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Photograph of Existing Conditions - Looking South from Bridge Deck Figure 3

Page 4: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4

2019

Page 5: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

41’-0”

99’-0”Approx. Overall Bridge Length

19’-0” +/- Existing BlackChain Link Fence

Precast Arch Fascia Panel with Masked Interior 27” Concrete Beams

Existing Modular Block Wall

2’-0” Typical

14’-6” +/-

Non-Structural Pier

Corner Overlook

Fremont Ave Sign

Existing Retaining Wall

Existing Fence

Existing VegetationAbutment Face

2’-0” Typical

29’-0”

TrailWalk

29’-0”10’-0” +/-

Embankment

Abutment Face

Wing Wall w/ Shallow Arch Relief

Corner Overlook

Concrete Parapet w/ Inset Panels

Pipe and Cable Railing

Pilaster

19’-0” +/-

East Elevation - Looking West Figure 5

0’ 10’ 5’ 20’

FREMONT AVENUE

Page 6: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Parapet Pilaster

Steel Pipe and Cable Railing

Concrete Parapet

Bridge Deck

Arched Precast Concrete Fascia Panel

Precast Concrete Beams

3’-6”

1’-

1”

4’-6”

2’-1”

49’ -4”Overall Bridge Deck Width

10’ Sidewalk 26’- 0” Roadway 10’ Sidewalk

11’ Drive Lane 11’ Drive Lane

1’-8”

2’-0” C.G. 2’-0” C.G.

1’-8”

Figure 6Bridge Cross Section - Looking North

0’ 2.5’ 5’ 10’ 20’

Page 7: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Figure 7Arched Pier Elevation - Looking North

0’ 2.5’ 5’ 10’ 20’

Non Structural Arched Concrete Pier

Midtown Greenway

Arched Precast Concrete Fascia Panel

Solid Concrete Diaphragm Typ.13

’-5’’

9’-6”Typical

2’-0”Typical

1’- 1”

3’ - 6

49’4”Overall Bridge Deck Width

1’ -1

”Ty

pica

l

Page 8: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Figure 8

4’- 8”To Face of

Coping

North Abutment Elevation

0’ 2.5’ 5’ 10’ 20’

Existing Adjacent Concrete Wall and Railing

1-1/2” Coping Relief

Midtown Greenway

Parapet Pilaster

Steel Pipe and Cable RailingConcrete Parapet Wall

14’-6

” +/-

3’ -6

1’ -1

”Co

ping

47’ - 10”

4’- 8”To Face of

Coping 49’- 4”Overall Deck Width

Page 9: Photograph of Existing Conditions - Looking West from ...Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4 2019. ... East Elevation

Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County

Figure 9

4’- 8”To Face of

Coping 49’- 4”Overall Deck Width

South Abutment Elevation - 3” Arch Relief

0’ 2.5’ 5’ 10’ 20’

Existing Concrete Wall and Railing

3” Arched Relief

Abutment Face

Trench

2’Typical

9’ - 6”Typical

19’ +

/-3’

-6”

1’ -1

”Ty

pica

l