1

Photo highlight showing the major work involvements for the

Site formation process for

The City University new Administrative Complex

Prepared by Raymond Wong

January 2011

Overall site formation area for the Administrative Compound

Page 2: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

2

site formation area – the southern portion

(down-hill main site)

December 2009

Page 3: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

3

December 2009 – before the slope cutting

February 2010

Page 4: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

4

February 2010

Mid April 2010With site form and foundation worked at the same time

Page 5: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

5

Mid July 2010

Mid July 2010

Page 6: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

6

End Aug 2010

Early October 2010

1st portion of pile cap under construction

Page 7: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

7

End October 2010

2nd Portion of pile cap under construction

December 2010

The entire pile cap for the future tower being completed

Page 8: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

8

January 2011 – Site formation basically completed and the superstructure work started

Core wall structures for the new building

Cutting the rock slope along Tat Chee Avenue

Page 9: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

9

Cut into rock to form the ground beams and pile cap

Pit for pile cap

Working under the vehicular bridge

Page 10: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

10

Pipe pile walling as side protection to vertical-cut line

Site formation area – the northern portion

(up-hill strip)

Page 11: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

11

February 2010

August 2010 (with foundation works all completed at this stage)

September 2009 (early stage after site handing over to contractor)

Page 12: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

12

June 2010

Temporary retaining wall to protect the cut-slope at the 1st stage (plastic sheet to protect soil surface being washed by rain)

September 2010

Addition support when excavation proceeded downward

Page 13: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

13

Site formation and foundation working at the same time in March 2010

Forming the foundation using bore-pile

Page 14: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

14

October 2010

Forming a new pit and supported by pipe-pile for the construction of a pile cap

November 2010

Page 15: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

15

December 2010

New pile cap before concreting

December 2010

Page 16: Photo highlight showing the major work involvements for ... · January 2011 Overall site formation area for the Administrative Compound. 2 ... December 2009 – before the slope cutting

16

January 2011