Upload
dangtuyen
View
218
Download
3
Embed Size (px)
Citation preview
‘A wide range of transferable skills with a proven track record of success in designing and delivering award winning architecture’.
Phillip Pollington RIBA Resume
Address: 1 Sunday School Square,
Chapel-en-le- Frith, High Peak,
SK23 0HN, England.
Telephone: +44 (0) 7817464417
E-mail: [email protected]
phillip pollington phillip pollington —— architectarchitect
RIBA Membership No: 7047923
BA (Hons), Dip Arch, RIBA.BA (Hons), Dip Arch, RIBA.
Yorkshire 2011, Project of the Year - Winner
Professional Profile
Awards City College, Sheffield.
A
A
Terminal 1 Retail, Manchester Airport.
Barnsley Sixth Form College Learning Resource Centre
Sheffield Hallam University
Ground Transport Interchange
Manchester
Student Housing St Pancras Way London
Professional Profile
Skills SummarySkills Summary
A
Awards
A dedicated and dynamic architect director with a highly successful background in all aspects of an architectural business from managing clients and teams to assisting and contributing in the running of the business.
Experienced in working in a wide variety of sectors with primary focus on exceeding expectations for customer service delivery whilst ensuring architectural excellence.
Possesses excellent design, interpersonal, communication and negotiation skills with the ability to develop and maintain mutually beneficial internal and external relationships.
Operated at Regional and National level specialising in design services, leading bids, marketing and sales, sustainability, and delivery of projects along with business growth throughout the UK in the highly competitive public and private sector markets.
Has the tenacity, drive, flexibility and agility to provide strong leadership and direction. One strength is his ability to identify a client – nurture them and obtain repeat business whilst devel-oping new opportunities, by building strategic relationships and securing new business.
Ability to listen, interpret, communicate, innovate and adapt to situations whilst not losing focus and be a team player with strong stakeholder management skills.
A RICS North West 2007 - RIBA North West 2007
Manchester Transport Interchange
Management excellence.
Team leadership.
Securing new business and maintaining it.
High success rate of repeat business.
Ran profitable office.
Bid writing.
Presentations.
Excellent Designer and Project Manager.
Team player.
AutoCad proficient / Free– hand perspectives.
Extensive experience of Microsoft Office suite.
Some Photoshop.
Estate Master planning Stockport College
City College Manchester—Sports Hall
February 1999 – Present.
Jefferson Sheard Architects – Associate Director . Associate Director managing clients and teams in the design and delivery of projects along with a commercial focus. Key client account manager. Successfully developed and leads the Education sector in the Practice - schools, Further Education and Higher Education. Playing a pivotal role in the marketing and future development of the business. Responsible for a series of commissions within a variety of sectors for the practice. Ran the Manchester office as Regional Director from 2004 till 2008. The office was profitable with a turnover of £1.2million (20no. staff). Excellent all round designer, work opportunist, bid leader and presenter, job runner and technically proficient. Project Director on a variety of projects delivering award-winning schemes.
Professional Profile
A
Opal One, Burley Road, Leeds—Student Accommodation
Housing Scheme Knutsford
Green Apple Awards 2012, Commerce & Industry Sector, - Winner
Awards
Think Low Carbon Centre, Barnsley. A
Main Campus, Barnsley College Opal One, Burley Road, Leeds
—Student Accommodation
3
Sustainability Portfolio
A
Developed Award Winning Think Low Carbon Centre (Director in Charge)
A Low Carbon building demonstrating active and passive technologies integrated into the building .
Carbon emissions are greatly reduced.
TLC Demonstration Garden, .
Environmental Technology Centre, East Riding, College Beverley
TLC Straw
Bale Wall
TLC Reception—All services exposed
TLC Demonstration Technologies contained within the building
TLC Solalr Thermal
City College, Sheffield—Wind Turbines and Photo-Voltaics
TLC Windturbine
Sustain Awards 2012, Sector 2: Trade & Industry, Energy Category - Winner
Think Low Carbon Centre, Barnsley. A
Awards
Shortlisted for Vanke Innovation House—Beijing Green Building Park.
Hartlepool Civic Society Awards 2010, New Build of the Year - Winner
3
4
Education Portfolio
Hartlepool Sixth Form College
1
1
2
5
2
3 5
6
6
6
Awards
A A
2
3
Education Portfolio
Background Image—Main Campus , Barnsley College
Key to images.
1. Collegiate Learning Resource Centre — Completed 2001 D&B Cost £3.5 Million ($5.25 Million)
Role — Project Architect
2. East Durham College — Completed 2008 D&B Cost £22.0 Million ($33.0 Million)
Role —Secured Project / Project Director
3. East Riding College —Completed 2008 D&B Cost £10.0 Million ($15.0 Million)
Role — Secured Project / Project Director / Architect
4. Soundhouse —Completed 2009 D&B Cost £2.0 Million ($3.0 Million)
Role — Secured Project
5. Hartlepool Sixth Form College —Completed 2009 D&B Cost £18.0 Million ($27.0 Million)
Role — Secured Project /Project Director
6. Main Campus, Barnsley College — Completed 2012 D&B Cost £35.0 Million ($52.0 Million).
Role — Secured Project /Project Director / Architect
“The new campus is a tremendous asset to the College and Bridlington. I am delighted to see it so busy with students and staff taking advantage of the new facilities.....Without doubt East Riding College now has some of the best further education facilities in the country which will have such a positive impact on enhancing the learning opportunities for our stu-dents while adding to their enjoyment of their time at the College.”
Principal Derek Branton,
East Riding College
SCALA Civic Building of the Year Awards 2011,
- Winner
Awards
Hartlepool Sixth Form College
3
Transport Portfolio
LABC North and East Yorkshire Building Excellence Awards 2010 -
3 1
1 1
2
5
6
6
2
4
4
East Riding College, Bridlington. A
Awards
5
A
3
Transport Portfolio
Key to images.
1. Manchester Airport Ground Transport Interchange — Completed 2002 D&B Cost £25.0 Million ($38.0 Million)
Role — Project / Site Based Architect
2. Wrexham Bus Station — Completed 2005 D&B Cost £3.5 Million ($5.25 Million)
Role — Competition winning design / Project Director / Architect
3. Manchester Transport Interchange — Completed 2006 Traditional Cost £28.0 Million ($42.0 Million)
Role — Presentation team winning project
4. Barnsley Interchange —Completed 2007 D&B Cost £24.0 Million ($36.0 Million)
Role — Regional Director Resource Management and Contractor Client Interface
5. Warrington Bus Interchange—Completed 2006 Traditional Cost £8.0 Million ($12.0 Million)
Role — Project Director / Architect
6. Swansea Quadrant Interchange—Completed 2010 Traditional Cost £9.0 Million ($13.5 Million)
Role — Project Director / Architect
Background Image—Manchester Airport GTI
Awards
Bridlington and District Civic Society Award 2009 - Built Environment
A
East Riding College, Bridlington. A
3
2011, Project of the Year - Winner Main Campus Barnsley College
Other Portfolio
1
4
2 2 3
4
5 Awards
A A
3
T1 Retail Manchester Airport
Other Portfolio
Key to images.
1. Variety of Residential schemes — Completed / Ongoing Cost Varies
Role — Project Director / Architect
2. Opal One Burley Road Leeds —Student Accommodation — Completed 2008 D&B Cost £26.0Million ($39.0 Million)
Role — Secured work / Project Director
3. Manchester 2 Wilmslow Road — Student Accommodations—Completed 2009 D&B Cost £13.0 Million ($19.5 Million)
Role — Project Director
4. Barnsley Sixth Form College — Feasibility Studies — Ongoing Anticipated Cost £12.0 Million ($18.0 Million)
Role — Project Director / Architect
5. Masterplanning — Ongoing for a variety of clients—Barnsley College, Grimsby Institute etc. Costs £20.0 — £50.0 Million
($30.0– $75.0 Million)
Role —Project Director / Architect
Background Image—Think Low Carbon Centre, Barnsley
Awards
Town Retail Scheme 2009 - Gold Award A A
August 1998 – February 1999.
Roger Smith Architects / ESE Project Management .
Self Employed - Architect.
Blackpool Victoria Mammography Unit £350K. Blackpool Victoria Oncology £2M. Variety of flats, new houses and other hospital projects
July 1997- July 1998 .
NJSR Architects, Stockport - Architect.
Emmaus, Mossley £400K - Retail, Residential, Industrial. Stretford Arndale Shopping Centre (Feasibility) £5M Hopwood Hall Hotel, Rochdale £3M ,Colshaw Hall Golf Club £5M Mount Carmel, Sports Hall and Teaching Block £2M .Variety of Churches - New Build, Repair and Restoration
December 1994 - July 1997.
Ellis Williams Architects, Stockport - Architect.
St James the Less RC Primary School £1.1MHuddersfield New College FEFC £2M - 3 storey Teaching Block and Performing Arts Centre Oldham County Court (Design & Build) £2.5M. St Matthews RC Secondary School, Moston £2.5M - New Sports Hall and Teaching Block
January 1994 - December 1994.
John McCall Architects, New Mills - Architect.
Crown Lane, Horwich £2M - 84 Housing units for NBHA & IVHA The Court Scholes, Wigan £2M - 104 Housing units for Grosvenor HA. Industrial Units / workshops, Trafford Park. Various other resi-dential schemes for Housing Associations
September 1993 - January 1994.
James Thornely Chartered Architect - Architect.
Chapel-en-le-frith Methodist Church £80k Chinley Surgery £120k
July 1990 – September 1993.
Roger Smith Chartered Architect - Architect / Arch Assistant.
Old Hall Hotel (Listed Building) Buxton £32k. Irlam Catholic Mens Club £105k / Industrial Units, Ashton £70k. Self-build projects, New Houses and Barn Conversions
August 1988- August1989.
Ellis Williams Partnership, Stockport - Arch Assistant.
Our Lady's RC Secondary School, Royton £1.7M.St Aidan's and Oswald’s RC Primary School, Royton £800k.
Previous Experience