IMPROVEMENT OF QUALITY MANAGEMENT FOR
HIGHWAY AND BRIDGE CONSTRUCTION AND
MAINTENANCE, PHASE II
PHILIPPINE HIGHWAYMAINTENANCE MANAGEMENT
MANUAL
2014
Department of Public Works and Highways
8/10/2019 Philippine Hightway Maintenance Management Manual
2/200
8/10/2019 Philippine Hightway Maintenance Management Manual
3/200
IMPROVEMENT OF QUALITY MANAGEMENT FORHIGHWAY AND BRIDGE CONSTRUCTION AND
MAINTENANCE, PHASE II
PHILIPPINE HIGHWAY
MAINTENANCE MANAGEMENT MANUAL
SEPTEMBER 2014
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
JAPAN INTERNATIONAL COOPERATION AGENCY
8/10/2019 Philippine Hightway Maintenance Management Manual
4/200
8/10/2019 Philippine Hightway Maintenance Management Manual
5/200
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
8/10/2019 Philippine Hightway Maintenance Management Manual
6/200
8/10/2019 Philippine Hightway Maintenance Management Manual
7/200
Philippine Highway Maintenance Management Manual 2nd
Edition -ii-
ACKNOWLEDGEMENT
The Japan International Cooperation Agency (JICA) together with the Department of Public Works and
Highways (DPWH) improved and updated the Highway Maintenance Management Manual during the
implementation of the Technical Cooperation Project (TCP) for the Improvement of Quality Management
for Highways and Bridge Construction and Maintenance, Phase II (2011-2014). Special Thanks to the
following individuals who contributed to the improvement of this very important manual:
Mr. Hideo Nagao JICA Team Leader/ Bridge Expert
Mr. Ryoichi Yamasaki JICA Co-Team Leader/ Road Expert
Ms. Judy F. Sese, PhD Project Manager, Bureau of Research & Standards
Ms. Carolina S. Canuel Deputy Project Manager, DPD, Planning Service
Mr. Aristarco M. Doroy TWG Member, Bureau of Construction
Mr. Adriano M. Doroy TWG Member, Bureau of Design
Ms. Edna F. Meez TWG Member, Bureau of Maintenance
Mr. Felipe S. Ramos TWG Member, Bureau of Research & Standards
Ms. Elsa T. Naboye Regional Project Manager, CAR
Ms. Ramie B. Doroy Regional Project Manager, Region VII
Ms. Rowena P. Jamito Regional Project Manager, Region XI
Elsa G. Grumo CWG Member, DPWH-Region XI
Alex R. Tamondong CWG Member, Bureau of Maintenance
Ernante S. Antonio CWG Member, Bureau of Maintenance
Ruth S. Duyo CWG Member , CAR
Fitzgerald R. Icamen CWG Member, Region VII
Ms. Mary Ann T. Bautista TCP Coordinator, Planning Service
Mr. Feliciano Carpio JICA Team, Asst. Engineer
Mr. Rodrigo A. Yago JICA Team, Asst. Engineer
8/10/2019 Philippine Hightway Maintenance Management Manual
8/200
8/10/2019 Philippine Hightway Maintenance Management Manual
9/200
Philippine Highway Maintenance Management Manual - 2nd
Edition -iii-
TABLE OF CONTENTS
Page No.
FOREWORD. i
ACKNOWLEDGEMENT ii
TABLE OF CONTENTS. iii
DEFINITION OF TERMS... vi
CHAPTER 1MANAGEMENT SYSTEM . 1-1
1.1 Introduction 1-1
1.2 Activities. 1-2
1.3 Organization... 1-3
1.4 Planning.. 1-3
1.5 Scheduling.. 1-3
1.5.1 Maintenance Needs. 1-4
1.5.2 Quincenal Schedule 1-4
1.5.3 Work Assignment 1-4
1.6 Directing. 1-4
1.7 Reporting 1-4
1.7.1 Activity Cards. 1-5
1.7.2 Activity Summary Work Sheets. 1-5
1.7.3 Monthly Reports. 1-5
1.7.4 Monthly Data Summary. 1-5
1.7.5 Quarterly Performance Summary.. 1-6
1.8 Control 1-6
CHAPTER 2 - ACTIVITIES... 2-1
2.1 Activity List 2-1
2.2 Activity Standard 2-1
2.2.1 Name andNumber.. 2-2
2.2.2 Description.. 2-2
2.2.3 Purpose 2-2
2.2.4 Authorization... 2-2
2.2.5 Work Control Category 2-2
2.2.6 Scheduling Criteria.. 2-3
2.2.7 Typical Crew... 2-3
2.2.8 Typical Equipment. 2-3
2.2.9 Typical Material.. 2-3
2.2.10 Typical Work Method 2-3
2.2.11 Daily Production Range.. 2-3
2.2.12 Notes 2-3
2.3 Activity Number. 2-4
CHAPTER 3ORGANIZATION.. 3-1
3.1 Crew Organization. 3-1
3.2 District Organization.. 3-1
3.3 Regional Organization 3-2
3.4 Management System Responsibilities 3-2
3.4.1 District Maintenance Foreman 3-2
3.4.2 District Maintenance Area In-Charge. 3-2
8/10/2019 Philippine Hightway Maintenance Management Manual
10/200
-iv- Philippine Highway Maintenance Management Manual - 2nd
Edition
3.4.3 District Maintenance Engineer 3-2
3.4.4 District Engineer.. 3-3
3.4.5 Regional Maintenance Engineer. 3-3
3.4.6 Regional Maintenance Management Engineer 3-3
3.4.7 Regional Maintenance Inspectorate Engineer 3-4
CHAPTER 4
PLANNING. 4-1
4.1 Planning Concepts.. 4-1
4.2 Department Objectives... 4-1
4.3 Planning Limitations.. 4-2
4.4 Maintenance Feature Inventory. 4-3
4.5 Compilation 4-4
4.6 Annual Updating 4-7
4.7 Inventory Instructions 4-7
4.8 Annual Maintenance Work Program/Performance Budget (AMWP/PB). 4-7
4.9 Work Program 4-7
4.10 Performance Budget... 4-8
4.11 Routine Maintenance.. 4-15
4.12 Monthly Crewday Distribution.. 4-22
CHAPTER 5SCHEDULING... 5-1
5.1 Maintenance Needs 5-1
5.2 Quincenal Schedules.. 5-1
5.2.1 Available Man-Days 5-2
5.2.2 Activities and Locations.. 5-2
5.2.3 Workdays, Crew Sizes and Man-Days 5-2
5.2.4 Scheduled Dates.. 5-2
5.2.5 Scheduled Equipment and Materials.. 5-3
5.2.6 Area-In-Charge 5-3
5.2.7 Remarks... 5-3
5.2.8 Alternate Work 5-3
5.3 Work Assignment... 5-3
CHAPTER 6DIRECTING.. 6-1
CHAPTER 7REPORTING. 7-1
7.1 Reporting System... 7-1
7.2 TAD 1.1Highway Maintenance Activity Card. 7-3
7.3 TAD 2.1Activity Card Summary Worksheet 7-3
7.4 TAD 2.2Activity Data Summary 7-3
7.5 TAD 2.3Activity Performance Summary.. 7-3
7.6 TAR 2.1TAN 3.1 - Activity Data Summary Worksheet 7-5
7.7 TAR 2.2/3.2TAN 3.2 - Activity Data Summary.... 7-5
7.8 TAR 2.3/3.3TAN 3.3 - Activity Performance Summary Worksheet 7-5
7.9 TAR 2.4/3.4TAN 3.4 - Activity Performance Summary.. 7-5
CHAPTER 8CONTROL.. 8-1
8.1 Procedure 8-1
8.1.1 Comparison with Plans and Standards 8-1
8.1.2 Identification of Significant Deviations. 8-18.1.3 Investigation of Significant Deviations.. 8-2
8/10/2019 Philippine Hightway Maintenance Management Manual
11/200
Philippine Highway Maintenance Management Manual - 2nd
Edition -v-
8.1.4 Identification of Corrective Actions.. 8-2
8.1.5 Implementation of Corrective Action 8-2
8.1.6 Follow-Up of Actions. 8-2
8.2 Operational Control 8-14
8.2.1 Area-In-Charge 8-14
8.2.2 District Maintenance Engineers.. 8-14
8.2.3 District Engineers 8-14
8.2.4 Regional Directors.. 8-14
8.3 System Control... 8-14
8.4 Management and Fiscal Control 8-15
LIST OF FIGURESFigure 1.1 Management System Components Functional Relationships. 1-2
Figure 2.1 Example of Activity Standard. 2-4
Figure 4.1 Maintenance Features and Inventory Units 4-4
Figure 4.2 Maintenance Feature Inventory Worksheet 4-5
Figure 4.3 Maintenance Feature Inventory Summary. 4-6
Figure 4.4 Workday Planning Value Worksheet. 4-9
Figure 4.5 Performance Budget -Workday Standard Cost.. 4-10
Figure 4.6 Average Daily Labor Cost.. 4-12
Figure 4.7 Standard Unit Costs for Work DaysResource Requirement
(Labor and Equipment).. 4-13Figure 4.8 Standard Unit Costs for Work DaysResource Requirement
(Materials). 4-14Figure 4.9 Annual Maintenance Work Program Performance Budget 4-16
Figure 4.10 Annual Maintenance Work Program Performance Budget Summary 4-21Figure 4.11 Monthly Crewday Distribution 4-23
Figure 5.1 Maintenance Needed Report... 5-2
Figure 5.2 Semi-monthly Schedules.... 5-4
Figure 5.3 Activity CardWork Assignment. 5-5
Figure 7.1 Activity Card Flow Chart 7-2
Figure 8.1 Control ChartWorkdays or Accomplishment Less than Planned.. 8-3
Figure 8.2 Control ChartWorkdays or Accomplishment Greater than Planned. 8-6
Figure 8.3 Control ChartAccomplishment per Workday Less than Planned 8-9
Figure 8.4 Control ChartAccomplishment per Workday Greater than Planned 8-12
LIST OF APPENDICESAppendix A-1 Activity List
Appendix A-2 Activity Standards
Appendix B Instructions for Highway Maintenance Feature Inventory
Appendix C Maintenance Equipment List
Appendix D Maintenance Materials List
Appendix E Maintenance Management Forms
8/10/2019 Philippine Hightway Maintenance Management Manual
12/200
8/10/2019 Philippine Hightway Maintenance Management Manual
13/200
DEFINITION OF TERMS
Philippine Highway Maintenance Management Manual 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
14/200
8/10/2019 Philippine Hightway Maintenance Management Manual
15/200
8/10/2019 Philippine Hightway Maintenance Management Manual
16/200
Crew A crew is a group of workmen assigned to perform an activity at a given time
and location. Crew members are assigned by number and classification as
indicated on the "Activity Standard".
Crew Size Crew size is the number of workmen assigned to work on an activity and is
reported as the number of man-days per workday.
Daily Production Daily production is work quantity per workday.
Daily Production
Range The daily production range denotes the typical accomplishments per workday of
an activity. Typical daily productions are expressed as a range to recognize the
variations in conditions that occur in roadway maintenance and affect production.
The activity standard for an activity shows the daily production range.
Emergency
Maintenance Emergency maintenance is work performed on the roadway system during and
after storms, calamities and other emergency conditions to protect the travelling
public and roadway system and provide temporary passage when possible.
Inventory Unit An inventory unit is the basic measurement unit of a maintenance feature. For
example, unpaved roadways are measured in centerline kilometers. A
maintenance feature is assigned an inventory unit which can be easily identified
and counted.
Inventory Quantity The inventory quantity of a maintenance feature is number of inventory units
occurring within specified boundaries (e.g., 1,000 centerline kilometers ofunpaved roadway in a District).
Level of Service The level of service is the physical condition of the roadway or facility attained
as a result of maintenance activities.
Maintenance Feature A maintenance feature is a distinct part of the roadway system that requires one
or more activities to be performed on it.
Maintenance
Management System The maintenance management system is a group of interrelated concepts and
procedures used to help make decisions about maintenance work. The system isconcerned with the following major areas:
planning;
scheduling;
reporting;
controlling, and
directing.
Man-day A man-day is a day of work by one person. The man-days planned and reported
for an activity are the product of the crew size and number of workdays.
Monthly Distribution A monthly distribution is an allocation of an annual planned quantity to thevarious months. A monthly distribution can be made for workdays, man-days,
-vii- Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
17/200
resource quantities or pesos. The monthly workday distribution can be called a
"long range schedule" or "work calendar". A monthly peso distribution can becalled a "cash flow".
Performance Budget Performance budget is the annual work program expressed in pesos required for
the resource needed to accomplish the program. An annual performance budget
is prepared for each district by applying standard daily resource costs to the
number of work days in the annual work program.
Planning Value A planning value is a numerical input to either a work program or performance
budget. Examples of planning values are inventory quantities, quantity standards,
planned daily production, planned crew sizes, standard unit costs for required
resources of man-day, equipment day and material.
Quantity Standard A quantity standard is the annual work quantity planned per inventory unit. A
quantity standard usually does not apply to each inventory unit-only the total
inventory quantity. For example, a quantity standard of 200 linear meters of ditchcleaned per kilometer of ditch does not mean that in each kilometer of ditch 200
linear meters are to be cleaned. It means that the total planned work quantity
averages 200 linear meters per kilometer.
"Other" Activity Activities that are not required frequently enough to require a separate "Activity
Standard" are planned and recorded under an "other" group or sub-group Activity
Number. (e.g. "Other" Unpaved Roadway Surface Maintenance or "Other"
Roadside Maintenance). The type of maintenance work is described on the daily
work card and is planned and reported in man-days.
Maintenance Project Maintenance project activities include:
resurfacing unpaved roads;
bituminous surface treatment;
redecking timber bridge decks; and
repainting steel bridge members.
Roadway System A roadway system includes roadway surfaces, shoulders, embankments, ditches,
rights of way, bridges, drainage structures, signs, markers, lights, signalization,
landscape works, guardrails, protective devices and related facilities.
Roadway Maintenance Roadway maintenance is the act if preserving and keeping the roadway system
in, as near as possible, its originally constructed or subsequently improved state,
to protect the investment in the roadway system and provide safety, comfort and
convenience to the traveling public.
Routine Maintenance Routine maintenance is maintenance regularly performed throughout the year.
Standard Cost A standard cost of a resource is the product of the resource quantity and the
standard unit cost of the resource.
Standard Unit Cost Standard unit cost is the planning value of one unit of measurement of a resource
as used in the preparation of the AMWP and Performance Budget. For example,labor is expressed as pesos per man-day, equipment is based on peso per day per
Philippine Highway Maintenance Management Manual - 2nd
Edition -viii-
8/10/2019 Philippine Hightway Maintenance Management Manual
18/200
equipment type, material is pesos per unit, i.e. cubic meter, liter or accepted unit
of measurement. Standard unit costs consist of weighted average costs of
purchase, production, inflation, transporting and handling and are constant
throughout the year for all planning, scheduling and reporting. Only major
material items are listed and include the costs of accessories and hardware
associated with their use.
Typical "Typical" is used to describe values or conditions that are representative of a type
of work, resource, situation, etc. It should not be confused with the word
"average". For example, data from an activity might indicate that 90 percent of
the workdays have crew sizes of from 4 to 7, and the weighted average for all
workdays is a crew size of 5.2. From 4 to 7 is typical, while 5.2 is average.
Workday A workday is a crew performing an activity, according to the activity standard,
for one day. There may be more than one workday of an activity in a calendar
day. For example, if three crews perform an activity for a day, three workdays of
the activity were performed during the calendar day.
The annual planned number of workdays for an activity is found by dividing theannual planned work quantity by the planned daily production.
Work Quantity A work quantity of an activity is the amount of work expressed in work units.
"Planned" or "scheduled work quantity" can be used for a work quantity prior to
completion while "accomplishment" can be used for work completed.
"Production" can be used to denote work rates, such as in the term "daily
production". The annual planned work quantity for an activity is the product of
the inventory quantity and the quantity standard.
Work Unit A work activity is assigned a work unit that is used to express planned and
reported work quantities. An activity work unit remains the same throughout the
year. Work units should be easy to identify in the field and should reflect the
output expected from the activity.
Inventory Units
Centerline
Kilometers Centerline kilometers are the longitudinal measurement unit along the centerline
of the roadway cross section. Readings on kilometer posts indicate centerline
kilometers.
LaneKilometers Lane kilometers equal the product of the centerline kilometers and the number of
lanes. A lane is a traveled lane or parking lane, approximately 3 meters in width.
A paved shoulder may be considered a lane if it functions as a traveled lane andis of sufficient width.
ShoulderKilometers Shoulder kilometers equal the product of the centerline kilometers and the
number of shoulders.
Ditch
-ix- Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
19/200
Kilometers Ditch kilometers equal the product of the centerline kilometers and number of
ditches.
Linear Meters Linear meters are the longitudinal measurement in meters along the centerline of
the feature cross section.
Maintenance Feature Inventory
Unpaved
Roadways Unpaved roadways have travelled ways of aggregate or earth. By definitionunpaved roadways do not have shoulders.
BituminousRoadways Bituminous roadways have traveled ways with bituminous mix or bituminous
treated surfaces. The base may be aggregate, aggregate stabilized with
bituminous material or bituminous mix.
Roadway with bituminous surface and Portland cement concrete base -- over-laidconcrete surfaces -- are classified as Portland cement concrete roadway.
Concrete
Roadways Concrete roadways have travelled ways with Portland concrete surfaces.
Concrete roadways that are overlaid with bituminous mix or treated with
bituminous material are Portland cement concrete roadways.
Bituminous
Pavements Bituminous pavements are the traveled ways of bituminous roadways. They mayinclude bituminous shoulders adjacent to either bituminous or Portland cementconcrete pavement, if the shoulders functions as traveled lanes and are of
sufficient width. They do not include bituminous shoulders that do not functionas traveled ways or other areas paved with bituminous material.
Concrete Pavements Portland cement concrete pavements are the traveled ways of Portland cementconcrete roadways. They do not include other areas paved with Portland cement
concrete.
Unpaved Shoulders Unpaved shoulders are shoulders composed of aggregate or earth. By definition
unpaved roadways do not have shoulders.
Shoulders are the portion of the roadway immediately adjacent to the pavement
and designed to provide lateral support to the pavement and a safety lane for
vehicles.
Ditches Drainage ditches are the channels designed to provide roadway drainage and for
which DPWH highway maintenance has responsibility.
Drop Inlet, Catch
Basin, Manhole A receptacle or reservoir that receives surface water runoff or drainage. Typicallymade of precast concrete, brick, or concrete masonry.
Cross/LateralDrainage Reinforced concrete pipe culvert/Lined or earth canal
Philippine Highway Maintenance Management Manual - 2nd
Edition -x-
8/10/2019 Philippine Hightway Maintenance Management Manual
20/200
Box Culvert Box culvert can be described as either a precast concrete or reinforced concrete
structure in rectangular figure, facilitating water flow through an embankment ofroad, etc., as a similar function performed by concrete pipe culvert.
Roadside Structure Road slope protection works, retaining walls
Ferries A boat or ship for conveying passengers and goods, especially over a relativelyshort distance and as a regular service
Traffic Signs,Km Post, Etc This feature includes the facilities in its name; culvert, markers, painted markers
on bridge ends and district/city boundary signs are included. Kilometer posts arenot included. One unit is counted for each installation, regardless of the numberof sign faces, posts or reflectors.
Guardrails All types of guardrail are included. Guardrail adjacent to bridges is indicated;bridge railing is not included.
Steel Bridge This feature includes bridges with major structural components of metal; truss,composite I-beam and Bailey bridges are included. Bridge railings are not major
structural components.
Concrete Bridge This feature includes bridges with no major structural components of metal;
concrete and timber bridges are included.
Bailey Bridge Athrough type of steel Deck Girder; the roadway is being carried between thetwo main girders. The main girders are formed from modular elements 3m longpinned together end to end for quick assembly.
Timber Bridge A type of bridge made of wood.
Concrete Deck Top of bridge superstructure
-xi- Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
21/200
8/10/2019 Philippine Hightway Maintenance Management Manual
22/200
Figure 1.1
Management System Components
Functional Relationships
The remainder of this chapter briefly explains the other chapters in this manual.
1.2 Activities
All types of work performed by maintenance field forces are described by activities. Activities are used
throughout the management systemwork is planned, schedule, directed, reported and controlled by
activity.
The majority of work activities relate to the maintenance of distinct features of the roadway system. Anannual work program of activity work units required to provide an acceptable level service on the roadway
maintenance feature is combining work activities and road way maintenance features. To facilitate the
preparation and understanding of the program, each activity is assigned easily identifiable units of measure
which are compatible with the various work units.
Activity work units are used to measure planned, schedule and reported work, on distinct roadway
maintenance features, as described by a work activity.
An activity standard is developed for each and includes the following information:
name and number;
description ;
1-2 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
23/200
purpose;
authorization;
scheduling criteria;
typical crew size and composition;
typical equipment;
typical material;
typical work method; and
daily production range;
Work activities and standards are detailed in Chapter 2.
1.3 Organization
Maintenance personnel and equipment are assigned by activity according to the work to be performed.
Crews are not permanently assigned to any activity or location but are utilized in the most efficient and
effective combinations for the work scheduled.
Districts are divided into geographical areas to help organize management activities. Personnel and
equipment are assigned to areas for duration determined by the District/Maintenance Engineer. District
Area In-Charge is assigned to share responsibility for managing maintenance in the areas.
Organization structures and responsibilities are in Chapter 3.
1.4 Planning
Planning serves to estimate the annual work quantities, resource requirements and standard costs needed to
meet Departments objectives for roadway maintenance. The annual maintenance work
program/performance budget documents and communicates these objectives.
Annual work program/performance budgets are developed for each district and summarized into regional
and national program/budgets.
The sequence for developing a district program/budget is as follows:
1.
identify planning concepts;
2.
summarize maintenance feature units;
3.
prepare the work program and performance budget;
4. prepare the monthly workday distribution;
5.
prepare other monthly distributions;
6.
estimate resource requirements; and7.
compare with available resources and funds and revise as appropriate.
The planning procedures outlined above are explained in detail in Chapter 4.
1.5 Scheduling
Successful performance of an annual maintenance work program is dependent on good scheduling
practices which should be established and followed continually.
Work scheduling is composed of:
identification of maintenance needed;
determination of work activity and workday required;
Philippine Highway Maintenance Management Manual - 2nd
Edition 1-3
8/10/2019 Philippine Hightway Maintenance Management Manual
24/200
preparation of quincenal schedule; and
assignment of work activity and resources requirements.
1.5.1 Maintenance Needs
The District Area In-Charge is responsible for conducting routine inspections of all the roads in the area atleast once a quincena. He identifies maintenance needs by comparing observed conditions with the
description, purpose and scheduling criteria on activity standards or by engineering judgment.
1.5.2 Quincenal Schedule
Quincenal schedules are prepared each quincena for each district area. They are prepared by the District
Area In-Charge during scheduling meetings.
During a scheduling meeting maintenance needs are compared with the work program, workday
distribution, activity standards, available resources and other pertinent information to determine what
activities are to be scheduled, when the activities are to be performed and the work methods ad resources
to be used.
The schedule documents the following:
the activities and locations schedule;
the workdays, crew sizes and man days scheduled; and
the equipment and material scheduled; and the scheduled supervisor.
1.5.3 Work Assignment
The work assignment is made by the District Area In-Charge to the scheduled supervisor. Both written and
verbal instructions are used. The important aspects of work assignment are that the scheduled supervisorunderstands what work is assigned, where, when how and how well it is to be performed and who is to
perform it.
Written instructions are placed on an activity card, which authorizes the supervisor to perform one
workday of the activity at the location assigned.
Details of scheduling procedures are discussed in Chapter 5.
1.6 Directing
Directing consists of the actions necessary to produce acceptable work results after the work assignment is
received. A work assignment does not detail every aspects of the work. Numerous decisions must be madeat the work site to produce acceptable results.
The activity standard is an important guide for producing acceptable work results. The work method,
purpose and daily production range provide guidance.
Chapter 6 contains the details of Directing.
1.7 Reporting
District reporting consists of the following:
all workdays are reported on activity card;
the activity cards are summarized on activity card summary work sheet; and
1-4 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
25/200
the activity card summary work sheets and planning data are used to prepare monthly reports.
Regional reports are summaries of district reports and are submitted to the Bureau of Maintenance for
preparation of national performance reports.
1.7.1 Activity Cards
The assigned supervisor completes the activity card issued to him during the work assignment procedure.
The following information is completed:
time worked by the crew members;
time worked by the equipment;
the quantities of materials use; and
the accomplishments.
1.7.2 Activity Summary Work Sheets
A clerk or engineering assistant completes the activity card summary work sheets as the activity card issubmitted. The work sheets are totaled at the end of the month and the following information is derived for
each activity.
total workdays;
total accomplishment;
total man-days;
equipment and material types and quantities; and
labor, equipment, fuel, material and total standard costs.
The standards costs are calculated by multiplying the resource quantities by the standard unit costs used for
planning.
Monthly and year-to-date values are calculated for the following:
accomplishment per workday;
man-days per workday; and
total standard cost per accomplishment.
1.7.3 Monthly Reports
A monthly data summary and a monthly performance summary is prepared.
Monthly data summary lists the reported month and year-to-date totals for each activity. The data is used
for in-depth analysis and for updating plans and standards.
1.7.4 Monthly Data Summary
The monthly performance summary lists reported and planned data for the month and year-to-date.
The following data are included:
workdays;
accomplishments,
accomplishment per workday values, and
standard cost per accomplishment values.
Philippine Highway Maintenance Management Manual - 2nd
Edition 1-5
8/10/2019 Philippine Hightway Maintenance Management Manual
26/200
1.7.5 Quarterly Performance Summary
Regional and national performance summary reports are prepared quarterly. The reports are used by
managers to help identify deviations from plans and standards to help discern trends.
Reporting details and formats are in Chapter 7.
1.8 Control
Control involves both operational and system control.
Operational control is continuous to ensure intelligent decisions about scheduling, directing and reporting.
System control occurs at least annually to correct system guidelines, plans and standards. Both types of
control employ the same procedure.
The procedure for controlling work is a follows:
work performance and management actions are compared with plans and standards;
significant deviations are investigated to determine when they occurred;
the most appropriate corrective actions are identified;
the corrective actions are implemented; and
the corrective actions are followed up to ensure that they are effective.
Chapter 8 contains full details on Control.
1-6 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
27/200
CHAPTER 2 ACTIVITIES
The Annual Maintenance Work Program prepared by the Maintenance Management System is expressed
in maintenance activity work units applied to roadway maintenance features.
The roadway maintenance features are assigned easily identifiable and measurable units for counting and
summarizing into a convenient Maintenance feature inventory.
Maintenance work activities are described, names and numbered according to the maintenance feature on
which they are performed. Units of work measure that is compatible with the maintenance feature unit
measure are assigned to each activity.
2.1 Activity List
The Activity List includes all activities. Each activity listing includes the activity number, name, work
units, maintenance feature, Inventory unit and quantity standard unit. The activities are grouped andnumbered according to the general classification of expenditure.
Activities are numbered in sub-groups indicating the maintenance feature on which the activities are
performed. These groups and sub-groups are formed to allow summarization and comparisons of program
planning and accomplishments. The major groups and sub-groups of the revised activities are shown
below:
o Group by Maintenance Features+ 100 Road and Related Features
+ 200 Roadside Features+ 300 Traffic Services
o
Group by Expenditure Category+400 Emergency Work
+ 500 Supervision Support and Overhead (Project)+ 600 Maintenance Projects
+ 700 Special Maintenance
The Activity List is shown in Appendix A-1.
2.2 Activity Standard
Maintenance work activities should be clearly defined in order that personnel responsible for planning,
scheduling and reporting have a uniform understanding of their operation.
Major activities should not be inclusive as to combine distinctly different types of work or so restrictive as
to include only a few steps in a work method. For example, pot-holes patching and bituminous surface
treatment should not be combined in a single activity nor should be work step for compacting a patch be an
activity separate from pothole patching.
Activities are used throughout the management system work is planned, scheduled, directed, reported
and controlled by activity. An Activity Standard is developed for each activity. It includes the following
information:
name and number;
description; purpose;
Philippine Highway Maintenance Management Manual 2nd
Edition 2-1
8/10/2019 Philippine Hightway Maintenance Management Manual
28/200
authorization;
work control category;
scheduling criteria;
typical crew size and composition;
typical equipment;
typical materials;
typical work method;
daily production range; and
notes.
An example of an activity standard is shown in Figure 2.1 Details of the Activity Standards are shown in
Appendix A-2
2.2.1 Name and Number
An activity is given a name and number to provide easy and clear reference to the type of work described
in the activity standard.
The numbers assigned reflect the type of work. For example, numbers 101 to 104 are reserved for unpaved
roadway repair and numbers 111 to 114 are reserved for bituminous roadway surface maintenance.
2.2.2 Description
The description is necessary to standardize terminology and make communications clear and concise. For
example, grading has different meanings to different maintenance engineers from a few light passes on
the surface to complete reshaping of the surface and ditches. The description for Activity 104, Machine
Grading Unpaved Roadways, leaves little doubt as to the type of work included in the activity.
2.2.3 Purpose
The purpose indicates why the activity is performed. It supplements the description and is useful in
planning, scheduling and directing the work.
2.2.4 Authorization
The authorization indicates the person who approves the Work to be called and/ or performed. The
standards recognize two levels of management in agreement with the organization of the Department. The
two people who authorize work are the District Engineer and the Regional Director. In practice, the
responsibility is designated to other engineers.
2.2.5 Work Control Category
For proper implementation of the maintenance activities, work control categories are assigned to theactivities, such as:
Unlimited control category that signifies that activity is a priority activity and should be performed asneeded, usually to repair hazardous defects.
Limited indicates 2ndpriority, activity should be performed approximately in the quantity planned.
Variable signifies the lowest priority, the activity quantity should be reduced when other activities
overrun planned quantities.
2-2 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
29/200
Project - Indicates an activity initially planned as lump sum and re-programmed as a series of projects
requiring approving authority or implementation
2.2.6 Scheduling Criteria
The scheduling criteria indicate when the work should be scheduled. They may refer to the seasons of theyear, road conditions, and coordination with other activities or other pertinent information.
2.2.7 Typical Crew
The typical crew size and composition are representative of what should be used when the work is
performed according to the activity standard. Typical crews range in size according to the type and
quantity of equipment required and/or available. Activities should be performed using an appropriate crew
size within the given range.
2.2.8 Typical Equipment
Typical equipment indicates the types and number of pieces of equipment used to perform the workaccording to the activity standard. The planned equipment is representative of the majority of workdays
and should be interpreted as a guide rather than a mandate.
2.2.9 Typical Material
Typical material includes the major types used when the work is performed according to the activity
standard.
2.2.10 Typical Work Method
Typical work method indicates how the work should be performed on the majority of workdays. The work
method is presented in numbered steps for clarity.
2.2.11 Daily Production Range
The daily production range indicates the amount of the appropriate unit of work expected to be
accomplished on a typical workday performed according to the activity standard.
The range is used to reflect that workday accomplishments vary acceptably according to conditions no
single workday can be expected to result in the average accomplishment.
2.2.12 Notes
The notes usually refer to how the activity should be scheduled and reported.
Philippine Highway Maintenance Management Manual 2nd
Edition 2-3
8/10/2019 Philippine Hightway Maintenance Management Manual
30/200
Figure 2.1 Example of Activity Standard
Effetive Date: DPWH HIGHWAY MAINTENANCE
ACT. NO 104 NAME: MACHINE GRADING UNPAVED ROAD SURFACES
DESCRIPTION: Use this activity for correcting minor surface erosion, ruts, corrugations, potholes
depressions, etc., and restoring the surface crown by using a road grader.
Reclaiming surface materials and reshaping ditches, if needed, are included.
However, adding new materials and/or surface widening are not included
PURPOSE: To provide smooth, well drained surfaces. Reclaiming surface material and ditching
are secondary purposes.
AUTHORIZATION: WORK CONTROL
District Engineer CATEGORY: Limited
SCHEDULING: Schedule when defects control traffic speeds or threaten the structure of the
road surface. Schedule ditching when there is need 1/.
Schedule a roller only when there is sufficient natural moisture for compaction 2/.
Defects that cannot be removed by scarrifying, such as subgrade failures (soft spots) 3/.
should be corrected first prior to scheduling this activity.
1-2* Operators 1. Place safety devices.
2 Laborers 2. Scarify or cut surface to remove potholes, erosion scars,
corrugations, high areas, etc.
3. Clean and recut ditches and outlets/turnouts. Remove
* - if roller is used spoil material from culvert inlets and outlets.
4. Reclaim suitable material from ditches and sides.
5. Remove oversize or unsuitable material.
No. Code: Description 6. Blend reclaimed material with scarified surface materials,
7. Spread, reshape and compact.
1 N1 Road Grader 8. Check cross section, profile and drainage. Rework if
1 Z4 Pneumatic/tandem needed.
(steel wheel)* 9. Remove safety devices.
Hand toolsSafety devices
PPE (refer to Act. 503)
* If available
Code: Descriptions
none
1-3 centerline kilometers graded.
NOTES: 1/ If primary purpose is ditching, use Act. 141 or 199.2/ If watering is needed, schedule ahead of grading under Act. 199.
3/ Use Act.199 for subgrade repair(soft spots).
DAILY PRODUCTION RANGE:
ACTIVITY STANDARD
TYPICAL CREW: TYPICAL WORK METHOD:
TYPICAL EQUIPMENT:
TYPICAL MATERIALS:
2.3 Activity Number
Numbers are assigned to each maintenance activity to provide quick and easy identification and reference.
The present numbers are of three digits to provide reference to the category of maintenance expenditures,
to the roadway maintenance feature upon which is being performed and the activity within the system.
The general expenditure categories are identified for funding and are identified as follows:
Routine Maintenance Activity 100 through 600 under Routine Maintenance, general expenditure
categories are represented by the numbers in the hundreds as follows:
2-4 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
31/200
100 Road and Related Features
200 Roadside Features
300 Traffic Services
400 Emergency Work
500 Supervision Support and Overhead
600 Maintenance Project
700- Special Maintenance
The routine maintenance annual work program/performance budget is summarized by these expenditure
categories for analysis of planned distributions of maintenance funds. Quarterly and annual reports are
similarly grouped for review and comparison.
Maintenance on specific roadway maintenance features are in Group 100, 200 and 300 and identify the
maintenance feature as follows:
The activities listed above represent the Routine Maintenance Program. The establishment of the above
activity numbers will be easily adapted to future computerization of the maintenance management system.
Presently, the decisions of determining the priority of expenditures are facilitated by the establishment and
use of the activity numbering system.
In the form for Annual Maintenance Work Program and Performance Budget Roads and Bridge
(Total) MVUC (see Appendix E form TAD 4.1 New) currently used by DPWH, standard routine
maintenance activities are further subdivided into the following WORK CATEGORIES:
101 to 104 Unpaved Road Surfaces 171 Temporary Repairs
111 to 114 Bituminous Pavements 199 Other Maintenance and Repairs
121 to 123 Concrete Pavements 201 to 209 Roadside features
131 to 133 Unpaved Shoulders
301 to 309 Traffic Services 141 to 144 Drainage 501 to 510 Supervision, Support and Overhead
151 to 157 Bridges 61X 69X Maintenance Project
161 Ferries 71X Special Maintenance
Activity No. Description Activity No. Description
Work Category No. 10 - Pavement Maintenance Work Category No. 15 - Shoulder Maintenance
111 Premix Patching Bituminous Pavements 131 Manual Repair of Unpaved Shoulders
112 Penetration Patching Bituminous Pavements 132 Manual Patching Unpaved Shoulders
113 Sealing Bituminous Pavements 133 Machine Grading Unpaved Shoulders
114 Replacement of Bituminous Pavements Work Category No. 16 - Drainage Maintenance
121 Patching of Concrete Pavements 141 Manual Ditch Cleaning
122 Crack & Joints Sealing of Concrete Pavements 142 Manual Inlet/outlet cleaning
123 Replacement of Concrete Pavements 143 Culvert line cleaning
101 Manual Repair of Unpaved Road Surfaces 144 Repair and/or Replacement of Minor Drainage Structure
102 Manual Patching of Unpaved Road Surfaces 199 Other Maintenance to Roadways and Related Features
103 Machine Patching of Unpaved Road Surfaces Work Category No. 17 - Vegetation Control
104 Machine Grading of Unpaved Roadways 201 Vegetation Control
171 Temporary Patching 202 Erosion Repair and Control to Roadsides401 Initial Res p ons e to Emergencies -Roadways 203 Repair of Major Roads ide Structures
41X Emergency Projects 209 Other Roadside Maintenance
503 Indirect Cost Work of Expens es Work Category No. 18 - Traffic Services Maintenance
504 Other Work or Expenses 301 Sign Maintenance
509 Foreman Supervision 302 Centerline and Lane Line Repainting
510 Unproductive Time 303 Guardrail Maintenance
Work Category No. 11 - Regravelling 304 Sight Distance Mowing and Clearing
61X Resurfacing of Unpaved Roadways 309 Other Traffic Services
63X Resurfacing of Unpaved Shoulders 71X Special Maintenance
Work Category No. 12 - Bridge and Structure Maintenance Production Activities
151 Cleaning of Bridges 501 Production of Bituminous Premix
152 Patching of Concrete Deck 502 Other Material Prtoduction or Handling
153 Repairs of Concrete Bridges
154 Repairs of Steel Bridges
155 Repairs of Bailey Bridges
156 Repairs of Timber Bridges157 Clearing Bridge Waterways
402 Initial Response to Emergencies Bridges
Philippine Highway Maintenance Management Manual 2nd
Edition 2-5
8/10/2019 Philippine Hightway Maintenance Management Manual
32/200
8/10/2019 Philippine Hightway Maintenance Management Manual
33/200
CHAPTER 3 ORGANIZATION
This Chapter examines organization structures as they relate to the management system and is organized
under the following headings:
Crew Organization;
District Organization; and
Regional Organization.
Exhibits at the end of the chapter list management system responsibilities for selected positions.
3.1 Crew Organization
In order to apply roadway maintenance management according to the concept covered in Chapter I, using
the activity standards explained in Chapter 2, the district highway maintenance personnel must be
organized to provide the number of work days for each employee classification as developed in the Annual
Maintenance Work Program. The number in each classification is determined by the number of work days
of the various activities required to maintain the district national road system and the typical crew
described in the activity standards. The assignment of maintenance personnel according to the activity
standard of the work to be performed and the flexibility of assignment to any location is necessary to fulfill
the annual work program. Thus, in general, maintenance personnel are assigned to either a certain work
activity or location but rather as required according to their abilities.
3.2 District Organization
Districts are divided into geographical areas to organize management activities.
Area boundaries are established on a flexible basis and can be revised as transportation capabilities and
other factors change.
The establishment of boundaries to maximize the roadway kilometers within an area will develop a
sufficient workload to keep both men and equipment assigned to that area and reduces transportation
requirements. Travel times, geographical features and transportation capabilities determine the best size of
an area.
A centralized area office and yard is desirable to provide a meeting place, safe storage for equipment and
materials and overnight facilities for personnel.
Area boundaries, and arrangements for area offices and yards when feasible, are submitted by the district
for approval by the Regional Director prior to implementation.
Personnel and equipment are assigned to an area for durations required to perform work activities
scheduled by the Area In Charge and approved by the District Maintenance Engineer. A District Area In
Charge is assigned to share responsibility for managing maintenance in the area. Foremen are assigned to
direct activity crews. Personnel, with special knowledge or abilities, and scarce equipment may be shared
among areas to satisfy activity scheduling. Personnel are assigned to any area to perform work as benefits
the Department.
District Maintenance Engineer procures resources, coordinates work among the areas and provides control
of work scheduling and reporting. The District Maintenance Engineer functions as the Area In Charge indistricts having only one area.
Philippine Highway Maintenance Management Manual - 2nd
Edition 3-1
8/10/2019 Philippine Hightway Maintenance Management Manual
34/200
The District Engineer provides overall control of work and money expenditures to meet Department
objectives and priorities.
3.3 Regional Organization
The Regional Highway Maintenance Division is headed by a Regional Maintenance Engineer and is
composed of two major sections: Maintenance Management and Inspectorate. Maintenance Management
section is headed by a Regional Maintenance Management Engineer and is concerned with planning,
reporting and system control. Inspectorate section is headed by a Regional Maintenance Inspectorate
Engineer and is concerned with scheduling, directing and operational control.
3.4 Management System Responsibilities
3.4.1 District Maintenance Foremen
Directs one or more activity crews to perform work as assigned in accordance with plans and
standards;
Reports work on activity cards;
Performs related work as assigned by District Maintenance Area Engineer In Charge.
3.4.2 District Maintenance Area In-Charge
Conducts field inspections to identify and document maintenance needs;
Prepares quincenal schedule to satisfy maintenance needs and to achieve Department
objectives and priorities;
Assign work to foremen in an effective manner
Collects and reviews activity cards;
Conducts field inspections of work-in-progress and completed work to ensure work is directed
appropriately and effectively;
Conducts field inspection and takes corrective measures to ensure activity cards are accurate
and submitted on time;
Performs related work as assigned by DistrictMaintenance Area In Charge
3.4.3 DistrictMaintenance Engineer
Prepares workday distribution, resource use/standard cost distributions and resource
requirements for annual maintenance work program;
Conduct field inspections to ensure that current maintenance needs are identified;
Conducts quincenalschedulingmeeting and coordinates scheduling among district areas; Reviews quincenal schedules to ensure schedules are written to satisfy maintenance needs and
to achieve Department objectives and priorities;
Approves quincenal schedules;
Takes corrective measures to ensure work assignment procedures are appropriate and
effective;
Procures resources for maintenance work; Assigns resources for district area;
Supervises preparation of monthly reports;
Conduct field inspections and takes corrective measures to ensure monthly reports are
accurate and submitted on time;
Reviews and analyzes monthly reports for operational control purposes;
Directs the DistrictMaintenance Area In Charge;
Performs related work as assigned by DistrictEngineer;
3-2 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
35/200
Prepares project maintenance estimates;
Supervises preparation of maintenance feature inventory.
3.4.4 DistrictEngineer
Ensures resources are used and money is spent to achieve Department objectives andpriorities;
Reviews and submits project maintenance estimates;
Reviews and submits workday distribution, resource use/standard cost distributions and
resource requirements for annual maintenance work program;
Reviews and submits monthly reports;
Ensures resources are properly procured and assigned for maintenance work;
Ensures that proper scheduling and coordination exist among district areas;
Directs the DistrictMaintenance Engineer;
Performs related work as directed by the Regional Director;
Reviews and submits maintenance feature inventory.
3.4.5 Regional Maintenance Engineer
Assists districts in highway maintenance management systems of operations by:
conducting field inspections to confirm current maintenance needs are identified
attending quincenal scheduling meetings to confirm schedules are written to satisfy
maintenance needs and achieve Department objectives and priorities
reviewing work assignment procedures to confirm that they are appropriate and effective
conducting field inspections of work-in-progress and completed work to confirm that
work is directed appropriately and effectively completed
conducting field inspections and reviews to confirm activity cards and monthly reports
are accurate and submitted on time
Coordinates scheduling among districts in the region to maximize equipment utilization and
material availability;
Reviews and analyzes monthly reports for operational control purposes;
Identifies and investigates significant deviations from plans and standards;
Suggests corrective actions to the Regional Highway Maintenance Inspectorate Engineer or
the districtsdepending on the nature and severity of the actions;
Implements and follows up corrective actions when specifically assigned by the Regional
Director; and
Performs related work as assigned by the Regional Director.
3.4.6 Regional Maintenance Management Engineer
Prepare district and regional maintenance work program/performance budgets;
Reviews and corrects district AMWP/PB submissions; Prepares regional summaries of
AMWP/PBs;
Reviews maintenance feature inventory submissions and compiles regional inventory;
Reviews maintenance project estimates and recommends appropriate action by Regional
Maintenance Engineer;
Advises and assists districts in AMWP/PB preparation;
Advises and assists regional and district personnel in report preparation and analysis;
Compiles regional summary reports;
Philippine Highway Maintenance Management Manual - 2nd
Edition 3-3
8/10/2019 Philippine Hightway Maintenance Management Manual
36/200
Reviews and analyzes regional summary reports and other data for system control purposes;
Conducts investigation for system control purposes;
Recommends corrective actions to the Regional Maintenance Engineer;
Reviews and analyzes accounting reports and records for standard unit cost analysis and
comparisons with nationwide standard unit cost;
Maintains records of other planning values for comparisons with nationwide values;
Directs personnel in the Regional Management Maintenance Engineer;
Performs related work as assigned by the Regional Maintenance Engineer.
3.4.7 Regional Maintenance Inspectorate Engineer
Coordinates scheduling among subregions;
Evaluates corrective action suggestions from the Subregional Engineers;
Reviews and analyzes regional summary reports for operational control purposes;
Recommends corrective actions to the Regional Maintenance Engineer;
Implements and follows up corrective actions when specifically assigned by the Regional
Director;
Directs personnel in the Regional Inspectorate Maintenance Engineer; and
Performs related work as assigned by the Regional Maintenance Engineer.
3-4 Philippine Highway Maintenance Management Manual - 2nd
Edition
8/10/2019 Philippine Hightway Maintenance Management Manual
37/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-1
CHAPTER 4 PLANNING
Planning serves to estimate the annual work quantities, resource requirements and standard costs needed to
meet the Department objectives for roadway maintenance. The Annual Maintenance Work Program andPerformance Budget (AMWP/PB) documents and communicates these objectives.
AMWP/PBs are prepared for Routine Maintenance budget of each District national roadway system.
These are summarized by regions for a Regional AMWP/PB and the regional program/budgets are
summarized to become the National Highway Maintenance budget request.
The sequence for developing a District program/budget is as follows:
Identify planning concepts;
Inventory maintenance features;
Prepare the work program and performance budget;
Prepare the monthly crewday distributions;
Prepare other monthly distributions; and
Estimate resource requirements.
The remainder of this chapter examines this sequence and the important forms used for documenting the
AMWP/PB.
4.1 Planning Concepts
Concepts for preparing and interpreting the AMWP/PB recognize important Department objectives and
planning limitations.
4.2 Department Objectives
A list of important planning objectives, from the list of system objectives in Chapter One, is as follows:
To provide uniform levels of maintenance service throughout the Philippines;
To plan the use of labor, equipment and material in manners appropriate to the Philippines;
To provide objective bases to plan maintenance work programs;
To provide direct relationship between programmed work and budgeted costs;
To provide planned work quantities for meaningful comparisons with actual performance;
To provide a measurement of effectiveness of the present standard value assigned to compute
the annual national highway budget allotment; and To provide a programmed estimate of additional funding required to complete programmed
routine maintenance.
These objectives are examined in the following paragraphs.
In order to provide for uniform levels of service throughout the Philippines, national planning values are
used to program equal quantities of maintenance activity work units to all maintenance feature inventories
and to estimate the amount of resources and funding required to perform the program. Variations in the
actual requirements of an individual district are taken cared of by scheduling appropriate quantities of
work activities needed to provide the desired level of service.
8/10/2019 Philippine Hightway Maintenance Management Manual
38/200
4-2 Philippine Highway Maintenance Management Manual2nd
Edition
Appropriate use of labor, equipment and material, to best meet the needs of the Philippines, is reflected in
the planning values developed for the work activities. The distributions of labor, equipment and material
in all work activities considers the most appropriate and effective use of the resources and funds available.
The planning concept of labor intensive, equipment intensive or least fund requirement work programs isprovided through adjustment of planning standards. The nationwide standards and planning values must
be revised annually to meet the Departmentsconcepts.
The objectives bases provided for developing a maintenance work program attuned to a roadway system
are the identification of roadway system features that require maintenance and a description of the work
activities needed to meet these maintenance requirements. Applications of nationwide activity planning
values to districtmaintenance feature inventory develops maintenance work programs using these bases.
Performance budgets are calculated by applying unit costs to estimate resource quantities required to
complete the work programs; the procedure provides direct relationships between programmed work and
budgeted cost.
Programmed work quantities are expressed in work units, easily identified in the field, in workdays and in
man-days. Budgeted costs are calculated using standard unit costs that remain as constants throughout the
year and are also used in the reporting component of the management system. These concepts provide the
bases for meaningful comparisons of planned work with actual performance.
The annual performance budget is developed using national work quantity standards that provide a routine
maintenance program for national road maintenance provided by the standard value of pesos per
Equivalent Maintenance Kilometer (EMK). The effectiveness of the standard peso value will be
determined by the level of service provided by the routine maintenance work program.
Other, more specific Department objectives may be expressed in the individual planning values. Forexample, a desire to increase the levels of service for bituminous pavements would be expressed by
increasing the planned quantity of work for the appropriate activities.
4.3 Planning Limitations
Development of an Annual Maintenance Work Program/Performance Budget uses one set of real,
identifiable values in the process, the inventory, or quantity, of Roadway Maintenance Features. All other
factors and planning values are estimates developed in various ways. For example:
Quantity standards express the amount of work per activity per maintenance feature per year
applied to the total feature inventory, not individual inventory units. They are developed from
historical data, qualified experience and sound engineering judgment.
Average daily production represents the weighted average of the total production achieved in
the total work days for one year.
Average crew size used for each activity, is the average of all work days reported in one year
divided into total man-days.
Workday planning values of resources per day are based on the activity standard and annual
reported average usage.
Standard unit costs are based on the nationwide actual fiscal costs adjusted for predicted
inflation, handling, transporting and to include cost of minor accessories and hardware.
The overall accuracy of a work program increases as its scope increases but its applicability to any specific
maintenance feature unit, or small number of units, in district maintenance work must be scheduled as
needed, within the limits of the program, and reported as actually accomplished. Comparison of the
8/10/2019 Philippine Hightway Maintenance Management Manual
39/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-3
reported values with the planned values may be issued at the end of a year for adjusting future planning
values. Reports of less duration nine, six or three months maybe analyzed to indicate trends but
comparisons of daily, weekly or monthly reports with the annual work program of workday distributions is
based mainly on historical weather patterns. Identical monthly weather patterns in any two years seldom
occur. Weather is one of the main factors in determining roadway maintenance requirements and as
weather changes so does maintenance. Management must keep this in mind when reviewing performancereports. Roadway maintenance should be scheduled by field requirements and reported as accurately as
possible. Reports adjusted to make favorable comparisons with annual report program are detrimental to
the overall system and are not acceptable.
Annual nationwide planning values must be adjusted to meet anticipated funding in accordance with the
Departments objectivefor the national road maintenance.
The national quantity standard planning values for routine maintenance will be based on the present EMK
value.
The standard EMK value multiplied by the total EMK for the roads and bridges for each district furnished
by the BOM is the gross amount allotted by the national budget. Before distribution, five percent (5%) is
deducted for a contingency fund for the regional office and another five percent (5%) is deducted for the
maintenance of newly converted roads (local road to national road).
4.4 Maintenance Feature Inventory
A maintenance feature is a distinct part of the roadway system on which one or more activities must be
performed. A maintenance feature inventory is the counting and recording of the measurement units of
each maintenance feature. The total units called the inventory.
A list of maintenance features and inventory units is summarized from the activity list in Chapter Two and
shown as Figure 4.1 - Maintenance Feature Inventory Work Units . Descriptions of these inventory unitsare in shown The Definition of Terms.
Maintenance feature inventories are maintained for each district and summarized into regional and national
inventories. They are separate from other inventories, are permanent records and after initial compilation,
require only annual updating.
8/10/2019 Philippine Hightway Maintenance Management Manual
40/200
4-4 Philippine Highway Maintenance Management Manual2nd
Edition
Figure 4.1
Maintenance Features and Inventory Units
Maintenance Features Inventory Units
Unpaved Roadways - Centerline kilometers
Bituminous Roadways - Centerline kilometersConcrete Roadways - Centerline kilometersBituminous Pavements - Lane kilometers
Concrete Pavements - Lane kilometersUnpaved Shoulders - Shoulder kilometers
Ditches - Ditch kilometersDrop Inlets/Catch Basin/Manholes - Number of structures
Cross/Lateral Drainage - Number of linesBox Culverts - Number of structuresRoadside Structures - Number of structures
Ferries - Number of ferries
Traffic Signs, KM Post, Etc. - Number of sign, KM Post, Etc.
Guardrail - Linear metersSteel Bridges - Linear meterConcrete Bridges - Linear meter
Bailey Bridges - Linear meterTimber Bridges - Linear metersNumber of Bridge - Number
Concrete Decks - Linear meters
Width of Waterways - Linear meters
4.5 Compilation
The maintenance feature inventory is compiled from the results of field inspection or from Roads andBridge Information Application (RBIA).
The feature inventory for an inventory section is recorded on the Maintenance Feature Inventory section
recorded on the Maintenance Feature Inventory Work Sheet, which is shown in Figure 4.2.
The form for the summary of inventory quantities for all road sections is shown in Figure 4.3. The
inventory quantities are totaled to produce the maintenance feature inventory for a district.
Regional summaries are compiled by Regional Maintenance Management Engineer and national
summaries are compiled by the BOM.
8/10/2019 Philippine Hightway Maintenance Management Manual
41/200
8/10/2019 Philippine Hightway Maintenance Management Manual
42/200
4-6 Philippine Highway Maintenance Management Manual2nd
Edition
Figure 4.3
Maintenance Feature Inventory Summary
8/10/2019 Philippine Hightway Maintenance Management Manual
43/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-7
4.6 Annual Updating
Maintenance feature inventories are updated by adding, deleting or revising Work Sheets and making
corresponding revisions based on Roads and Bridge Information Application (RBIA).
4.7 Inventory Instructions
Detailed instructions in using the inventory forms for compiling and updating District maintenance feature
inventories are included in Appendix D-Maintenance Feature Inventory Instructions.
4.8 Annual Maintenance Work Program/Performance Budget (AMWP/PB)
Work programs and performance budgets are separate entities but are combined into a single presentation
to emphasize the concept of planning and identifying work quantities and computing the budget
requirements for the resources needed to perform the work program. The two components require the
development and use of special planning values.
The work program is expressed in work units, workdays and man-days and is developed as follows:
Maintenance Feature Inventory X Quantity Standards = Work Units
Work Units X Average Daily Production = Workdays
Workdays X Average Crew Size = Man-days
The performance budget is expressed in pesos required for labor, equipment and material for the number of
work days in each activity and summarized to express the total funds required for the work program.
The development of the planning values and forms for the two components are described in the following
paragraphs.
4.9 Work Program
The annual work program is developed by applying nationwide planning values for quantity standard,
average daily production and average crew size to the maintenance feature inventories of each district,
region, and the nation. The regional programs will equal the total of its districts and the national program
will equal the sum of the regions.
The forms and planning values will be developed and distributed by BOM. The planning values for the
work program include:
+ Quantity Standard
+ Average Daily Production
+ Average Crew Size
Quantity Standards control the quantity of work planned for each activity for one year and thus establish
the level of maintenance service, the quantity of resources and the finances required.
Evaluation of quantity standards must be made annually but adjustments should be based on trends and
averages of several years rather that to meet one year reported data.
8/10/2019 Philippine Hightway Maintenance Management Manual
44/200
4-8 Philippine Highway Maintenance Management Manual2nd
Edition
In the future, experience may prove that maintenance requirements vary sufficiently in different parts of
the country because of weather, terrain or other causes, to mandate the establishment of standards for
separate regions, or zones consistent of several regions, to meet those variations.
Average daily production represents the planning value equal to the total accomplishment divided by the
total workdays during a year. This planning value should not be used for comparisons of daily, monthly orquarterly reports. Most activities have an accepted daily production range that depends on the assigned
crew, equipment and activity location.
Average crew size planning value expresses the number of man-days per workday for a years activity. It
should fall within the Typical Crew Size given by the activity standards but should not be used for short
term comparisons or evaluations.
4.10 Performance Budget
In order to convert a work program into a performance budget, standard daily costs must be developed for
each activity. A Workday Planning Value sheet for each activity is prepared by the BOM staff annually
and the standard workday costs for labor, equipment, material and total resources are distributed with the
other forms.
The workday planning value sheet identifies the work units, planning daily production, planning crew size,
resource descriptions, resource use factors, standard unit cost and standard daily cost for labor, equipment
and material. The form is shown in Figure 4.4.
The development of the workday planning values will utilize the work program planning values for daily
production and crew size. Resource descriptions will be in agreement with the typical crew, planned
equipment and material shown on the activity Activity Standard. (See Appendix- A-2).
Resource use factors identify the average daily usage of the resources needed. For example, the crew maybe made up of a foreman, driver, operator and 3 laborers. If the entire crew spent all day performing the
activity, the use factor would be 1 for foreman, driver and operator and 3 for laborer. If the foreman and
driver spent only half time on the activity the use factor would be 0.5 for them, 1 for operator and 3 for
laborer.
Equipment would show the same pattern of use factor. If the foreman and driver were using a service
vehicle, its use factor would be 0.5, the operators equipment would show the same use factor as the
operator and hand tools would show a use factor of 3. Fuel resource use will be equal to the sum of the
standard cost of equipment.
Material units would be described in the resource unit column and the average daily production is
measured in cubic meters of aggregate for example, then the resource factor would agree with the planned
daily production.
Resource use factors will be compiled from daily work, reports (Form TAD 1.1/MPP 1 and 2) in District
offices and forwarded to regional maintenance offices for review and analysis and then forwarded to BOM
for use in annual planning value review and update.
A sample of the Workday Standard Costs form is shown in Figure 4.5 and summarizes the workday
planning value sheets.
8/10/2019 Philippine Hightway Maintenance Management Manual
45/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-9
Figure 4.4 Workday Planning Value Worksheet
Workday Planning Values Prepared By As of Date
ACTIVITY NAME Act. No.
Work Units Plan Daily Production PlanCrew Size
Resource Description Resource Resource Standard Standard
Unit Use Unit Cost Cost
Labor
Foreman Man-Days X X
Operator Man-Days X X
Driver Man-Days X X
Artisan Man-Days X XLaborer Man-Days X X
Labor Sub-Total Man-Days X X
Equipment
Fuel
Hand Tools
Equipment Subtotal X X X
Material
Material Subtotal X X X
All Resources
Total All Resources X X X
8/10/2019 Philippine Hightway Maintenance Management Manual
46/200
4-10 Philippine Highway Maintenance Management Manual2nd
Edition
Figure 4.5 - Performance Budget: Workday Standard Cost
ACTIVITYLabor Equipment Material
Contractual
and
Other Exp.*Total
No. Description Peso per day Peso per day Peso per day Peso per day Peso per day
GROUP 100ROAD AND RELATED
FEATURES
UNPAVED ROAD SURFACES
101 Manual Repair of Unpaved Road Surfaces
102Manual Patching of Unpaved Road
Surfaces
103Machine Patching of Unpaved RoadSurfaces
104 Machine Grading of Unpaved Roadways
BITUMINOUS PAVEMENTS
111 Premix Patching Bituminous Pavements
112 Penetration Patching BituminousPavements
113 Sealing Bituminous Pavements
114 Replacement of Bituminous Pavements
CONCRETE PAVEMENTS
121 Patching of Concrete Pavements
122Crack & Joints Sealing of Concrete
Pavements
123 Replacement of Concrete Pavements
UNPAVED SHOULDERS
131 Manual Repair of Unpaved Shoulders
132 Manual Patching Unpaved Shoulders133 Machine Grading Unpaved Shoulders
DRAINAGE
141 Manual Ditch Cleaning
142 Manual Inlet/outlet cleaning
143 Culvert line cleaning
144 Repair and/or Replacement of Minor
Drainage Structure
BRIDGES
151 Cleaning of Bridges
152 Patching of Concrete Deck153 Repairs of Concrete Bridges
154 Repairs of Steel Bridges
155 Repairs of Bailey Bridges
156 Repairs of Timber Bridges
157 Clearing Bridge Waterways
FERRIES
161 Ferry Service
*Where applicable
8/10/2019 Philippine Hightway Maintenance Management Manual
47/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-11
Figure 4.5 - Performance Budget: Workday Standard Cost (Continuation)
ACTIVITYLabor Equipment Material
Contractualand
Other Exp.*Total
No. Description Peso per day Peso per day Peso per day Peso per day Peso per day
TEMPORARY REPAIRS
171 Temporary Patching
OTHER MAINTENANCE AND
REPAIRS
199Other Maintenance to Roadways andRelated Features
GROUP 200 - ROADSIDE FEATURES
201 Vegetation Control
202 Erosion Repair and Control to Roadsides
203 Repair of Major Roadside Structures
209 Other Roadside Maintenance
GROUP 300 - TRAFFIC SERVICES
301 Sign Maintenance
302 Centerline and Lane Line Repainting
303 Guardrail Maintenance
304 Sight Distance Mowing and Clearing
309 Other Traffic Services
GROUP 400 - EMERGENCY WORKS
401 Initial Response to Emergencies-Roadways
402 Initial Response to Emergencies Bridges
41X Emergency Projects
GROUP 500 - SUPERVISION,
SUPPORT AND OVERHEAD
501 Production of Bituminous premix
502 Other materials production and handling
503 Indirect Cost Work of Expenses
504 Other Work or Expenses
509 Foreman Supervision
510 Unproductive Time
GROUP 600 - MAINTENANCE
PROJECTS
61x Resurfacing Unpaved Roadways
62X Resealing Bit. Surface Methods "A" & "B"
63XResurfacing Unpaved Shoulders Methods"A" & "B"
64X Replacing timber Decks
65XSelected Replacement of ConcretePavement
66X Bridge Repainting
69X Maintenance Support
GROUP 700 - SPECIAL
MAINTENANCE
71x Special Maintenance
*Where applicable
8/10/2019 Philippine Hightway Maintenance Management Manual
48/200
4-12 Philippine Highway Maintenance Management Manual2nd
Edition
Standard unit cost will be developed on a regional average of combined district values. District
engineering offices will prepare and submit to their regional maintenance engineering offices, The
worksheet for determining Average Labor Cost is shown in Figure 4.6 below.
Figure 4.6 Average Daily Labor Cost
District: Date
ANNUAL LABOR COST
Personnel Cost per Classification
Peso paid to employee or to special funds for employee
Average Peso permonth
Foreman Operator Driver Artisan Laborer Total
Salary -
Allowance-
Per Diem -
Pag-Ibig -
PhilHealth -
Life Insurance -
Retirement -
Total Peso per month -
X 12 = P per year -
X No. employees
= Annual Labor Cost
per Classification
Annual Labor Cost
Total employees = Annual P per employee
ANNUAL PAID WORKING DAYS
Average Paid Days per Employees per /year52 week x 5 days/week = 260
Average Paid non-working days per employee
Non-working holidays = 10
Non-working annual leave entitlement = 15
Non-working sick leave entitlement = 15
Non-working days 40 - 40
Average paid working days 220
AVERAGE DAILY LABOR COST
Annual Peso per employee = A= C Average Daily Labor Cost
Annual Paid Workdays per employee = B
Average Daily Labor Cost = ___________________________ = P
8/10/2019 Philippine Hightway Maintenance Management Manual
49/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-13
Standard unit cost for equipment days will be determined from current Association of Carriers and
Equipment Lessors, Inc. (ACEL) rates and/or the Department. Fuel costs per day will be included and
computed as a percentage of the total daily equipment costs. The percentage will be determined by BOM
staff and will apply equally in all districts for theprogram year. Hand tools are included in equipment costs
as a fixed rate per labor man-days. The daily rate will be fixed by BOM staff.
Material standard unit costs will be determined by BOM staff with assistance from regional and district
engineering offices in submitting actual fiscal costs in their respective procurement areas. Standard unit
costs will be used in computing costs of all reported resource usages throughout the program year.
Significant differences between performance budget standard costs and actual fiscal costs are adjusted
prior to the development of the next annual work program and performance budget.
Standard unit cost per workday resource requirement will be distributed to each district engineering offices
with detailed instructions and standard forms and planning values as shown in Figure 4.7 and 4.8.
Figure 4.7 Standard Unit Costs For Work Days
Resource Requirements CY 20____
Labor
Highway maintenance crew personnel P________per man-day
Equipment
Air Compressor with attachments P________per dayAsphalt Kettle P________per day
Asphalt Distributor P________per day
Concrete Mixer P________per dayConcrete Saw P________per day
Payloader P________per day
Road Grader P________per day
Service Vehicle (Pick-up) P________per dayPlate Compactor P________per dayRoad Roller P________per day
Truck, Dump P________per day
Truck, Stake P________per dayWater Truck P________per day
Pneumatic Roller P________per dayBackhoe with breaker P________per day
Portable Generator P________per dayJack Hammer P________per dayKneading Machine with Applicator P________per day
Power Spray P________per day
Bridge Inspection Vehicle (BIV) P________per dayPruning Saw P________per day
Chainsaw P________per dayGrass Cutter P________per day
Miscellaneous* P________per day
Fuel - % Daily Equipment Cost
Hand tools P________per laborer
man-day
*Report by description & rate
8/10/2019 Philippine Hightway Maintenance Management Manual
50/200
4-14 Philippine Highway Maintenance Management Manual2nd
Edition
Figure 4.8 Standard Unit Costs For Work Days
Resource Requirements CY20__
Materials Planning Value Cost per Unit
Aggregate Sub Base Course (Item 200) P_________per cu. MeterAggregate Base Course (Item 201) P_________per cu. meter
Aggregate Surface Course (Item 300) P_________per cu. meterAggregate Chips P_________per cu. meter
Sand P_________per cu. meterGravel P_________per cu. Meter
Common Borrow (Item 104) P_________per cu. meterBoulders/Riprap P_________per cu. meterBituminous Hot Mix P_________per cu. Meter
Bituminous Cold Mix P_________per cu. Meter
Bituminous Prime Coat (Item 301) P_________per cu. MeterBituminous Tack Coat (Item 302) P_________per cu. Meter
Concrete Epoxy P_________per literPenetration Asphalt P_________per liter
Emulsified Asphalt P_________per literPortland Cement P_________per bagPolymer Cement Mortar P_________per bag
P.C. Pipe Culvert P_________per linear meterLumber P_________per board feet
Bridge Paint P_________per liter
Traffic Paint P_________per literSign Faces P_________eachSign Post P_________each
Guardrail P_________per pieceTimber Piles P_________each
Bailey Panels P_________each
Miscellaneous
The viability of the concept of a highway maintenance management system depends on annual evaluation
of values applied to these planning factors and logical meaningful adjustment of the value to meet existing
or anticipated changes. The evaluation and adjustment are the responsibility of the BOM staff but the
regional, and district staffs are responsible for providing accurate and timely data for evaluation. These
standard unit costs are only valid in the maintenance management system and do not represent financial
transactions at any time.
8/10/2019 Philippine Hightway Maintenance Management Manual
51/200
Philippine Highway Maintenance Management Manual2nd
Edition 4-15
4.11 Routine Maintenance
The preparation of the routine AMWP/PB for district and regional engineering offices will be done on
Form TA 4.1 shown in Figure 4.9 and summarized as shown in Figure 4.10. The maintenance feature
inventory quantities will be generated from the present RBIA database and be used with the national
quantity standards, daily productions and crew sizes to determine the planned work quantity, number ofworkdays and man-days. The numbers of work days will be multiplied by the workday standard costs as
shown in Figure 4.5.
Routine maintenance activities are divided into general groups as follows:
Group 100Road and Related Features
Group 200Roadside Features
Group 300Traffic Services
Group 400Emergency Works
Group 500Supervision, Support, and Overhead
Group 600Maintenance Projects
Group 700Special Maintenance
This procedure identifies the required funding for a total annual maintenance work program of routinemaintenance. It also identifies the adequacy of the present standard value for funding maintenance and
provides a basis for requesting additional funds for national roads maintenance without increasing the
standard value.
8/10/2019 Philippine Hightway Maintenance Management Manual
52/200
4-16 Philippine Highway Maintenance Management Manual2nd
Edition
Figure 4.9Annual Maintenance Work Program Performance Budget
Sheet1of5
DATE:
DATE:
DATE:
UNIT
QTY.
UNIT
CARRIAGEWAYMAINTENANCE
WorkCategoryNo.1
0
PavementMaintenance
111
PremixPatchingBituminous
Pavements
un-ltd
lane.
Km
cu.m
112
PenetrationPatchingBituminous
Pavements
ltd
lane.
Km
cu.m
113
SealingBituminousPavements
ltd
lane.
Km
ltrs
114
ReplacementofBituminous
Pavements
var
lane.
Km
sq.m
121
PatchingofConcretePavements
un-ltd
lane-km
cu.m
122
Crack&JointsSealingofConcrete
Pavements
ltd
lane-km
ltrs.
123
ReplacementofConcretePavements
var.
lane-km
sq.m
101
ManualRepairofUnpavedRoad
Surfaces
ltd
CL-km
CL-m
102
ManualPatchingofUnpavedRoad
Surfaces
un-ltd
CL-km
cu.m
103
MachinePatchingofUnpavedRoad
Surfaces
un-ltd
CL-km
cu.m
104
MachineGradingofUnpaved
Roadways
ltd
CL-km
CL-km
171
TemporaryPatching
Var.
CL-km
CL-m
401
InitialResponsetoEmergencies-
Roadways
Unltd
CL-km.
Man-days
*WhereApplicable
(17)=
(13)+(14)
+(15)+(16)
(11)
(12)=
(10)X(11)
(13)
(14)
(15)
(2)