4
Marshall University Joan C. Edwards Stadium Prepared by: Huntington, West Virginia LOCATION MAP 001 Title Sheet, Drawing Index and General Notes 101 East Grandstands Steel Framing Reference Plans 201 East and South Grandstands Typical Raker Sections THP Limited, Inc. 100 East Eighth Street Cincinnati, Ohio 45202 513-241-3222 REVISIONS ISSUES DRAWN BY: DRAWING TITLE PROJECT MANAGER: CHECKED BY: JOB NUMBER DATE DRAWING NUMBER THP Limited, Inc. 100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 Fax: 513.241.2981 www.thpltd.com PHASE III RESTORATION G.J. Schmitz S.E. Harden C.W. Przywara 18136.00 4/2018 Marshall University Joan C. Edwards Stadium Phase III Restoration CODES AND DOCUMENTS 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH ALL APPLICABLE CITY, COUNTY, STATE AND FEDERAL LAWS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) AND REGULATIONS ADOPTED PURSUANT THERETO. 2. ALL WORK SHALL CONFORM TO THE CURRENT WEST VIRGINIA BUILDING CODE AND ALL LOCAL REQUIREMENTS. 3. A SEPARATE BOUND PROJECT MANUAL DATED APRIL 2018 EXISTS AND IS PART OF THE CONTRACT DOCUMENTS. GENERAL CONDITIONS, TECHNICAL INFORMATION, AND REQUIREMENTS ARE INCLUDED IN THE PROJECT MANUAL, CLEARLY ORGANIZED AND DESCRIBED IN SECTIONS CONSISTENT WITH NORMALLY ACCEPTED CONSTRUCTION SPECIFICATION INSTITUTE FORMATS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIREMENTS LISTED IN THE PROJECT MANUAL, BUT NOT NECESSARILY SHOWN IN THE DRAWINGS. 4. ALL DETAILS, SECTIONS AND NOTES ON THE DRAWINGS ARE INTENDED TO BE TYPICAL FOR SIMILAR SITUATIONS ELSEWHERE, UNLESS OTHERWISE NOTED. 5. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED BY THE CONTRACTOR. COORDINATION AND CONSTRUCTION 1. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT FOR SUCCESSFUL COMPLETION OF THIS PROJECT. 2. CONTRACTOR SHALL APPLY, SECURE, AND PAY FOR ALL REQUIRED LOCAL PERMITS, FEES, LICENSES, AND APPROVAL FOR COMPLETION OF THE WORK. 3. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE SITE PRIOR TO SUBMITTING SHOP DRAWINGS AND FABRICATING ANY WORK. IMMEDIATELY REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NEW CONSTRUCTION WORK SHALL ALIGN WITH AND MATCH EXISTING CONSTRUCTION EXCEPT WHERE OTHERWISE DIMENSIONED OR DETAILED. 5. ANY ADJACENT, EXISTING FINISHES AND/OR EQUIPMENT DAMAGED DURING DEMOLITION OR CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE. 6. CONTRACTOR WILL COORDINATE ALL CONSTRUCTION ACTIVITIES, SCHEDULE, AND PHASING WITH THE OWNER AND THE ENGINEER. 7. CONTRACTOR SHALL DISPOSE OF ALL DEBRIS OFF SITE IN A LAWFUL MANNER. MATERIALS THAT CAN BE RECYCLED SHALL BE AT A LOCAL RECYCLING PLANT. SAFETY 1. PROJECT SAFETY IS CONTRACTOR'S RESPONSIBILITY. CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE EMPLOYEES, GENERAL PUBLIC, WORKMEN AND STRUCTURE DURING CONSTRUCTION. 2. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 3. ENGINEER'S REVIEW OF CONSTRUCTION PROGRESS IS FOR CONTRACTOR'S PERFORMANCE TO ACHIEVE THE COMPLETED DESIGN, AND IS NOT INTENDED TO INCLUDE REVIEW OF ADEQUACY OF CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. GENERAL NOTES: DRAWING INDEX: TITLE SHEET, DRAWING INDEX AND GENERAL NOTES 001 Joan C Edwards Stadium 102 South Grandstands Steel Framing Reference Plans

Phase III Restoration - cbblueprint.com Job Information/MU Joan C... · the completed design, and is not intended to include review of adequacy of contractor's ... w24x76 raker beam

  • Upload
    lymien

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Phase III Restoration - cbblueprint.com Job Information/MU Joan C... · the completed design, and is not intended to include review of adequacy of contractor's ... w24x76 raker beam

Marshall UniversityJoan C. Edwards Stadium

Prepared by:

Huntington, West Virginia

LOCATION MAP

001 Title Sheet, Drawing Index and General Notes

101 East Grandstands Steel Framing Reference Plans

201 East and South Grandstands Typical Raker Sections

THP Limited, Inc.100 East Eighth StreetCincinnati, Ohio 45202513-241-3222

RE

VIS

ION

SIS

SU

ES

DRAWN BY:

DRAWING TITLE

PROJECT MANAGER:

CHECKED BY:

JOB NUMBER DATE

DRAWING NUMBER

THP Limited, Inc.

100 East Eighth Street

Cincinnati, Ohio 45202Phone: 513.241.3222

Fax: 513.241.2981www.thpltd.com

PHASE III RESTORATION

G.J. Schmitz

S.E. Harden

C.W. Przywara

18136.00 4/2018

Marshall

University

Joan C. EdwardsStadium

Phase III Restoration

CODES AND DOCUMENTS

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH ALL APPLICABLE CITY, COUNTY, STATE

AND FEDERAL LAWS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) AND REGULATIONS

ADOPTED PURSUANT THERETO.

2. ALL WORK SHALL CONFORM TO THE CURRENT WEST VIRGINIA BUILDING CODE AND ALL LOCAL

REQUIREMENTS.

3. A SEPARATE BOUND PROJECT MANUAL DATED APRIL 2018 EXISTS AND IS PART OF THE CONTRACT

DOCUMENTS. GENERAL CONDITIONS, TECHNICAL INFORMATION, AND REQUIREMENTS ARE INCLUDED IN

THE PROJECT MANUAL, CLEARLY ORGANIZED AND DESCRIBED IN SECTIONS CONSISTENT WITH NORMALLY

ACCEPTED CONSTRUCTION SPECIFICATION INSTITUTE FORMATS. THE CONTRACTOR IS RESPONSIBLE FOR

ALL REQUIREMENTS LISTED IN THE PROJECT MANUAL, BUT NOT NECESSARILY SHOWN IN THE DRAWINGS.

4. ALL DETAILS, SECTIONS AND NOTES ON THE DRAWINGS ARE INTENDED TO BE TYPICAL FOR SIMILAR

SITUATIONS ELSEWHERE, UNLESS OTHERWISE NOTED.

5. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED BY THE CONTRACTOR.

COORDINATION AND CONSTRUCTION

1. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT FOR SUCCESSFUL COMPLETION

OF THIS PROJECT.

2. CONTRACTOR SHALL APPLY, SECURE, AND PAY FOR ALL REQUIRED LOCAL PERMITS, FEES, LICENSES, AND

APPROVAL FOR COMPLETION OF THE WORK.

3. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE SITE PRIOR TO

SUBMITTING SHOP DRAWINGS AND FABRICATING ANY WORK. IMMEDIATELY REPORT ANY DISCREPANCIES

TO THE ENGINEER.

4. NEW CONSTRUCTION WORK SHALL ALIGN WITH AND MATCH EXISTING CONSTRUCTION EXCEPT WHERE

OTHERWISE DIMENSIONED OR DETAILED.

5. ANY ADJACENT, EXISTING FINISHES AND/OR EQUIPMENT DAMAGED DURING DEMOLITION OR

CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE.

6. CONTRACTOR WILL COORDINATE ALL CONSTRUCTION ACTIVITIES, SCHEDULE, AND PHASING WITH THE

OWNER AND THE ENGINEER.

7. CONTRACTOR SHALL DISPOSE OF ALL DEBRIS OFF SITE IN A LAWFUL MANNER. MATERIALS THAT CAN BE

RECYCLED SHALL BE AT A LOCAL RECYCLING PLANT.

SAFETY

1. PROJECT SAFETY IS CONTRACTOR'S RESPONSIBILITY. CONTRACTOR SHALL PROVIDE ALL MEASURES

NECESSARY TO PROTECT THE EMPLOYEES, GENERAL PUBLIC, WORKMEN AND STRUCTURE DURING

CONSTRUCTION.

2. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY

AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS

AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY

AND NOT BE LIMITED TO NORMAL WORKING HOURS.

3. ENGINEER'S REVIEW OF CONSTRUCTION PROGRESS IS FOR CONTRACTOR'S PERFORMANCE TO ACHIEVE

THE COMPLETED DESIGN, AND IS NOT INTENDED TO INCLUDE REVIEW OF ADEQUACY OF CONTRACTOR'S

SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE.

GENERAL NOTES:DRAWING INDEX:

TITLE SHEET,DRAWING INDEX AND

GENERAL NOTES

001

Joan C Edwards Stadium

102 South Grandstands Steel Framing Reference Plans

Page 2: Phase III Restoration - cbblueprint.com Job Information/MU Joan C... · the completed design, and is not intended to include review of adequacy of contractor's ... w24x76 raker beam

36

35

34

33

32

31

3029

28

W18x50

W18x50

W18x50

W18x50

W18x50W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50 W18x50

W18x50

W18x50

W18x50

W18x50W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W24x68

W24x68

W24x68

W24x68

W24x68

W24x68W24x68

W24x68 W24x68

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22

W12

x22W

12x2

2

W12

x22W

12x2

2

W12

x22

W18x50

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18

W8x18 W8x1

8

W8x18

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NTW33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W33

x130

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W24

x76

BE

NT

W18x50W18x50W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

19

20

21

22

23

24

2526

27

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50 W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W24x68

W24x68

W24x68

W24x68

W24x68

W24x68

W24x68W24x68

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W12x22

W18x50

W8x18

W8x

18

W8x

18

W8x18

W8x

18

W8x18

W8x

18

W8x18

W8x

18W8x18

W8x

18W8x18

W8x1

8W8x18

W8x1

8

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

TW

33x130 BE

NT

W33x130 B

EN

T

W33x130 B

EN

T

W33x130 B

EN

T

W33x130 B

EN

T

W33x130 B

EN

T

W24x76 B

EN

T

W24x76 B

EN

T

W24x76 B

EN

T

W24x76 B

EN

T

W24x76 B

EN

T

W24x76 B

EN

TW

24x76 BE

NT

W24x76 B

EN

TW

24x76 BE

NT

W24x76 B

EN

TW

24x76 BE

NT

W24x76 B

EN

TW

24x76 BE

NT

W24x76 B

EN

TW

24x76 BE

NT

W24x76 B

EN

TW

24x76 BE

NT

W18x50W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W18x50

W33

x130

BE

NT

W24

x76

BE

NT

G

F

E

D

C

AT COLUMN LINE C

AT COLUMN LINE C

AT COLUMN LINE C

AT COLUMN LINE CAT COLUMN LINE C

AT COLUMN LINE CAT COLUMN LINE C AT COLUMN LINE C AT COLUMN LINE C AT COLUMN LINE C AT COLUMN LINE C

AT COLUMN LINE CAT COLUMN LINE C

AT COLUMN LINE C

AT COLUMN LINE C

AT COLUMN LINE C

AT COLUMN LINE C

W33

x130

BE

NT

W33

x130

BE

NT

W12

x22

W12

x22

CROSS-BRACING,

TYPICAL EACH BAY.

PARTIAL PLAN2

101 NO SCALE

EAST GRANDSTANDS

1010 2020 3030 4040 5050 4040 3030 2020 1010

KEY PLAN N

N

RE

VIS

ION

SIS

SU

ES

DRAWN BY:

DRAWING TITLE

PROJECT MANAGER:

CHECKED BY:

JOB NUMBER DATE

DRAWING NUMBER

THP Limited, Inc.

100 East Eighth Street

Cincinnati, Ohio 45202Phone: 513.241.3222

Fax: 513.241.2981www.thpltd.com

PHASE III RESTORATION

G.J. Schmitz

S.E. Harden

C.W. Przywara

18136.00 4/2018

Marshall

University

Joan C. EdwardsStadium

EASTGRANDSTAND STEEL

FRAMING REFERENCE PLAN

101

Page 3: Phase III Restoration - cbblueprint.com Job Information/MU Joan C... · the completed design, and is not intended to include review of adequacy of contractor's ... w24x76 raker beam

RE

F

STADIUM

CLCC

9

1

2

3

4

5

6

7

8

10 11 12 13 14 15 16

A

B

C

C1

D

D1

B1

W30x99

W30

x99

W30x99

W30x9

9

W30

x99

W30

x99

W30

x99

W30

x99

W24

x76

W24

x76

W24

x76

W24

x76

W24

x76 W

24x7

6

W10

x22

W10x2

2

W10x22

W10x22

W24x76

W24x76W24x76W24x76

W24x7

6

W24

x76

W24

x76

W24

x76

W24

x76

W24

x76

W10x12

W10x12

W10x12

W10x12

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10

x12

W10

x12

W10

x12

W10x12W10x12

W10x12W10x12W10x12

W10x12W10x12W10x12

W10x12

W10x12

W10x12W10x12W10x12W10x12W10x12W10x12

W10x12W10x12W10x12

W10x12

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10x1

2

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10x22

W24X76

W30x90

W16

W14

W14

W12

W12

W12

W14W14W14W14W14

W14

W14

W14W14W14W14W14

W14

W14

W14

W14W14W14W14W14

W14

W14W14W14W14

W14W14

W14W14W14

W14

W14W14W14W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W10x12W10x12

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14W14W14

W14

W14W14

W14

W14

W14W14W14

W14

W14

W14

W14

W14

W14

W14

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14

W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)

W14W14

W14W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W24

x76

W10

x22

W10

x22

W10

x22

W10

x22

W10

x22

W10

x12

W14W14W14W14

W14W14W14W14

W14W14W14W14

W14W14W14

W30x90

W30

x99

W30

x99

W30

x99

W10x22

W10x12

W10x12

W10x12W10x12W10x12

W10x12

2

201

W10x12W10x12

W10x12W10x12

W10

x12

W10

x12

W10x12

3

201

STADIUM

CLCC

RE

F

15 16 17 18 19 20 2122

23

24

25

26

27

28

29

30

W10

x22

W10

x12

W30x99

W30x99

W30x99

W30x99

W30x99

W30x99

W30x99W

24x7

6

W24

x76

W24

x76

W24

x76

W24

x76W

24x7

6W

24x7

6W

24x7

6W

24x7

6W

24x7

6W

24x7

6W

10x2

2W

10x2

2W

10x2

2

W10

x22

W10x22

W10x22

W10x22

W24x76

W24x76W24x76W24x76

W24x76

W24x76

W24x76

W24x76

W24x76

W10x12

W10x12

W10x12

W10x12

W10x12W

10x12W

10x12

W10x12

W10x12W

10x12

W10x12

W10x12W

10x12

W10x12

W10x12

W10x12W10x12W10x12

W10x12W10x12W10x12

W10x12

W10x12

W10x12W10x12W10x12

W10x12W10x12W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12W

10x12

W10x12

W10x12

W10x12W

10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10

x12

W10x22

W24X76W24X76W24X76

W30x90

W16

W14

W14

W14

W12

W12

W12

W14W14

W14

W14

W14W14W14W14W14

W14W14W14

W14W14W14

W14

W14W14W14W14W14

W14

W14W14W14W14

W14

W14W14W14 W14 W14W14

W14

W14W14W14W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W14

W10x12W10x12

W14

W14

W14

W14

W14

W14

W14W14W14W14

W14

W14

W14

W14W14

W14

W14

W14

W14

W14

W14

W14

W14

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14 (REINFORCE)

W14

W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)

W14W14

W14

W14

W14

W14

W14

W14

W14

W14W14W14W14

W14W14W14W14

W14

W14

W14

W14

W14

W14 (REINFORCE)W14 (REINFORCE)W14 (REINFORCE)

W30x99

W30x99

W30x99

W30x99W30x99W30x99

W30x90

A

B

C

C1

D

D1

B1

W10x22

W14

W14

W14

W14

2

201

SIM., OPP HAND

W10x12

W10x12

W10x12

W10x12W

10x12

W10x12

3

201

OPP. HAND

RE

VIS

ION

SIS

SU

ES

DRAWN BY:

DRAWING TITLE

PROJECT MANAGER:

CHECKED BY:

JOB NUMBER DATE

DRAWING NUMBER

THP Limited, Inc.

100 East Eighth Street

Cincinnati, Ohio 45202Phone: 513.241.3222

Fax: 513.241.2981www.thpltd.com

PHASE III RESTORATION

G.J. Schmitz

S.E. Harden

C.W. Przywara

18136.00 4/2018

Marshall

University

Joan C. EdwardsStadium

PARTIAL PLAN1

102 NO SCALE

SOUTH GRANDSTANDS

SOUTHGRANDSTAND STEEL

FRAMING REFERENCE PLANS

102

N1010202030

KEY PLAN N

PARTIAL PLAN2

102 NO SCALE

SOUTH GRANDSTANDS

20 1010

101020203030404050504040303020201010

KEY PLAN N

MA

TC

HLI

NE

, SE

E 2

/201

MA

TC

HLI

NE

, SE

E 1

/102

N

Page 4: Phase III Restoration - cbblueprint.com Job Information/MU Joan C... · the completed design, and is not intended to include review of adequacy of contractor's ... w24x76 raker beam

C D E F G

SECTION1

201 3/16" = 1'-0"

TYPICAL RAKER

CONCESSION

RESTROOM

W33x130 RAKER BEAM

W24x76 RAKER BEAM

W24x76 RAKER BEAM

W33x130 RAKER BEAM

W27

12"

DIA

. SC

H. 8

0

W12

x87

W12

x65

3/8" END PLATE

VARIES

D C1 C B1 B AD1

SPLICE

SPLICE

1 2 3 4 5 6

CL STRUT

CL STRUT

T/PIER

CL NEW BRACE

SECTION2

201 NO SCALE

SOUTH GRANDSTANDS TYPICAL RAKER

SECTION3

201 NO SCALE

SOUTH GRANDSTANDS CROSS BRACING

7 (NEAR COLUMN LINE C.1)

VIEW AT COLUMN LINE D

AT COLUMN LINES 1-6 AND 25-30AT COLUMN LINES 1-6 AND 25-30

AT COLUMN LINES 6-7 AND 24-25AT COLUMN LINES 6-7 AND 24-25

AT COLUMN LINES 7-14 AND 17-24AT COLUMN LINES 7-14 AND 17-24

AT COLUMN LINES 14-17AT COLUMN LINES 14-17

W33x99 RADIAL BEAM

W24x76 RADIAL BEAM

13SIM. (END PLATE)

13SIM.

14

14

14

14

14

14

9

9

9

9

16

18

17

4

18

13

SIM.

7 TYP.

16

8 TYP.

4

18

18

14

7 TYP.

4

16

17

13 SIM. (END PLATE)SIM. (END PLATE)

7 TYP.

16

ALUMINUM STADIA SEATING NOT SHOWN

9 99 16TYP.

18 TYP.

7 TYP.14 TYP.

16 TYP. 19 TYP.

16 TYP.

18 TYP.

18 TYP.

14 TYP.7 TYP.

EXISTING STEEL PIPE COLUMN TO BE PREPARED AND OVERCOATED. REFER TO SPECIFICATION

SECTION 099100.

EXISTING PRECAST CONCRETE STADIA UNITS TO REMAIN. DO NOT DAMAGE.

EXISTING STEEL BEARING ASSEMBLY. PREPARE AND COAT. REFER TO SPECIFICATION SECTION

099100.

EXISTING BASE PLATE ASSEMBLY. PREPARE SURFACES TO BARE STEEL AND RECOAT BASE

PLATE ASSEMBLY. REFER TO SPECIFICATION SECTION 099100.

AT AREAS OF FAILED OR MISSING COATING, SPOT REPAIR AREAS PRIOR TO OVERCOATING

STEEL FRAMING MEMBRANE. REFER TO SPECIFICATION SECTION 099100.

EXISTING STEEL WIDE FLANGE COLUMN TO BE OVERCOATED. REFER TO SPECIFICATION

SECTION 099100.

EXISTING WIDE FLANGE STEEL RAKER BEAM. PREPARE SURFACES AND OVERCOAT. REFER TO

SHEET 101 FOR LOCATION INFORMATION. REFER TO SPECIFICATION SECTION 099100.

EXISTING CONNECTION BOLT. CONNECTION FOUND LOOSE SHALL BE TIGHTENED PRIOR TO

PREPARATION EFFORTS FOR OVERCOAT INSTALLATION.

EXISTING CAST-IN-PLACE CONCRETE FOOTING/PIER FOR COLUMN SUPPORT.

EXISTING CONCRETE FIELD WALL.

EXISTING PRECAST CONCRETE SPANDREL TO REMAIN. DO NOT DAMAGE.

EXISTING X-BRACING AND TURNBUCKLE ASSEMBLY (FIELD VERIFY LOCATIONS PRIOR TO

BIDDING). PREPARE SURFACES AND OVERCOAT. REFER TO SPECIFICATION SECTION 099100.

EXISTING STIFFENER PLATES. PREPARE SURFACES AND RECOAT /OVERCOAT IN CONJUNCTION

WITH ADJACENT PAINTING EFFORTS. REFER TO SPECIFICATION SECTION 099100.

EXISTING STEEL FRAMING MEMBER. PREPARE AND OVERCOAT. REFER TO SPECIFICATION

SECTION 099100.

PREPARE SURFACES AND INSTALL SILICONE COVE SEALANT. REFER TO SPECIFICATION

SECTION 099100.

HSS STEEL COLUMN. PREPARE AND OVERCOAT. REFER TO SPECIFICATION SECTION 099100.

HSS STEEL BRACE. PREPARE AND OVERCOAT. REFER TO SPECIFICATION SECTION 099100.

STEEL WIDE FLANGE BRACE/STRUT. PREPARE AND OVERCOAT. REFER TO SPECIFICATION

SECTION 099100.

STEEL ANGLE BRACING MEMBER. PREPARE AND OVERCOAT. REFER TO SPECIFICATION

SECTION 099100.

DRAWING NOTES:

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

9

4 8

13

7TYP.

2TYP.

8

4

6

14

13

3 TYP. STADIA BEARING ASSEMBLYTYP. STADIA BEARING ASSEMBLYTYP. STADIA BEARING ASSEMBLY

7 TYP.

6

13

14

13 SIM, (END PLATE)SIM, (END PLATE)SIM, (END PLATE)14

138

7

2 TYP.

14

13

8

1

9

15

7

14

2 TYP.

3 TYP. STADIA BEARING ASSEMBLY14

13

13SIM, (END PLATE)

6

9

84

11

13SIM, (END PLATE)

14

7 TYP.

RE

VIS

ION

SIS

SU

ES

DRAWN BY:

DRAWING TITLE

PROJECT MANAGER:

CHECKED BY:

JOB NUMBER DATE

DRAWING NUMBER

THP Limited, Inc.

100 East Eighth Street

Cincinnati, Ohio 45202Phone: 513.241.3222

Fax: 513.241.2981www.thpltd.com

PHASE III RESTORATION

G.J. Schmitz

S.E. Harden

C.W. Przywara

18136.00 4/2018

Marshall

University

Joan C. EdwardsStadium

EAST AND SOUTHGRANDSTANDS TYPICAL

RAKER SECTIONS

201