16
Columbia River RIVER EDGE CONSTRUCTION SEQUENCE I-5 SB LINE I-5 NB LINE PHASE 1 RIVER EDGE EXISTING SB I-5 EXISTING NB I-5 1 2 CONSTRUCTION SEQUENCE: PIER 8 PIER 6 PIER 5 PIER 4 PIER 3 SMB MCB LCB MMB SPB PIER 1 OR-16 PIER 2 160 160 165 165 170 170 175 175 180 180 185 185 CHANNEL~200’ ALT. BARGE CHANNEL ~ 300’ CHANNEL ~ 250’ COLUMBIA RIVER BRIDGE PIER 7 OPEN EXISTING CHANNEL OPEN EXISTING CHANNEL OPEN EXISTING CHANNEL WA-1 1 INSTALL COFFERDAM AND WORK BRIDGE AT PIER 2 FOR CONSTRUCTION OF NB AND SB SHAFT CAPS. 2 INSTALL TEMPORARY WORKS AT PIER 3, INSTALL SHAFTS, CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT CONCRETE FOR NB AND SB STRUCTURES. WORK BRIDGE WORK PLATFORM

PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Colu

mbia

Riv

er

RIVER EDGE

CONSTRUCTION SEQUENCE

I-5 SB LINE

I-5 NB LINE

PHASE 1

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

1

2

CONSTRUCTION SEQUENCE:

PIER 8

PIER 6PIER 5PIER 4

PIER 3

SM

BM

CB

LC

B

MM

BS

PB

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

CHANNEL~200’

ALT. BARGECHANNEL ~ 300’

CHANNEL ~ 250’

COLUMBIA RIVER BRIDGE

PIER 7

OPEN EXISTINGCHANNEL

OPEN EXISTINGCHANNEL OPEN EXISTING

CHANNEL

WA-1

1 INSTALL COFFERDAM AND WORK BRIDGE AT PIER 2 FOR

CONSTRUCTION OF NB AND SB SHAFT CAPS.

2 INSTALL TEMPORARY WORKS AT PIER 3, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT

CONCRETE FOR NB AND SB STRUCTURES.

WORK BRIDGE WORK

PLATFORM

Page 2: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

CONSTRUCTION SEQUENCE

PHASE 2

CONSTRUCTION SEQUENCE:

Colu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

2

PIER 8

PIER 6PIER 5PIER 4

PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

CHANNEL~200’

ALT. BARGE

PIER 7

Colu

mbia

Riv

er

1

LC

B

MM

B

SP

B

MM

B

MM

B

SC

B

SM

B

3

COLUMBIA RIVER BRIDGE

OPEN EXISTINGCHANNEL

WA-1

CHANNEL ~ 300’

OPEN EXISTINGCHANNEL

CHANNEL ~ 250’

OPEN EXISTINGCHANNEL

1 INSTALL TEMPORARY WORKS AT PIER 2, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT CONCRETE

FOR NB AND SB STRUCTURES.

2 FLOAT-IN PREFABRICATED SHAFT CAP AT PIER 3, CONSTRUCT

NB AND SB SHAFT CAPS.

3 INSTALL TOWER CRANE AT PIER 3.

CATAMARAN BARGE USED

TO FLOAT-IN PREFABRICATED

SHAFT CAP TEMPLATES

WORK BRIDGE

Page 3: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

CONSTRUCTION SEQUENCE

PHASE 3

CONSTRUCTION SEQUENCE:

Colu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

2

4

PIER 8

PIER 6PIER 5PIER 4

PIER 3

SM

B

MM

B

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

CHANNEL~200’

ALT. BARGE

PIER 7

Colu

mbia

Riv

er

COLUMBIA RIVER BRIDGE

3

1

MC

B

SM

B

SC

B

5

LC

B

MM

BS

PB

CLOSED EXISTINGCHANNEL

WA-1

CHANNEL ~ 300’

OPEN EXISTINGCHANNEL

CHANNEL ~ 250’

OPEN EXISTINGCHANNEL

1 CONSTRUCT SHAFT CAPS AT PIER 2 FOR NB AND SB STRUCTURES.

2 REMOVE COFFERDAM AND WORK BRIDGE AT PIER 2.

3 INSTALL TOWER CRANE AT PIER 2.

4 CONSTRUCT COLUMNS AND PIER TABLES AT PIER 3 FOR NB AND

SB STRUCTURES.

5 INSTALL TEMPORARY WORKS AT PIER 4, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT

CONCRETE FOR NB AND SB STRUCTURES.

WORK PLATFORM

Page 4: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

CONSTRUCTION SEQUENCE

PHASE 4

CONSTRUCTION SEQUENCE:

SM

B

MC

B

MM

B

MM

B

Colu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

2

PIER 8

PIER 6PIER 5PIER 4

PIER 3

MMB

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

Colu

mbia

Riv

er

1

Colu

mbia

Riv

er

CHANNEL~200’

ALT. BARGE

5

LC

B

MM

BS

PB

6

SM

B

4

3

SC

B

COLUMBIA RIVER BRIDGE

MMB

MM

B

CLOSED EXISTINGCHANNEL CHANNEL ~ 300’

OPEN EXISTINGCHANNEL

CHANNEL ~ 250’

WA-1

CLOSED EXISTINGCHANNEL

7

1 CONSTRUCT COLUMNS AND PIER TABLES AT PIER 2 FOR NB

AND SB STRUCTURES.

2 ERECT BALANCED CANTILEVERS AT PIER 3 FOR NB AND SB

STRUCTURES.

3 FLOAT-IN PREFABRICATED SHAFT CAP AT PIER 4, CONSTRUCT

NB AND SB SHAFT CAPS.

4 ERECT TOWER CRANE AT PIER 4.

5 INSTALL TEMPORARY WORKS AT PIER 6, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT CONCRETE

FOR NB AND SB STRUCTURES.

6 INSTALL COFFERDAM AND WORKBRIDGE AT PIER 7 FOR CONSTRUCTION

OF NB AND SB PILECAPS.

7 CONSTRUCT DRILLED SHAFTS, SHAFT CAP, AND PIER AT PIER 1.

CATAMARAN BARGE USED

TO FLOAT-IN PREFABRICATED

SHAFT CAP TEMPLATES

WORK

PLATFORMWORK BRIDGE

Page 5: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

CONSTRUCTION SEQUENCE

PHASE 5

CONSTRUCTION SEQUENCE:

SM

B

SC

B

MM

B

MM

B

Colu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6PIER 5PIER 4

PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

Colu

mbia

Riv

er

1

Colu

mbia

Riv

er

CHANNEL~200’

ALT. BARGE

5 LC

B

MM

BS

PB

5

3

MMB

SC

B

COLUMBIA RIVER BRIDGE

MMB

4

MM

B

Colu

mbia

Riv

er

CLOSED EXISTINGCHANNEL

WA-1

CHANNEL ~ 300’

OPEN EXISTINGCHANNEL

CHANNEL ~ 250’

CLOSED EXISTINGCHANNEL

1 ERECT BALANCED CANTILEVERS AT PIER 2 FOR NB AND SB STRUCTURES.

2 CONSTRUCT COLUMNS AND PIERS TABLES AT PIER 4 FOR NB AND SB

STRUCTURES.

3 FLOAT-IN PREFABRICATED SHAFT CAP AT PIER 6, CONSTRUCT NB AND SB

SHAFT CAPS.

4 ERECT TOWER CRANE AT PIER 6.

5 INSTALL TEMPORARY WORKS AT PIER 7, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT CONCRETE

FOR NB AND SB STRUCTURES.

CATAMARAN BARGE USED

TO FLOAT-IN PREFABRICATED

SHAFT CAP TEMPLATES

WORK BRIDGE

Page 6: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

CONSTRUCTION SEQUENCE

PHASE 6

CONSTRUCTION SEQUENCE:

MC

B

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6PIER 5PIER 4

PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

3

LC

B

MM

BS

PB

4

1

SC

B

COLUMBIA RIVER BRIDGE

MM

B

5

7

SM

B

6

2

MMB

MMB

Colu

mbia

Riv

er

CLOSED EXISTINGCHANNEL

WA-1

CHANNEL ~ 250’

OPEN EXISTINGCHANNELCHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

1 ERECT BALANCED CANTILEVERS AT PIER 4 FOR NB AND

SB STRUCTURES.

2 CAST MIDSPAN CLOSURE BETWEEN PIERS 3 AND 4 FOR NB AND

SB STRUCTURES.

3 CONSTRUCT COLUMNS AND PIER TABLES AT PIER 6 FOR NB

AND SB STRUCTURES.

4 CONSTRUCT SHAFT CAPS AT PIER 7 FOR NB AND SB STRUCTURES.

5 REMOVE COFFERDAM AND WORK BRIDGE AT PIER 7.

6 INSTALL TEMPORARY WORKS AT PIER 5, INSTALL SHAFTS,

CLEAN-OUT, INSTALL REINFORCING, AND PLACE SHAFT CONCRETE

FOR NB AND SB STRUCTURES.

7 INSTALL TOWER CRANE AT PIER 7.

WORK PLATFORM

Page 7: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

CONSTRUCTION SEQUENCE

PHASE 7

CONSTRUCTION SEQUENCE:

CHANNEL ~ 200’

DRAFT

SM

B

SC

B

MM

B

MM

BC

olu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6PIER 5PIER 4

PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

1

5

2

SM

B

4

MMB

MMB

COLUMBIA RIVER BRIDGE

OPEN

TEMPORARY

CHANNEL

3

CLOSED EXISTINGCHANNEL

CHANNEL ~ 250’

CLOSED EXISTINGCHANNEL

CHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

WA-1

1 ERECT BALANCED CANTILEVERS AT PIER 6 FOR NB AND

SB STRUCTUES.

2 CONSTRUCT COLUMNS AND PIERS TABLES AT PIER 7 FOR

NB AND SB STRUCTURES.

3 FLOAT-IN PREFABRICATED SHAFT CAP AT PIER 5, CONSTRUCT

NB AND SB SHAFT CAPS.

4 INSTALL TOWER CRANE AT PIER 5.

5 CONSTRUCT DRILLED SHAFTS AND SHAFT CAP AT PIER 8, FOR

NB AND SB STRUCTURE.

CATAMARAN BARGE USED

TO FLOAT-IN PREFABRICATED

SHAFT CAP TEMPLATES

Page 8: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

CONSTRUCTION SEQUENCE

PHASE 8

CONSTRUCTION SEQUENCE:

CONSTRUCTION SEQUENCE:

MM

B

CHANNEL ~ 200’

SC

B

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

3

1

4

OPEN

TEMPORARY

CHANNEL

2

Colu

mbia

Riv

er

CHANNEL ~ 200’

COLUMBIA RIVER BRIDGE

MMB

CLOSED EXISTINGCHANNEL

WA-1

1 CONSTRUCT COLUMNS AND BENT CAPS AT PIER 8 FOR NB AND

SB STRUCTURE USING A LAND-BASED CRANE.

2 CONSTRUCT COLUMNS AND PIER TABLES AT PIER 5 FOR

NB AND SB STRUCTURES.

3 ERECT BALANCED CANTILEVERS AT PIER 7 FOR NB AND SB STRUCTURES.

4 CAST MIDSPAN CLOSURE BETWEEN PIERS 6 AND 7 FOR NB AND

SB STRUCTURE.

CHANNEL ~ 250’

CLOSED EXISTINGCHANNELCHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

Page 9: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

CONSTRUCTION SEQUENCE

PHASE 9

Colu

mbia

Riv

er

CONSTRUCTION SEQUENCE:

CONSTRUCTION SEQUENCE:

1 ERECT BALANCED CANTILEVERS AT PIER 5 FOR NB

AND SB STRUCTURES.

2 CAST MIDSPAN CLOSURE BETWEEN PIERS 4 AND 5

FOR NB AND SB STRUCTURES.

MMB

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6

PIER 5PIER 4

PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

1

TEMPORARY

CHANNEL

2

CHANNEL ~ 200’

Colu

mbia

Riv

er

CLOSED

COLUMBIA RIVER BRIDGE

SC

B

MMB

CLOSED EXISTINGCHANNEL

WA-1

CHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

CHANNEL ~ 250’

OPEN EXISTING

CHANNEL

Page 10: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

CONSTRUCTION SEQUENCE

PHASE 10

CONSTRUCTION SEQUENCE:

Colu

mbia

Riv

er

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

EXISTING NB I-5

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

1

TEMPORARY

CHANNEL

2

CHANNEL ~ 200’

Colu

mbia

Riv

er

SC

B

COLUMBIA RIVER BRIDGE

1

3

4

4

4

5

6

CLOSED EXISTINGCHANNEL

OPEN

WA-1

CHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

CHANNEL ~ 250’

OPEN EXISTING

CHANNEL

1 COMPLETE SB OREGON AND WASHINGTON APPROACH STRUCTURES.

2 CAST MIDSPAN CLOSURE BETWEEN PIERS 5 AND 6 FOR NB AND SB

STRUCTURES.

3 RE-ROUTE TRAFFIC TO SB STRUCTURE TO BEGIN DEMOLITION

OF THE EXISTING INTERSTATE BRIDGE.

4 COMPLETE NB OREGON AND WASHINGTON APPROACH STRUCTURES.

REMOVE TOWER CRANES.

5 RE-ROUTE TRAFFIC TO NB STRUCTURE, COLUMBIA RIVER BRIDGES COMPLETE.

6 REMOVE EXISTING BRIDGES.

Page 11: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

M M

M

M M

MM

M

CL PIER

+135’ -

+13

5’-

VARIES 50’ TO 100’ VARIES 50’ TO 100’

VA

RIE

S 5

0’

TO

150’

VA

RIE

S 5

0’

TO

150’

MOORING PILE (TYP.)

PROPOSED 10 DIAM.

DRILLED SHAFT (TYP.)

PROPOSED SHAFT

CAP (TYP.)

TEMPORARY WORK PLATFORM

PLAN

CL PIER

TEMPORARY

BATTERED PILE (TYP.)

TEMPORARY

VERTICAL PILE (TYP.)PROPOSED 10 DIAM.

DRILLED SHAFT (TYP.)

PROPOSED

COLUMN

PROPOSED SHAFT CAPTEMPORARY

FRAMINGTIMBER DECK

PLANKS (TYP.)

ELEVATION

CONCEPTUAL TEMPORARY WORKS

18" to 24" DIAM. TEMPORARY

BATTERED PILE (TYP.)

18" TO 24" DIAM. TEMPORARY

VERTICAL PILE (TYP.)

42" TO 48" DIAM. TEMPORARY

VERTICAL PILE (TYP.)

18" TO 24" DIAM.

TEMPORARY PILE (TYP.)42" TO 48" DIAM.

TEMPORARY PILE (TYP.)

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

CONCEPT - I

clemekat
Typewritten Text
clemekat
Typewritten Text
NOTE: 1/2 of a work structure as described in Section 3.
clemekat
Typewritten Text
Page 12: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

PRECAST SEGMENTAL CONCRETE BRIDGE, UPSTREAM

DEMOLITION SEQUENCE

PHASE A

DEMOLITION SEQUENCE:

KEY:

WORK BEING COMPLETED AT ELEMENT.

FULL REMOVAL (DEMOLITION) OF ELEMENT.

EXISTING NB I-5

SPAN 1SPAN 10 SPAN 9 SPAN 8 SPAN 7 SPAN 6 SPAN 5 SPAN 4 SPAN 3 SPAN 2SPAN 11

Colu

mbia

Riv

er

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

TEMPORARY

CHANNEL

CHANNEL ~ 200’

CLOSED EXISTINGCHANNEL

OPEN

INTERSTATE BRIDGE

DEMOLITION SEQUENCE

MC

B

MM

B

MM

B

MC

B

EX

IST

ING

PIE

R 1

MC

B

MM

B

MM

B

MC

B

EX

IST

ING

PIE

R 2

EX

IST

ING

PIE

R 3

EX

IST

ING

PIE

R 4

CBCB

A

A

A LOCK NB AND SB LIFT SPAN 3.

B LOWER AND REMOVE COUNTERWEIGHTS.

C REMOVE NB AND SB LIFT SPAN TOWERS.

EX

IST

ING

PIE

R 1

2

EX

IST

ING

PIE

R 1

1

EX

IST

ING

PIE

R 1

0

EX

IST

ING

PIE

R 9

EX

IST

ING

PIE

R 8

EX

IST

ING

PIE

R 7

EX

IST

ING

PIE

R 6

WA-1

CHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

CHANNEL ~ 250’

CLOSED EXISTINGCHANNEL

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

Page 13: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

PRECAST SEGMENTAL CONCRETE BRIDGE, UPSTREAM

DEMOLITION SEQUENCE

PHASE B

CONSTRUCTION SEQUENCE:

KEY:

WORK BEING COMPLETED AT ELEMENT.

DEMOLITION SEQUENCE:

FULL REMOVAL (DEMOLITION) OF ELEMENT.

EXISTING NB I-5

SPAN 1SPAN 10 SPAN 9 SPAN 8 SPAN 7 SPAN 6 SPAN 5 SPAN 4 SPAN 3 SPAN 2SPAN 11

Colu

mbia

Riv

er

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

TEMPORARY

CHANNEL

CHANNEL ~ 200’

CLOSED EXISTINGCHANNEL

OPEN

EX

IST

ING

PIE

R 1

EX

IST

ING

PIE

R 2

EX

IST

ING

PIE

R 3

EX

IST

ING

PIE

R 4

BA

BAD

EXISTING NB I-5

MC

BSMB

MMB

SMB

INTERSTATE BRIDGE

DEMOLITION SEQUENCE

D D

DD

D

C

A DEMOLISH NS AND SB DECKS AT SPAN 3.

B LIFT AND REMOVE NB AND SB SPAN 3 VIA BARGE.

C OPEN PRIMARY CHANNEL.

D DEMOLISH NB AND SB DECKS AT SPANS 2, 4, AND 5.

EX

IST

ING

PIE

R 1

2

EX

IST

ING

PIE

R 1

1

EX

IST

ING

PIE

R 1

0

EX

IST

ING

PIE

R 9

EX

IST

ING

PIE

R 8

EX

IST

ING

PIE

R 7

EX

IST

ING

PIE

R 6

EXISTING SB I-5

WA-1WA-1

CHANNEL ~ 250’

CLOSED EXISTINGCHANNEL

CHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

MM

BM

MB

MM

BM

MB

Page 14: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

PRECAST SEGMENTAL CONCRETE BRIDGE, UPSTREAM

DEMOLITION SEQUENCE

PHASE C

KEY:

WORK BEING COMPLETED AT ELEMENT.

DEMOLITION SEQUENCE:

FULL REMOVAL (DEMOLITION) OF ELEMENT.

MC

B

SMB (TYP.)

EXISTING NB I-5

SPAN 1SPAN 10 SPAN 9 SPAN 8 SPAN 7 SPAN 6 SPAN 5 SPAN 4 SPAN 3 SPAN 2SPAN 11

Colu

mbia

Riv

er

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

TEMPORARY

CHANNEL

CHANNEL ~ 200’

CLOSED EXISTINGCHANNEL

OPEN

EX

IST

ING

PIE

R 1

EX

IST

ING

PIE

R 2

EX

IST

ING

PIE

R 3

EX

IST

ING

PIE

R 4

BA

AB

INTRSTATE BRIDGE

DEMOLITION SEQUENCE

C

CCCCC

CC

CCC

C

SCB

MC

B

A

A

EX

IST

ING

PIE

R 6

EX

IST

ING

PIE

R 8

EX

IST

ING

PIE

R 7

EX

IST

ING

PIE

R 9

EX

IST

ING

PIE

R 1

0

EX

IST

ING

PIE

R 1

1

EX

IST

ING

PIE

R 1

2

A LIFT AND REMOVE NB AND SB SPANS 4 AND 5 VIA BARGE.

B DEMOLISH NB AND SB SPAN 2 USING LAND-BASED CRANE.

C DEMOLISH NB AND SB DECKS AT SPANS 6, 7, 8, 9, 10, AND 11.

WA-1WA-1WA-1

CHANNEL ~ 250’

OPEN EXISTING

CHANNELCHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

MM

BM

MB

MM

BM

MB

MM

BM

MB

MM

BM

MB

MM

B

MM

B

MM

BM

MB

Page 15: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

PRECAST SEGMENTAL CONCRETE BRIDGE, UPSTREAM

DEMOLITION SEQUENCE

PHASE D

CONSTRUCTION SEQUENCE:

DEMOLITION SEQUENCE:

KEY:

WORK BEING COMPLETED AT ELEMENT.

FULL REMOVAL (DEMOLITION) OF ELEMENT.

SMB (TYP.)

EXISTING NB I-5

SPAN 1SPAN 10 SPAN 9 SPAN 8 SPAN 7 SPAN 6 SPAN 5 SPAN 4 SPAN 3 SPAN 2SPAN 11

Colu

mbia

Riv

er

CHANNEL ~ 200’

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

EXISTING SB I-5

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

CHANNEL~200’

ALT. BARGE

TEMPORARY

CHANNEL

CHANNEL ~ 200’

CLOSED EXISTINGCHANNEL

OPEN

EX

IST

ING

PIE

R 1

EX

IST

ING

PIE

R 2

EX

IST

ING

PIE

R 3

EX

IST

ING

PIE

R 4

D

E

B

F

EF

MC

B

EX

IST

ING

PIE

R 6

EX

IST

ING

PIE

R 8

EX

IST

ING

PIE

R 7

EX

IST

ING

PIE

R 9

EX

IST

ING

PIE

R 1

0

EX

IST

ING

PIE

R 1

1

EX

IST

ING

PIE

R 1

2

WA-1WA-1WA-1

CHANNEL ~ 250’

OPEN EXISTING

CHANNELCHANNEL ~ 300’

CLOSED EXISTINGCHANNEL

A INSTALL COFFERDAM AT PIER 4 FOR REMOVAL OF PIER.

B WIRE CUT AND REMOVE PIER 4, CUT-OFF PILES.

C REMOVE COFFERDAM AT PIER 4.

D OPEN NEW PRIMARY CHANNEL.

E LIFT AND REMOVE VIA BARGE NB

AND SB SPANS 6, 7, 8, 9, AND 10.

F DEMOLISH NB AND SB SPAN 11

USING LAND-BASED CRANE.

E

E

EE

MC

B

E

MC

B

E

E

MC

B

E

A C

CHANNEL ~ 300’

NEW PRIMARY CHANNEL

INTERSTATE BRIDGE

DEMOLITION SEQUENCE

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

Page 16: PHASE 1 COLUMBIA RIVER BRIDGE CONSTRUCTION SEQUENCEdot.wa.gov/accountability/ssb5806/docs/6_Project... · mcb = medium crane barge, 150’ long x 70’ wide x 12.5’ depth, ~ 300

Columbia River

CROSSING

ABBREVIATIONS FOR CONSTRUCTION EQUIPMENT

SCB = SMALL CRANE BARGE, 116’ LONG x 52’ WIDE x 10’ DEPTH, ~ 165 TON CAPACITY

SMB = SMALL MATERIAL BARGE, 110’ LONG x 35’ WIDE x 8’ DEPTH

MCB = MEDIUM CRANE BARGE, 150’ LONG x 70’ WIDE x 12.5’ DEPTH, ~ 300 TON CAPACITY

MMB = MEDIUM MATERIAL BARGE, 150’ LONG x 48’ WIDE x 9.5’ DEPTH

LCB = LARGE CRANE BARGE, 300’ LONG x 100’ WIDE x 18’ DEPTH, ~ 700 TON CAPACITY

LMB = LARGE MATERIAL BARGE, 164’ LONG x 50’ WIDE x 13.5’ DEPTH

SPB = SPOILS BARGE, 180’ LONG x 50’ WIDE x 16’ DEPTH

CATB = CATAMARAN BARGE WITH LIFTING FRAME, 2 EA MMB FIXED 120’ APART BY LIFTING FRAME

CONCEPTUAL DESIGN

CONCEPTUAL

NOT FOR CONSTRUCTION

NOVEMBER 11, 2009

PRECAST SEGMENTAL CONCRETE BRIDGE, UPSTREAM

DEMOLITION SEQUENCE

PHASE E

CONSTRUCTION SEQUENCE:

KEY:

FULL REMOVAL (DEMOLITION) OF ELEMENT.

Colu

mbia

Riv

er

RIVER EDGE

I-5 SB LINE

I-5 NB LINE

RIVER EDGE

PIER 8

PIER 6

PIER 5PIER 4PIER 3

PIER 1OR-16

PIER 2

160

160

165

165

170

170

175

175

180

180185

185

PIER 7

EX

IST

ING

PIE

R 1

EX

IST

ING

PIE

R 3

EX

IST

ING

PIE

R 6

EX

IST

ING

PIE

R 8

EX

IST

ING

PIE

R 7

EX

IST

ING

PIE

R 9

EX

IST

ING

PIE

R 1

0

EX

IST

ING

PIE

R 1

1

EX

IST

ING

PIE

R 1

2

WA-1WA-1WA-1

CHANNEL ~ 250’

CHANNEL ~ 300’

NEW PRIMARY CHANNEL

INTERSTATE BRIDGE

DEMOLITION SEQUENCE

DEMOLITION SEQUENCE:

EX

IST

ING

PIE

R 2

BA CBA C

CLOSED EXISTINGCHANNEL

BA CBA CBA CBA CBA C

BA C

A INSTALL COFFERDAM AT PIERS 3, 2, 6, 7, 8, 9, 10, AND 11.

B WIRE CUT AND REMOVE PIERS 3, 2, 6, 7, 8, 9, 10, AND 11.

C REMOVE COFFERDAM AT PIERS 3, 2, 6, 7, 8, 9, 10, AND 11.