Upload
alberta-hodges
View
218
Download
0
Tags:
Embed Size (px)
Citation preview
Phantom WorksMathematics & Computing Technology
Real Options and Mean-Reverting Prices
Gregory F. RobelMathematics & Engineering AnalysisJuly 14, 2001
Phantom WorksMathematics & Computing Technology
2
Acknowledgements
I would like to thank several colleagues for useful discussions, including Dr. Stuart Anderson, Dr. Mike Epton and Dr. Roman Fresnedo of The Boeing Company; and Dr. Dan Calistrate and Professor Gordon Sick of The University of Calgary.
The usual disclaimer applies.
Phantom WorksMathematics & Computing Technology
3
Outline
• Standard capital budgeting paradigm
• Real option extension of standard paradigm
• McDonald-Siegel model
• Survey and critique of some proposed models of mean-reverting prices
• Specification of a “new,” more appropriate model
• Analytical solution of some option problems for the “new” model, and some comparative statics
• Remarks on numerical approaches for more complex problems
• Conclusion
Phantom WorksMathematics & Computing Technology
4
Shareholder Value and Capital Budgeting
• A firm’s investment decisions are the most important determinant of shareholder value (Modigliani-Miller theorem).
• The standard Net Present Value rule can be expressed as follows:
-- Estimate the value S0 which the project’s future net cash inflows would have, if they were traded in the financial markets. -- Estimate the cost I of launching the project.
• If S0 > I , then the project has a positive net present value: NPV = S0 - I > 0. Launching the project creates shareholder value, since in so doing, the firm is acquiring an asset for less than the shareholders could themselves acquire a comparable asset in the financial markets.
Phantom WorksMathematics & Computing Technology
5
Basis for NPV Rule
• The Fisher Separation Theorem states that if markets are perfect and complete, then maximizing the market value of the firm’s equity simultaneously enables all shareholders to maximize their expected lifetime utility of consumption.
• Estimating the market value of a hypothetical set of cash flows requires the existence of a portfolio of traded securities which tracks these cash flows sufficiently well. (This is a weak form of the complete market assumption.)
• This estimation usually involves an asset pricing model such as the Capital Asset Pricing Model (CAPM) or the Arbitrage Pricing Theory (APT), to estimate the expected rate of return which the market would demand for these cash flows.
-- Empirical support less than overwhelming, especially for CAPM.
• In principle, each project has its own cost of capital.
Phantom WorksMathematics & Computing Technology
6
Critique of NPV Rule
• Correct, as far as it goes.
• Implicit assumptions:
-- Project has a directly associated stream of future net cash inflows
-- Decision must be made now or never
-- Management strategy fixed in advance
-- Similar to evaluating stocks or bonds
Phantom WorksMathematics & Computing Technology
7
Real Options
• Many projects create future opportunities, which may be a significant, or even the sole, source of value.
• These opportunities are analogous to financial options.
• The term real options has been coined to refer to a firm’s discretionary opportunities involving real assets.
• Discounted cash flow methods fail for the evaluation of options.
• Financial economists have recognized the analogy between real and financial options.
• The same assumptions which justify the use of discounted cash flow methods for evaluating a project also justify the use of an option pricing model for evaluating options associated with the project.
Reference: [CoA]
Phantom WorksMathematics & Computing Technology
8
Types of Options
• In general, an option is a financial contract which gives its holder the right, but not the obligation, to buy or sell another, underlying asset, at a specified price, on or until a specified expiration date.
• An option to buy is a call option.
• An option to sell is a put option.
• An option with an infinite expiration date is said to be perpetual.
• An option which can be exercised only on its expiration date is said to be European.
• An option which can be exercised at any time up until and including its expiration date is said to be American.
Phantom WorksMathematics & Computing Technology
9
Exponential Growth under Uncertainty
• Suppose that some random quantity (e.g., a stock price) St > 0 evolves continuously in time, in such a way that:
1. On the average, St grows at a constant exponential rate .
2. At any instant, there may be random errors between the expected value and the observed value.
3. The past history of these (relative) errors is of no use in predicting their future values.
4. Each possible path of St is a continuous function of time, almost surely.
Phantom WorksMathematics & Computing Technology
10
Geometric Brownian Motion, I
• Then it can be shown1 that St is governed by the following expression, which is called a stochastic differential equation (SDE) :
where is the expected rate of growth of St , determines the rate of growth of the variance of St ,
and Bt is a particular random process
called a standard Brownian motion or “random walk.”
• One refers to St as a Geometric Brownian Motion, with drift and volatility .1Assuming that the variance of the error between the logarithm of St and its expected value is proportional to time.
,tttt BdStdSSd
Phantom WorksMathematics & Computing Technology
11
Two Possible Paths of Geometric Brownian Motion
• S0 = 42, e = 1.15, = 0.20.
Title:Boeing Graphics Primitives PostScript Output File Creator:EASY5 Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.
Title:Boeing Graphics Primitives PostScript Output File Creator:EASY5 Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.
Phantom WorksMathematics & Computing Technology
12
Geometric Brownian Motion, II
• Explicit solution:
• Conclusion: St > 0 almost surely, and the logarithm of St at any time t > 0 is normally distributed.
• Expected value and variance of St :
•
.1Var
E
2220
0
ttt
tt
eeSS
eSS
tBt
t eSS
2
0
2
Phantom WorksMathematics & Computing Technology
13
McDonald - Siegel Model, I
• Suppose that a firm is considering whether to launch a new project. Assume that its estimate Vt of the market value of the completed project evolves as a geometric Brownian motion, so that
for some > 0 .
• Suppose that the fixed costs associated with launching the project are known, irreversible, and equal to I .
• Then one can ask two questions:--
How much is this opportunity worth? -- At what point is it optimal to launch the project?
References: [DP], [McDS]
.tttt BdVtdVVd
Phantom WorksMathematics & Computing Technology
14
McDonald - Siegel Model, II
• Suppose that the required rate of return on the project (its cost of capital) is .
• For the problem to make economic sense, one must have > .
-- If = , then the value of the option is the same as that of the underlying asset, and one would
never rationally exercise it.
-- If thenthe value of the underlying asset and the option are both infinite.
• Let = - > 0 , and let r > 0 be the riskless interest rate.
Phantom WorksMathematics & Computing Technology
15
McDonald - Siegel Model, III
• Then there exists a critical value V* such that the value C ( V ) of the opportunity is given by
• The project should be launched at the first time t 0 for which Vt V* .
.if
;if
VVIV
VVVA
VC
p
*,
*0,
Phantom WorksMathematics & Computing Technology
16
McDonald - Siegel Model, IV
• The parameter p , the coefficient A , and the optimal exercise threshold V* are given by
.
and,
,
IIp
pV
Ip
pA
rrrp
pp
p
1*
1
12
2
1
2
1
1
1
2
2
22
Phantom WorksMathematics & Computing Technology
17
McDonald - Siegel Model, V
• For example, suppose that
= 0.13 , = 0.08 , and = 0.20 .
• Suppose that the required investment I = 1 , and that the riskless interest rate r = 0.05.
• Then one finds that A = 0.2253 , p = 2.1583 , and V* = 1.8633 . Hence, the value of the option to launch the project is
.otherwise,
;if,
1
8633.102253.0 1583.2
V
VV
VC
Phantom WorksMathematics & Computing Technology
18
McDonald - Siegel Model, VI
Payoff = max( V - 1 , 0 )
F( V ) = A V p
V* = 1.8633
Phantom WorksMathematics & Computing Technology
19
McDonald - Siegel Model, VII
NPV Rule
Optimal Rule
Phantom WorksMathematics & Computing Technology
20
McDonald - Siegel Model, VIII
• If r , then
• If r , then
• McDonald and Siegel also considered the case where the exercise price I is stochastic, and where the value of the underlying asset might suddenly jump to zero.
• Returning to the case where the exercise price I is nonstochastic, other authors (e.g., Dixit and Pindyck) have noted that the same methodology can be applied more generally, to problems where the value of the underlying asset can be written as some function of some state variable which follows a geometric Brownian motion.
.IV
*lim0
.IV
*lim0
Phantom WorksMathematics & Computing Technology
21
Motivation for Mean-Reverting Prices
• The “workhorse” stochastic process for much of the early work on real options is geometric Brownian motion.
• This is a natural model for exponential growth (or decay) under uncertainty.
• Consider a real option where the underlying state variable is the price of some input or output.
• One might argue that the price may be subject to random shocks, but that in the long run, competitive pressures will ensure that it tends to revert to some sustainable level.
Phantom WorksMathematics & Computing Technology
22
• Mean-Reverting Ornstein-Uhlenbeck process:
• Explicit solution:
• Conclusion: Xt is normally distributed, with
• The process does indeed revert to a mean, but can take negative values.
References: [KP], [Si]
Candidate “Mean-Reverting” Price Processes, I
ttt BdtdXXXd
t
sstt
t BdeeXXXX00
t
t
tt
eX
eXXXX
2
20
12
Var
E
Phantom WorksMathematics & Computing Technology
23
• Exponential of a Mean-Reverting Ornstein-Uhlenbeck process:
• From Ito’s lemma, one then finds that
• Conclusion: Xt is lognormally distributed, and the logarithm of Xt reverts to a mean.
Reference: [Si]
Candidate “Mean-Reverting” Price Processes, II
ttt
Yt
BdtdYYYd
eX t
where,
ttttt BdXdtXXYXd
log
2
1 2
Phantom WorksMathematics & Computing Technology
24
The Homogeneity Condition
• Question: If the price of one widget reverts to some mean value, shouldn’t the price of two widgets revert to twice that same mean value, “in the same manner”?
• More generally (and more precisely), it seems reasonable to require the following: Suppose that the price Xt follows the stochastic process
Then for any > 0 , Yt Xt should follow the stochastic process
where
• In a word, the drift and diffusion of the process should be homogeneous functions of degree one, of the pair
• The previous model violates this condition.
.tttt BdXXgtdXXfXd ,,
,tttt BdYYgtdYYfYd ,,
.XY
.XX t ,
Phantom WorksMathematics & Computing Technology
25
• Stochastic logistic or Pearl-Verhulst equation:
• Explicit solution:
• Conclusion: Xt > 0 almost surely, for all t > 0 .
• What are E[ Xt ] and Var[ Xt ] ?
• Does this process really revert to a mean?
• This model violates the homogeneity condition.
References: [DP], [KP], [Pin]
Candidate “Mean-Reverting” Price Processes, III
ttttt BdXtdXXXXd
t
s
t
t
sdBsXX
BtX
X
0
2
0
2
2exp
1
2exp
Phantom WorksMathematics & Computing Technology
26
• Inhomogeneous geometric Brownian motion (IGBM) :
• Explicit solution:
• Conclusion: Xt > 0 almost surely, for all t > 0 . (Remark: If Xt
follows an inhomogeneous geometric Brownian motion, and if Yt = 1 / Xt , then it follows from Ito’s lemma that Yt observes a stochastic logistic equation, as on the previous slide.)
• This model satisfies the homogeneity condition.References: [B], [KP], [Pil], [Si]
Candidate “Mean-Reverting” Price Processes, IV
tdXBdXtdX
BdXtdXXXd
ttt
tttt
t
stt sdBsXXBtX0
2
0
2
2exp
2exp
Phantom WorksMathematics & Computing Technology
27
First and Second Moments of Inhomogeneous Geometric Brownian Motion, I
• Let Xt be an inhomogeneous geometric Brownian motion, and let
• Then one can show that
Reference: [KP]
.
,
]E[
]E[2
2
1
t
t
Xtm
Xtm
.
and,
tmXtmtd
md
Xtmtd
md
1222
11
22
Phantom WorksMathematics & Computing Technology
28
First and Second Moments of Inhomogeneous Geometric Brownian Motion, II
• One finds that
• Hence, the expected value of Xt tends to
• Moreover,
where is the “half-life” of the deviation between
.tt eXXXX 0][E
.as, tX
,
2/1
2log
t
2/1t .and XX t ][E
Phantom WorksMathematics & Computing Technology
29
First and Second Moments of Inhomogeneous Geometric Brownian Motion, III
• One also finds that
.if,
;if,
;if,
0212
012
021
222
2
02
2
2
220
2
2
2
20
2
22
22
ttt
tt
t
eeXXX
eX
etXXXeX
eXXXtX
][E 2
tX
Phantom WorksMathematics & Computing Technology
30
Density Function of Inhomogeneous Geometric Brownian Motion
• Suppose that
• Let p( x , t ) be the probability density function of Xt .
• Then one can show that p( x , t ) is a solution of the following initial value problem for Kolmogorov’s forward equation (also known as the Fokker-Planck equation):
Reference: [W]
.given, 0XBdXtdXXXd tttt
.,
;,,
xXxxp
txpxXx
pxxt
p
0
22
2
2
0,
02
1
Phantom WorksMathematics & Computing Technology
31
Mean-Reverting and Lognormal Distributions, I
0 2 4 6 8 100
1
2
3
4
5
x
dens
ity
0 2 4 6 8 100
0.2
0.4
0.6
0.8
1
1.2
x
prob
abilit
y
1,1,200347.0,1,2.0 2/10 ttXX
Maximum error = 0.0347
Phantom WorksMathematics & Computing Technology
32
Mean-Reverting and Lognormal Distributions, II
0 10 20 30 40 50 600
0.04
0.08
0.12
0.16
0.2
0.24
x
dens
ity
0 10 20 30 40 50 600
0.2
0.4
0.6
0.8
1
x
prob
abilit
y
1,1,200347.0,1,5 2/10 ttXX
Maximum error = 0.0142
Phantom WorksMathematics & Computing Technology
33
Valuation of an Asset Contingent on an Inhomogenous Geometric Brownian Motion, I
• Suppose that there exists a traded security Mt such that risk uncorrelated with changes in Mt is not priced. Suppose that there are no cash payouts associated with Mt , and that
Zt is a standard Brownian motion, and where M > 0 and M > 0 are constant.
• Suppose that Xt follows the inhomogeneous geometric Brownian motion
• Suppose that there is a constant instantaneous risk-free interest rate r > 0 .
• Let dt be the instantaneous correlation between dBt and dZt , for some constant | | 1 .
• Let be the market price of risk.
where,ttMtMt ZdMtdMMd
.tttt BdXtdXXXd
M
M r
Phantom WorksMathematics & Computing Technology
34
Valuation of an Asset Contingent on an Inhomogenous Geometric Brownian Motion, II
• Consider an asset of market value V( x , t ) , which is completely determined by x = Xt and by time t 0 .
• Suppose that this asset generates a cash flow of c( x , t ) dt during the time interval ( t , t + dt ) .
• Then, under certain “perfect market” assumptions, one can show that V( x , t ) satisfies the partial differential equation (PDE)
for 0 < x < , 0 < t .
txcVrt
V
x
VxxX
x
Vx ,
2
12
222
Phantom WorksMathematics & Computing Technology
35
Valuation of an Asset Contingent on an Inhomogenous Geometric Brownian Motion, III
• Moreover, suppose that follows the inhomogeneous geometric Brownian motion
where
• Then for any time t0 and any value of the state variable X0 , V( X0 , t0 ) may be evaluated as follows:
• One refers to as the risk-neutralized version of .
References: [Co], [Sh], [Si]
tX̂
;given, 0ˆˆˆˆˆˆ XBdXtdXXXd tttt
.and XX
ˆˆ
0
0 000ˆ,ˆE,
t
srts sdeXXtXctXV .
tX̂ tX
Phantom WorksMathematics & Computing Technology
36
Derivation of (PDE), I
• Consider a portfolio P = V - h M .
• Then, using Ito’s lemma and the SDEs for V and for M ,
.BdX
VXZdMh
tdMhX
VX
X
VXX
t
V
ZdMtdMh
tdXX
VBdXtdXX
X
Vtd
t
V
ZdMtdMhXdX
VXd
X
Vtd
t
V
MdhVdPd
M
M
MM
MM
2
222
22
2
2
2
2
2
2
1
2
1
2
1
Phantom WorksMathematics & Computing Technology
37
Derivation of (PDE), II
• Choose h such that
is uncorrelated with dZ :
• Then
is uncorrelated with M .
BdX
VXZdMh M
X
V
M
Xh
ZdBdX
VXZdMh
M
M
0E 2
XX
VVM
X
V
M
XVP
MM
Phantom WorksMathematics & Computing Technology
38
Derivation of (PDE), III
• Therefore, for this choice of h , the expected return on portfolio P must equal the riskless rate r .
• Portfolio P ‘s (instantaneous) expected return, moreover, must equal its expected (instantaneous) capital gain plus its (instantaneous) cash flow.
• Therefore
• The PDE follows after rearranging, and substituting X = x and
tdX
X
VVrtdPr
M
.tdtXctdX
VX
X
VX
X
VXX
t
V
M
M ,2
12
222
.M
M r
Phantom WorksMathematics & Computing Technology
39
Valuation of a Perpetuity Contingent upon an Inhomogeneous Geometric Brownian Motion
• Suppose that
and consider a perpetual cash flow of Xt dt , beginning at t = 0 .
• Then the current ( t = 0 ) value of this perpetuity is
;given, 0XBdXtdXXXd tttt
.
r
eX
X
r
eX
sdeeXXXsdeXXX
r
srssrs
r 0
ˆ
000ˆˆˆˆE
Phantom WorksMathematics & Computing Technology
40
Valuation of an Annuity Contingent upon an Inhomogeneous Geometric Brownian Motion
• Suppose that
and consider an annuity with instantaneous cash flow Xt dt , beginning at t = 0 and ending at t = 0 .
• Then the current ( t = 0 ) value of this annuity is (as given by Bhattacharya (1978))
Reference: [B]
;given, 0XBdXtdXXXd tttt
.
r
r
r er
eX
X
er
eXr
110
Phantom WorksMathematics & Computing Technology
41
Valuation of a Perpetual American Call Option on an Underlying Asset which is a Function of an IGBM, I
• Suppose that some asset value or commodity price V = V( x ) is completely determined by x = Xt , where Xt evolves in accordance with
and consider a perpetual American option to purchase V for an exercise price I .
• While it is optimal to hold the option, its value F = F( x ) is governed by the ordinary differential equation (ODE)
• We will impose the natural boundary condition that F( x ) is bounded as x 0+ .
;given, 0XBdXtdXXXd tttt
. xFrxd
FdxxX
xd
Fdx 0,0
2
12
222
Phantom WorksMathematics & Computing Technology
42
Valuation of a Perpetual American Call Option on an Underlying Asset which is a Function of an IGBM, II
• For convenience, rewrite the ODE as
where
• Note that > 0 and > 0 . Moreover, we will assume that < , which is equivalent to - ( + r ) .
• Up to a constant multiplier, there is exactly one solution to the ODE which is bounded as x 0+ . It is
where p is the positive solution of the quadratic equation
and
where U( a, b, z ) is Tricomi’s confluent hypergeometric function.
,02
22 F
xd
Fdx
xd
Fdx
.and,,
222
222
rX
,111 ,22, xppUxxF
p
,012 pp
Phantom WorksMathematics & Computing Technology
43
Valuation of a Perpetual American Call Option on an Underlying Asset which is a Function of an IGBM, III
• Tricomi’s confluent hypergeometric function U( a, b, z ) is defined by
where ( . ) is Euler’s gamma function, and where M( a, b, z ) is Kummer’s confluent hypergeometric function, defined by
• The function U( a, b, z ) can be computed numerically using a rational function approximation algorithm devised by Luke (1977).
References: [L], [SpO]
,zbbaMza
bzbaM
ba
bzbaU
b,2,1
1,,
1
1,,
1
.
!,,
0 k
z
kb
b
a
kazbaM
k
k
Phantom WorksMathematics & Computing Technology
44
Valuation of a Perpetual American Call Option on an Underlying Asset which is a Function of an IGBM, IV
• The particular solution F1( x ) of the ODE satisfies the initial conditions
• Moreover, using the facts that > 0 , > 0 , and < , and some classical identities for confluent hypergeometric functions, one can show that
., 0010 11
xd
FdF
.for,and xxxd
Fdx
xd
Fd000
2
12
1
Phantom WorksMathematics & Computing Technology
45
Valuation of a Perpetual American Call Option on an Underlying Asset which is a Function of an IGBM, V
• The value of the American call option is
for some constant A > 0 .
• The constant A must be chosen so that F( x ) solves the free boundary problem
,xFAxF 1
.
;
;asbounded
;,
**
**
0
*002
12
222
xxd
Vdx
xd
Fd
IxVxF
xxF
xxFrxd
FdxxX
xd
Fdx
Phantom WorksMathematics & Computing Technology
46
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, I
• Consider a perpetual American call option on a mean-reverting perpetuity, which begins payment immediately after the option has been exercised (so that = 0 , on page 19 ).
• Then the free boundary problem for this option is
.
;
;asbounded
;,
rx
xd
Fd
Ir
Xx
r
XxF
xxF
xxFrxd
FdxxX
xd
Fdx
1*
**
0
*002
12
222
Phantom WorksMathematics & Computing Technology
47
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, II
• To be specific, suppose that
• Suppose that I = 14.0438 . (This is the value the perpetuity would have if the currently observed value of Xt were 1 .)
• Then one finds that A = 0.0937 , x* = 1.2402 . The option value is plotted below, as a function of x .
.and,,,,, 05.04.012.0514.01 2/1 rtX
Phantom WorksMathematics & Computing Technology
48
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, III
• Suppose that we fix
.and,,,,, 034.144.012.0514.01 2/1 ItX
r = 0.04
r = 0.05r = 0.06
x = 1
Phantom WorksMathematics & Computing Technology
49
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, IV
• Suppose that we fix
.and,,,,, 034.1405.04.02.0514.01 2/1 IrtX
= 0
= 0.5
= 1
x = 1
Phantom WorksMathematics & Computing Technology
50
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, V
• Suppose that we fix
.and,,,,, 034.1405.04.01514.01 2/1 IrtX
= 0.1
= 0.2
= 0.3
x = 1
Phantom WorksMathematics & Computing Technology
51
Example: Valuation of a Perpetual American Option on a Mean-Reverting Perpetuity, VI
• Suppose that we fix
.and,,,,, 034.1405.04.012.01 IrX
t1/2 = 2.5
t1/2 = 5
t1/2 = 10 x = 1
Phantom WorksMathematics & Computing Technology
52
Binomial Tree Approach, I
• For more complex problems, one can use a binomial approximation to the risk-neutralized mean-reverting process.
• Calistrate (2000) suggests the following approach:--
Let t = T / n , where T is the time horizon and n is the number of time steps.
--Let
--The value of the state variable at time i , after j “up” steps, is
.andu
deu t 1
.jij duXjiX 0,ˆ
Phantom WorksMathematics & Computing Technology
53
Binomial Tree Approach, II
--The probability of an “up” step at time i , after j “up” steps, is
where
and where
• The analytical models presented earlier can be used to validate a binomial tree.
Reference: [Ca]
,
ji
tPjip ,*1
2
1,
,
2,ˆ,ˆ
,*2
jiX
jiXXji
.if,
;if,
;if,
x
xx
x
xP
11
10
00
Phantom WorksMathematics & Computing Technology
54
Conclusion
• Of the models we have considered for a mean-reverting price process, inhomogeneous geometric Brownian motion is the most appropriate.
--It is guaranteed to be positive--One can compute its moments--It really does revert to a mean--It has an appealing homogeneity property--The available evidence suggests that it is (at least approximately) lognormal
• Bhattacharya (1978) showed how to value certain cash flow streams which depend on such a process.
• We have shown how to value certain options on such cash flow streams.
Phantom WorksMathematics & Computing Technology
55
References, I
[B] S. Bhattacharya, “Project Valuation with Mean-Reverting Cash Flow Streams,” Journal of Finance 33, December 1978, pp. 1317-1331.
[BØ] K. Brekke and B. Øksendal, “The High Contact Principle as a Sufficiency Condition for Optimal Stopping.” Stochastic Models and Option Values, D. Lund and B. Øksendal, editors, Elsevier Science Publishers, 1991,
pp. 187-208.
[Ca] D. Calistrate, “Setting Lattice Parameters for Derivatives Valuation”, private communication, 2000.
[Co] G. Constantinides, “Market Risk Adjustment in Project Valuation,” Journal of Finance 33, May 1978, pp. 603-
616.
[CoA] T. Copeland and V. Antikarov, Real Options: A Practitioner’s Guide, Texere, 2001.
[DP] A. Dixit and R. Pindyck, Investment under Uncertainty, Princeton University Press, 1994.
Phantom WorksMathematics & Computing Technology
56
References, II
[KP] P. Kloeden and E. Platen, Numerical Solution of Stochastic Differential Equations, Springer-Verlag, 1992.
[L] Y. Luke, “Algorithms for Rational Approximations for a Confluent Hypergeometric Function,” Utilitas Math. 11 (1977), pp. 123-151.
[McDS] R. McDonald and D. Siegel, “The Value of Waiting to Invest,” Quarterly J. Econ. 101 (1986), pp. 707-728.
[Pil] D. Pilipovic, Energy Risk, McGraw-Hill, 1998.
[Pin] R. Pindyck, “Irreversibility, Uncertainty, and Investment,” J. Econ. Lit. 19 (1991), pp. 1110-1148.
[R] B.L.S. Prakasa Rao, Statistical Inference for Diffusion Type Processes (Kendall’s Library of Statistics 8), Arnold / Oxford University Press, 1999.
[Sh] D. Shimko, Finance in Continuous Time--A Primer, Kolb, 1992.
Phantom WorksMathematics & Computing Technology
57
References, III
[Si] G. Sick, “Real Options.” Finance (Handbooks in Operations Research and Management Science, Volume 9), R. Jarrow, V. Maksimovic, and W. Ziemba, editors, pp. 631-691, North-Holland, 1995.
[SO] I. Shoji and T. Ozaki, “Comparative Study of Estimation Methods for Continuous Time Stochastic Processes,” J. Time Series Analysis 18 (1997), pp. 485-506.
[SpO] J. Spanier and K. Oldham, An Atlas of Functions, Hemisphere, 1987.
[T] L. Trigeorgis, Real Options, MIT Press, 1996.
[W] P. Wilmott, Paul Wilmott on Quantitative Finance, Wiley, 2000.