8
Experience and best practice from Danish businesses 'PGTI[ GŒEKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF GZVTCEVKQP U[UVGOU

PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

Experience and best practice from Danish businesses

Page 2: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

2 Energy efficiency improvements of ventilation and extraction systems

- and are used extensively by Danish businesses

Ventilation and extraction systems have many

ventilation is used to control temperatures and

ventilation and extraction systems that often

Ventilation and extraction systems account for 15% of electricity consumption

total electricity consumption by businesses/

extraction systems consume considerable

hours•

quantities of air•

heat recovery units•

surfaces lead to major pressure losses• Older buildings often consume additional

• Many of the systems have not been

experience of other businesses

Danish businesses have implemented numerous energy saving projects and have performed analyses of energy intensive

most important experience from businesses into a number of feature articles targeted at

Did you know that…

• Fibervision

Page 3: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

3 Danish Energy Agency, Tel: +45 3392 6700, website: www.ens.dk/en

- and stronger competitiveness in the green transition

and extraction systems means that even small steps often generate huge savings on

reduce the amount of air to be replaced by

parameter

footprint and strengthen its position as one the

competitiveness and prepare the ground for Did you know that…

used for ventilation and extraction

• Danish manufacturing businesses

usually save 5-15% on system energy

Did you know that…

• Danish businesses are among the most

Page 4: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

4 Energy efficiency improvements of ventilation and extraction systems

CASE • Fertin Pharma A/S saved almost DKK 1 million (EUR 130,000) a year by making ventilation

amounts of energy on

humidity and room temperature in production

convert several existing systems to recirculate

ventilation system and refurbishment of existing

Emission to the surroundings

exchanger Ventilated room

Page 5: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

5 Danish Energy Agency, Tel: +45 3392 6700, website: www.ens.dk/en

CASE • Needs reduction and increased system

(EUR 70,000) a year

both electricity consumption and clean steam

• operations and energy consumption

kW

26 %

3

10 %

Page 6: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

6 Energy efficiency improvements of ventilation and extraction systems

that the best results are achieved if you systematically analyse your energy needs and

1. Needs reduction: you accept less air change or larger

2.

3. Optimisation of operations:

savings by adjusting the ventilation system

operation of systems can generate large

- experience and best practice from other businesses

Vald. Birn A/S

Remember…

Place demands on your supplier!

Page 7: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

7 Danish Energy Agency, Tel: +45 3392 6700, website: www.ens.dk/en

– and achieve the best results

all relevant aspects of your systems and your

1. Identify the original design basis•

example in relation to health and safety

2. Analyse your current needs and existing operations•

• • Can you establish local zones and/or local

• Can you reduce pressure losses in your

4. Optimise your system operating parameters•

• Can you reduce or adjust the operational

5. Optimise your system maintenance procedures•

• Do you regularly clean ventilation ducts

• Can you set an operating target for

• Can you measure air change across the

Remember…

You can apply for subsidies from an energy

Page 8: PGTI[ G REKGPE[ KORTQXGOGPVU QH XGPVKNCVKQP CPF ... · 'pgti[ ucxkpiu ygtg cejkgxgf d[ guvcdnkujkpi etquu uqy jgcv gzejcpigtu kp uqog xgpvkncvkqp u[uvgou cv (gtvkp 2jctoc # 5 *qygxgt

Phot

os: S

canp

ix an

d KA

M

• •

• •