1.Status of ST1
2.Status of integration of ST1 and ST2
Jean PeyréBadesi - May 2006
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 2
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 3
Peyre
j @
ip
no.i
n2p
3.f
r
Status of ST1
• 9 tracking Quadrants (Q1 to Q9) of ST1 are now constructed till end of March
• Gain homogeneity, Gas leakage, Mechanical tension on wires and Dark current are within defined standards
• Only on one quadrant (Q2), mean mechanical tension on wires is two high (70g instead of 60g).About 2 wires are breaking per 6 months. The wires have to be changed and stretched at nominal tension of 60g
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 4
Peyre
j @
ip
no.i
n2p
3.f
r
Status of ST1
• Quadrants are being equipped now with electronic exit boards before final mounting at CERN (waiting for MANU cards)
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 5
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
a) Tests of installation for supports
b) Tests of installation for Monitoring System
c) Gas
d) Cooling
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 6
Peyre
j @
ip
no.i
n2p
3.f
r
Preassembly in Orsay in 2005/2006 of the whole support structure
CERN sept2006
Integration of ST1 and ST2
Design of supports for Station 1 & 2 by IPNO
Integration/Cooling and Construction of supports for Station 1 & 2 by IPNO
DumDummy my
FASSFASS
RealReal FASSFASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 7
Peyre
j @
ip
no.i
n2p
3.f
rIntegration of ST1 and ST2
IN2P3 HAllIN2P3 HAll
Rails Rails ST1 & ST2ST1 & ST2
Supports Supports ST1/ST2ST1/ST2
DummyDummyFASSFASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 8
Peyre
j @
ip
no.i
n2p
3.f
rIntegration of ST1 and ST2Mounting of Structure with crane
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 9
Peyre
j @
ip
no.i
n2p
3.f
rIntegration of ST1 and ST2
Mounting of dummy absorber with crane
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 10
Peyre
j @
ip
no.i
n2p
3.f
rIntegration of ST1 and ST2
Mounting of real Quadrants for ST1
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 11
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
a) Tests of installation for supports
b) Tests of installation for Monitoring System
c) Gas
d) Cooling
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 12
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests for mounting
ST1/ST2
• The aim of this test is to study all problems related to the mounting of:
1. Rails2. Supports for Station1 & Station23. Hanging and positioning quadrants of Station 1 &
Station2• An other purpose is
to imagine and realise the tools needed for achieving this job without electrical crane from cavern in a volume isolated from the cavern where only 2 or 3 persons can work at the same time
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 13
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Fixation of hanging hooks for manual cranes
SpecialSpecialScaffold Scaffold Adapted Adapted to the to the FASSFASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 14
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Hanging the rails
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 15
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Lifting the rails to the ceiling of the FASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 16
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Rails fixed to the ceiling of the FASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 17
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Hanging and fixing the supports ST1 & ST2
SpecialSpecialaccessory accessory for for hanging hanging supportssupports
All tools and accessories will be certified by APAVE as requested by CERN
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 18
Peyre
j @
ip
no.i
n2p
3.f
r
RAILSRAILS
WAGGONSWAGGONS
Assembly tests ST1/ST2 Hanging and fixing the supports ST1 &
ST2
Lifting Lifting supportsupport
Support Support fixedfixed
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 19
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Hanging and fixing the quadrants of ST1
Fixations of Fixations of QuadrantQuadrant
Weights for Weights for balancebalance
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 20
Peyre
j @
ip
no.i
n2p
3.f
rAssembly tests ST1/ST2
Hanging and fixing the quadrants of ST2
Fixations of Fixations of QuadrantQuadrant
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 21
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
a) Tests of installation for supports
b) Tests of installation for Monitoring System
c) Gas
d) Cooling
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 22
Peyre
j @
ip
no.i
n2p
3.f
rTest of monitoring Platforms
IPN Lyon
Platform for Platform for Monitoring Monitoring SystemSystem
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 23
Peyre
j @
ip
no.i
n2p
3.f
rTest of monitoring Platforms
IPN Lyon
Tests in Orsay of the Monitoring system 11th and 12th of May on real size dummy FASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 24
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
a) Tests of installation for supports
b) Tests of installation for Monitoring System
c) Gas
d) Cooling
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 25
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 26
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Dipole Dipole MagnetMagnet
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 27
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Quadrants ST2Quadrants ST2
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 28
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Quadrants ST1Quadrants ST1
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 29
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Supports ST1 & Supports ST1 & ST2ST2
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 30
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Cooling Cooling pipespipes
Gas pipesGas pipes
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 31
Peyre
j @
ip
no.i
n2p
3.f
r
Where is gas, Cooling?
Gas pipesGas pipes
CROCUS BoxesCROCUS BoxesLow Voltage Low Voltage BoxesBoxes
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 32
Peyre
j @
ip
no.i
n2p
3.f
r
Tuyau Inox sur chambre 8
Tuyau Sertoflex 8
Tuyau Inox 6Union double Serto
SO51021-8
Union double réduite Serto
SO51021-8-6
2 Douilles d’appui Serto
SO50003-8-5
GAS INPUT
Tuyau Inox sur chambre 8
Union double Serto
SO51021-8
2 Douilles d’appui Serto
SO50003-8-5
Tuyau Sertoflex 8
Réduction Serto
SO51821-A12-8
Union double Serto
SO51021-12
Tuyau Inox 12
STATION 1
Gas connections for ST1 Serto technology
GAS OUTPUT
Connection between Quadrants and Gas tubes inside the FASS
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 33
Peyre
j @
ip
no.i
n2p
3.f
rSpecial requirements for ST2
From 2nd to 12th of may, our colleagues from SINP came to Orsay to test the mounting of ST2. Here are our main commun conclusions:
1. Special care must be taken to verify the size of real chambers
2. SINP has to study and construct the tools for lifting quadrants of ST2
3. Low Voltage Bus Bars are in contact with metallic supports and plateform of alignment systems. SINP has in charge the modification of the bus bars to avoid those problems
4. SINP has in charge the connection of gas tubes to the general gas system
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 34
Peyre
j @
ip
no.i
n2p
3.f
r
1.Status of ST1
2.Status of integration of ST1 and ST2
a) Tests of installation for supports
b) Tests of installation for Monitor System
c) Gas
d) Cooling
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 35
Peyre
j @
ip
no.i
n2p
3.f
r
By FBy Françoisrançois Launay Launay
Cooling for ST1/ST2Simulation 2002 IPNO – Model ST1
AdditionaAdditional Air l Air outletoutlet
Air Air outletoutlet
Air Air inletinlet
Gap Gap 40mm40mm
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 36
Peyre
j @
ip
no.i
n2p
3.f
r
By FBy Françoisrançois Launay Launay
Cooling for ST1/ST2Simulation 2002 IPNO – Air Velocity
Gap Gap 40mm40mm
Gap Gap 0mm0mm
AdditionaAdditional Air l Air outletoutlet
Air Air stoppstopp
eded
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 37
Peyre
j @
ip
no.i
n2p
3.f
r
By FBy Françoisrançois Launay Launay
Cooling for ST1/ST2Simulation 2002 IPNO - Air Temperature
Gap Gap 40mm40mm
Gap Gap 0mm0mm
AdditionaAdditional Air l Air outletoutlet
~64°C
~38°C
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 38
Peyre
j @
ip
no.i
n2p
3.f
rCooling for ST1/ST2
TOPTOPOUTLETOUTLET
ST1ST1
ST2ST2
BOTTOMBOTTOMINLETINLET
Design issued from Design issued from previous previous simulationssimulations
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 39
Peyre
j @
ip
no.i
n2p
3.f
rCooling for ST1/ST2 Bottom – Blowing Air
Air output Air output speed of 3-4 speed of 3-4 m/s m/s
On each outlet, On each outlet, special grids are special grids are fixed for settling fixed for settling airflow airflow
184m184m33/h/h184m184m33/h/h
184m184m33/h/h184m184m33/h/h184m184m33/h/h
184m184m33/h/h
37m37m33/h/h
37m37m33/h/h
37m37m33/h/h
37m37m33/h/h
207m207m33/h/h
207m207m33/h/h
207m207m33/h/h
207m207m33/h/h
210m210m33/h/h
210m210m33/h/h
2500m2500m33/h/h
Cooling Cooling CROCUS CROCUS
Cooling Cooling Quadrants Quadrants
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 40
Peyre
j @
ip
no.i
n2p
3.f
rCooling for ST1/ST2
Top – Inhaling Air
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 41
Peyre
j @
ip
no.i
n2p
3.f
rCooling for ST1/ST2
Top – Inhaling Air
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 42
Peyre
j @
ip
no.i
n2p
3.f
rCooling for ST1/ST2
Top – Inhaling Air
164m164m33/h/h164m164m33/h/h
443m443m33/h/h
20m20m33/h/h
443m443m33/h/h
20m20m33/h/h
15m15m33/h/h
15m15m33/h/h
376m376m33/h/h376m376m33/h/h
158m158m33/h/h
158m158m33/h/h37m37m33/h/h
37m37m33/h/h
37m37m33/h/h
37m37m33/h/h
2500m2500m33/h/h Air output Air output speed of 3-4 m/s speed of 3-4 m/s
On each output, On each output, special grids are special grids are fixed for settling fixed for settling airflow airflow
Special pipes Special pipes for Hot spots for Hot spots
Cooling Cooling CROCUS CROCUS
Cooling Cooling Quadrants Quadrants
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 43
Peyre
j @
ip
no.i
n2p
3.f
rInstallation at CERN
Schedule
2006September October November36
37
38
39
40
41
42
43
44
45
46
47
48
Installation- Rails
Installation- Supports
Installation- Cooling
Installation - Quadrants To be discussedTo be discussed
**
*: Amec Spie*: Amec Spie
Badesi - Sardinia - May 2006
IPNO-RDD-Jean Peyré 44
Peyre
j @
ip
no.i
n2p
3.f
r
Many Thanks to all participants