Peter-Raymond Kett Peter-Raymond Kett le le MEG Review February 2007 MEG Review February 2007 1 Cockcroft- Cockcroft- Walton Walton Status Status Carlo Bemporad Carlo Bemporad Angela Papa Angela Papa Giovanni Signorelli Giovanni Signorelli Peter-Raymond Peter-Raymond Kettle Kettle

Peter-Raymond Kettle MEG Review February 2007 1 Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad

Embed Size (px)

Citation preview

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 11

Cockcroft-Walton Cockcroft-Walton Status StatusCockcroft-Walton Cockcroft-Walton Status Status

Carlo BemporadCarlo Bemporad

Angela PapaAngela Papa

Giovanni SignorelliGiovanni Signorelli Peter-Raymond KettlePeter-Raymond Kettle

Carlo BemporadCarlo Bemporad

Angela PapaAngela Papa

Giovanni SignorelliGiovanni Signorelli Peter-Raymond KettlePeter-Raymond Kettle

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 22

OverviewOverview

Machine Production Status & Schedule Machine Production Status & Schedule

C-W Area + Beam Line Status & ScheduleC-W Area + Beam Line Status & Schedule

Integration into Beam Schedule 2007Integration into Beam Schedule 2007

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 33

Machine StatusMachine Status• original Completion Date: original Completion Date: ~ mid-May 2007~ mid-May 2007

• NEW Completion Date: NEW Completion Date: ~ end-February & expected~ end-February & expectedReady for testing mid-April ~ 2007 Ready for testing mid-April ~ 2007

• original Completion Date: original Completion Date: ~ mid-May 2007~ mid-May 2007

• NEW Completion Date: NEW Completion Date: ~ end-February & expected~ end-February & expectedReady for testing mid-April ~ 2007 Ready for testing mid-April ~ 2007

MEG C-W.MEG C-W.StatusStatusEndEnd20062006

MEG C-W.MEG C-W.StatusStatusEndEnd20062006

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 44

• Bellows system Tested Bellows system Tested ready for shipmentready for shipment• Beam Elements Beam Elements availableavailable• Power Supplies Power Supplies availableavailable• Beam Diagnostic ElementsBeam Diagnostic Elements ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera)( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) available or almost readyavailable or almost ready

• Bellows system Tested Bellows system Tested ready for shipmentready for shipment• Beam Elements Beam Elements availableavailable• Power Supplies Power Supplies availableavailable• Beam Diagnostic ElementsBeam Diagnostic Elements ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera)( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) available or almost readyavailable or almost ready

Beam Line ComponentsBeam Line Components

C-WC-WC-WC-W

ComponentsComponentsSectionSection

• Quadrupole DoubletQuadrupole Doublet• x-, y-Steering Magnetsx-, y-Steering Magnets• beam Shutter + Slitsbeam Shutter + Slits

• Quadrupole DoubletQuadrupole Doublet• x-, y-Steering Magnetsx-, y-Steering Magnets• beam Shutter + Slitsbeam Shutter + Slits

BellowsBellowsSectionSection

• Bellows System with Bellows System with stroke of ~ 2.2m drives stroke of ~ 2.2m drives COBRA Insertion System COBRA Insertion System to place target at centre of to place target at centre of COBRA MagnetCOBRA Magnet

• Bellows System with Bellows System with stroke of ~ 2.2m drives stroke of ~ 2.2m drives COBRA Insertion System COBRA Insertion System to place target at centre of to place target at centre of COBRA MagnetCOBRA Magnet

TargetTargetSupportSupportTargetTargetSupportSupport

• LiF Target holder +LiF Target holder +

vacuum chambervacuum chamber

• LiF Target holder +LiF Target holder +

vacuum chambervacuum chamber

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 55

Machine ScheduleMachine Schedule

Completion of manufacture Completion of manufacture ~ end-February 2007~ end-February 2007

Acceptance Tests in Amersfoort NL (or PSI)Acceptance Tests in Amersfoort NL (or PSI) with HVEE, INFN, PSI with HVEE, INFN, PSI ~ mid-April 2007 ?~ mid-April 2007 ?

Shipment to PSIShipment to PSI ~ end-April ?~ end-April ?

Machine Installation + Machine Installation + Shipment/Guarantee Test Shipment/Guarantee Test ~ mid-April to mid-May 2007~ mid-April to mid-May 2007

Completion of manufacture Completion of manufacture ~ end-February 2007~ end-February 2007

Acceptance Tests in Amersfoort NL (or PSI)Acceptance Tests in Amersfoort NL (or PSI) with HVEE, INFN, PSI with HVEE, INFN, PSI ~ mid-April 2007 ?~ mid-April 2007 ?

Shipment to PSIShipment to PSI ~ end-April ?~ end-April ?

Machine Installation + Machine Installation + Shipment/Guarantee Test Shipment/Guarantee Test ~ mid-April to mid-May 2007~ mid-April to mid-May 2007

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 66

Cockcroft-Walton AreaCockcroft-Walton Area C-W AREA:C-W AREA: • Area presented Nov. 2006 at Area presented Nov. 2006 at Coordination Committee ResearchCoordination Committee Research Area WestArea West

• Officially in Shutdown ProgrammeOfficially in Shutdown Programme area & infrastructure area & infrastructure planned beplanned be installed by the end of Shutdowninstalled by the end of Shutdown

• beam-axis extension survey end 2006beam-axis extension survey end 2006

• infrastructure groups + Health Physicsinfrastructure groups + Health Physics notified – notified – need Ministry of Health need Ministry of Health clearance for the new area + C-Wclearance for the new area + C-W

• M3 shielding to be removed now to M3 shielding to be removed now to check spacecheck space

• more detailed meetings still needed to more detailed meetings still needed to finalize all points (Interlock system)finalize all points (Interlock system)

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 77

Cockcroft-Walton Area cont.Cockcroft-Walton Area cont.ConstraintsConstraints

• Safety System +Safety System + Electrical InfrastructureElectrical Infrastructure unalteredunaltered• Permanent Access from Permanent Access from outsideoutside

ConstraintsConstraints• Safety System +Safety System + Electrical InfrastructureElectrical Infrastructure unalteredunaltered• Permanent Access from Permanent Access from outsideoutside

M3 M3 ShieldingShieldingMust be Must be

MODIFIEDMODIFIED

M3 M3 ShieldingShieldingMust be Must be

MODIFIEDMODIFIED

E5 ZoneE5 Zone E5E5Shielding Shielding

Wall needsWall needsmodifyingmodifying

E5E5Shielding Shielding

Wall needsWall needsmodifyingmodifying

Approx. formApprox. formC-W AreaC-W Area

Approx. formApprox. formC-W AreaC-W Area

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 88

C-W Area LayoutC-W Area Layout

Virtually all StandardVirtually all StandardConcrete BlocksConcrete BlocksVirtually all StandardVirtually all StandardConcrete BlocksConcrete Blocks

StillStillProblematicProblematic

StillStillProblematicProblematic

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 99

C-W Area ShieldingC-W Area ShieldingPlanned Work needed for CompletionPlanned Work needed for Completion (By mid-April)(By mid-April)

removal of walls + measure & removal of walls + measure & layout check - freeze designlayout check - freeze design

order special shielding + start order special shielding + start standard shielding constructionstandard shielding construction

infrastructure completion:infrastructure completion: water, compressed-air, powerwater, compressed-air, power

Safety systems completion (Interlock)Safety systems completion (Interlock)

Ministry of Health ApprovalMinistry of Health Approval

test of Safety System test of Safety System (Beg. April)(Beg. April)

Peter-Raymond KettlePeter-Raymond Kettle MEG Review February 2007MEG Review February 2007 1010

Testing & Integration into Beam ScheduleTesting & Integration into Beam Schedule

Full test with LiF-target only possible when:Full test with LiF-target only possible when:

• area + safety aspects completedarea + safety aspects completed• C-W beam line components magnets, vacuum chambers etc. at PSIC-W beam line components magnets, vacuum chambers etc. at PSI• C-W Bellows System at PSI (will arrive soon storage arranged)C-W Bellows System at PSI (will arrive soon storage arranged)• target preparedtarget prepared

CONSTRAINTS:CONSTRAINTS:

• cannot be tested in parallel with Beam Commissioning cannot be tested in parallel with Beam Commissioning bellows system cannot be placed in zone DC insertion system neededbellows system cannot be placed in zone DC insertion system needed

• C-W Bellows System cannot be in place during any DS InsertionC-W Bellows System cannot be in place during any DS Insertion TCs or DCs or End-Cap installation/removal !!!TCs or DCs or End-Cap installation/removal !!!

Proposed Commissioning mid-April – mid-JuneProposed Commissioning mid-April – mid-June SEE Proposed Beam Schedule 2007SEE Proposed Beam Schedule 2007

Full test with LiF-target only possible when:Full test with LiF-target only possible when:

• area + safety aspects completedarea + safety aspects completed• C-W beam line components magnets, vacuum chambers etc. at PSIC-W beam line components magnets, vacuum chambers etc. at PSI• C-W Bellows System at PSI (will arrive soon storage arranged)C-W Bellows System at PSI (will arrive soon storage arranged)• target preparedtarget prepared

CONSTRAINTS:CONSTRAINTS:

• cannot be tested in parallel with Beam Commissioning cannot be tested in parallel with Beam Commissioning bellows system cannot be placed in zone DC insertion system neededbellows system cannot be placed in zone DC insertion system needed

• C-W Bellows System cannot be in place during any DS InsertionC-W Bellows System cannot be in place during any DS Insertion TCs or DCs or End-Cap installation/removal !!!TCs or DCs or End-Cap installation/removal !!!

Proposed Commissioning mid-April – mid-JuneProposed Commissioning mid-April – mid-June SEE Proposed Beam Schedule 2007SEE Proposed Beam Schedule 2007