An overview of offshore w ind in the UK
Peter MadiganOffshore Wind Development Manager
15th December 2009
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
2/16
BWEA | CSTP/Supergrid meeting | 15-12-2009
BWEA members
Over 540 Company members
Broad membership of developers, suppliers,
grid companies, financiers and service providers
Sponsors
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
3/16
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
4/16BWEA | CSTP/Supergrid meeting | 15-12-2009
Renewable Energy Targets
EU TARGET = 15% of all UK energy by 2020
In the UK this could translate to*:
10% Renewable Transport
14% Renewable Heat
30% Renewable Electricity
*Government Renewable Energy Strategy consultation scenario
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
5/16BWEA | CSTP/Supergrid meeting | 15-12-2009
~30% renewable electricity by 2020 could translate to*:
Onshore wind: 14GW, ~10% Offshore wind: 20GW, ~19% Wave & tidal: 1-2GW, ~1%
UK wind (on and off shore) is currently 4 GW, = ~3%
Renewable heat and transport starting at a low base
Wind energy needs to deliver the major share
*BWEA scenario assumes capacity factors of30% onshore and 40% offshore
How big could it be?
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
6/16BWEA | CSTP/Supergrid meeting | 15-12-2009
Pre-Budget Announcement
All projects accredited between April 2010 andMarch 2014 receive 2ROC/MWh
More generous than original proposal
Questions over projects building close to March 2014
170 million for R&D and ports infrastructure
Industry aims to bring costs down Supply chain competition
Exchange rate risk
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
7/16BWEA | CSTP/Supergrid meeting | 15-12-2009
Offshore w ind Economics
Bubble area represents project capacity
London Array
Walney
Sheringham Shoal
Thanet
Greater Gabbard
Gunfleet Phase II
Gunfleet Phase I
Horns Rev II
Alpha Ventus
Robin RiggRhyl Flats
Thornton Bank
Princess Amalia (Q7)
Lillgrund
EgmondBarrow
Kentish FlatsScroby Sands
Middlegrundden
Irene Vorrink
Lely
Bockstigen
Blyth
Utgrunden
Tuno Knob
North Hoyle
Horns Rev
Yttre StengrundNysted
Sams
LID
0
1
2
3
4
1990 1995 2000 2005 2010 2015
Year (main contracts signed)
ProjectCapEx
(M/MW)
Contract (Post 2009 Budget) Contracted (Pre 2009 Budget)Under Construction Operational
Near-Contract (Expected) Projection (High Supply Chain Confidence)Projection (Low Supply Chain Confidence)
Costs have increased to 3.1m/MW Report: Charting the right course
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
8/16BWEA | CSTP/Supergrid meeting | 15-12-2009
688 MW installed
1156 MW under construction
3442 MW consented
3420 MW in planning
Projects
UnderwayRounds 1 & 2
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
9/16
Round 3
Government go-ahead thissummer
Crown Estateallocation Q42009
Majorexpansion onRounds 1&2,
~25GW
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
10/16
Scottish
TerritorialWaters
Exclusivity ofsites allocated
SEA to be
performed Over 6GW of
capacity
Similar deliverytimetable toRound 3
UK Offshore Wind Capacity
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
11/16
BWEA | CSTP/Supergrid meeting | 15-12-2009
UK Offshore Wind Capacity(With supply chain limitations imposed)
1 0 0 1 1 1 1 2 1.1 2.2 2.3 4.1 2.3 2.4 2.3 1.4 2.7 4.2 5.6 6.5 6.8
0
1,000
2,000
3,000
4,000
'00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17 '18 '19 '20
AnnualCapacity
(MW)
0
5,000
10,000
15,000
20,000
CumulativeCapacity(MW)
*Excludes Scottish Territorial Waters
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
12/16
BWEA | CSTP/Supergrid meeting | 15-12-2009
BVG Estimated European InstalledOffshore Wind Capacity to 2050
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
13/16
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
14/16
BWEA | CSTP/Supergrid meeting | 15-12-2009
Major Business Opportunity for the UK
Supply chain isalready expanding
JDR cables newfacility Hartlepool Opened July 2009
100 new jobs
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
15/16
BWEA | CSTP/Supergrid meeting | 15-12-2009
Onshore grid infrastructure investment isurgently required to ensure that grid capacity is
available.
A strategic plan is needed
for UK connection
points and capacity.
Further interconnection with
Europe is hugely beneficial.
Grid
8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting
16/16
Thank you
Peter Madigan BWEA Offshore Wind Development [email protected]