    An overview of offshore w ind in the UK

    Peter MadiganOffshore Wind Development Manager

    15th December 2009

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    2/16

    BWEA | CSTP/Supergrid meeting | 15-12-2009

    BWEA members

    Over 540 Company members

    Broad membership of developers, suppliers,

    grid companies, financiers and service providers

    Sponsors

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    3/16

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    4/16BWEA | CSTP/Supergrid meeting | 15-12-2009

    Renewable Energy Targets

    EU TARGET = 15% of all UK energy by 2020

    In the UK this could translate to*:

    10% Renewable Transport

    14% Renewable Heat

    30% Renewable Electricity

    *Government Renewable Energy Strategy consultation scenario

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    5/16BWEA | CSTP/Supergrid meeting | 15-12-2009

    ~30% renewable electricity by 2020 could translate to*:

    Onshore wind: 14GW, ~10% Offshore wind: 20GW, ~19% Wave & tidal: 1-2GW, ~1%

    UK wind (on and off shore) is currently 4 GW, = ~3%

    Renewable heat and transport starting at a low base

    Wind energy needs to deliver the major share

    *BWEA scenario assumes capacity factors of30% onshore and 40% offshore

    How big could it be?

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    6/16BWEA | CSTP/Supergrid meeting | 15-12-2009

    Pre-Budget Announcement

    All projects accredited between April 2010 andMarch 2014 receive 2ROC/MWh

    More generous than original proposal

    Questions over projects building close to March 2014

    170 million for R&D and ports infrastructure

    Industry aims to bring costs down Supply chain competition

    Exchange rate risk

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    7/16BWEA | CSTP/Supergrid meeting | 15-12-2009

    Offshore w ind Economics

    Bubble area represents project capacity

    London Array

    Walney

    Sheringham Shoal

    Thanet

    Greater Gabbard

    Gunfleet Phase II

    Gunfleet Phase I

    Horns Rev II

    Alpha Ventus

    Robin RiggRhyl Flats

    Thornton Bank

    Princess Amalia (Q7)

    Lillgrund

    EgmondBarrow

    Kentish FlatsScroby Sands

    Middlegrundden

    Irene Vorrink

    Lely

    Bockstigen

    Blyth

    Utgrunden

    Tuno Knob

    North Hoyle

    Horns Rev

    Yttre StengrundNysted

    Sams

    LID

    0

    1

    2

    3

    4

    1990 1995 2000 2005 2010 2015

    Year (main contracts signed)

    ProjectCapEx

    (M/MW)

    Contract (Post 2009 Budget) Contracted (Pre 2009 Budget)Under Construction Operational

    Near-Contract (Expected) Projection (High Supply Chain Confidence)Projection (Low Supply Chain Confidence)

    Costs have increased to 3.1m/MW Report: Charting the right course

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    8/16BWEA | CSTP/Supergrid meeting | 15-12-2009

    688 MW installed

    1156 MW under construction

    3442 MW consented

    3420 MW in planning

    Projects

    UnderwayRounds 1 & 2

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    9/16

    Round 3

    Government go-ahead thissummer

    Crown Estateallocation Q42009

    Majorexpansion onRounds 1&2,

    ~25GW

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    10/16

    Scottish

    TerritorialWaters

    Exclusivity ofsites allocated

    SEA to be

    performed Over 6GW of

    capacity

    Similar deliverytimetable toRound 3

    UK Offshore Wind Capacity

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    11/16

    BWEA | CSTP/Supergrid meeting | 15-12-2009

    UK Offshore Wind Capacity(With supply chain limitations imposed)

    1 0 0 1 1 1 1 2 1.1 2.2 2.3 4.1 2.3 2.4 2.3 1.4 2.7 4.2 5.6 6.5 6.8

    0

    1,000

    2,000

    3,000

    4,000

    '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17 '18 '19 '20

    AnnualCapacity

    (MW)

    0

    5,000

    10,000

    15,000

    20,000

    CumulativeCapacity(MW)

    *Excludes Scottish Territorial Waters

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    12/16

    BWEA | CSTP/Supergrid meeting | 15-12-2009

    BVG Estimated European InstalledOffshore Wind Capacity to 2050

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    13/16

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    14/16

    BWEA | CSTP/Supergrid meeting | 15-12-2009

    Major Business Opportunity for the UK

    Supply chain isalready expanding

    JDR cables newfacility Hartlepool Opened July 2009

    100 new jobs

  • 8/9/2019 Peter Malligan BWA 091215 PM CSTP Supergrid Meeting

    15/16

    BWEA | CSTP/Supergrid meeting | 15-12-2009

    Onshore grid infrastructure investment isurgently required to ensure that grid capacity is

    available.

    A strategic plan is needed

    for UK connection

    points and capacity.

    Further interconnection with