Page 1: Peter C Wilson - Portfolio

Professional Work | PETER WILSON

p o r t f o l i o

Page 2: Peter C Wilson - Portfolio

ENTRANCE

FFE-2.1

FIRST FLOORFURNITURE, FIXTURES AND EQUIPMENT PLAN

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

FIRST FLOOR FURNITURE,FIXTURE AND EQUIPMENT PLANA-2.11

SCALE:1/4"=1'-0"

GUESTBATHROOM

WETBAR

PATIO

9'-0"

-12'-4"

FFE-2.0

BASEMENTFURNITURE, FIXTURES AND EQUIPMENT PLAN

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

FURNITURE, FIXTURE, EQUIPMENT PLANFFE-2.0

1SCALE:1/4"=1'-0"

6'-4"3'-10" 3'-10"6'-8

"10

'-7"

OPEN TO BELOW

FFE-2.2

SECOND FLOORFURNITURE, FIXTURES AND EQUIPMENT PLAN

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

SECOND FLOOR FURNITURE, FIXTURES AND EQUIPMENT PLANA-2.21

SCALE:1/4"=1'-0"

PROVIDE ADD ALTERNATE FOR ALL WORK ON STORAGE SHED.

KEYED NOTES

CONFIRM DIMENSIONS WITH ARCHITECT, TYP.

SETBACK LINE

DRIVEWAY

EXISTING STONE WALL

STONE WALL

--

--

DIAMETER

SITE LEGEND

TYPE

PROPERTY LINE

STONE WALL

ROAD

CONTOUR LINE

EXISTING CONTOUR LINE

LINE TYPES

SYMBOL DESCRIPTION

M MAPLE

O OAK

A ASH

B BIRCH

TU TULIP

--- ---

SPOT GRADE

---

---

---

---

---

---

---

---

+119.7

HOLETEST

30'-0"

50'-2"

20'-0"

A-1.0

SITE PLAN

SITE PLANA-1.01

SCALE:1/32"=1'-0"

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

Provided By: Jay A. Greenwell, PLSLand Planning-Land Surveying85 Lafayette AvenueSuffern, New York 10901T: 845.357.0830F: 845.357.0756

basement floor plan

basswood study models 3d study models

first floor plan second floor plan

vicinity map

south facing elevation

west facing elevation

north facing elevation

east facing elevation

YAGER RESIDENCEcompleted:2006

site location:Piermont, NY

A-4.2

EXTERIORELEVATIONS & SECTIONS

SECTION ELEVATION - NORTHA-4.0.2

23/16"-1'-0"

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

SECTION ELEVATION - EASTA-4.0.2

13/16"-1'-0"

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

STUCCO STUCCO

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

STUCCO

STUCCO6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

CULTUREDFIELDSTONE

CULTUREDFIELDSTONE

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

CULTUREDFIELDSTONEAND LOW WALL

COPPERFLASHING

4" GAP BETWEEN BOTTOM OF CULTURED STONE WALL AND GRAVEL, TYP. @CULTURED STONE WALLS

GRAVEL

STONE EDGING AND GRAVEL @ CULTURED STONE WALLS

LINE OF WATER

STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.

LINE OF FINISHED FLOOR AT LIVING ROOM

LINE OF FINISHED FLOOR OF SECOND FLOOR

LINE OF FINISHED FLOOR AT BASEMENT

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.

STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.

SECTION ELEVATION - WESTA-4.0.1

13/16"-1'-0"

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

SECTION ELEVATION - SOUTHA-4.0.1

23/16"-1'-0"

EXTERIORELEVATIONS & SECTIONS

A-4.1

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

STUCCO

STUCCO

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

STUCCO

DECORATIVE LEADERTO DRAIN

CULTUREDFIELDSTONE

AC

EPDM MEMBRANE

STANDING SEAMCOPPER ROOF

COPPER SIDING

EPDM MEMBRANE

EPDM MEMBRANE

WROUGHTIRON RAILING,TYP.

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

TO UNDERGROUNDPERFORATED DRAINPIPE, TYP.

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

4" WOOD TRIM

4" WOOD TRIM 4" WOOD TRIM

4" WOOD TRIM

6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

4" WOOD TRIM

A-4.3

SECTION ELEVATIONS

12

Project No. 04-105

NORTH

0 4 8 16

No. Date Description

REVISIONS

01 06.13.05 FOR PERMIT

copyright date: 01.01.05

All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.

No. Date Description

27 Castle RoadTown of Orangetown, NY10968

Yager Residence

BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com

02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION

SECTION ELEVATION - WESTA-4.31

1/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

31/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

51/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

71/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

81/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

61/8"-1'-0"

SECTION ELEVATION - WESTA-4.3

41/8"-1'-0"

SECTION ELEVATION - WESTA-4.32

1/8"-1'-0"

INTERIOR ELEVATIONS SHOWN FOR COORDINATION ONLY AND SHALL BE REVIEWED BY ARCHITECT AND GENERAL CONTRACTOR PRIOR TO CONSTRUCTION.

Project Manager / Lead Designer BAM STUDIO ARCHITECTS

Page 3: Peter C Wilson - Portfolio
Page 4: Peter C Wilson - Portfolio

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLY

CLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

DRY

CLEANING

OFFICE

EQUIPMENT

STORAGE

ROOM

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTH

WOMEN'S

VESTIBULE

SOFT SEATING

MEETING

RESTROOM

SOFT

SEATING

MEETING

10

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ATM

11

12

9

3

2

1

4

MICRO MICRO

5 6 7 8

REF

COFFEE

MIC

RO

SPRINKLER

WATER

COFFEE

42

" FL

AT

SC

RE

EN

42" FLAT SCREEN

42

" F

LA

T S

CR

EE

N

42

" F

LA

T S

CR

EE

N

42

" F

LA

T S

CR

EE

N

42

" F

LA

T S

CR

EE

N

42

" F

LA

T S

CR

EE

N

42

" FL

AT

SC

RE

EN

42

" F

LA

T S

CR

EE

N

54

" F

LA

T S

CR

EE

N5

4"

FL

AT

SC

RE

EN

42

" F

LA

T S

CR

EE

N4

2"

FL

AT

SC

RE

EN

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

OFFICE117 118

MEETING119

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE185

OFFICE107

OFFICE108

180

IDF ROOM

181

COPY

182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION189VESTIBULE

WOMEN190

MEN177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE

173

CONFERENCE161

PHONE171

PHONE172

RESTROOM

ADA

164

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE

158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING144

OFFICE145

MEETING146

147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR

133

134

VESTIBULE100

SOFT

SEATING

MEETING

SOFT

SEATING

MEETING

WOMEN132

MEN136

COPY138

137

IDF139

162

167

FLASHCAM168

COPY169

ELEC.184

VESTIBULE

135MEN'S

VESTIBULE

42

" FL

AT

SC

RE

EN

VESTIBULE126

60

" F

LA

T S

CR

EE

N

VESTIBULE159

CLOSET

170CLOSETCLOSET

CLOSET

CLOSET CLOSET

CLOSET ELEC.

FD

FD

FD FD

FD

FD

A-4.1.3

ELEVATIONS

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

1

A-4.1.3

KEY PLANA-4.1.3

3NOT TO SCALE

2

A-4.1.3

SECTION ELEVATIONA-4.1.2

1.11/4" - 1-0'

SECTION ELEVATIONA-4.1.2

1.21/4" - 1-0'

SECTION ELEVATIONA-4.1.2

1.31/4" - 1-0'

SECTION ELEVATIONA-4.1.2

2.11/4" - 1-0'

SECTION ELEVATIONA-4.1.2

2.21/4" - 1-0'

SECTION ELEVATIONA-4.1.2

2.31/4" - 1-0'

FREE STANDING SINK4" RUBBER BASE, TYP.

GWB LIGHT COVE GWB LIGHT COVE

MILLWORK SCREEN ENCLOSURECURVED GWB DROP CEILING

GLASS PARTITION

GLASS RAIL TERRAZZO STAIRS

MILLWORK SCREEN

ENCLOSURE

MILLWORK RECEPTION DESK

GWB LIGHT COVE

PROJECTION SCREEN

RECESSED PROJECTOR

METAL LOCKERS

P. LAM PIPE SHROUD

GLASS RAIL TERRAZZO STAIRS

GWB LIGHT COVE

FURNITURE CREDENZA

STAINLESS STEEL

RESTROOM PARTITIONSHOLLOW METAL FRAME DOOR

WITH SIDELITE6" HIGH TILE BASE 4" RUBBER BASE, TYP.

4" RUBBER BASE, TYP.

HOLLOW METAL FRAME

DOOR WITH SIDELITE

HOLLOW METAL FRAME

DOOR WITH SIDELITE ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE GWB CEILING ACOUSTICAL CEILING TILE

SOLID SURFACE COUNTER

ADA MIRROR

4" RUBBER BASE, TYP.

HOLLOW METAL FRAME

DOOR WITH SIDELITE

ACOUSTICAL CEILING TILE

GWB CEILING

STAINLESS STEEL

RESTROOM PARTITIONS

HOLLOW METAL FRAME

DOOR WITH SIDELITE

HOLLOW METAL FRAME

DOOR WITH SIDELITE

ACOUSTICAL CEILING TILE

4" RUBBER BASE, TYP.

HOLLOW METAL

FRAME DOORACOUSTICAL CEILING TILE HOLLOW METAL

FRAME DOOR

FREE STANDING SINK

HOLLOW METAL

FRAME DOOR

FRAMELESS TEMP. ACID ETCHED

GLASS DOOR WITH SIDELITE

HOLLOW METAL FRAME

DOOR WITH SIDELITE

4" RUBBER BASE, TYP.

HOLLOW METAL

FRAME DOOR

ACOUSTICAL CEILING TILE

GWB CEILINGRECEPTION DESK

MILLWORK

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE

EXISTING SKYLIGHT

RECEPTION

SUPPLY

DW

ELEC.

MAILROOM

ELEVATOR

ENCODING ENCODING

ENCODING

EQUIPMENT

STORAGE

ROOM

COAT

CLOSET

PRAYER RO

PHONE BOO

RESTROOM

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ENCODINGASST

A10

A11

A12

A7

A8

A9

A4

A5

A6

A1

A2

A3

6'-0"

8'-0"

8'-0"

6'-0"6'-0"

6'-0"

CR

ED

EN

ZA

CR

ED

EN

ZA

LOCKERS

TVTV TV TV TV

TV90

TV90

TV90

TV90

9090909090

DATA

RACK

DATA

RACK

TV 60

TV

TV

60

60

TV 90

TV 90

TV 90

TV90TV90

TV90

TV90

TV90 TV90

TV90TV90

TV90

TV90

TV90

REF

COFFEE

MIC

RO

TV 90

UM

BR

ELLA

NIC

HE

WATER

1

2

3

4

7

8

9

10

5

6

11

12

13

14

15

16

17

18

19

20

21

22

23

24

27

28

29

30

25

26

31

32

33

34

35

36

39

40

41

42

37

38

43

44

TV60

42" F

LA

T S

CR

EE

NAV

CA

RT

TV

60

42" FLAT SCREEN

AV CREDENZA

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV 60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV 60

TV 60

54"

FLA

T S

CR

EE

N

TV 60

54"

FLA

T S

CR

EE

N

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE185

OFFICE107

OFFICE108

180

IDF ROOM181

COPY182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION189VESTIBULE

WOMEN190

MEN177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

164

COAT

174

CLOSET

148

149

150

151

152

154

VESTIBULE100

SOFT

SEATING

MEETING

162

167

FLASHCAM168

COPY169

ELEC.184

VESTIBULE

2

60"

FLA

T S

CR

EE

N

CLOSET

170CLOSETCLOSET

CLOSET

FD

FD

FD FD

27'-0" TYP

27'-0

" T

YP

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLY

CLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

GAMING

DRY

CLEANING

OFFICE

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTHWOMEN'S

VESTIBULE

SOFT SEATING

MEETING

SOFT

SEATING

MEETING

10

ATM

RECYCLE BINS

(BELOW)

11

12

9

3

2

1

4

BAR

COUNTER

MICRO MICRO

COUNTER

TRASH BINS

(BELOW)

TRASH BINS

(BELOW)

5 6 7 8

COUNTER

SPRINKLER

COFFEE

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T

AV CART

42" F

LA

T S

CR

EE

N

AV CART

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T4

2"

FLA

T S

CR

EE

N AV

CA

RT

AV

CA

RT

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

5

VESTIBULE116

OFFICE117 118

MEETING119

MEETING101

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING144

OFFICE145

MEETING146

147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR133

134

VESTIBULE100

FT

ING

ING

SOFT

SEATING

MEETING

WOMEN132

MEN136

COPY138

137

IDF139

162

135MEN'S

VESTIBULE

2 23 3

42" F

LA

T S

CR

EE

N

VESTIBULE126

60"

FLA

T S

CR

EE

N

VESTIBULE159

CLOSET CLOSET

CLOSET ELEC.

FD

FD

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLY

CLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

ENCODING ENCODING

ENCODING

GAMING

DRY

CLEANING

OFFICE

EQUIPMENT

STORAGE

ROOM

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTHWOMEN'S

VESTIBULE

SOFT SEATING

MEETING

RESTROOM

SOFT

SEATING

MEETING

10

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ENCODINGASST

ATM

RECYCLE BINS

(BELOW)

A10

A11

A12

A7

A8

A9

A4

A5

A6

A1

A2

A3

6'-0"

8'-0

"

8'-0

"

6'-0"6'-0"

6'-0

"

11

12

9

3

2

1

4

BAR

COUNTER

MICRO MICRO

COUNTER

TRASH BINS

(BELOW)

TRASH BINS

(BELOW)

5 6 7 8

CR

ED

EN

ZA

CR

ED

EN

ZA

COUNTER

LOCKERS

DATARACK

DATARACK

REF

COFFEE

MIC

RO

SPRINKLER

UM

BR

ELLA

NIC

HE

WATER

COFFEE

1

2

3

4

7

8

9

10

5

6

11

12

13

14

15

16

17

18

19

20

21

22

23

24

27

28

29

30

25

26

31

32

33

34

35

36

39

40

41

42

37

38

43

44

42

" FL

AT

SC

RE

ENA

V C

AR

T

42" FLAT SCREEN

AV CREDENZA

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

AV CART

42

" FL

AT

SC

RE

EN

AV CART

42

" F

LA

T S

CR

EE

NA

V C

AR

T

54

" F

LA

T S

CR

EE

N5

4"

FL

AT

SC

RE

EN

42

" F

LA

T S

CR

EE

NA

V C

AR

T4

2"

FL

AT

SC

RE

EN A

V C

AR

T

AV

CA

RT

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA

1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

OFFICE117 118

MEETING119

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE

185

OFFICE107

OFFICE108

180

IDF ROOM181

COPY182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION

189VESTIBULE

WOMEN190

MEN

177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE

173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

164

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING

144OFFICE

145MEETING

146147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR133

134

VESTIBULE100

SOFT

SEATING

MEETING

SOFT

SEATING

MEETING

WOMEN132

MEN

136

COPY

138

137

IDF139

162

167

FLASHCAM

168

COPY

169

ELEC.184

VESTIBULE

135MEN'S

VESTIBULE

2 23 3

42

" FL

AT

SC

RE

EN

VESTIBULE126

60

" F

LA

T S

CR

EE

N

VESTIBULE159

CLOSET

170CLOSETCLOSET

CLOSET

CLOSET CLOSET

CLOSET ELEC.

128S 130S

128S2130S2

128S3130S3

128S4 130S4

128S5 130S5

127S4

127S3

126S4

126S3

127S

125S

131S2

131S3

131S4

124S4

124S3

131S5

132S

132S1

132S2

132S3

132S4

123S4

123S3

123S1

123S

122S1

122S

122S3

122S4

133S4

133S3

133S2

133S1

133S134S

134S1

134S2

134S3

134S4

120S4

120S3

121S1

121S

120S1

120S119S

119S1 118S1

118S

117S1

117S

116S1

116S

136S

136S1

137S

137S1 138S1

137S3

137S5

118S5

116S3

115S3

114S3

240S2

252S2

140S141S

141S1

142S

142S1

143S

143S1

143S2

143S3

143S4

143S5

112S5

112S4

112S3

114S

113S1

113S

112S1

112S

144S

144S1

144S2

144S3

144S4

144S5

111S4

111S3

111S1

111S110S

110S1

110S3

110S4

146S5

146S4

146S3

146S2

145S1

145S 146S

146S1

147S2

147S3

147S4

147S5

108S4

108S3

111S

111S

108S1

108S

147S

147S1

107S104S

104S3

107S3

107S4

148S4

151S2

148S151S

103S

100S

103S3 101S3

101S4

154S4

153S2 154S2

152S 155S

155N

153N1

101N1

103N3

103N5

153N4

104N

104N1

104N2 105N2

105N1

105N

104N3

106N3

148N

107N3

106N2 107N2

106N1 107N1

106N 107N 108N

108N1

108N2 109N2

109N1

109N 110N

110N1

110N2 111N2

111N1

111N

109N3

110N3

146N5

144N

114N

115N2

112N3 113N3

141N5

142N

138N

138N1

137N 136N

137N1 136N1

138N2137N2

140N4

115N4 118N3 119N3

118N2

116N

118N1

118N

119N1

119N

140N5

135N

135N1

134N

134N1

133N 132N

133N1

132N1

134N3

134N4

121N4

121N3

120N1

120N

121N1

121N

132-3 131-3

132-4 131-4

132-5 131-5

122N5 123N5

122N4 123N4

122N3 123N3

122N

122N1 123N1

123N

131N

131N

130N

130N1 128N

131-3 130-3 129-3 128-3

131-4 130-4 129-4 128-4

129-5 128-5

126N5 127N5

124N4 125N4 126N4 127N4

124N3 125N3 126N3 127N3

124N2

124N

125N2

125N

127N

0

1

2

3

4

5

5

4

3

2

1

0

0

1

2

3

4

5

5

4

3

2

1

0

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

50 51 52 53 54 55 55 53 52 51

50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28

54

27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

0 0 2 3 41

5 6 7 8 9 10 11

12 13 14 15

16 17 18 19 20 21 22 23 24 25 26 27

FD

FD

FD FD

FD

FD

27'-0" TYP

27'-0"

TY

P

FURNITURE LEGEND

GENERAL NOTES

ELECTRIC PROJECTION SCREEN (DA-LITE BOARDROOM ELECTROL HDTV OR EQ.

52"x92" VIEWING AREA). PROVIDE BLOCKING FOR MOUNTING AS NECESSARY.

ELKAY DOUBLE BASIN STAINLESS STEEL SINK WITH OFFSET DRAIN, AND ELKAY

ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE SPRAYER. SEE PLUMBING

DRAWINGS.

SOLID SURFACE UNDERMOUNT SINK WITH ADA FAUCET, TYP.

1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES.

SEE ELECTRICAL DRAWINGS FOR CIRCUITING.

2. CONTRACTOR SHALL PROVIDE AND INSTALL ROLL-DOWN SOLAR SHADES ON ALL

PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND

INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS AND POWER PLAN

FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S

INSTALLER.

3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND

INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER

FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE

FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD

CONDITIONS.

4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS

PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY

DISCREPANCIES.

5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY

THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.

6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED

WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT

AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH

MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.

7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN

.DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW

FURNITURE QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.

ADA COMPLIANT WALL HUNG TOILET AND FLUSH VALVE, TYP. U.O.N.

ADA COMPLIANT GRAB BARS

ADA COMPLIANT TANK TOILET

STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:

(2) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003

(1) SANITARY NAPKIN/TAMPON VENDOR B-3500 (WOMEN'S RESTROOMS ONLY)

(1) SOAP DISPENSER B-306 PER EVERY (2) SINKS

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN

DISPOSAL AND TOILET TISSUE DISPENSER B-357 PER STALL (WOMENS RESTROOM ONLY)

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER AND TOILET TISSUE

DISPENSER B-3471 PER STALL (MENS RESTROOM ONLY)

(1) HAT AND COAT HOOK B-682 PER STALL

MIRROR - FULL-WIDTH OF COUNTER, FULL HEIGHT TO CEILING. PROVIDE CUTOUTS FOR

SCONCES.

ADA COMPLIANT URINAL

ELKAY GECR2521R1 ADA COMPLIANT SINGLE BASIN STAINLESS STEEL SINK WITH

OFFSET DRAIN, AND ELKAY ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE

SPRAYER. SEE PLUMBING DRAWINGS.

STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:

(1) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003

(1) SOAP DISPENSER B-306

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN

DISPOSAL AND TOILET TISSUE DISPENSER B-357

(1) HAT AND COAT HOOK B-682

(1) FIXED POSITION TILT MIRROR B-293 1836

ADA COMPLIANT HANDICAPPED SINK, ADA COMPLIANT FAUCET WITH PADDLE HANDLES

JANITOR MOP SINK

PANTRY EQUIPMENT:

(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR

(1) GE MONOGRAM MICROWAVE

COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

CAFE EQUIPMENT:

(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR

(2) GE MONOGRAM MICROWAVE

(1) COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

(1) WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

VENDING MACHINES (BY OTHERS)

FLAT PANEL TELEVISION (BY OTHERS)

PAPER TOWEL/WASTE, SOAP, COATHOOK, MIRROR (WALL MOUNTED, FULL HEIGHT AND

WIDTH).

FURNITURE, FIXTURES

AND EQUIPMENT PLAN

FIRST FLOOR

FFE-2.1

FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR SOUTH ENDFFE-2.1

1SCALE:1/8"=1'-0"

FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR NORTH ENDFFE-2.1

2SCALE:1/8"=1'-0"

KEY PLANFFE-2.1

3SCALE:3/32"=1'-0"

SOUTH END NORTH END

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

RECEPTION

SUPPLY

DW

ELEC.

MAILROOM

ELEVATOR

ENCODING ENCODING

ENCODING

EQUIPMENT

STORAGE

ROOM

COAT

CLOSET

PRAYER RO

PHONE BOO

RESTROOM

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ENCODINGASST

A10

A11

A12

A7

A8

A9

A4

A5

A6

A1

A2

A3

6'-0"

8'-0"

8'-0"

6'-0"6'-0"

6'-0"

CR

ED

EN

ZA

CR

ED

EN

ZA

LOCKERS

TVTV TV TV TV

TV90

TV90

TV90

TV90

9090909090

DATA

RACK

DATA

RACK

TV 60

TV

TV

60

60

TV 90

TV 90

TV 90

TV90TV90

TV90

TV90

TV90 TV90

TV90TV90

TV90

TV90

TV90

REF

COFFEE

MIC

RO

TV 90

UM

BR

ELLA

NIC

HE

WATER

1

2

3

4

7

8

9

10

5

6

11

12

13

14

15

16

17

18

19

20

21

22

23

24

27

28

29

30

25

26

31

32

33

34

35

36

39

40

41

42

37

38

43

44

TV60

42" F

LA

T S

CR

EE

NAV

CA

RT

TV

60

42" FLAT SCREEN

AV CREDENZA

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV 60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV60

42"

FLA

T S

CR

EE

NA

V C

AR

T

TV 60

TV 60

54"

FLA

T S

CR

EE

N

TV 60

54"

FLA

T S

CR

EE

N

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE185

OFFICE107

OFFICE108

180

IDF ROOM181

COPY182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION189VESTIBULE

WOMEN190

MEN177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

164

COAT

174

CLOSET

148

149

150

151

152

154

VESTIBULE100

SOFT

SEATING

MEETING

162

167

FLASHCAM168

COPY169

ELEC.184

VESTIBULE

2

60"

FLA

T S

CR

EE

N

CLOSET

170CLOSETCLOSET

CLOSET

FD

FD

FD FD

27'-0" TYP

27'-0

" T

YP

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLY

CLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

GAMING

DRY

CLEANING

OFFICE

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTHWOMEN'S

VESTIBULE

SOFT SEATING

MEETING

SOFT

SEATING

MEETING

10

ATM

RECYCLE BINS

(BELOW)

11

12

9

3

2

1

4

BAR

COUNTER

MICRO MICRO

COUNTER

TRASH BINS

(BELOW)

TRASH BINS

(BELOW)

5 6 7 8

COUNTER

SPRINKLER

COFFEE

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T

AV CART

42" F

LA

T S

CR

EE

N

AV CART

42"

FLA

T S

CR

EE

NA

V C

AR

T

42"

FLA

T S

CR

EE

NA

V C

AR

T4

2"

FLA

T S

CR

EE

N AV

CA

RT

AV

CA

RT

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

5

VESTIBULE116

OFFICE117 118

MEETING119

MEETING101

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING144

OFFICE145

MEETING146

147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR133

134

VESTIBULE100

FT

ING

ING

SOFT

SEATING

MEETING

WOMEN132

MEN136

COPY138

137

IDF139

162

135MEN'S

VESTIBULE

2 23 3

42" F

LA

T S

CR

EE

N

VESTIBULE126

60"

FLA

T S

CR

EE

N

VESTIBULE159

CLOSET CLOSET

CLOSET ELEC.

FD

FD

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLY

CLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

ENCODING ENCODING

ENCODING

GAMING

DRY

CLEANING

OFFICE

EQUIPMENT

STORAGE

ROOM

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTHWOMEN'S

VESTIBULE

SOFT SEATING

MEETING

RESTROOM

SOFT

SEATING

MEETING

10

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ENCODINGASST

ATM

RECYCLE BINS

(BELOW)

A10

A11

A12

A7

A8

A9

A4

A5

A6

A1

A2

A3

6'-0"

8'-0

"

8'-0

"

6'-0"6'-0"

6'-0

"

11

12

9

3

2

1

4

BAR

COUNTER

MICRO MICRO

COUNTER

TRASH BINS

(BELOW)

TRASH BINS

(BELOW)

5 6 7 8

CR

ED

EN

ZA

CR

ED

EN

ZA

COUNTER

LOCKERS

DATARACK

DATARACK

REF

COFFEE

MIC

RO

SPRINKLER

UM

BR

ELLA

NIC

HE

WATER

COFFEE

1

2

3

4

7

8

9

10

5

6

11

12

13

14

15

16

17

18

19

20

21

22

23

24

27

28

29

30

25

26

31

32

33

34

35

36

39

40

41

42

37

38

43

44

42

" FL

AT

SC

RE

ENA

V C

AR

T

42" FLAT SCREEN

AV CREDENZA

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

42

" F

LA

T S

CR

EE

NA

V C

AR

T

AV CART

42

" FL

AT

SC

RE

EN

AV CART

42

" F

LA

T S

CR

EE

NA

V C

AR

T

54

" F

LA

T S

CR

EE

N5

4"

FL

AT

SC

RE

EN

42

" F

LA

T S

CR

EE

NA

V C

AR

T4

2"

FL

AT

SC

RE

EN A

V C

AR

T

AV

CA

RT

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA

1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

OFFICE117 118

MEETING119

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE

185

OFFICE107

OFFICE108

180

IDF ROOM181

COPY182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION

189VESTIBULE

WOMEN190

MEN

177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE

173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

164

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING

144OFFICE

145MEETING

146147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR133

134

VESTIBULE100

SOFT

SEATING

MEETING

SOFT

SEATING

MEETING

WOMEN132

MEN

136

COPY

138

137

IDF139

162

167

FLASHCAM

168

COPY

169

ELEC.184

VESTIBULE

135MEN'S

VESTIBULE

2 23 3

42

" FL

AT

SC

RE

EN

VESTIBULE126

60

" F

LA

T S

CR

EE

N

VESTIBULE159

CLOSET

170CLOSETCLOSET

CLOSET

CLOSET CLOSET

CLOSET ELEC.

128S 130S

128S2130S2

128S3130S3

128S4 130S4

128S5 130S5

127S4

127S3

126S4

126S3

127S

125S

131S2

131S3

131S4

124S4

124S3

131S5

132S

132S1

132S2

132S3

132S4

123S4

123S3

123S1

123S

122S1

122S

122S3

122S4

133S4

133S3

133S2

133S1

133S134S

134S1

134S2

134S3

134S4

120S4

120S3

121S1

121S

120S1

120S119S

119S1 118S1

118S

117S1

117S

116S1

116S

136S

136S1

137S

137S1 138S1

137S3

137S5

118S5

116S3

115S3

114S3

240S2

252S2

140S141S

141S1

142S

142S1

143S

143S1

143S2

143S3

143S4

143S5

112S5

112S4

112S3

114S

113S1

113S

112S1

112S

144S

144S1

144S2

144S3

144S4

144S5

111S4

111S3

111S1

111S110S

110S1

110S3

110S4

146S5

146S4

146S3

146S2

145S1

145S 146S

146S1

147S2

147S3

147S4

147S5

108S4

108S3

111S

111S

108S1

108S

147S

147S1

107S104S

104S3

107S3

107S4

148S4

151S2

148S151S

103S

100S

103S3 101S3

101S4

154S4

153S2 154S2

152S 155S

155N

153N1

101N1

103N3

103N5

153N4

104N

104N1

104N2 105N2

105N1

105N

104N3

106N3

148N

107N3

106N2 107N2

106N1 107N1

106N 107N 108N

108N1

108N2 109N2

109N1

109N 110N

110N1

110N2 111N2

111N1

111N

109N3

110N3

146N5

144N

114N

115N2

112N3 113N3

141N5

142N

138N

138N1

137N 136N

137N1 136N1

138N2137N2

140N4

115N4 118N3 119N3

118N2

116N

118N1

118N

119N1

119N

140N5

135N

135N1

134N

134N1

133N 132N

133N1

132N1

134N3

134N4

121N4

121N3

120N1

120N

121N1

121N

132-3 131-3

132-4 131-4

132-5 131-5

122N5 123N5

122N4 123N4

122N3 123N3

122N

122N1 123N1

123N

131N

131N

130N

130N1 128N

131-3 130-3 129-3 128-3

131-4 130-4 129-4 128-4

129-5 128-5

126N5 127N5

124N4 125N4 126N4 127N4

124N3 125N3 126N3 127N3

124N2

124N

125N2

125N

127N

0

1

2

3

4

5

5

4

3

2

1

0

0

1

2

3

4

5

5

4

3

2

1

0

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

50 51 52 53 54 55 55 53 52 51

50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28

54

27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

0 0 2 3 41

5 6 7 8 9 10 11

12 13 14 15

16 17 18 19 20 21 22 23 24 25 26 27

FD

FD

FD FD

FD

FD

27'-0" TYP

27'-0"

TY

P

FURNITURE LEGEND

GENERAL NOTES

ELECTRIC PROJECTION SCREEN (DA-LITE BOARDROOM ELECTROL HDTV OR EQ.

52"x92" VIEWING AREA). PROVIDE BLOCKING FOR MOUNTING AS NECESSARY.

ELKAY DOUBLE BASIN STAINLESS STEEL SINK WITH OFFSET DRAIN, AND ELKAY

ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE SPRAYER. SEE PLUMBING

DRAWINGS.

SOLID SURFACE UNDERMOUNT SINK WITH ADA FAUCET, TYP.

1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES.

SEE ELECTRICAL DRAWINGS FOR CIRCUITING.

2. CONTRACTOR SHALL PROVIDE AND INSTALL ROLL-DOWN SOLAR SHADES ON ALL

PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND

INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS AND POWER PLAN

FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S

INSTALLER.

3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND

INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER

FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE

FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD

CONDITIONS.

4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS

PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY

DISCREPANCIES.

5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY

THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.

6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED

WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT

AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH

MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.

7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN

.DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW

FURNITURE QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.

ADA COMPLIANT WALL HUNG TOILET AND FLUSH VALVE, TYP. U.O.N.

ADA COMPLIANT GRAB BARS

ADA COMPLIANT TANK TOILET

STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:

(2) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003

(1) SANITARY NAPKIN/TAMPON VENDOR B-3500 (WOMEN'S RESTROOMS ONLY)

(1) SOAP DISPENSER B-306 PER EVERY (2) SINKS

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN

DISPOSAL AND TOILET TISSUE DISPENSER B-357 PER STALL (WOMENS RESTROOM ONLY)

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER AND TOILET TISSUE

DISPENSER B-3471 PER STALL (MENS RESTROOM ONLY)

(1) HAT AND COAT HOOK B-682 PER STALL

MIRROR - FULL-WIDTH OF COUNTER, FULL HEIGHT TO CEILING. PROVIDE CUTOUTS FOR

SCONCES.

ADA COMPLIANT URINAL

ELKAY GECR2521R1 ADA COMPLIANT SINGLE BASIN STAINLESS STEEL SINK WITH

OFFSET DRAIN, AND ELKAY ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE

SPRAYER. SEE PLUMBING DRAWINGS.

STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:

(1) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003

(1) SOAP DISPENSER B-306

(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN

DISPOSAL AND TOILET TISSUE DISPENSER B-357

(1) HAT AND COAT HOOK B-682

(1) FIXED POSITION TILT MIRROR B-293 1836

ADA COMPLIANT HANDICAPPED SINK, ADA COMPLIANT FAUCET WITH PADDLE HANDLES

JANITOR MOP SINK

PANTRY EQUIPMENT:

(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR

(1) GE MONOGRAM MICROWAVE

COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

CAFE EQUIPMENT:

(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR

(2) GE MONOGRAM MICROWAVE

(1) COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

(1) WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)

VENDING MACHINES (BY OTHERS)

FLAT PANEL TELEVISION (BY OTHERS)

PAPER TOWEL/WASTE, SOAP, COATHOOK, MIRROR (WALL MOUNTED, FULL HEIGHT AND

WIDTH).

FURNITURE, FIXTURES

AND EQUIPMENT PLAN

FIRST FLOOR

FFE-2.1

FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR SOUTH ENDFFE-2.1

1SCALE:1/8"=1'-0"

FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR NORTH ENDFFE-2.1

2SCALE:1/8"=1'-0"

KEY PLANFFE-2.1

3SCALE:3/32"=1'-0"

SOUTH END NORTH END

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

RECEPTION

SUPPLY

DW

ELEC.

JANITOR

SUPPLYCLOSET

MAILROOM

OFFICE

OFFICE

COPY

COAT

CLOSET

ELEVATOR

DRY

CLEANING

OFFICE

EQUIPMENT

STORAGEROOM

COAT

CLOSET

PRAYER ROOM /

PHONE BOOTHWOMEN'S

VESTIBULE

SOFT SEATING

MEETING

RESTROOM

SOFT

SEATING

MEETING

SEATING

MEETING /

SCREENING

ROOM

CLOSET

ATMSPRINKLER

OFFICE109

SEATING

MEETING110

OFFICE111

OPEN AREA1-A

OPEN AREA1-B

OPEN AREA1-C

OPEN AREA1-D

OPEN AREA1-E

OPEN AREA1-F

OPEN AREA1-G

OPEN AREA1-H

OPEN AREA1-I

OPEN AREA1-J

OFFICE112

OFFICE113

MEETING114 115

VESTIBULE116

OFFICE117 118

MEETING119

SOFT103

MEETING101

OFFICE105 OFFICE

104

MEETINGSEATING

SOFT102

MEETINGOFFICE106

VESTIBULE185

OFFICE107

OFFICE108

180

IDF ROOM181

COPY182

SOFT

183

186

JANITOR187

WOMENS

188

LACTATION189VESTIBULE

WOMEN190

MEN177

PANTRY175

MEN'S

176CLOSET

177

STAIR179

SUPPLY191

166

PHONE

165 ADA

163

PHONE173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

164

COAT

174

CLOSET

155

156 157

CAFE140

LOUNGE158

PANTRY/STORAGE141

QA LAB143

QA LAB142

MEETING144

OFFICE145

MEETING146

147148

149

150

151

152

153

154

120

121

122

123

124

125124A

127128

130

131

STAIR133

134

VESTIBULE100

SOFT

SEATING

MEETING

SOFT

SEATING

MEETING

WOMEN132

MEN136

COPY138

137

IDF139

162

167

FLASHCAM168

COPY169

ELEC.184

VESTIBULE

135MEN'S

VESTIBULE

VESTIBULE126

VESTIBULE159

CLOSET

170CLOSETCLOSET

CLOSET

CLOSET CLOSET

CLOSET ELEC.

FD

FD

FD FD

FD

FD

RECEPTION

NT

E

CLOSETRESTROOMPHONE

ADA

PHONE173

CONFERENCE161

PHONE171

PHONE172

RESTROOMADA

AM

FD FD

A-5.1.5

MILLWORK DETAILS

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

KEY PLANA-5.1.5

6NOT TO SCALE

SECTION ELEVATIONA-5.1.5

11/2" - 1-0'

SECTION ELEVATIONA-5.1.5

21/2" - 1-0'

MILLWORK DETAILSA-5.1.5

33/4" - 1-0'

MILLWORK DETAILSA-5.1.5

43/4" - 1-0'

MODERNFOLD MOVEABLE

PARTITION PANELS, SEE

DOOR SCHEDULE.

PROJECTION SCREEN.PROJECTOR

MILLWORK

SECURITY DESK

WHITEBOARD

FLATSCREENTV

FLATSCREENTV

FLATSCREENTV

FLATSCREEN

TV

CUTOUT IN GWB FOR

PROJECTION SCREEN.

CUTOUT IN GWB FOR

PROJECTION SCREEN.

WOOD VENEER

CABINETS

WOOD VENEER

CABINETS

DOORS BY

MODERNFOLD.

MODERNFOLD MOVEABLE

PARTITION PANELS, SEE

DOOR SCHEDULE.

PROJECTOR PROJECTOR

WHITEBOARD

FLATSCREEN

TV

FURNITURE PROVIDED

BY OTHERS.

3

A-5.1.6

7

A-5.1.6

7

A-5.1.6

3

A-5.1.6

AREA OF DETAIL

ENLARGED KEY PLANA-5.1.5

5NOT TO SCALE

2

A-5.1.5

1

A-5.1.5

4

A-5.1.5

3

A-5.1.5

MONITOR NICHE MONITOR NICHE

1/4" REVEAL ON ALL SIDES 1/4" REVEAL ON ALL SIDES

1/4" REVEAL ON ALL SIDES

vicinity map

nbc universal digital media campus completed:

2008

site location:Englewood Cliffs, NJ

EXISTING METAL FENCE AND GATES TO REMAIN.

DEMOLITION KEYED NOTES

EXISTING DOOR TO REMAIN

EXISTING DOOR TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

DEMOLITION PLAN LEGEND

EXISTING CONCRETE PATHWAY TO REMAIN.

EXISTING GUARD STATION TO REMAIN.

EXISTING CONCRETE STAIRS AND LANDING TO REMAIN. PATCH AND REPAIR CRACKS

AND CHIPS.

EXISTING AREAWAY TO REMAIN. PATCH AND REPAIR CRACKS AND CHIPS.

PARKING

PARKING

PARKING

PALISADES INTERSTATE PKWY

SYLVAN AVENUE (RTE. 9W)

SOUTHBUILDING

A-1.1

SITE PLAN

DEMOLITION SITE PLAND-1.1

1SCALE:1/16"=1'-0"

KEY PLAND-1.1

2NOT TO SCALE

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

Project No. 04-104.13

NORTH

No. Date Description

REVISIONS

01 06.11.07 RCP CLARIFICATION

copyright date: 12.01.06

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM StudioSecond Floor

415 West BroadwayNew York, NY

10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

North Building

1st and 2nd Floor

904 Sylvan Avenue

Englewood Cliffs, NJ

07632

NBC UNIVERSAL

DIGITAL MEDIA CAMPUS

33 04.13.07 FOR END USER RECORD

34 04.16.07 FOR CODE REVIEW

34 04.18.07 FOR CLIENT REVIEW

(FOR 1-32 SEE PREVIOUSLY ISSUED SET )

35 04.18.07 FOR STRUCTURAL ENGINEER

36 04.25.07 FOR FURNITURE COORDINATION

37 04.30.07 FOR STAIR COORDINATION

38 05.03.07 50% PROGRESS

39 05.08.07 FOR CLIENT REVIEW

40 05.11.07 FOR CLIENT REVIEW

41 05.18.07 FOR HR COORDINATION

42 05.22.07 ROOM NUMBERING + MATV

COORDINATION

43 05.22.07 FOR BID

44 05.23.07 FOR BID BULLETIN

45 06.01.07 FOR BID BULLETIN #2 -

PARTITION TYPES

46 06.01.07 FOR BID BULLETIN #3 -

BATHROOOM ELEVATIONS

47 06.06.07 FOR BID BULLETIN #4 -

EXIT LIGHTS

48 06.08.07 FOR BID BULLETIN #5 -

BATHROOM SPECS

49 06.08.07 FOR BID BULLETIN #6 -

SECURITY DOOR COORD.

50 06.08.07 FOR BID BULLETIN #7 -

MILLWORK DETAILS

52 06.11.07 FOR BID BULLETIN #9 -

RCP CLARIFICATION

51 06.08.07 FOR BID BULLETIN #8 -

RFI RESPONSE #2

53 06.12.07 FOR TV WIRING COORDINATION

54 06.12.07 FOR BID BULLETIN #10 -

FLOOR DRAIN ADD

55 06.13.07 FOR BID BULLETIN #11 -

VESTIBULE ELEVATIONS

56 06.15.07 FOR PERMIT

02 06.22.07 VALUE ENGINEERING

03 06.26.07 VALUE ENGINEERING

57 06.28.07 ROOM NUMBERING AND MATV

COORDINATION

58 06.28.07 FOR BUILDING DEPTARTMENT-

EGRESS PLAN

59 07.07.07 FOR IT+PVD COORDINATION

60 07.16.07 FOR CONTRACT / CONSTRUCTION

vicinity mapnyc

Project Manager / Lead Designer BAM STUDIO ARCHITECTS

Issues:Five different user groups, each with distinct needs, were being consoli-dated into one building to foster collaboration, acess to research material and use of advanced digital technology.

Action:BAM worked closely with senior management, Facilities, and the five user groups to accommodate and merge common needs, and guide compromise on secondary needs, in order to achieve the goal of creat-

Results:A beautiful environment was created which accommodates library stor-age, individual work areas, small group meetings and large presentation spaces, with a layout that encourages cross pollination of ideas and se-

↑ Ground Floor Plan ↑ Sections and Elevations

↑ Central stair and atrium from 2nd Floor. ↑ Central stair and reception area from Ground Floor. ↑ Soft seating meeting room and atrium corridor 2nd Floor. ↑ Large conference room(s) with folding partition - Ground Floor.

Page 5: Peter C Wilson - Portfolio

↑ Custom digital workstation. ↑ Custom digital workstation area. ↑ Soft seating meeting area.

nbc universal artworksProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2008

site location:30 Rockefeller CenterNew York, NY

vicinity mapvicinity map

↑ Main entry from corridor. ↑ Main entry concept rendering. ↑ Workstation area conept rendering.

↑ Corridor conept rendering.

Issues:NBC staff needed to see and experience visual content from multiple sources while working in an environment that reflected their strong design ideals and accomodated their ergonomic needs.

Action:BAM created fresh, dynamic environments that allowed for flexibility and ease of use, while at the same time implementing the latest technol-ogy and modern design aesthetic.

Results:Strong design, superior technical quality and user friendly spaces made for creative and productive work environments which won positive reviews from NBC Universal staff.

↑ 3D concept rendering, birdseye view.

Page 6: Peter C Wilson - Portfolio

nbc universal conference centerProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2008

site location:30 Rockefeller CenterNew York, NY

vicinity mapvicinity map

Issues:NBC Universal needed a number of flexible high profile conference room spaces at 30 Rockefeller Center which would serve as training and meeting facilities for NBC corporate staff from across the country.

Action:BAM created fresh, dynamic environments that allowed for flexibility and ease of use, while at the same time implementing the latest technology and modern design aesthetic.

Results:Strong design, superior technical quality and user friendly spaces made for creative and productive work environments which won positive re-views from NBC Universal staff.

↑ Concept models. ↑ Space planning study. ↑ Space planning study.

↑ Reception and elevatior lobby. ↑ Video presentation wall - Conference Room ‘A’. ↑ Conference Rooms ‘A’ and ‘B’ open plan. ↑ Women’s Restroom. ↑ Conference Room ‘A’ and ‘B’.

↑ Corridor, public gathering area outside of conference rooms.

Page 7: Peter C Wilson - Portfolio

↑ View of interior and exterior wall of Studio B. ↑ Studio B interior. ↑ View to Studio A with dual oversized custon ‘barn’ doors.

Urban Studiodigital imaging studio | entertainment venue

Project Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2008

site location:ChelseaNew York York, NY

vicinity map

Action:BAM understood the business imperative, the equipment needs, and how to work with highly creative people. An integrated de-sign on two floors of a Chelsea loft were fully renovated, main-taining the core business functions that had propelled Urban Stu-dio to the top.

Results:The new studio space was unveiled to rave re-views by photographers, clients and staff.

↑ Main entry and common areas. ↑ Bar and seating area. View ahead to photography studio. ↑ Perspective birdseye view. ↑ Perspective plan view.

↑ Main entry with view to reception area. ↑ Bar and common area.

↓ Concept models.

Issues:Urban Studio is a creative imaging studio whose core services included print retouching, color cor-rection and advertising production. The client was in the process of broadening their services to also include robust 2D and 3D Computer Generated Imaging (CGI), Motion Graphics, and Motion Edito-rial. In addition, they have developed the latest technology for custom, cloud-based, Digital Asset Management. The program called for digital workstations, photoshoot studios, offices and common areas which could double as an entertainment venues for their clients.

Page 8: Peter C Wilson - Portfolio

biomed realty trust Corporate Campus Fitness CenterProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2010

site location:Tarrytown, NY

Issues:The Landmark at Eastview is a biomedical re-search campus comprised of 8 buildings total-ing 1.1 million rsf. Efforts to retain and attract tenants are on-going to solidify their market position as a cutting edge research facility.

Action:Working closely with BMR, the campus own-er, BAM developed a Campus Plan focused on creating a centralized focal point which would cater to the wide variety of people using the facilities throughout the day. The design solution adhered to the tight budget. Added amenties included a cafeteria, fitness center and conference space to accommo-date large and small groups.

Results:The new facilities have generated significant excitement and high usage by the tenants, positioning the campus for employee satis-faction and morale. Creation of a Campus Center marked a major milestone in BMR’s commitment to providing state-of-the-art facilities and amenities for tenants.

↑ Main equipment room.

↑ Main exercise room and stretching area.

Page 9: Peter C Wilson - Portfolio

SYMBOL LEGEND

PROJECT DATA

VICINITY MAP

1

A-4.0

A-4.0

1

A-5.0

1

OFFICE2001

X

ELEVATION

SECTION

ENLARGED PLAN

COLUMN LINE

ROOM NAME/NUMBER

AREA NOT IN CONTRACT

CLIENT:

COMBE INCORPORATED

765 OLD SAW MILL RIVER ROAD

TARRYTOWN, NY

10591

CONTACT: MARK WOFFORD

EMAIL: [email protected]

TEL: 914.461.4117

FAX: 914.694.6320

ARCHITECT:

BAM STUDIO, PLLC

SECOND FLOOR

415 WEST BROADWAY

NEW YORK, NY 10012

CONTACT: PETER WILSON

EMAIL: [email protected]

TEL: 646.522.5502

FAX: 646.349.5556

PROJECT DESCRIPTION:

DEMOLITION OF EXISTING PARTITIONS AND

CEILING AS NOTED; RECONFIGURATION OF

SPACE AS PROPOSED IN DESIGN

NO CHANGE IN USE, OCCUPANCY, OR EGRESS

A-001.00

A-002.00

A-003.00

A-004.00

A-005.00

A-101.00

DM-201.00

DM-301.00

A-201.00

A-202.00

A-301.00

A-401.00

A-402.00

A-403.00

A-404.00

A-405.00

A-501.00

A-502.00

A-601.00

A-701.00

A-801.00

PROJECT DIRECTORY DRAWING LIST

ARCHITECTURE

COVER

GENERAL NOTES

GENERAL NOTES

GENERAL NOTES

TYPICAL MOUNTING HEIGHTS

SITE PLAN / PHASING PLANS

DEMOLITION PLAN

DEMOLITION REFLECTED CEILING

PARTITION PLAN

PARTITION PLAN WITH DIMENSIONS

REFLECTED CEILING PLAN

ELEVATIONS & SECTIONS

ELEVATIONS & SECTIONS

ELEVATIONS & SECTIONS

ELEVATIONS & SECTIONS

ELEVATIONS & SECTIONS

MILLWORK SECTIONS AND DETAILS

MILLWORK SECTIONS AND DETAILS

FINISH PLAN

FURNITURE, FIXTURES AND EQUIPMENT PLAN

POWER & COMMUNICATION PLAN

MECHANICAL LEGEND AND NOTES

MECHANICAL SCHEDULES

CATWALK LEVEL MECHANICAL DEMOLITION PLAN

FIRST FLOOR MECHANICAL DEMOLITION PLAN

CATWALK LEVEL MECHANICAL CONSTRUCTION PLAN

FIRST FLOOR MECHANICAL CONSTRUCTION PLAN

MECHANICAL DETAILS SHEET I

MECHANICAL DETAILS SHEET II

MECHANICAL DETAILS SHEET III

MECHANICAL DETAILS SHEET IV

MECHANICAL BMS DETAILS

ELECTRICAL LEGEND SCHEDULES AND DETAILS

ELECTRICAL DEMOLITION PLAN

ELECTRICAL CONSTRUCTION PLAN

ELECTRICAL CONSTRUCTION PLAN - PENTHOUSE

ELECTRICAL LIGHTING PLAN

FIRE ALARM CONSTRUCTION PLAN

FIRE ALARM RISER DIAGRAM AND NOTES

PLUMBING LEGEND AND RISER

FIRST FLOOR PLUMBING DEMOLITION PLAN

CATWALK LEVEL PLUMBING CONSTRUCTION PLAN

FIRST FLOOR PLUMBING CONSTRUCTION PLAN

PLUMBING DETAILS

MEP/FP

M-000.00

M-010.00

M-100.00

M-110.00

M-200.00

M-210.00

M-500.00

M-501.00

M-502.00

M-503.00

M-504.00

E-000.00

E-101.00

E-201.00

E-202.00

E-301.00

FA-201.00

FA-400.00

P-000.00

P-101.00

P-200.00

P-201.00

P-500.00

ABBREVIATIONS

AMERICANS WITH DISABILITIES ACT

ADJUSTABLE

ABOVE FINISHED FLOOR

ALUMINUM

ACOUSTICAL CEILING TILE

BUILDING

BUILDING STANDARD

CENTER LINE

CEILING

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

DEPTH

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DOWN

DETAIL

EXISTING

EACH

ELECTRIC/ELECTRICAL

ELEVATION/ELEVATOR

EMERGENCY

EQUAL

EXISTING TO REMAIN

EXISTING

FIRE ALARM

FIRE EXTINGUISHER CABINET

FLOOR DRAIN

FLUORESCENT

FINISH

FOOT/FEET

FURNISH AND INSTALL

GAUGE

GYPSUM

GYPSUM WALLBOARD

HEIGHT

HIGH INTENSITY DISCHARGE

HOLLOW METAL

HEATING, VENTING AND AIR CONDITIONING

HARDWARE

JUNCTION BOX

LENGTH

LAVATORY

LINEAR FEET

A.D.A.

ADJ.

A.F.F.

ALUM.

A.C.T.

BLDG.

BLDG. STD.

C.L.

CLG.

C.M.U.

COL.

CONC.

D

D.F.

DIA.

DIAG.

DIM.

DN

DTL.

E

EA.

ELEC.

ELEV.

EM.

EQ.

E.T.R.

E/EXIST

F.A.

F.E.C.

F.D.

FLUOR.

FNSH.

FT

F / I

GA.

GYP.

G.W.B

H

H.I.D.

H.M.

HVAC

HW.

J.B.

L

LAV.

L.F.

MAXIMUM

MEDIUM DENSITY FIBERBOARD

MECHANICAL

MANUFACTURER

MINIMUM, MINUTES

METAL

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

PLASTIC LAMINATE

PLYWOOD

PANEL

PROJECTION SCREEN

PRESSURE TREATED

QUANTITY

RELOCATED

RADIUS

REFLECTED CEILING PLAN

ROOF DRAIN

REFRIGERATOR

ROOM

ROUGH OPENING

RENTABLE SQUARE FEET

ROOF TOP UNIT

SQUARE FEET

STAINLESS STEEL

STANDARD

STEEL

TELEPHONE

THICKNESS

TOP OF

TYPICAL

UNDER CUT

UNLESS OTHERWISE NOTED

USABLE SQUARE FOOTAGE

VERIFY IN FIELD

VINYL COMPOSITION TILE

WIDTH

WITH

WITHOUT

WALLCOVERING

WOOD

WATER FOUNTAIN

WATER HEATER

WORKING POINT

WEIGHT

MAX.

MDF

MECH.

MFR.

MIN.

MTL.

N/A

N.I.C.

NO.

P.LAM

PLYWD

PNL.

PROJ.

P.T.

QTY.

R

RAD.

R.C.P.

R.D.

REF.

RM.

R.O.

R.S.F.

R.T.U.

S.F.

S.S.

STD.

STL.

TEL.

THK.

T.O.

TYP.

U.C.

U.O.N.

U.S.F.

V.I.F.

V.C.T.

W

W/

W/O

WC

WD.

WF

W.H.

WP.

WT.

BUILDING DESIGN:

TOTAL AREA:

OCCUPANCY TYPE:

3,352 USF

TYPE B - BUSINESS

ENGINEER:

M-E ENGINEERS

417 FIFTH AVENUE

FIFTH FLOOR

NEW YORK, NY 10016

CONTACT: CHARLES WARNER

EMAIL: [email protected]

TEL: 212.447.6770 x19

FAX: 212.447.6615

LANDLORD/BUILDING MANAGER:

BIOMED REALTY TRUST, INC.

777 OLD SAW MILL RIVER ROAD

TARRYTOWN, NY

10591

CONTACT: TIMOTHY STOLL

EMAIL:

[email protected]

TEL: 617.225.2440

FAX: 617.225.0847

SPECIAL INSPECTIONS:

FIRESTOP, DRAFTSTOP, AND FIREBLOCK SYSTEMS BC 1704.25

PROGRESS INSPECTIONS:

FINAL 28-116.2.4.2; BC-109.5; DIRECTIVE 14, 1975

A-201.0.0

SHEET NAMING

DISCIPLINE DEMOLITION

ARCHITECTURE

ELECTRICAL

FIRE ALARM

FIRE PROTECTION

MECHANICAL

PLUMBING

PUBLIC ASSEMBLY

STRUCTURAL

SPRINKLER

DM

A

E

FA

FP

M

P

PA

S

SP

COVER, SCHEDULES, GENERAL NOTES

SITE PLAN/ PHASING PLANS/ LIFE SAFETY PLAN

FLOOR PARTITION PLAN

REFLECTED CEILING PLAN

ELEVATIONS AND SECTIONS

CONSTRUCTION AND MILLWORK DETAILS

FINISH PLAN

FURNITURE, FIXTURE AND EQUIPMENT PLAN

POWER AND COMMUNICATION PLAN

0

1

2

3

4

5

6

7

8

SERIES

SUFFIX IDENTIFIES MULTIPLE DRAWINGS WITHIN A SERIES

DRAWING REVISION NUMBER

DETAIL BLOW OUT NUMBER

IF REQUIRED, A LOWERCASE LETTER

IDENTIFIES DETAILED BLOWOUT OF

ORIGINAL DRAWING.

APPLICABLE CODES:

BUILDING:

FIRE SAFETY:

ELECTRICAL:

MECHANICAL:

PLUMBING:

HANDICAPPED:

ENERGY:

NEW YORK STATE BUILDING CODE

NEW YORK STATE BUILDING CODE

NEW YORK STATE ELECTRICAL CODE

NEW YORK STATE BUILDING CODE

NEW YORK STATE BUILDING CODE

ANSI A117.1

NEW YORK STATE ENERGY CODE

SITE:

COMBE

01-Level

Building 777

Landmark at Eastview

BioMed Realty Trust, Inc.

777 Old Saw Mill River Road

Tarrytown, NY

10591

BULDING771

A-001.00

COVER SHEET

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

FURNITURE AND EQUIPMENT LEGEND

6'-6" X 7'-6" WORKSTATION COMBINATION, (1) 1'-6" WIDE VERTICAL LATERAL FILE, (1)

3'-6" LATERAL FILE, 4'-6" X 2'-6" DESK, 1'-6" X 3'-6" RETURN, TASK CHAIR, (2) GUEST

CHAIR (ALL BY OTHERS). SYSTEM SHALL BE WIRED 3+1. PROVIDE (1) CIRCUIT FOR

RECEPTACLES NOTED 'CPU', (1) CIRCUIT FOR RECEPTACLES NOTED 'PRINTER'.

REMAINING CIRCUITS SHALL BE FOR TASK LIGHTING AND CONVENIENCE

RECEPTACLES. SEE PC PLAN

4'-0" X 7'-0" WORKSTATION, 4'-0" X 4'-0" CORNER DESK, 2'-0" X 4'-0" RETURN, TASK

CHAIR (ALL BY OTHERS).

LARGE COPY MACHINE WITH COLLATOR (BY COMBE): TO BE DISCONNECTED, RELOCATED

AND RE-INSTALLED BY GC.

STORAGE UNITS (EXISTING): TO BE RELOCATED BY GC.

1'-4" DIA. SIDE TABLE (BY OTHERS)

18-1/2" X 28-3/4" LATERAL FILE (BY OTHERS)

2'-6" X 2'-6" TABLE - BREAK ROOM (BY OTHERS).

TASK CHAIR (BY OTHERS)

GUEST CHAIR #1 - RECEPTION WAITING AREA (BY OTHERS).

GUEST CHAIR #2 - OFFICE AREAS (BY OTHERS).

COPIER

DRYER

CHAIR

DRYER CHAIR - SALON AREA (BY COMBE): TO BE DISCONNECTED, RELOCATED AND

RE-INSTALLED BY GC.

LIGHT

BOOTH LIGHT BOOTH (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

BREAK AREA, 2'-6" X 2'-6" TABLE AND (4) GUEST CHAIR (BY OTHERS)

REF

FAD

ALKALI

ACIDS

OVEN

MICRO

H

SAFETYGEAR

ACIDS (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

FEC

MILLWORK LEGEND

- MILLWORK RECEPTION DESK WITH 3FORM RESIN TRANSACTION

COUNTERTOP AND VERTICAL FACE(S), SEE DETAILS.

CASEWORK LEGEND

DW

MIXER

RECYC

WATER

TRASH

MIXER (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

INTEGRAL SEAMLESS STAINLESS STEEL SINK (MIXING AREA):

30"Lx16"Wx12"D - 14 GA. STAINLESS STEEL SINK WITH INTEGRAL STAINLESS STEEL COUNTERTOP.

FORM BACKSPLASH, SINK REAR, BOTTOM AND FRONT FROM SINGLE SHEET OF STAINLESS STEEL.

SQUARE EDGE SEALED TO BASE CABINET.

FAUCET: KOHLER TRITON FAUCET WITH STANDARD WATER-GUARD AERATOR AND WRISTBLADE

LEVER HANDLES K-7304-K AND K-16012-5

- GC TO PROVIDE DEDUCT ALTERNATE FOR: ELKAY GOURMET UNDERMOUNT SINGLE BOWL SINK;

MODEL ELU281612; PULL OUT SPRAYER.

VANITY SINK FIXTURE (SALON):

SINK: KOHLER BOLERO K-2610.

FAUCET: KOHLER STILLNESS WIDESPREAD LAVATORY FAUCET MODEL NUMBER K-942-4.

VA

V

A

VA

DW

EM SH

EMERGENCY SHOWER (LAB):

VWR INTERNATIONAL SPEAKMAN WALL-MOUNT SHOWER; MODEL NUMBER: VF-0227-SE.

GUEST CHAIR #3 - BREAK AREA (BY OTHERS).

HAIR SALON SPECIALITY CHAIR (BY OTHERS)

MILLWORK CABINETRY BEHIND RECEPTION DESK:

- MILLWORK CABINETRY AND COAT CLOSET WITH LATERAL FILES.

- (2) SETS OF 42" WIDE 5-HIGH LATERAL FILES WITH METAL FILE

CABINETS ABOVE.

- MILLWORK /WOOD DOORS WITH CONCEALED HINGES, POCKET SLIDE

CASSETTE ROLLER AND PUSH/PULL HARDWARE.

- SEE SECTION/ELEVATIONS.COAT CLOSET

WITH HANGAR

ROD.

LATERAL FILES.

MILLWORK CABINETRY AT HAIRSTYLING STATION:

- MILLWORK/WOOD CABINETRY WITH MIRRORS MOUNTED

ON STAINLESS STEEL BRACKETS

- SEE SECTION/ELEVATIONS.

- MILLWORK /P-LAM DRAWERS AND CABINET DOORS WITH

CONCEALED HINGES.

BENCH

TO

WE

LS

TRASH

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

EY

EW

AS

H

FREESTANDING METAL LAB CASEWORK, UMBILICAL, END STORAGE CABINET AND

REAGENT RACK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS WITH

RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.

FREESTANDING METAL LAB CASEWORK, UMBILICAL, END SINK CABINET AND REAGENT

RACK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS WITH RECESSED

DRAWER AND CABINET PULLS. SEE ELEVATIONS.

METAL LAB CASEWORK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS

WITH RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.

METAL LAB CASEWORK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS

WITH RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.

-3 FORM: READY TO GO SOLUTIONS, 200 PARTITIONS, 200.21.03. WITH

STRUTTURA DUO PANELS CUSTOM SIZE .

-CUSTOM STAINLESS STEEL CURTAIN ROD AND MOUNTING BRACKETS

-CUSTOM CURTAIN WITH STAINLESS STEEL GROMMETS.

-MILLWORK BENCH.

-COAT HOOK.

-SEE ELEVATIONS AND FINISH LEGEND.

-MILLWORK P-LAM UPPER AND BASE CABINETS WITH STAINLESS STEEL

COUNTER AND FULL HEIGHT BACK SPLASH.

-MILLWORK / WOOD UPPER AND BASE CABINETS WITH STAINLESS

STEEL COUNTER AND FULL HEIGHT BACKSPLASH.

- MILLWORK /WOOD OPEN SHELVING.

- MILLWORK /WOOD DOORS WITH CONCEALED HINGES AND PUSH/PULL

HARDWARE.

-SEE ELEVATIONS.

OVEN (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

FAD (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

MICROWAVE: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

DISHWASHER: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

REFRIGERATOR: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

SAFETY GEAR CABINET: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

FIRE EXTINGUISHER CABINET

FLAM

FUME HOOD (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

FLAMMABLE CABINET (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.

ALKALI CABINET (EXISTING): TO BE RELOCATED BY GC.

WATER COOLER, SEE ENGINEERING DRAWINGS FOR SPECIFICATIONS. GC TO PROVIDE COLD

WATER SUPPLY.

RECYCLING BIN.

LARGE TRASH BIN.

STORAGE

SHELVES

STORAGE

SHELVES

STORAGE

SHELVES

STORAGE

SHELVES

METAL LAB CASEWORK, LAB SINK, DISHWASHER, DI WATER, EYEWASH. PHENOLIC RESIN

COUNTER AND BACKSPLASH. INSET DOORS WITH RECESSED DRAWER AND CABINET

PULLS. SEE ELEVATIONS.

MILLWORK CABINETRY AT MIXING AREA:

RESIN PANEL PARTITIONS AT CHANGING ROOM:

RECEPTION DESK:

STAINLESS STEEL LAY-IN PANTRY SINK AND FAUCET (BREAKROOM):

SINK; ELKAY LR2521 SINGLE BASIN STAINLESS STEEL SINK WITH DRAIN.

FAUCET; DELTA PANTRY FAUCET; SINGLE HANDLE DECK MOUNT, MODEL 100 W/ PULL OUT

SPRAYER.

P-2

P-5

P-6

P-1

STAINLESS-STEEL LAY-IN LAB SINK, FAUCET, DI FAUCET AND EMERGENCY EYEWASH:

SINK: STYLIST GROUP SLXD-2225-A-GR.

FAUCET; B-WH4 4" WRIST ACTION HANDLES, RIGID GOOSENECK WITH B-0103 ROSESPRAY

DI FAUCET; GRAY PVC SINGLE LEDGE FAUCET WITH RIGID GOOSENECK.

EMERGENCY EYEWASH: VWR INTERNATIONAL SPEAKMAN DECK-MOUNT EYEWASH MODEL NUMBER:

VF-0572-SE.

SHAMPOO BASIN:

TAKARA BELMONT - SARA SHAMPOO UNIT MODEL SH-495.

FAUCET: 500 DIAL-FLO.

P-4

P-3

42 W

IDE

(5) H

IGH

42 W

IDE

(5) H

IGH

P

LINE OF MILLWORK

ABOVE.

P-LAM MILLWORK

CABINETS.

GENERAL NOTES

1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL

DRAWINGS FOR CIRCUITING.

2. LANDLORD SHALL PROVIDE AND INSTALL MECCO SHADES ON ALL PERIMETER WINDOWS. ARCHITECT

TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS

AND POWER PLAN FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S

INSTALLER.

3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER.

CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT

SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD

CONDITIONS.

4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE

VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.

5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE

VENDOR PRIOR TO WIRING AND INSTALLATION.

6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS

AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE

FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.

7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND INSTALLATION PLAN DRAWINGS, IN .DWG

AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE QUOTE UNTIL

AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED. PROPOSAL APPROVAL IS CONTINGENT ON VENDOR

PROVIDING INSTALLATION PLAN DRAWINGS.

KEYED NOTES

MIRROR. COORDINATE INSTALLATION WITH ADJACENT TYPE 'N' LIGHT FIXTURES.

PARTIAL HEIGHT CUSTOM RESIN PANELS AND HARDWARE.

MIRROR.

GC TO COORDINATE THE DISCONNECTION, RELOCATION AND RE-INSTALLATION OF ALL EXISTING EQUIPMENT, FIXTURES

AND FURNITURE WITH COMBE. GC TO CONFIRM AND COORDINATE ALL MEP REQUIREMENTS FOR THESE ITEMS WITH

COMBE PRIOR TO START OF CONSTRUCTION.

GC TO PROVIDE COLD WATER SUPPLY TO WATER COOLER.

P-LAM CABINETS ABOVE.

CUSTOM STAINLESS STEEL CURTAIN ROD AND MOUNTING BRACKETS WITH CUSTOM CURTAIN AND STAINLESS

STEEL GROMMETS.

COORDINATE MOUNTING OF PENDANT LIGHTS ABOVE WITH LOCATION AND INSTALLATION OF MILLWORK AND

MIRRORS.

VERTICAL LIGHT COVE.

FULL HEIGHT MIRROR.

---

COAT HOOK.

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

REF

MIXER

FAD

FLAM

HH

STAIR---

OFFICE---

OFFICE---

V V

A

VA

DI EY

EW

AS

H

EYEWASH

EM

SH

FE

C

FEC

TRASH

RECYC

TO

WE

LS

TRASH

CORRIDOR006

MIXING

005

CHANGING

004

SALON002

RECEPTION001

MICRO

REF

WATER

OFFICE009

OFFICE010

OFFICE011

SUPPLY013

IT CLOSET015

SAFETYGEAR

A

COPY008

DRYER

CHAIR

LIGHT

BOOTH

OVENALKALI

ACIDS

BENCH

DI

C

C

DW

S

OVEN

COPIER

CORRIDOR101

BREAKROOM007

LAB012

DRYER/

003

LIGHT RM

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

42 W

IDE

(5) H

IGH

42 W

IDE

(5) H

IGH

P

ELECT.014

CLOSET

OFFICE

---

OFFICE

---

CONFERENCE

---

OFFICE

---

OFFICE

---

CONFERENCE

---

FILES/STORAGE

---

COPY/PRINT

---

CONFERENCE

---

OFFICE

---

ELEVATOR100

LOBBY

STORAGE

SHELVES

ST

OR

AG

E

SH

EL

VE

S

ST

OR

AG

E

SH

EL

VE

S

ST

OR

AG

E

SH

EL

VE

S

FURNITURE, FIXTURES

AND EQUIPMENT PLAN

A-701.00

FURNITURE, FIXTURES AND EQUIPMENT PLANA-701

1SCALE: 1/8"=1'-0"

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

OFFICE---

FE

C

TRASH

RECYC

TO

WE

LS

TRASH

CORRIDOR006

MIXING

005

CHANGING

004

002

RECEPTION001

MICRO

REF

WATER

OFFICE009

OFFICE010

OFFICE011

DRYER

CHAIR

LIGHT

BOOTH

BENCH

007

DRYER/

003

LIGHT RM

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

P

1'-8"2'-2"

6"

3'-2"

4"

4'-0"

3'-0" 1'-0"

2"

4"4"

2'-41

2"

8"

1'-4" 1'-4"

A-501.00

MILLWORK SECTIONS AND

DETAILS

KEY PLAN A-501 NOT TO SCALE

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

MILLWORK SECTIONS AND DETAILSA-501

11"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

31"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

21"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

51"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

41"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

61"-1'-0"

1

A-501.00

2

A-501.00

3

A-501.00

5

A-501.00

6

A-501.00

4

A-501.00

MILLWORK SECTIONS AND DETAILSA-501

71"-1'-0"

7

A-501.00

12'' RESIN PANEL

12'' RESIN TRANSACTION

TOP

PLASTIC LAMINATE

WORK SURFACE

12'' RESIN

TRANSACTION TOP

12'' RESIN TRANSACTION

TOP

1'' STAND OFF.

12'' RESINTRANSACTION TOP

12'' RESIN PANEL1'' STAND OFF.

12'' RESIN

TRANSACTION

TOP

PLASTIC LAMINATE

WORK SURFACE

12'' RESIN PANEL

1'' STAND OFF.

SUPPORT

BRACKET

SUPPORT

BRACKET

ADJUSTABLE

SHELF

P-LAM

DRAWER

FRAMELESS MIRROR.

STAINLESS STEEL

SUPPORT.

P-LAM

DOOR

STAINLESS

STEEL

CYLINDERSTAINLESS STEEL

COUNTER

PAINTED G.W.B.

SEE FINISH PLAN

PAINTED G.W.B.

SEE FINISH PLANPAINTED G.W.B.

SEE FINISH PLAN

P-LAM

P-LAM P-LAM

P-LAM P-LAMP-LAM

STAINLESS

STEEL COUNTER

P-LAM

14'' REVEAL

STAINLESS STEEL

COUNTER

FRAMELESS

MIRROR MOUNTED

ON STAINLESS

STEEL SUPPORT.

6" STAINLESS

STEEL ROCKLER

BAR PULLS, TYP.

OFFICE CORRIDOR CHANGING SALONHALLWAY

OFFICE CORRIDOR MIXINGHALLWAY

RECEPTION CORRIDOR CHANGING SALONHALLWAY

SHELVES

ALKALI

FLAM H

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

A-404.00

ELEVATIONS AND

SECTIONS

SECTION ELEVATIONA-404

31/4"-1'-0"

SECTION ELEVATIONA-404

41/4"-1'-0"

SECTION ELEVATIONA-404

11/4"-1'-0"

SECTION ELEVATIONA-404

21/4"-1'-0"

SECTION ELEVATIONA-404

71/4"-1'-0"

SECTION ELEVATIONA-404

51/4"-1'-0"

SECTION ELEVATIONA-404

61/4"-1'-0"

SECTION ELEVATIONA-404

81/4"-1'-0"

GWB CEILING

MILLWORK BASE CABINETLATERAL FILESMILLWORK CABINETS,

PROVIDE BLOCKING

MILLWORK UPPER CABINETS AND SHELVING

PROVIDE BLOCKING, TYP.

RESIN PANEL

WALL SYSTEM

STAINLESS STEEL

COUNTER AND

BACKSPLASH

WALL BASE

ACT CEILING ACT CEILING

ACT CEILING

ACT CEILING

ACT CEILING

GWB CEILING

METAL CASEWORK PHENOLIC RESIN COUNTER, TYP.

MILLWORK CABINET MIRROR

GWB CEILINGMILLWORK UPPER CABINETS,

PROVIDE BLOCKING, TYP.

MILLWORK BASE CABINETS,

COUNTER AND BACKSPLASH

METAL CASEWORK PHENOLIC RESIN

COUNTER, TYP.

SINK AND FAUCET

MILLWORK UPPER CABINETS,

PROVIDE BLOCKING, TYP

MILLWORK BASE CABINETS,

COUNTER AND BACKSPLASH

STAINLESS STEEL COUNTER

AND BACKSPLASH

SECTION ELEVATIONA-404

91/4"-1'-0"

SECTION ELEVATIONA-404

101/4"-1'-0"

SLAB HEIGHT

SLAB HEIGHT

ACT CEILING SLAB HEIGHT

GWB CEILINGSLAB HEIGHT

LAB CASEWORK.

LINE OF EXISTING STEEL BEAM.

LINE OF EXISTING STEEL BEAM.

LINE OF EXISTING STEEL BEAM.

SAFETY GEAR CABINET.

18" FACTORY PAINTED

SHEET METAL PANEL.

18" FACTORY PAINTED

PERFORATED SHEET

METAL PANEL MOUNTED

WITH 'L' BRACKET.

18" FACTORY PAINTED

SHEET METAL PANEL.

18" FACTORY PAINTED

PERFORATED SHEET

METAL PANEL MOUNTED

WITH 'L' BRACKET.

18" FACTORY PAINTED

SHEET METAL PANEL.

18" FACTORY PAINTED

PERFORATED SHEET

METAL PANEL MOUNTED

WITH 'L' BRACKET.

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

A-405

ELEVATIONS AND

SECTIONS

SECTION ELEVATIONA-405

81/4"-1'-0"

SECTION ELEVATIONA-405

61/4"-1'-0"

SECTION ELEVATIONA-405

71/4"-1'-0"

SECTION ELEVATIONA-405

41/4"-1'-0"

SECTION ELEVATIONA-405

91/4"-1'-0"

SECTION ELEVATIONA-405

101/4"-1'-0"

SECTION ELEVATIONA-405

31/4"-1'-0"

SECTION ELEVATIONA-405

21/4"-1'-0"

SECTION ELEVATIONA-405

11/4"-1'-0"

OFFICELAB

H

FLAM

OVEN

LABLAB

REF

OFFICE---

FE

C

TRASH

RECYC

TO

WE

LS

TRASH

CORRIDOR006

MIXING

005

CHANGING

004

002

RECEPTION001

MICRO

REF

WATER

OFFICE009

OFFICE010

OFFICE011

DRYER

CHAIR

LIGHT

BOOTH

BENCH

007

DRYER/

003

LIGHT RM

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

DIS

PE

NS

ER

BIN

P

1'-8"2'-2"

6"

3'-2"

4"

4'-0"

3'-0" 1'-0"

2"

4"4"

2'-41

2"

8"

1'-4" 1'-4"

A-501.00

MILLWORK SECTIONS AND

DETAILS

KEY PLAN A-501 NOT TO SCALE

NORTH

No. Date Description

REVISIONS

01 10.22.10 FOR PERMIT AND BID

xx 00.00.00 xxx xxxxx xxxxx

copyright date: 01.01.10

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY

10012T: 646.522.5550

F: 646.349.5556www.bam-studio.com

BAM

Project No. 08-104.004k

01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.

777 Old Saw Mill River RoadTarrytown, NY10591

Combe

02 12.22.10 FOR CONSTRUCTION

MILLWORK SECTIONS AND DETAILSA-501

11"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

31"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

21"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

51"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

41"-1'-0"

MILLWORK SECTIONS AND DETAILSA-501

61"-1'-0"

1

A-501.00

2

A-501.00

3

A-501.00

5

A-501.00

6

A-501.00

4

A-501.00

MILLWORK SECTIONS AND DETAILSA-501

71"-1'-0"

7

A-501.00

12'' RESIN PANEL

12'' RESIN TRANSACTION

TOP

PLASTIC LAMINATE

WORK SURFACE

12'' RESIN

TRANSACTION TOP

12'' RESIN TRANSACTION

TOP

1'' STAND OFF.

12'' RESINTRANSACTION TOP

12'' RESIN PANEL1'' STAND OFF.

12'' RESIN

TRANSACTION

TOP

PLASTIC LAMINATE

WORK SURFACE

12'' RESIN PANEL

1'' STAND OFF.

SUPPORT

BRACKET

SUPPORT

BRACKET

ADJUSTABLE

SHELF

P-LAM

DRAWER

FRAMELESS MIRROR.

STAINLESS STEEL

SUPPORT.

P-LAM

DOOR

STAINLESS

STEEL

CYLINDERSTAINLESS STEEL

COUNTER

PAINTED G.W.B.

SEE FINISH PLAN

PAINTED G.W.B.

SEE FINISH PLANPAINTED G.W.B.

SEE FINISH PLAN

P-LAM

P-LAM P-LAM

P-LAM P-LAMP-LAM

STAINLESS

STEEL COUNTER

P-LAM

14'' REVEAL

STAINLESS STEEL

COUNTER

FRAMELESS

MIRROR MOUNTED

ON STAINLESS

STEEL SUPPORT.

6" STAINLESS

STEEL ROCKLER

BAR PULLS, TYP.

↑ Custom designed reception desk. ↑ Custom designed millwork hair styling stations. ↑ Reception waiting area. ↑ Hair styling stations. ↑ Custom millwork grooming area. ↑ Custom millwork mixing area with integral stainless steel sink, counter and backsplash.

↑ Research lab.

↑ Sections and Elevations.

Combe Inc.research lab & Hair SalonProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2010

site location:Tarrytown, NY

vicinity map

Issues:Create a new research facility and hair salon for a health and beauty company well known for it’s con-sumer brand names.

Action:Working with the challenges of a 1970’s building, the design ap-proach was to create a natural light filled environment to make the space attractive to subjects who agreed to participate in on site testing of the products.

Results:A project that was completed successfully on a tight budget and succeeded in improving the process and appearance of the facility.

Page 10: Peter C Wilson - Portfolio

↑ North campus feasibility study. 3D view looking northwest.

biomed realty trust

campus planningClient Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS

site location:Tarrytown, NY

vicinity map

Issues:Reposition a major bio-technology campus to be the leading facility in the New York region.

Action:BAM developed master planscenarios ranging from modest to exten-sive, comparing and contrasting the fea-sibility of each to come up with the most effective plan to implement.

Results:BAM and BioMed Realty are building a strong relationship to create work environ-ments for the future.

↑ North campus feasibility study. 3D view looking northwest.

↑ BMR Campus. Aerial view looking north.

↑ South campus main entry schematic design proposal.

↑ North campus feasibility study. Plan view with space planning study.

↑ North campus feasibility study. 3D birdseye view looking north.

↑ North campus feasibility study. 3D view looking south into central courtyard.

↑ North campus feasibility study. 3D view looking south into central courtyard.

↑ North campus feasibility study. 3D view looking northwest.

↑ North Campus schematic design proposal. Handsketches, sketchup and photoshop.

Page 11: Peter C Wilson - Portfolio

KEYED NOTES

EXTERIOR STAIR.

ADA RAMP. SEE ELEVATIONS AND DETAILS.

RETAINING WALL.

STAIR WITH CANOPY ABOVE. SEE ELEVATION DRAWINGS.

REPAINT/REFURBISH EXISTING STAIR TO LIKE NEW CONDITION.REPLACE RUSTING HARDWARE WITH NEW.

EXISTING BRIDGE ABOVE TO REMAIN.

CURB LINE TO REPLACE EXISTING

EXISTING VENTS TO REMAIN.

EXISTING UTILITY BOX TO REMAIN.

WATERFALL FEATURE.

SANITARY SEWER MANHOLE. SEE CIVIL DRAWINGS.

EXISTING STAIR AND AREAWAY TO REMAIN.

AWNING ABOVE. SEE ELEVATION DRAWINGS.

1. FURNISH AND INSTALL MINIMUM OF 10 WASTE RECEPTACLES, 20

BENCHES AND 20 PLANTERS IN THE NEW HARDSCAPE AREA.

2. FURNISH AND INSTALL BOLLARD LIGHTING, PATHWAY AND STAIR

LIGHTING, AND LIGHTING AT ENTRY STAIRS AND RAMPS.

3. INSTALL NEW TREES, SHRUBS AND GROUND COVERING, INCLUDING

IRRIGATION SYSTEMS IN AND AROUND THE NEW MAIN STREET AREA. SEE

CIVIL ENGINEERING DRAWINGS.

4. CLEAN AND REPAIR ALL LOUVERS AND METAL PANELS AT THE CENTRALUTILITY PLANT.

5. REMOVE AND/OR MODIFY SECTIONS OF THE EXISTING CUP FACADE/CURTAIN

WALL AND REPLACE SCREEN WITH NEW CURTAIN WALL ELEMENTS. SEE CUP

PLANS AND ELEVATIONS.

6. REPAIR THE CENTRAL UTILITY PLANT TO BE CODE COMPLIANT, INCLUDING

DOORS, EXIT SIGNS AND LIGHTING. SEE ARCHITECTURAL AND ENGINEERING

DRAWINGS.

7. INSTALL UP TO 20 NEW SITE LIGHTING STANDARDS AND FIXTURES AND

REPAIR EXISTING ISTE LIGHTING IN PARKING AREAS AND WALKWAYS. SEE CIVIL

ENGINEERING DRAWINGS.

8. INSTALL ADDITIONAL TREES, SHRUBS, GROUND COVER AND GRASS AREAS

THROUGHOUT THE PROJECT SITE INCLUDING IRRIGATION SYSTEMS.

9. REPLACE OLD WALKWAYS OR REPAIR EXISTING WALKWAYS, PATHS AND ADA

ACCESS AREAS THROUGHOUT THE PROJECT SITE. SEE PLANS AND ELEVATIONS.

SEE CIVIL ENGINEERING DRAWINGS.

10. INSTALL NEW WAYFINDING AND BASIC CAMPUS SIGNAGE AND ASSOCIATED

LIGHTING. COORDINATE LOCATIONS AND QUANTITY WITH BMR AND ARCHITECT.

11. PROVIDE NEW PROJECT MAIN MONUMENT SIGN AND ASSOCIATED LIGHTING

AT PROJECT ENTRY. COORDINATE LOCATION AND DESIGN WITH BMR AND

ARCHITECT.

SITE PLAN GENERAL NOTES

12. RAZE THE EXISTING CAFETERIA BUILDING. EXISTING CAFETERIA

FOUNDATION WALLS MAY REMAIN IN PLACE SERVING AS RETAINING WALLS FOR

LANDSCAPE. EXISTING UTILITY CONNECTIONS WILL BE CUT AND CAPPED IN

PLACE. CAFETERIA BUILDING FOOTPRINT WILL BE REMOVED AND PLANTED WITH

LANDSCAPE MATERIAL. FURNISH AND INSTALL SOLID WOOD FENCE TO INFILL

GAP AT DEMOLISHED STOREFRONT FACING MAIN STREET.

CENTRAL UTILITY

PLANT (CUP)

UP

CONNECTOR

BUILDING

DN

BUILDING 420

BUILDING 410

BUILDING 440 CAFETERIA

UP

UP

UP

UP

P1

P1P1

P1

P1

P1

P1

P1

P1

P1 P1

P1

P1

P1

P1

P1

P1

P1

P1

P1P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

Q

Q

Q Q

Q

Q

Q

Q

P1

P1

P1

P1 P1

P1

S S

Q

Q

Q

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

T

T

TT

T

P2

P2

P2

P2 P2 P2

P2

P2

P2

P2

P1

P1

T

T

DNDN

DN DN

UP

DNDN

SITE PLAN LEGEND

PERVIOUS PAVER SYSTEM. COORDINATE DRAINAGE WITH CIVIL ENGINEERING DRAWINGS.

GRASS/PLANTS

STONE DUST PATHWAY.

TREE

HEDGE

LIGHT BOLLARD. COORDINATE WITH ELECTRICAL ENGINEERING DRAWINGS.

DIRECTIONAL SIGNAGE

MONUMENT SIGNAGE

TR

LITTER RECEPTACLE

BIKE RACKS

P

Q ROUND IN-GROUND LED LIGHT. COORDINATE WITH ELECTRICAL ENGINEERING DRAWINGS.

BUILDING ENTRANCE

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

A-101.00

SITE PLAN - ENLARGED

SITE PLAN AT MAIN STREET AND CONNECTOR AREAA-101

2SCALE: 1/16"=1'-0"

SITE PLAN AT CENTRAL UTILITY PLANTA-101

1SCALE: 1/16"=1'-0"

01

01

CONNECTOR

BUILDING

ENTRANCE

BUILDING

420

NORTH

ENTRANCE

BUILDING 410

SOUTH

ENTRANCE

11

08 08

06

0203

05

05

09

12

13 13

WATER FEATURE

04

5'-0"

3'-6"

5'-0" 30'-0"

S-9

S-10

S-10

S-10

S-9 S-9

delete dims aftersurvey.-Tony 080211

21 31.1

S-10

S-10

S-10

S-11 S-11

S-9

P-12

S-10

S-11

NEW ELEV:+ 147.8' -TJ

S-9 S-9

S-9

S-10

S-10

S-10

S-10

S-11

S-10

S-10

S-10

S-10S-10

DN

UP

UP

DNDN

DN DN

DNDN

F-11 S-12

F-11

F-11

F-10F-10

F-11

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

A-606.00

FINISH ELEVATIONS& LANDSCAPE FINISHES

FINISH EAST ELEVATIONA-606

2SCALE: 1/16''=1'-0''

FINISH WEST ELEVATION/SECTIONA-606

1SCALE: 1/16''=1'-0''

SECTION LOOKING NORTHA-606

3SCALE: 1/8''=1'-0''

FINISH: SOUTH ELEVATIONA-606

4SCALE: 1/8''=1'-0''

METAL PANEL WITH

PLYWOOD BACKING. FINISH

TO MATCH EXISTING.

LANDSCAPE FINISHESA-606

4SCALE: 1/8''=1'-0''

STAINLESS STEEL CHANNEL

STAINLESS STEEL CHANNEL

EXISTING STONE WALL.

EXISTING STONE WALL.

CONCRETE WITH BROOM

FINISH

CONCRETE WITH BROOM

FINISH

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

A-405.00

CUP ELEVATION/SECTIONS

CUP FRONT ELEVATIONA-405

2SCALE: 1/16''=1'-0''

CUP LOUVER FRAMING ELEVATIONA-405

3SCALE: 1/16''=1'-0''

CUP EXISTING FRONT ELEVATIONA-405

1SCALE: 1/16''=1'-0''

2

A-531

1

A-530

CUP BUILDING SECTIONA-405

4SCALE: 1/16''=1'-0''

4

A-405

CUP BUILDING SECTIONA-405

5SCALE: 1/16''=1'-0''

CUP BUILDING SECTIONA-405

6SCALE: 1/16''=1'-0''

CUP BUILDING SECTIONA-405

7SCALE: 1/16''=1'-0''

5

A-405

6

A-405

7

A-405

3

A-531

UP

UP

H

1 1.9 2 2.1

2.2 43.232.9

2.8

GG

.aF

F.a

SWITCHLL-003

GEAR ROOM

MECHANICALLL-004

ROOM

MECHANICALLL-005

TUNNEL

DATALL-006

ROOM

CLOSETLL-00X

CLOSETLL-00X

CLOSETLL-00X

CLOSETLL-00X

STORAGELL-00X

SPACE

MECHANICALLL-001

ROOMSTORAGE

LL-002

ROOM

MECHANICALLL-007

CORRIDOR

STAIR #2LL-00F

ELEC. CLOSETLL-00X MECHANICAL

LL-00X

ROOM

UP

UP

H

1 1.9 2 2.1

2.2 43.232.9

2.8

GG

.aF

F.a

SWITCHLL-003

GEAR ROOM

MECHANICALLL-004

ROOM

MECHANICALLL-005

TUNNEL

DATALL-006

ROOM

CLOSETLL-00X

CLOSETLL-00X

CLOSETLL-00X

CLOSETLL-00X

STORAGELL-00X

SPACE

MECHANICALLL-001

ROOMSTORAGE

LL-002

ROOM

MECHANICALLL-007

CORRIDOR

STAIR #2LL-00F

ELEC. CLOSETLL-00X MECHANICAL

LL-00X

ROOM

21 3

D

B

C

B

21 3

A.a

D

C

1.1

1.1

AA

D.a

EE

FF

24

24

24

24

24

24

01

KEYED NOTES

EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.

ADA RAMP, SEE ELEVATIONS AND DETAILS.

EXISTING RETAINING WALL TO REMAIN.

RETAINING WALL.

DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.

PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE

INCLUDED IN SCOPE OF WORK.

EXPANSION JOINT.

PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE

OF WORK.

MECHANICAL LOUVERS.

REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS

FOOTPRINT OF NEW KITCHEN AREA.

LOADING DOCK LEVELER, SEE FFE LEGEND.

COORDINATE WITH SITE PLAN. SEE A-100.00

CURTAIN WALL. SEE ELEVATION DRAWINGS.

CURB LINE TO REPLACE EXISTING.

STAIR WITH CANOPY ABOVE.

STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.

REPAINT/REFURBISH EXISTING STAIR.

HVAC SHAFT.

WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.

SHAFT.

LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.

LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.

CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.

FUTURE ELEVATOR PROVIDED BY TENANT.

PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.

U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.

EXISTING BRIDGE TO REMAIN.

ROOFTOP UNIT SCREEN. SEE FFE LEGEND.

INFILL SLAB TO LEVEL OUT FLOOR.

CONCRETE PAD. SEE MEP DRAWINGS.

CANOPY BELOW.

UP

UP

H

1 1.9 2 2.1

2.2 43.232.9

2.8

GG

.aF

F.a

EC

BA

DC

.b

SWITCH

LL-003

GEAR ROOM

MECHANICALLL-004

ROOM

MECHANICALLL-005

TUNNEL

DATA

LL-006

ROOM

CLOSET

LL-00X

CLOSET

LL-00X

CLOSET

LL-00X

CLOSET

LL-00X

STORAGE

LL-00X

SPACE

MECHANICAL

LL-001

ROOMSTORAGE

LL-002

ROOM

MECHANICALLL-007

CORRIDOR

STAIR #2LL-00F

ELEC. CLOSETLL-00X MECHANICAL

LL-00X

ROOM

UP

UP

H

1 1.9 2 2.1

2.2 43.232.9

2.8

GG

.aF

F.a

EC

BA

DC

.b

SWITCH

LL-003

GEAR ROOM

MECHANICALLL-004

ROOM

MECHANICALLL-005

TUNNEL

DATA

LL-006

ROOM

CLOSET

LL-00X

CLOSET

LL-00X

CLOSET

LL-00X

CLOSET

LL-00X

STORAGE

LL-00X

SPACE

MECHANICAL

LL-001

ROOMSTORAGE

LL-002

ROOM

MECHANICALLL-007

CORRIDOR

STAIR #2LL-00F

ELEC. CLOSETLL-00X MECHANICAL

LL-00X

ROOM

420 Mech Level

36'-712"7'-6"4'-6"

3'-10

1 2"

4'-5

1 2"

11'-1"

15'-4"

10'-6"

20'-8"

21 3

D

B

C

B

A.a

D

C

1.1

AA

D.a

EE

FF

2'-4

"

24

24

24

24

24

24

01

A-200KEY PLANA-200

3SCALE: 1/32"=1'-0"

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

MATCH LINE

CONNECTOR FOOTING PLANBUILDING 420 LOWER LEVELMECHANICAL ROOMS

PARTITION PLAN - CONNECTOR SLAB AND FOOTING PLAN AND BUILDING 420 LOWER LEVEL MECHANICAL ROOMSA-200

1SCALE: 1/8"=1'-0"

PARTITION PLAN - CONNECTOR SLAB AND FOOTING PLAN AND BUILDING 420 LOWER LEVEL MECHANICAL ROOMSA-200

2SCALE: 1/8"=1'-0"

LINE OF

CONNECTOR

SLAB ABOVE.

LINE OF BUILDING

410 SLAB ABOVE.

25

LINE OF BUILDING 410 SLAB ABOVE

UPUP

UP

MEN'S LL-029

ROOM

WOMEN'S LL-027

ROOM

IDFLL-025

ROOMPANTRYLL-026

ELEVATORLL-00C

STAIR #2LL-00B

9 10 11 13 14 15 16 17

A

C

E

12

B

D

SWITCHBOARDLL

ROOM

EMERGENCYLL

ROOM

---LL- 00X

ELEVATORMACHINE RM.

STORAGELL

ROOM

FIRE ALARMLL

CLOSET

-49

STORAGELL-006

CORRIDORLL-045

STAIR # 4LL-00E

STAIR # 5LL-00E

01 01

03

05

04

D

D

D

D

BB

04

03

04

0404

05

07

08

02

0530 05

K

D

G

L

UP

ATSLL-004

ROOM

STAIRLL-00A

#1

CORRIDORLL-040

JCLL-042

MEN'SLL-038

ROOM

WOMEN'SLL-039

ROOM

ELEC.LL-036

ROOM

IDFLL-035

ROOM

CORRIDORLL-037

MECHANICALLL-006

ROOM

1 2 4 6 7 8 953

MECHANICALLL-00X

ROOM

TELEPHONE/LL-001

DATA RM

FURNITURELL-003

OFFICESTORAGELL-004A

STORAGELL-006

BOILERLL--XXX

ROOM

ELEC CL01-034

STORAGE01-004

OFFICE03-005

OFFICE01-006

BREEZEWAY03-00H

OFFICE01-011

CORRIDOR01-007

CORRIDOR01-003

VESTIBULE01-00G

LOBBY01-001

STORAGE01-029

HR RECEPTION01-026

AREA

MEETING01-025

ROOM

OFFICE01-024

CONFERENCE01-023

ROOM

OFFICE01-022

OFFICE01-021

OFFICE01-020

OFFICE01-019

WS AREA01-018

OFFICE01-017

OFFICE01-016

WS AREA01-015

OFFICE01-014

OFFICE01-013

WS AREA01-012

SUPPLY01-035

ROOM

HR TESTING01-032

ROOM

HR FILE/01-003

WORK ROOM

WS AREA01-036

H

1 1.9 2 43.23

G

G.a

F

F.a

E

D

C

B

A

C.b

2.1 2.82.2 2.2

DN

UP

DN

UP

WOMEN'S01-031

ROOM

MEN'S01-030

ROOM

OFFICE01-027

TELE RM.

COPY RM/01-028

PANTRY

ELEV.01-00B

#1IDF01-00A

STAIR01-00C

#1

COATS01-002

ELEV.01-00D

#2

STAIR #201-0OF

DN

DN

ELEC. CLOSET01-XXX

IDF RM01-XXX

ELEVATOR01-XXX

MACHINE RM

SUPPLY01-XXX

CLOSET

21 3

D

B

C

B

21 3

A.a

D

C

1.1

1.1

AA

D.a

EE

FF

LOADING DOCK01-XXX

H

01

01

0304

05

0909

11

08

02

04

04

10

06

E

BH

BB

B

B

B

D

H

C

H

H

B

H

H

H

B

B

B

G

G

D

D

D

D

F

FF

F

01

02

03

25

12

25

04

04D

05

04

27

27

27

27

04

02

30

30

D

09

07

06

D

05

KEYED NOTES

EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.

ADA RAMP, SEE ELEVATIONS AND DETAILS.

EXISTING RETAINING WALL TO REMAIN.

RETAINING WALL.

DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.

PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE

INCLUDED IN SCOPE OF WORK.

EXPANSION JOINT.

PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE

OF WORK.

MECHANICAL LOUVERS.

REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS

FOOTPRINT OF NEW KITCHEN AREA.

LOADING DOCK LEVELER, SEE FFE LEGEND.

COORDINATE WITH SITE PLAN. SEE A-100.00

CURTAIN WALL. SEE ELEVATION DRAWINGS.

CURB LINE TO REPLACE EXISTING.

STAIR WITH CANOPY ABOVE.

STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.

REPAINT/REFURBISH EXISTING STAIR.

HVAC SHAFT.

WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.

SHAFT.

LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.

LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.

CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.

FUTURE ELEVATOR PROVIDED BY TENANT.

PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.

U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.

EXISTING BRIDGE TO REMAIN.

ROOFTOP UNIT SCREEN. SEE FFE LEGEND.

INFILL SLAB TO LEVEL OUT FLOOR.

CONCRETE PAD. SEE MEP DRAWINGS.

CANOPY BELOW.

UP

UPUP

UP

1 2 4 6 7 8 9 10 11 13 14 15 16 171253

-49

STORAGE01-004

OFFICE03-005

OFFICE01-006

BREEZEWAY

03-00H

OFFICE

01-011

CORRIDOR01-007

CORRIDOR01-003

VESTIBULE

01-00G

LOBBY01-001

STORAGE

01-029

HR RECEPTION01-026

AREA

MEETING

01-025

ROOM

OFFICE

01-024

CONFERENCE

01-023

ROOM

OFFICE

01-022

OFFICE

01-021

OFFICE

01-020

OFFICE01-019

WS AREA

01-018

OFFICE

01-017

OFFICE

01-016

WS AREA

01-015

OFFICE01-014

OFFICE

01-013

WS AREA

01-012

SUPPLY

01-035

ROOM

HR TESTING01-032

ROOM

HR FILE/

01-003

WORK ROOM

WS AREA01-036

H

1 1.9 2 43.23

G

G.a

F

F.a

E

D

C

B

A

C.b

2.1 2.82.2 2.2

DN

UP

DN

UP

DN

DN

21 3

D

B

C

B

A.a

D

C

1.1

AA

D.a

EE

FF

PARTITION PLAN - FIRST FLOORA-201

2SCALE: 1/8"=1'-0"

A-201.00

PARTITION PLANFIRST FLOOR

PARTITION PLAN - FIRST FLOORA-201

1SCALE: 1/8"=1'-0"

KEY PLANA-201

3SCALE: 1/32"=1'-0"

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

MATCH LINE

1

A-410.00

12

A-410.00

MEN'S01-065

ROOM

ELEV #101-00C

ROOM

STAIR #201-00B

ROOM

WOMEN'S01-070

ROOM

COPY/01-072

PANTRY

ELEC CL.01-071

IDF01-064

ROOM

ELEV01-067

LOBBY

UPUP

9 10 11 13 14 15 16 17

A

C

E

12

B

DJANITOR'SCLOSET

VESTIBULE01-029

CORRIDOR01-076

CORRIDOR01-075

SUPPLY01-0XX

ROOM

DNDN

DN

UP

UP

TR

TR

TR

DNDN

DN DN

DNDN

17

13

16 15

26

03

03

02EE

E E E

A

G

G

L

F

F

OFFICE02-005

OFFICE02-004

OFFICE02-007

W.S AREA02-008

OFFICE02-009

OFFICE02-010

OFFICE02-003

W.S. AREA02-002

OFFICE02-001

OFFICE02-003

OFFICE02-003

MEETING02-011

AREA

OFFICE02-012

FILE02-013

ROOM

BREAK OUT02-031

AREA

CONFERENCE02-033

ROOM

OFFICE02-030

OFFICE02-029

OFFICE02-027

OFFICE02-028

OFFICE02-026

OFFICE02-025

OFFICE02-024

OFFICE02-023

WS AREA02-022

OFFICE02-021

OFFICE02-020

OFFICE02-019

WS AREA02-018

OFFICE02-017

OFFICE02-016

OFFICE02-015

OFFICE02-014

LEGAL FILE02-040

LIBRARY02-039

COPY ROOM02-041

WS AREA02-006

UP

DN

UP

DN

STAIR02-00C

#1

ELEV.02-00B

#1

COPY02-036

AREA

IDF02-00A

PIPE02-00D

CL

PANTRY02-035

ELEV.02-00E

#2

ELEC CL02-00H

JAN. CL02-00G

STAIR #202-00F

WOMEN'S02-038

ROOM

MEN'S ROOM02-037

H

1 1.9 2 43.23

G

G.a

F

F.a

E

D

C

B

A

C.b

2.1 2.82.2 2.2

STAIR01-00A

#1

CORRIDOR01-079

COAT CL.01-052

MEN'S01-054

ROOM

WOMEN'S01-056

ROOM

ELEC. CL.01-053

1 2 4 6 7 8 953

IDF ROOM01-00X

VESTIBULE01-006

CORRIDOR01-078

CORRIDOR01-077

UP

21 3

D

B

C

B

21 3

A.a

D

C

1.1

1.1

AA

D.a

EE

FF

UP

UP

UP

TR

TR

UP

14

E

E

02

13 12

17 17

4

H

C

C

B

H

C

C

H

H

H

B

G

G

H

C

C

10

14

08

04

27

27

27

27

22

H

C

08

13

B

E E E

F

OFFICE

02-005

OFFICE

02-004

OFFICE

02-007

W.S AREA02-008

OFFICE

02-009

OFFICE

02-010

OFFICE

02-003

W.S. AREA

02-002

OFFICE02-001

OFFICE

02-003

OFFICE

02-003

MEETING

02-011

AREA

OFFICE

02-012

FILE

02-013

ROOM

BREAK OUT02-031

AREA

CONFERENCE02-033

ROOM

OFFICE

02-030

OFFICE02-029

OFFICE

02-027

OFFICE

02-028

OFFICE

02-026

OFFICE

02-025

OFFICE02-024

OFFICE02-023

WS AREA02-022

OFFICE02-021

OFFICE

02-020

OFFICE02-019

WS AREA02-018

OFFICE02-017

OFFICE

02-016

OFFICE

02-015

OFFICE02-014

LEGAL FILE

02-040

LIBRARY02-039

COPY ROOM02-041

WS AREA02-006

UP

DN

UP

DN

H

1 1.9 2 43.23

G

G.a

F

F.a

E

D

C

B

A

C.b

2.1 2.82.2 2.2

UPUP

1 2 4 6 7 8 9 10 11 13 14 15 16 171253

DNDN

UP

21 3

D

B

C

B

A.a

D

C

1.1

AA

D.a

EE

FF

UP

DN

UP

UP

UP

TR

TR

TR

TR

DNDN

DN DN

UP

DNDN

14

08

04

27

27

27

27

17

16

08

13

26

KEYED NOTES

EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.

ADA RAMP, SEE ELEVATIONS AND DETAILS.

EXISTING RETAINING WALL TO REMAIN.

RETAINING WALL.

DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.

PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE

INCLUDED IN SCOPE OF WORK.

EXPANSION JOINT.

PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE

OF WORK.

MECHANICAL LOUVERS.

REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS

FOOTPRINT OF NEW KITCHEN AREA.

LOADING DOCK LEVELER, SEE FFE LEGEND.

COORDINATE WITH SITE PLAN. SEE A-100.00

CURTAIN WALL. SEE ELEVATION DRAWINGS.

CURB LINE TO REPLACE EXISTING.

STAIR WITH CANOPY ABOVE.

STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.

REPAINT/REFURBISH EXISTING STAIR.

HVAC SHAFT.

WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.

SHAFT.

LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.

LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.

CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.

FUTURE ELEVATOR PROVIDED BY TENANT.

PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.

U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.

EXISTING BRIDGE TO REMAIN.

ROOFTOP UNIT SCREEN. SEE FFE LEGEND.

INFILL SLAB TO LEVEL OUT FLOOR.

CONCRETE PAD. SEE MEP DRAWINGS.

PARTITION PLAN - SECOND FLOORA-202

2SCALE: 1/8"=1'-0"

A-202.00

PARTITION PLANSECOND FLOOR

PARTITION PLAN - SECOND FLOORA-202

1SCALE: 1/8"=1'-0"

KEY PLANA-202

3SCALE: 1/32"=1'-0"

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

RETAINING WALL BELOW

1213

13

04

1213

10

1

A-411

17

A-411

12

A-411

2

A-507

↑ Schematic Models

biomed realty trust

ardsley corporate campuscompleted:In construction

site location:Ardsley, NY

vicinity mapvicinity map

DN

+5 +5

+5 +5

UP

E

UP

+6

+6+6

+6

+6

+5

+5

-71

+15

+5+5

+5

+5

+5

+5

+5

+5

+5

+5

+5

+16

+16+5

+5 +5

+5

+5

+5

+5

+5 +5

+5

+9

+5

+10

+10

+5 +5

+6

+6

+15 +15

+5

+15

+15

+15

-136

UP

+0

+4

+12

+6

+15+15+15

15'-5"E

E

EE

E

E

E

E

EXISTING BULKHEAD

KEYED NOTES

EXISTING ROOF EQUIPMENT STRUCTURE

EXISTING MECHANICAL EQUIPMENT EXHAUST

METAL FRAME, SEE A-403.00

METAL SLATS/LOUVERS, SEE A-403.00

PLANTERS WITH UP LIGHTING BEHIND, SEE A-403.00

BACKLIGHTING FOR EXISTING LOUVERS, SEE A-403.00

EXISTING CONCRETE STRUCTURE

EXISTING I BEAM STRUCTURE

--

EXISTING DAMAGED ASPHALT.

EXISTING CONCRETE CURB.

EXISTING PIT. GC TO MAKE SAFE WITH HAND AND SAFETY RAILS.

--

--

--

GC TO ADD SAFETY RAIL TO MAKE SAFE.

---

EXISTING WOODEN STAIR

EXISTING CATWALK

EXISTING PIT WITH ENTRANCE TO TUNNEL.

EXISTING CONCRETE PAD, TYPICAL

EXISTING TRENCH WITH METAL GRATE, TYPICAL

EXISTING SPIRAL STAIRCASE

EXISTING TOILET, URINAL, SINKS, AND SHOWER

EXISTING MECHANICAL EQUIPMENT

EXISTING MECHANICAL EQUIPMENT WITH CEILING EXHAUST All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

A-205.00

CUP PARTITION PLAN - FIRST,SECOND, AND ROOF PLANS

2ND FLOOR PLANA-205

2SCALE: 1/8"=1'-0"

ROOF PLANA-205

1SCALE: 1/8"=1'-0"

1ST FLOOR PLANA-205

3SCALE: 1/8"=1'-0"

3

A-403.01

5

A-405

6

A-405

7

A-405

8

A-405

Client Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS

Page 12: Peter C Wilson - Portfolio

5'-0"

3'-6"

5'-0" 30'-0"

S-9

S-10

S-10

S-10

S-9 S-9

delete dims aftersurvey.-Tony 080211

21 31.1

S-10

S-10

S-10

S-11 S-11

S-9

P-12

S-10

S-11

NEW ELEV:+ 147.8' -TJ

S-9 S-9

S-9

S-10

S-10

S-10

S-10

S-11

S-10

S-10

S-10

S-10S-10

DN

UP

UP

DNDN

DN DN

DNDN

F-11 S-12

F-11

F-11

F-10F-10

F-11

All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.

BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012

T: 646.522.5550F: 646.349.5556www.bam-studio.com

NORTH

A r c h i t e c t u r e S t u d i o

Building 5807 East Main St.Durham, NC27701

T: 919.890.3880F: 646.349.5556www.bam-studio.com

M-E Engineers5th Floor29 West 38th StreetNew York, NY10018

Thornton TomasettiT: 917.661.7800F: 917.661.7801

51 Madison AvenueNew York, NY10010

John Meyer Consulting, PC

T: 914.273.5225F: 914.273.2102

120 Bedford RoadArmonk, NY10504

T: 212.447.6770F: 212.447.6615

Project No. 08-104.034

Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502

No. Date Description

REVISIONS

01 03.21.11 FOR CONSULTANT REVIEW

copyright date: 06.01.08

No. Date Description

02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY

ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID

01 08.16.11 ADDENDUM 1

11 09.09.11 FOR CONSTRUCTION

02 09.09.11 ADDENDUM 2

A-606.00

FINISH ELEVATIONS& LANDSCAPE FINISHES

FINISH EAST ELEVATIONA-606

2SCALE: 1/16''=1'-0''

FINISH WEST ELEVATION/SECTIONA-606

1SCALE: 1/16''=1'-0''

SECTION LOOKING NORTHA-606

3SCALE: 1/8''=1'-0''

FINISH: SOUTH ELEVATIONA-606

4SCALE: 1/8''=1'-0''

METAL PANEL WITH

PLYWOOD BACKING. FINISH

TO MATCH EXISTING.

LANDSCAPE FINISHESA-606

4SCALE: 1/8''=1'-0''

STAINLESS STEEL CHANNEL

STAINLESS STEEL CHANNEL

EXISTING STONE WALL.

EXISTING STONE WALL.

CONCRETE WITH BROOM

FINISH

CONCRETE WITH BROOM

FINISH

biomed realty trust

ardsley corporate campuscompleted:In construction

site location:Ardsley, NY

vicinity mapvicinity mapClient Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS

Page 13: Peter C Wilson - Portfolio

SYMBOL LEGEND

PROJECT DATA

VICINITY MAP

1

I-8.0

I-8.0

1

I-6.0

1

OFFICE2001

X

ELEVATION

SECTION

ENLARGED PLAN

COLUMN LINE

ROOM NAME/NUMBER

AREA NOT IN CONTRACT

CLIENT:

WESTCHESTER MEDICAL CENTER

VALHALLA CAMPUS

MOUNT PLEASANT, NY 10595

CONTACT: ANTHONY COSTELLO

EMAIL: [email protected]

TEL: 914.493.7028

ARCHITECT:

BAM STUDIO, PLLC

SECOND FLOOR

415 WEST BROADWAY

NEW YORK, NY 10012

CONTACT: PETER WILSON

EMAIL: [email protected]: 646.522.5502

FAX: 646.349.5556

PROJECT DESCRIPTION:

RECONFIGURATION OF EXISTING PARTITIONS

AND CEILING AS PROPOSED IN DESIGN

NO CHANGE IN USE, OCCUPANCY, OR EGRESS

PROJECT DIRECTORY DRAWING LIST

ARCHITECTURE

ABBREVIATIONS

AMERICANS WITH DISABILITIES ACT

ADJUSTABLE

ABOVE FINISHED FLOOR

ALUMINUM

ACOUSTICAL CEILING TILE

BUILDING

BUILDING STANDARD

CENTER LINE

CEILING

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

DEPTH

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DOWNDETAIL

EXISTING

EACH

ELECTRIC/ELECTRICAL

ELEVATION/ELEVATOR

EMERGENCY

EQUAL

EXISTING TO REMAIN

EXISTING

FIRE ALARM

FIRE EXTINGUISHER CABINET

FLOOR DRAIN

FLUORESCENT

FINISH

FOOT/FEET

FURNISH AND INSTALL

GAUGE

GYPSUM

GYPSUM WALLBOARD

HEIGHT

HIGH INTENSITY DISCHARGE

HOLLOW METAL

HEATING, VENTING AND AIR CONDITIONING

HARDWARE

JUNCTION BOX

LENGTH

LAVATORY

LINEAR FEET

A.D.A.

ADJ.A.F.F.

ALUM.

A.C.T.

BLDG.

BLDG. STD.

C.L.

CLG.

C.M.U.

COL.

CONC.

DD.F.

DIA.

DIAG.

DIM.DN

DTL.

EEA.

ELEC.

ELEV.EM.

EQ.

E.T.R.

E/EXIST

F.A.

F.E.C.

F.D.

FLUOR.

FNSH.

FT

F / I

GA.

GYP.

G.W.B

HH.I.D.

H.M.

HVACHW.

J.B.

L

LAV.L.F.

MAXIMUM

MEDIUM DENSITY FIBERBOARD

MECHANICAL

MANUFACTURER

MINIMUM, MINUTESMETAL

NOT APPLICABLE

NOT IN CONTRACTNUMBER

PLASTIC LAMINATE

PLYWOOD

PANEL

PROJECTION SCREEN

PRESSURE TREATED

QUANTITY

RELOCATED

RADIUS

REFLECTED CEILING PLAN

ROOF DRAIN

REFRIGERATOR

ROOM

ROUGH OPENING

RENTABLE SQUARE FEET

ROOF TOP UNIT

SQUARE FEET

STAINLESS STEEL

STANDARD

STEEL

TELEPHONE

THICKNESS

TOP OF

TYPICAL

UNDER CUT

UNLESS OTHERWISE NOTED

USABLE SQUARE FOOTAGE

VERIFY IN FIELD

VINYL COMPOSITION TILE

WIDTHWITH

WITHOUT

WALLCOVERING

WOOD

WATER FOUNTAINWATER HEATER

WORKING POINT

WEIGHT

MAX.MDF

MECH.MFR.

MIN.MTL.

N/A

N.I.C.

NO.

P.LAM

PLYWDPNL.

PROJ.

P.T.

QTY.

R

RAD.

R.C.P.R.D.

REF.RM.

R.O.

R.S.F.R.T.U.

S.F.

S.S.

STD.

STL.

TEL.

THK.

T.O.

TYP.

U.C.

U.O.N.

U.S.F.

V.I.F.

V.C.T.

W

W/

W/O

WC

WD.WF

W.H.WP.

WT.

ENGINEER:

M-E ENGINEERS

417 FIFTH AVENUE

FIFTH FLOOR

NEW YORK, NY 10016

CONTACT: CHARLES WARNER

EMAIL: [email protected]

TEL: 212.447.6770 x19

FAX: 212.447.6615

SITE:

SEVENTH FLOOR NORTH

MAIN BUILDING

WESTCHESTER MEDICAL CENTER

VALHALLA CAMPUS

VALHALLA, NY 10595

WESTCHESTER MEDICAL CENTER

APPLICABLE CODES:

BUILDING:

FIRE SAFETY:

ELECTRICAL:

MECHANICAL:

PLUMBING:

HANDICAPPED:

ENERGY:

12,255 USF

TYPE I-2 - INSTITUTIONAL

BUILDING DESIGN:

TOTAL AREA:

OCCUPANCY TYPE:

NEW YORK STATE BUILDING CODE

NEW YORK STATE BUILDING CODE

NEW YORK STATE ELECTRICAL CODE

NEW YORK STATE BUILDING CODE

NEW YORK STATE BUILDING CODE

ANSI A117.1

NEW YORK STATE ENERGY CODE

M-0.7.1

MD-3.7.1

M-3.7.1

M-4.7.1M-5.7.1

P-0.7.1

PD-2.7.1

P-2.6.1

P-2.7.1

P-5.7.1

SP-0.7.1

SPD-3.7.1

SP-3.7.1

SP-4.7.1

SP-5.7.1

ED-2.7.1E-2.7.1

E-3.7.1

E-5.7.1

E-5.7.2

E-5.7.3

MEP

MECHANICAL LEGEND AND SCHEDULES

MECHANICAL 7TH FL DEMOLITION PLAN

MECHANICAL 7TH FL CONSTRUCTION PLAN

MECHANICAL 7TH FL SECTIONS

MECHANICAL DETAILS SHEET

PLUMBING LEGEND AND SCHEDULES

PLUMBING 7TH FL DEMOLITION PLAN

PLUMBING 6TH FL CONSTRUCTION PLAN

PLUMBING 7TH FL CONSTRUCTION PLAN

PLUMBING DETAILS

SPRINKLER LEGENDS AND SCHEDULES

SPRINKLER 7TH FL DEMOLITION PLAN

SPRINKLER 7TH FL CONSTRUCTION PLAN

SPRINKLER RISERS

SPRINKLER DETAILS

ELECTRICAL 7TH FLOOR DEMOLITION PLAN

ELECTRICAL 7TH FLOOR CONSTRUCTION PLAN

ELECTRICAL 7TH FLOOR LIGHTING PLAN

ELECTRICAL RISER DIAGRAMS AND DETAILS

ELECTRICAL SCHEDULES

ELECTRICAL SCHEDULES

INFECTION CONTROL NOTES:

ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF

WORK:

1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.

2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS

BEFORE CONSTRUCTION BEGINS.

3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK

SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.

4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA

EQUIPMENT AIR FILTRATION UNITS.

7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

9. WET MOP WITH DISINFECTANT.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS TO DESIGNATED ELEVATOR / SITE.

11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS

THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA

COMMITTEE MEMBER.

13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.

A-201.0 0

SHEET NAMING

DISCIPLINE DEMOLITION

ARCHITECTURE

ELECTRICAL

FIRE ALARM

FIRE PROTECTION

MECHANICAL

PLUMBING

PUBLIC ASSEMBLY

STRUCTURAL

SPRINKLER

DMA

E

FAFP

MP

PA

S

SP

COVER, SCHEDULES, GENERAL NOTES

SITE PLAN/ PHASING PLANS/ LIFE SAFETY PLAN

FLOOR PARTITION PLAN

REFLECTED CEILING PLAN

ELEVATIONS AND SECTIONS

CONSTRUCTION AND MILLWORK DETAILS

FINISH PLAN

FURNITURE, FIXTURE AND EQUIPMENT PLAN

POWER AND COMMUNICATION PLAN

0

1

2

34

5

67

8

SERIES

SUFFIX IDENTIFIES MULTIPLE DRAWINGS WITHIN A SERIES

DRAWING REVISION NUMBER

DETAIL BLOW OUT NUMBER

IF REQUIRED, A LOWERCASE LETTER

IDENTIFIES DETAILED BLOWOUT OF

ORIGINAL DRAWING.

A-001.0.0

A-002.0.0

A-003.0.0

A-004.0.0

A-005.0.0DM-201.0.0

DM-301.0.0

A-101.0.0

A-201.0.0

A-202.0.0A-301.0.0

A-401.0.0

A-402.0.0

A-403.0.0

A-404.0.0

A-405.0.0A-406.0.0

A-407.0.0

A-501.0.0

A-502.0.0

A-503.0.0A-601.0.0

A-602.0.0

A-701.0.0

A-801.0.0

COVER

GENERAL NOTES

GENERAL NOTES

GENERAL NOTES

TYPICAL MOUNTING HEIGHTS

DEMOLITION PLAN - 7TH FLOOR

DEMOLITION REFLECTED CEILING - 7TH FLOOR

LIFE SAFETY / PHASING PLANS - 7TH FLOOR

PARTITION PLAN - 7TH FLOOR

DIMENSIONED PARTITION & REFLECTED CEILING PLAN - 7TH FLOOR

REFLECTED CEILING PLAN - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

ELEVATIONS & SECTIONS - 7TH FLOOR

CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR

CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR

CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR

FINISH PLAN - 7TH FLOOR

FINISH ELEVATIONS - 7TH FLOOR

FURNITURE, FIXTURES AND EQUIPMENT PLAN - 7TH FLOOR

POWER & COMMUNICATION PLAN - 7TH FLOOR

CMC-7121 PATIENT WING RENOVATIONS: 7 SOUTH CHANGE ORDER N-1 (7 NORTH)OGS- S4963

STRUCTURAL:

SEVERUD ASSOCIATES

469 SEVENTH AVENUE

SUITE 900

NEW YORK, NY 10018

CONTACT: J. BENJAMIN ALPER

EMAIL: [email protected]

TEL: 212.986.3700

FAX: 212.687.6467

S-1

STRUCTURAL

PARTITION FRAMING PLAN, SECTIONS,

DETAILS AND GENERAL NOTES

SPR

AIN

BR

OO

K P

AR

KW

AY

WO

OD

S R

OAD

HOSPITAL SERVICE ROAD

SUNSHINE COTTAGE ROAD

BEHAVIORALHEALTHCENTER(BHC)

TAYLOR CARECENTER(TCC)

MAIN

MACY

CHILDREN'S

HOSPITAL

MAIN/

TOWER

AREA

OF

WORK

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-001.00

SEVENTH FLOOR

COVER

1

OFFICE TASK CHAIR (BY OTHERS)

GENERAL NOTES

1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL DRAWINGS FOR CIRCUITING.

2. G.C.SHALL PROVIDE AND INSTALL SOLAR SHADES ON ALL PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL

SHEETS FOR MOUNTING DETAILS AND POWER PLAN FOR POWER REQUIREMENTS.

3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY

DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD CONDITIONS.

4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.

5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.

6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND

ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.

7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN .DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE

QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.

KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET

#K-4330-0:COLOR WHITE; SLOAN SLIMLINE BEDPAN WASHER

FLUSHOMETER #BPW-1105; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN

FRONT SEAT WITH ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL

MOUNTING HEIGHTS SHEET.

PURELL HAND SANITIZER (BY OTHERS)

42" 5HIGH LATERAL FILE (BY OTHERS)

18" PEDESTAL FILE (BY OTHERS)

PRINTER 21"HX16"WX16"D (BY OTHERS)

TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE POWER.

COORDINATE FINAL LOCATION AND TYPE WITH WMC.TV

KEYED NOTES

18" WIDE X 36" HIGH ANGLED WALL-MOUNTED MIRROR:BOBRICK# B-293 1836. SATIN STAINLESS STEEL FINISH.COORDINATE WITH LOCATION OF VANITY FIXTURE. SEE RCP.

WALL-MOUNTED SOAP DISPENSER (BY WMC, INSTALLED BY GC)

WALL MOUNTED PAPER TOWEL DISPENSER: GEORGIA PACIFICCOMBINATION C-FOLD/ MULTIFOLD PAPER TOWEL DISPENSERITEM# 56650-01 UPC UCC: 12 073310566504.FINISH: TRANSLUCENT SMOKE

WALL-MOUNTED TOILET PAPER DISPENSER: BOBRICK # B-4288,SATIN STAINLESS STEEL FINISH.

WALL-MOUNTED SANITARY NAPKIN DISPOSAL: BOBRICK # B-254,SATIN STAINLESS STEEL FINISH.

SURFACE MOUNTED TOWEL PIN: BOBRICK # B-677.

GRAB BARS: ELCOMA STAINLESS STEEL GRAB BARS: 24"#01-2224-KC, 36" #01-2236-KC, 42" #01-2242-KC. REFER TO PLANAND ELEVATIONS FOR SIZE.

PULL DOWN GRAB BARS: ELCOMA 30" FLIP UP SAFETY RAILSTAINLESS STEEL WITH TOILET PAPER HOLDER; MODEL#96-2230SW05-TF

VERTICAL GRAB BARS: ELCOMA 18" STAINLESS STEEL GRAB BAR,#01-2218-KC.

SHOWER ROD AND HOOKS: SHOWER CURTAIN ROD WITHCONCEALED MOUNTING 1" (25MM) DIAMETER ROD, 20-GAUGE(1.0MM), TYPE 304 STAINLESS STEEL, SATIN FINISH.BOBRICK 204-1 SHOWER CURTAIN HOOKS. BOBRICK TB-207 YPE304 STAINLESS STEEL. VERIFY REQUIRED LENGTHS IN FIELD.

**SEE TYPICAL MOUNTING HEIGHTS SHEET AND SHEETS A-401THROUGH SHEET A-407 FOR INSTALLATION LOCATIONS.

SHELV. SHELVING (BY OTHERS)

UNDER COUNTER REFRIGERATOR (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

PLUMBING GASES LEGEND

SYMBOL DESCRIPTION

V

O

A

W

H

C

OXYGEN CONNECTION

AIR CONNECTION

VACUUM CONNECTION

WASTE CONNECTION

HOT WATER CONNECTION

COLD WATER CONNECTION

PLUMBING CONNECTIONS ARE SHOWN FOR COORDINATION PURPOSES ONLY. SEE PLUMBING DRAWINGS FOR DETAILS.

NOTE:

18" x 48" COFFEE TABLE (BY OTHERS)

24" x 24" COFFEE TABLE (BY OTHERS)

TWO SEAT GANGED LOUNGE CHAIR (BY OTHERS)

"M"

"H"

"MP"

"T"

"N"

"Q"

"G"

"PG"

"VG"

"C"

NOTE: SHOWN FOR COORDINATION PURPOSES ONLY. SEE ENGINEERING DRAWINGS

FLOOR

MOUNTDESCRIPTION

CLNG

MOUNTMOUNT

WALL

LIFE SAFETY/SECURITY/EQUIPMENT LEGEND

REMARKS

MEDICAL GAS SHUT-OFF VALVE

FIRE EXTINGUISHER AND RECESSED

CABINET (STAINLESS STEEL)

SEE SHEET FA-1 FOR GENERAL LOCATION. CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO

INSTALLATION.

MG

FEC

BEDSIDE CABINET (BY OTHERS)

PYXISIVDD

COF

ICE

EKG

MW

SOAP DISPENSER (BY OTHERS)

LH LINEN HAMPER 33"HX18"WX20"D (BY OTHERS)

DIGITAL CLOCK. PRIMEX SNS7Y202F-1: WIRELESS SYNCHRONOUS NETWORK

SYSTEM (SNST). DISPLAY DIMMER CONTROLLED. 6-DIGIT DISPLAY, RED LED,

FLUSH MOUNT. 120VAC/50-60 CYCLE 18” CORD W/PIGTAIL. GC TO

COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

CL

COMPACT MICROWAVE (BY OTHERS). GC TO COORDINATE POWER, SEE PC

PLAN AND ELEVATIONS.

COFFEE MACHINE (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

WALL MOUNTED ICEMAKER (BY OTHERS). GC TO COORDINATE POWER,

BLOCKING, WALL BRACKETS AND WATER/ DRAINAGE REQUIREMENTS, SEE PC

PLAN, MEP DRAWINGS AND ARCHITECTURAL ELEVATIONS.

ELECTROCARDIOGRAM: 46"HX18"WX29"D (BY OTHERS)

DOUBLE PYXIS IV DISPENSER UNIT 79-1/2"HX52"WX28D (BY OTHERS)

CORIAN INTEGRAL SINK #810 WITH SLOAN FAUCET ETF-700-4-BDM: 4 TRIM

PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING VALVE.

TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30 SECOND

TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS SHEET

AND F-2.7 FOR DETAILS.

EQUIPMENT LEGEND

HOSPITAL BED, HEADBOARD, BED LOCATOR AND PHYSIOLOGIC

MONITOR DOCKING STATION (BY WMC, INSTALLED BY GC)

DF

HOUSE

CART

LINEN

CART

HOUSEKEEPING CART (BY OTHERS)

DEFIBRILLATOR 40HX24WX24D (BY OTHERS)

LINEN CART 36"HX36"WX22"D (BY OTHERS)

CRASH CART (BY OTHERS)

ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:

1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.

2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.

3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.

4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.

7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

9. WET MOP WITH DISINFECTANT.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.

11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA

COMMITTEE MEMBER.

13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.

15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION

AND LEAVE ELEVATOR BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE

AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER

FLOORS OPENING ON TO THIS SHAFT.

FURNITURE/ PLUMBING LEGEND

SYMMONS # 1-801S-458-FSB. HYDAPIP SURFACE MOUNTED

SHOWER SYSTEM WITH HAND SPRAY.

PL-10

PL-5

PL-3

PL-2

CORIAN INTEGRAL SINK MODEL #820 WITH SLOAN FAUCET ETF-700-4-BDM: 4

TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING

VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30

SECOND TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS

SHEET AND F-2.7 FOR DETAILS.

PL-6

FIAT SB SERIES SB2424. PRECAST TERRAZZO ONE PIECE MOP

BASIN WITH 6” HIGH CURB.

ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #LR2522; SINGLE

HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL FAUCET;

DUAL PADDLE CONTROL.

NURSE STATION TASK CHAIR (BY OTHERS)

LOUNGE TASK CHAIR (BY OTHERS)

5H 42

OFFICE GUEST CHAIR (BY OTHERS)

DESK WITH RETURN AND OVERHEAD CABINETS (BY OTHERS). DIMENSIONS

VARY BY ROOM. COORDINATE BLOCKING LOCATIONS WITH FURNITURE

VENDOR.

REF

MED

REF

MEDICATION REFRIGERATOR: 34.5"X27"X28" (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

"B" SHOWER SEAT: BOBRICK FOLDING SHOWER SEAT WITH PADDED

CUSHION #B-517 / B-518 (SEE PLAN FOR R/L ORIENTATION).

WALL MOUNTED PAPER TOWEL DISPENSER: G.C. TO CONFIRM MODEL WITH

W.M.C.

WALL MOUNTED PAPER TOWEL DISPENSER AT VANITY: G.C. TO CONFIRM

MODEL WITH W.M.C.

WALL-MOUNTED PAPER TOWEL/WASTE DISPOSAL UNIT: BOBRICK# B-43699,

SATIN STAINLESS STEEL FINISH.

CB

O2

CONFIDENTIALITY BIN 36"HX19"WX19"D (BY OTHERS)

OXYGEN CART 4512"HX231

2"WX18"D (BY OTHERS)

FAP FIRE ALARM PANEL EXISTING TO REMAIN

FIRE ALARM PULL EXISTING TO BE RELOCATED.FP

PROVIDE BLOCKING AS REQUIRED FOR ALL WALL MOUNTED

EQUIPMENT AND MILLWORK, TYP. COORDINATE LOCATIONS AND WITH

ARCHITECT AND WMC.

TEMPORARY PARTITION TO BE INSTALLED IN THIS AREA. SEE

PARTITION AND PHASING PLANS.

FHCFIRE HOSE CABINET EXISTING TO REMAIN

SRA

SIMPLEX (FIRE ALARM) REMOTE

ANNUNCIATOR.EXISTING TO BE RELOCATED.

CODE

CART IV

CODE CART (WITH IV POLE, SHARPS AND OXYGEN TANK ATTACHED):

55"HX38"WX25"D (BY OTHERS)

CENTRAL LINE CART: 47"HX32"WX24"D (BY OTHERS)

GOMCO SUCTION: 33-1/2"HX16"WX16"D (BY OTHERS).

LINE

CART

GS

ROLLING BLOOD PRESSURE MACHINE 54"HX20"WX20"D (BY OTHERS).BP

WOW: LAP-TOP WITH CART 44"HX30"WX24"D (BY OTHERS).WOW

SCALE HOYER: 50"HX28"WX48"D (BY OTHERS).

SAGE WARMER: 52"HX32"WX20"D (BY OTHERS).

SCALE WHEELCHAIR: 50"HX24"WX36"D (BY OTHERS).

SCALE

HOYER

SGW

SC

WC

PYXIS COMPUTER CART: 57"HX23"WX28"D (BY OTHERS)

PYXIS STORAGE CART: 48"HX23"WX27"D (BY OTHERS)

PYXIS TOWER: 78"HX30"X28"D (BY OTHERS)

PYXIS

CC

PYXIS

SC

PYXIS

TWR

COPY/

FAX

COPY AND FAX MACHINE: 45"HX39"WX49"D (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

NDL/

STRNEEDLE/SYRINGE STORAGE 79-1/2"HX31"WX28D" (BY OTHERS)

TM

SHP

SHARPS WALL MOUNTED DISPOSAL 22"HX14"WX8"D (BY OTHERS)

PACS MONITOR 13"HX16"WX6"D -- 18"H WITH STAND ( BY OTHERS).

PREMISE MONITORS 13"HX16"WX6"D EACH -- TWO STACKED TOTAL 30- 12"H

WITH STAND (BY OTHERS).

NURSE CALL MONITOR 11"HX14"WX6"D EACH -- 18"H WITH STAND

(BY OTHERS).

KEYBOARD, CPU, AND MONITOR (BY OTHERS)

ELECTRONIC WHITE-BOARD, DIMENIONS TBD (BY OTHERS). GC TO PROVIDE

BLOCKING AND COORDINATE POWER. COORDINATE FINAL LOCATION AND

TYPE WITH WMC.

WS STANDARD WASTE RECEPTACLE 31"HX20"WX16"D (BY OTHERS)

EWB

TRANSPORT MONITOR 12"HX12"WX12"D (BY OTHERS)

a

b

c

d

THREE SEAT GANGED LOUNGE CHAIR (BY OTHERS)CRASH

CART

CHEMO

BIN

RED

WASTE

BINRED WASTE BIN (BY OTHERS).

CHEMO BIN (BY OTHERS)

CA

PL-13

ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #DLFR(Q)191810;

SINGLE HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL

FAUCET; DUAL PADDLE CONTROL.

FUTURE TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE

POWER. COORDINATE FINAL LOCATION AND TYPE WITH WMC.FTV

RECESSED DIALYSIS CONNECTION. MATCH MOUNTING HEIGHTS TO 7

SOUTH.

FUTURE LOCATION FOR TV, TYP. .

KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET

#K-4330-0:COLOR WHITE; SLOAN UPPERCUT DUAL-FLUSH FLUSHOMETER

#WES-111; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN FRONT SEAT WITH

ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL MOUNTING HEIGHTS

SHEET.

BEDSIDE GUEST CHAIR (BY OTHERS)

PL-14

KOHLER MORNINGSIDE WHEELCHAIR LAVATORY K-12638 WITH SLOAN FAUCET

ETF-700-4-BDM;4 TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK

MECHANICAL MIXING VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60

HZ (35 VA). 30 SECOND TIME OUT. SEE MEP DRAWINGS.

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

TELE758

STAFF LOUNGE778

ELEVATOR LOBBY700

WOMEN746

MEN745

PANTRY762ANCS

760ELEC761

ON CALL748

ON CALL748b

WC749a

NURSE7s

STATION

MEDICATION759

MEDICATION752

HOOD756

JC753

FAMILY 754

LOUNGE

PATIENT ROOM712

PATIENT ROOM711

NURSE MGR.751c

WC750

PATIENT ROOM710

PATIENT ROOM709

PATIENT ROOM708

PATIENT ROOM707

PATIENT ROOM706

PATIENT ROOM705

PATIENT ROOM704

PATIENT ROOM703

PATIENT ROOM702

PATIENT ROOM701

PATIENT ROOM713

PATIENT ROOM714

PATIENT ROOM715

PATIENT ROOM716

PATIENT ROOM717

PATIENT ROOM718

PATIENT ROOM719

PATIENT ROOM720

PATIENT ROOM722

O

VV

O

AA

V O

A

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E E E

E

E E

E

E

E

E

E E

E

E E

E

E E E

E

E

E E

EE

E

E E

E E

E

STAIR

---CM CM

CM CM

ON CALL748c

EQUIPMENT765

SH

ELV

. C.HOOD757

CH

EM

O H

OO

D(D

UC

TE

D)

LA

MIN

AR

FL

OW

HO

OD

ANTE RM755

SH

ELV

.S

HE

LV

.

PHARMACY752a

MG

MG

NURSE PRACTITIONER764

LOCKER ROOM778b

OFFICE775c

ELECT. CLOS.

766b

PATIENT LOUNGE769

PATIENT ROOM744

PATIENT ROOM743

PATIENT ROOM742

PATIENT ROOM741

PATIENT ROOM740

PATIENT ROOM739

PATIENT ROOM738

PATIENT ROOM737

PATIENT ROOM736

PATIENT ROOM735

PATIENT ROOM734

PATIENT ROOM723

PATIENT ROOM724

PATIENT ROOM725

PATIENT ROOM726

PATIENT ROOM727

PATIENT ROOM728

PATIENT ROOM729

PATIENT ROOM730

PATIENT ROOM731

PATIENT ROOM732

PATIENT ROOM733

NURSE7N

STATION

DIRTY764b

LINEN ALCOVE765b

C.O.W

HOYER

LIFT

ME

D.

CA

RT

CODE

CART

W

H

C

W

H

C

W

H

C

W

H

C

HOCLEAN

764a

SUPPLY

SOCIAL749

WORKER

C.O.W.

C

CARMEL'S747

OFFICE

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

CW

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

W

H

C

CC

CC

FSU

PS

PS

FSU

36

P

36

PP

P

CC

CC

BB36

BB36

MG

FEC

E

EE

E

E EE

EE

EE

O

VV

O

AA

A

EE

EEE

E EE

EE

EE

O

VV

O

AA

E

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E EE

EE

EE

OOV

V

AA

EE

EE

E

E

O

V O

V

A A

EE

EEE

E EE

EE

E O

VV

O

AA

EE

EEE

E EE

EE

EE

O

VV

O

AA

E

EE

EEE

E EE

EE

EE

O

VV

O

A

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E

E

E

CL

E

E

E

E

E

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CLCLCL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CLCL

CA

CODE

CART

M

CA

WL

LHWS

WL

REF

DF

PY

X

TM

PY

X

DD

A

PY

X

SM

HOUSE

CART

TV IV WL

IVC WL CR

AS

H

CA

RT

M

MED.

CART

PY

X

TM

PY

X

SM

PYXDM

PYX

DA

PY

X

DD

A

PYX

DM

PYX

DA

COF

ICE

REF/

FRZREF/

FRZ

UC EC SH

LIN

EN

CA

RT

REF/FRZ

MW

TV

TV

WS

CA

CA

WS

WSLH

WL

WL

WL

WL

WL

WL WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

LH

LH

LH LH

LH

LH LH LH LH

CA CA

CA CA

CA CA CA CA CA

WL

WL

LHWS

WS

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

LH LH LH LH LH LH LH LH LH LH

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WSWS WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WLS H S H S H S H S H S H S H S H S H S H S H

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TVTVTV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

ABCDEFGHIJKL

1

2

3

4CHEMO

BIN

SH

ELV

.

RED

WASTE

BIN

PA

SS

-T

HR

U

36

365H

30

5H

30

5H

stack of

4 extra chairs

O

V

A

V

A

O

5H

3'-0"

4'-0"

4'-0"

4'-0"

COPIER

3'-3"3'-3"

NURSE PRACTITIONER764

36 5H

COPIER

3'-3"3'-3"

---765

MGE

MGE

FHC

E

FEC

FHCE

EWB

EXAM 771

ROOM

NOURISHMENT780

STATION

CLEAN HOLDING778

ROOM

SOILED777

HOLDING

REST 776

ROOM

NURSE7N

STATION

MEDICATION774

JAN. CL.773

TELE768

CLEAN HOLDING #2772

EQUIP. 782

STORAGE

EQUIP. 779

STORAGE

ICE

CORRIDOR 7NW

PATIENT ROOM721

TUBE FOOD781

STORAGE

REF

MW

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

E E

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

E E

EE

EE

E E

EE

EE

W

H

C

W

H

CS S

CO

PIE

R

S SS S S SS S S

C

W

H

WH

C

TV

STAIR

---

E

E

E

SC

SC

HOUSE

CART

O

V

A

V

A

O

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2 PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-10

PL-10

PL-11

PL-3

PL-3

PL-2

PL-3

PL-2

PL-3 PL-3PL-3 PL-3 PL-3 PL-3 PL-3 PL-3 PL-3

PL-6PL-2

5H

42

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CRASH

CART

EC UC

PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5

PL-5

PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

S

36

36

P

H H H H H

HHHHH

H H H H

HHHHHH

FP

E

EE

EE

E

H

PL-13

PL-5SB

SB

SC

SC

SC

CORRIDOR 7NE

POTENTIAL HOIST

LOCATION, IF

AUTHORIZED BY

OWNER

KRR

SRA, RFP, R

31

1

2

2

2 32

3

1

3

1

2

E

5H

5H

5H

5H

5H 60

36

72

72

84

PYXIS

CC

PYXIS

SC

PL-11

WOW

MED

REF

NDL/

STR

PYXIS

IVDD

SHP

PYXIS

CC

PYXIS

SC

WOW

MEDREF

NDL/

STR

PYXIS

IVDD

SW

SW

TM

TM

d

a

a

a

a

a

a

a

a

a

cb

cb

a

a

P

EWB

SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP

SHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHP

CODE

CART IVDF

LINE

CARTGS

BP

BP

EKGWOW

WOW

WOW WOW

WOW

WOW

SCALE

HOYERLINEN

CART

SGW

SGW

SC

WC

CB

O2

CB

O2

SW SW SW SW SW

SW SW

SW SW SW SW

SW SW SW SW SW SW SW SW SW SW

CA CA CA CA CA

CA CA

CA CA CA CA

CA CA CA CA CA

LH LH LH LH LH LH LH LH LH LH LH

LHLHLHLHLHLHLHLHLHLHLH

S

CA CA

CA CACA CACA CACA CACA

CLOSET766 SHP

CA CA CA CA CA CA

CA CACA CACA CACA CACA

H

ADA RESTROOM766a

ELEVATOR LOBBY700N

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

TV

CL

TV

CL

PL-14 PL-1A

SW

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-701.0.0

SEVENTH FLOOR

FURNITURE, FIXTURES

AND EQUIPMENT PLAN

FURNITURE, FIXTURES AND EQUIPMENT PLANA-701

1SCALE:1/8"=1'-0"

1

1

1

11

1

1

1

1

1 1 1 1 1 11 1 1 1

11 1 1 1 1 1 11 1 1 1

1

1

1

1

1

1

1

1

ACYLIC LENS1

4" SEMI-OPAQUEPLEXIGLASS.

SOLID SURFACE

WORKSTATIONS.

SOLID SURFACE

WORKSTATION.SOLID SURFACE

WORKSTATION.

GWB CEILING.

CHART RACK

SOLID SURFACE

WORKSTATION.

SLIDING DOORS. SLIDING DOORS.

SLIDING

CABINET

DOORS.

UNDERCABINET

LIGHT, TYP.7'-2"

DECORATIVE PANEL

BRACKET

PAPER CUBBIES

LATERAL FILE

RECESSED DOOR PULL:

SUGATSUNE HH-AS2, TYP.

LAMINATE

COUNTER

SUPPORTS

LIGHT

2'-10"

1'-8"

2'-6"

1'-1"HOLD

1'-1"HOLD

2'-6"

1'-8"

3'-0"

2'-0''

8" 8"

5"1'-3" 1'-3"

6"

3'-0"

14'' SATIN STAINLESS STEEL COUNTER SUNK TAMPER

PROOF SCREW (3)

3/4'' SATIN STAINLESS STEEL PANEL FASTENED

T0 PLYWOOD BACKING

(2) LAYERS OF 3 8''WACKY WOOD

HUNG ON Z CLIPS,

SHIPLOOSE

PLYWOOD STUD

PLASTIC LAMINATE

1/8'' PAINTED REVEAL

PLASTIC LAMINATE

PLYWOOD

BACKING

6" 2" x 2" STEEL TUBE WELDED TO STEEL PLATE

THAT IS BOLTED TO FLOOR SLAB, TYP.

SOLID SURFACE

COUNTER BELOW

EQEQEQEQEQEQ

EQEQEQEQEQEQ

15'-10''

2" 2"

2" 2"

5"

PLYWOOD STUD, TYP.

1'-512"

2'-7"

1'-512" 10'-101

2"

2'-7"

R6'-312"

1'-512"

R5"

R5"

1 12 "

R8'-3"

3"

3"3"

3"R5"

R5"

8"

1'-1012"

2'-0"R6'-312"

1'-1"

HO

LD

1'-1"

HO

LD CENTER POINT OF

RADIUS, TYP.

14'' SATIN STAINLESS

STEEL END CAP

COUNTER SUNK

TAMPER PROOF

SCREW (2)

18'' SATIN STAINLESS

STEEL PANEL

FASTENED T0

PLYWOOD BACKING

(2) LAYERS OF 3 8''WACKY WOOD

12''SOLID SURFACE

PLASTIC LAMINATE

2" x 2" STEEL TUBE BOLTED

TO FLOOR SLAB, TYP.

18'' SATIN STAINLESS

STEEL PANEL

1/8'' PAINTED REVEAL

PLYWOOD BACKING

34''

PLASTIC LAMINATE

18'' SATIN STAINLESS

STEEL EDGE PIECE

34''

34''

34''

34''

34'' PLYWOOD

STUD

4" PLASTIC LAMINATE

23

4''

23

4''

51 2"1

4'' SATIN STAINLESSSTEEL END CAP

COUNTER SUNK TAMPER

PROOF SCREW (2)

18'' SATIN STAINLESS

STEEL PANEL

FASTENED T0

PLYWOOD BACKING(2) LAYERS OF 3 8''WACKY WOOD

12''SOLID SURFACE

PLASTIC LAMINATE

2" x 2" STEEL TUBE BOLTED

TO FLOOR SLAB, TYP.

18'' SATIN STAINLESS

STEEL PANEL

1/8'' PAINTED REVEAL

PLYWOOD BACKING

PLASTIC LAMINATE

18'' SATIN STAINLESS

STEEL EDGE PIECE

PLASTIC LAMINATE

PLYWOOD STUD, TYP.

PLYWOOD STUD, TYP.

2'-0" 2

'-6"

PRINTER

SOLID SURFACE

WORKSTATION

1'-8"

10"

GROMMET HOLE

FOR ELECT./DATA

CABLES

4'-4"

2'-0"

7'-2"

10"

BRACKET

10'' SATIN STAINLESS

STEEL BASE TYP.

34' STAINLESS STEEL

P-LAM. SEE FINISH

SCHEDULE

SOLID SURFACE

WORK STATION

PRINTER

CABINET BEYOND

SOLID SURFACE COUNTER

SOLID SURFACE WORK

SURFACE

MILLWORK ACESS PANEL

BRACKET PLASTIC LAMINATE

SOLID SURFACE COUNTER

CONFIDENTIALITY BIN AND

OXYGEN NICHE

STAINLESS STEEL EDGE

PIECE

BRACKET

2'-6"

3'-6"

4'-2"

SATIN STAINLESS STEEL BASE

MILLWORK ACESS PANELMILLWORK ACESS PANEL

4'-2"

3'-7"

CONFIDENTIALITY

BIN

OXYGEN

TANK

STORAGE

STAINLESS STEEL

PANEL

SOLID SURFACE COUNTER

PLASTIC LAMINATE

SOLID SURFACE

ACRYLIC LENS

LIGHT

PENDANT

8"

3'-0"

6"

MGE

MGE

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-502.0.0

SEVENTH FLOOR

SECTIONS AND DETAILS

SECTION THROUGH NURSE STATION MILLWORKA-502

1SCALE: 1"-1'-0"

SECTION THROUGH NURSE STATION MILLWORKA-502

2SCALE: 1"-1'-0"

SECTION THROUGH NURSE STATION MILLWORKA-502

3SCALE: 1"-1'-0"

PLAN SECTION THROUGH NURSE STATION MILLWORKA-502

8SCALE: 1"-1'-0"

PLAN SECTION THROUGH NURSE STATION MILLWORKA-502

5SCALE:1"-1'-0"

1

A-502

6

A-502

8

A-502

PLAN SECTION THROUGH NURSE STATION MILLWORKA-502

6SCALE: 1"-1'-0"

NURSE STATION FLOOR PLAN A-502 3/8"= 1'-0"

5

A-502

9

A-502

ELEVATION NURSE STATION MILLWORKA-502

9SCALE: 1"-1'-0"

4

A-502

ELEVATION NURSE STATION MILLWORKA-502

4SCALE: 1"-1'-0"

ELEVATION NURSE STATION MILLWORKA-502

7SCALE: 1"-1'-0"

7

A-502

3

A-502

1

A-503

1

1

11

1 1

2

A-502

5

A-502

1

MONITOR

MONITOR MONITOR MONITOR

ALIGN GWB LIGHT COVE

BEYOND

GWB LIGHT SOFFIT

MILLWORK

PANEL.

ACT CEILING.

STAINLESS STEEL

PANEL MOUNTED TO

MDF BACKING. CENTER

PANEL ON CENTERLINE

OF HANDRAIL AS

INDICATED. SEE FINISH

LEGEND.

BASE, SEE

FINISH PLAN.

C

CORNER

GUARD

HANDRAIL.

PROVIDE BACKING FOR

MOUNTING BRACKETS

AS NECESSARY.

L

EQ

EQ

10"

3'-0"

MILLWORK

PANEL.

MILLWORK

PANEL.

STAINLESS

STEEL CORNER

GUARD

GWB

PARTITION.

HO

LD

, T

YP

. F

OR

AL

L H

AN

DR

AIL

S

STAINLESS

STEEL EDGE

2'-4"

J CLIP

WALLCOVERING

12" THK. SIDE FACE W/ TRIM

METAL STUD FRAMING

LIGHT FIXTURE,SURFACE-MOUNTED

MIRROR, FLUSH-MOUNTEDIN CORIAN

SENSOR-ACTIVATED FAUCET.SEE PLUMBING DRAWINGS.

STEEL FRAMING TIED BACK TOPARTITION BLOCKING.

12" THK. BOWL #820 SEE

FFE/ FINISH PLAN.

SEE MEP DRAWINGS FORPLUMBING DETAILS

MDF W/ P-LAM

METAL STUD FRAMING

12" THK. SOLID SURFACE W/ FACE TRIM, 1"

RADIUS. PROVIDE BLOCKING BEHIND ALLRADII, AS SHOWN. PROVIDE BLOCKING INPARTITION BEHIND THROUGHOUT, ASNECESSARY, TYP. SEE FINISH PLAN FORALL MATERIAL SPECIFICATIONS.

WALL-MOUNTED DISPENSERS,PROVIDED BY CLIENT

12" THK. SOLID SURFACE W/

FACE TRIM, 5" RADIUS

6" RADIUS

12" THK. SOLID SURFACE INTERIOR

ENCLOSURE

712"

14" RADIUS

MDF W/ P-LAM FACE,REMOVABLE W/ Z CLIPS.

STEEL FRAMING TIED BACK TOPARTITION BLOCKING.

8"

2'-3"

6"

12" THK. MDF W/ P-LAM

95°

1'-8

1 2"

WOOD BLOCKING, TYPICAL.

LOCATION OF ELECTRONICFAUCET CONTROL. COORDINATEWITH ELECTRIC DRAWINGS.

STEEL TUBE SINKSUPPORT AND FLANGE

VP

2'-10"

2'-0"

1'-7

1 2"

FACE, SEE SECTION FOR

MORE INFORMATION..

12" THICK SIDE PANEL,

BOTH SIDES, PROVIDE

BLOCKING SUPPORT

THROUGHOUT.

CORIAN W/ FACE TRIM

MDF PANEL W/ P-LAM

VISA LIGHTING ASTA

LIGHT FIXTURE -

SURFACE MOUNTED

4'-9"

5"

1'-6"

1'-4"

1'-2"

7"

8"

2'-4"

6"

LIGHT FIXTURE

CORIAN PANEL - 'AURORA'

LINE OF WALL-MOUNTED PAPER

TOWEL DISPENSER.

SENSOR-ACTIVATED

FAUCET. SEE

PLUMBING DRAWINGS.

12" THK. VANITY - 'CAMEL'

P.LAM SHROUD/

REMOVABLE PANEL

1"X1" METAL CORNER GUARD

(12" VISIBLE AT FRONT FACE)

CORIAN SINK #820 - 'BONE'

LINE OF CORIAN

CURVATURE, TYP.

LINE OF WALL BASE

MIRROR, FLUSH-

MOUNTED IN CORIAN

LINE OF CONCEALED, WALL-

MOUNTED SOAP DISPENSER.

PAINTED GWB

LINE OF DOOR FRAME

VP H

TV DISPLAY. SEE

FFE PLAN FOR

DETAILS

34" MDF DOOR W/

PLASTIC

LAMINATE,

TYP.SEE FINISH

PLAN

WOOD BLOCKING,

TYP.

1'-6"

EXISTING

PARTITION

WALL BASE

ADJUSTABLE

SHELF

1'-0"

1 1

2''

1 1

2''

1'-0"

STAINLESS STEEL

PANEL/CRASH

GUARD MOUNTED

TO MDF BACKING.

MILLWORK

P-LAM MILLWORK

PANEL, SEE FINISH

PLAN, TYP.

WALL BASE

EXISTING

PARTITION.

STAINLESS

EDGE TRIM.

STAINLESS STEEL

EDGE TRIM. FINISH

TO MATCH CRASH

GUARD.

ALIGN

STAINLESS STEEL

EDGE TRIM. FINISH

TO MATCH CRASH

GUARD.

ALIG

N

P-LAM MILLWORK

PANEL, SEE FINISH

PLAN, TYP.

34" MDF W/

PLASTIC

LAMINATE. SEE

FINISH PLAN

1 12" MDFCOUNTERTOP W/

PLASTIC LAMINATE.

SEE FINISH PLAN

BACKERBOARD

W/ PLASTIC

LAMINATE. SEE

FINISH PLAN

2'-0"

1'-0"

EXISTING

PARTITION

1"

1"

2'-6"

6'-1"

4"

6"

2'-0

"

312"

1'-0"

2" 8" 2"

1"

21 2"

8"

112" 61

2"4"

V.I.F.V.I.F.V.I.F.

ALIGN

34

"

2" 8" 2"

V.I.F.

6'-2

''

4'-5

1 2"

3'-3"

34''

11 2"

2'-012

"

V.I.F.

812"

112

"

1'-10"

11 2"

2'-9"3

'-3

''

RECESSED

DOOR PULL:

SUGATSUNE

HH AS2 METAL PLATE FOR TOUCH

AND RELEASE HARDWARE:

RECESSED METAL PLATE.

PROFILE AND DIMENSIONS

TO MATCH HAFELE MORTISE

PULL: ITEM: 151.01.729.

3.29''HX1.5''W. FINISH TO

MATCH CORNER GUARDS,

SEE FINISH PLAN.

1'-8 1/2''

MIN.

1'-2 ''

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-501.0.0

SEVENTH FLOOR

SECTIONS AND DETAILSTYP. SECTION AT PATIENT ROOM ENTRY A-501

7SCALE: 1"-1'-0"

SECTION THROUGH SINK MILLWORKA-501

3SCALE: 1"-1'-0"

SECTION THROUGH SINK MILLWORKA-501

2SCALE: 1"-1'-0"

1

A-501

TYP. SECTION AT PATIENT ROOM ENTRY A-501

8SCALE: 1"-1'-0"

SECTION THROUGH PATIENT ROOM SINK VANITY MILLWORKA-501

1SCALE: 1"-1'-0"

PATIENT LOUNGE MILLWORK SECTIOA-501

5SCALE: 1"-1'-0"

PATIENT LOUNGE MILLWORK SECTIONA-501

6SCALE: 1"-1'-0"

SECTION THROUGH NURSE SERVER CABINETA-501

4BSCALE: 1"-1'-0"

PLAN SECTION THROUGH NURSE SERVER CABINETA-501

4DSCALE: 1"-1'-0"

4D

A-501

4C

A-501 PLAN SECTION THROUGH NURSE SERVER CABINETA-501

4CSCALE: 1"-1'-0"

SECTION THOUGH CORNER GUARD A-501

9SCALE: 1"-1'-0"

8

A-501

SECTION THROUGH SINK MILLWORKA-501

3ASCALE: 3"-1'-0"

3A

A-501

SECTION THROUGH SINK MILLWORKA-501

3BSCALE: 3"-1'-0"

3B

A-501

'OUTWATER' SOSS INVISIBLE HINGE

WALL-MOUNTED DISPENSERS,

PROVIDED BY CLIENT.

SENSOR-ACTIVATED FAUCET.

SEE PLUMBING DRAWINGS.

12" THK. SOLID SURFACE INTERIOR

ENCLOSURE

14" RADIUS

12" THK. SOLID SURFACE W/ FACE TRIM,

1" RADIUS. PROVIDE BLOCKING BEHIND

ALL RADII, AS SHOWN. PROVIDE

BLOCKING IN PARTITION BEHIND

THROUGHOUT, AS NECESSARY, TYP.

SEE FINISH PLAN FOR ALL MATERIAL

SPECIFICATIONS.

12" THK. SIDE

FACE W/ TRIM

PLASTIC LAMINATE ON3

4'' MDF MILLWORKPANEL MOUNTED ON

J-CLIPS.

18'' REVEAL.

18'' THICK STAINLESS STEEL

CORNER GUARD, FINISH TO

MATCH STAINLESS STEEL CRASH

GUARD PANEL, SEE FINISH PLAN.

MDF W/ P-LAM FACE,

REMOVABLE W/ Z CLIPS.

MDF W/ P-LAM

METAL STUD FRAMING

LOCATION OF ELECTRONIC

FAUCET CONTROL. COORDINATE

STEEL FRAMING TIED

BACK TO PARTITION

BLOCKING.

12" THK. BOWL #820

SEE FFE/ FINISH

PLAN.

12" THK. MDF

W/ P-LAM

PATIENT ROOM WINDOW SHADE DETAILA-501

4SCALE: 1/2"-1'-0"

Z-CLIP

4A

A-501

PATIENT ROOM WINDOW SHADE DETAILA-501

4ASCALE: 3"-1'-0"

EXISTING STEEL

HEADER. MODIFY

EXISTING STEEL AS

NEEDED. COORDINATE

WITH STRUCTURAL

ENGINEER AND

ARCHITECT PRIOR TO

PERFORMING ANY STEEL

WORK.

EXISTING WINDOW

FRAME.

EXISTING WINDOW

ACT CEILING

C-CHANNEL

INDUCTION UNIT

COVER, SEE

FINISH AND

PARTITION PLAN

PATCH EXISTING GWB

FASCIA ABOVE WINDOW

HEADER, TYP.

FABRICATE NICHE FOR

RECESSED

MECHOSHADE MECHO/4

WIDE BRACKET WITH 2"

CLOSURE MOUNT AND

WALL ANGLE.

COORDINATE WITH

WINDOW SHADES. SEE

ELEVATIONS, FINISH

PLAN & DETAILS.

STEEL TUBE SINK SUPPORT ANF FLANGE

SECTION THOUGH CORNER GUARD A-501

10SCALE: 1"-1'-0"

WALL COVERING

TACK WALLCOVERING

BEHIND MILLWORK REVEAL.

4B

A-501

18'' REVEAL

TACK WALLCOVERING BEHIND

MILLWORK REVEAL

10

A-501

WALL BASE

WALL BASE

PAINTED WOOD

WEDGE IN REVEAL

9

A-501

REPLACE

INSULATION BELOW

WINDOWSILL 4A

A-501

PARTITION

1

1

1

1 1

1

1

1 1

1

11

TV TV2'-11

1 2"

3'-8"

2'-2"

1'-9''

23

4"

34

"

9"

6"

1'-0"

1"

2'-2"

1'-01

2"

EQ EQ

2'-6"

4'-11"

10" 6'-212"

1"5'-11" 6'-21

2"

1"10" 3'-9"3'-9"10" 10"

MGE

MGE

MGE

MGE

1'-3"

2'-0"

R2"

R5"2'-51

2"

11

'-7"

2'-512"

2'-0"

1'-3"

R5"

R2"R5"

R5"

2'-0"

1'-3"R

14

'-312"

61 2"

212"

2"

R18

'-512"

R14

'-412

"

2'-5

1 2"

R2"

41 2"

6'-91 2"

6'-3"

6'-5"

5'-11"

6'-9

1 2"

101 2"

2'-0

1 2"

1'-21 2"

2'-01 2"

1'-2

1 2"

R2'-7"

41 2"

R1'-912"

R6 1

2 "

R6"

R9"

101 2"

2'-51 2"

212"

11 2"

61 2"

1'-9"

R2"

R22'-4

"

R18

'-512"

R2"

1'-3"

1'-5

1 2"

R22

' -4"

1'-3

"1'-5 12 "

4'-7

"

2'-7"

2'-7"

4'-7" 21

2"

2"

212"

1"

11 2"

1"

R9"

9"

9"

1'-634"

6"

111

2"

7"

1"

6" 6"

1'-01

2"

1'-01

2"

1'-81

2"

2'-6"

512"

1112"

EQ

.

1"

2"

712"

23

4"

3"

34

"

EQ

.E

Q.

EQ

.E

Q.

EQ

.

2'-2"

6"

1'-01

2"

1'-01

2"

6" 6"

1'-01

4"

1'-63

4"

9"

MIN

.

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-503.0.0

SEVENTH FLOOR

SECTIONS AND DETAILS

ELEVATION NURSE STATION MILLWORKA-503

11/2"=1'-0"

NURSE STATION FLOOR PLAN A-503 1/2"= 1'-0"

DETAIL NURSE STATION MILLWORKA-503

23"=1'-0"

DETAIL NURSE STATION MILLWORKA-503

41"=1'-0"

DETAIL NURSE STATION MILLWORKA-503

33"=1'-0"

1

A-503

2

A-503

4

A-503

3

A-503

METAL DIVIDERSLIDING

DOORS

CHART

RACK.

BEDBOARD

ACRYLIC

LENS.

COPIER/FAX

BEDBOARD

ACRYLIC LENSED LIGHT POCKETA-503

63"=1'-0"

LIGHT FIXTURE

ACRYLIC LENS

THUMB HOLE 36" O.C.

EM

EM EM

EM

OPEN

CORRIDOROPEN

CORRIDOR

1

1

1

METAL DIVIDER

SECTION NURSE STATION MILLWORKA-503

51/2"=1'-0"

BEDBOARD BEDBOARD

CHART RACK CHART RACK

CABINET CABINET

1

2 LAYERS OF

WACKY WOOD

WITH PLASTIC

LAMINATE FRONTICE, TYP.

5

A-503

18"X1

8" REVEAL.

METAL CHART DIVIDERS.

34" P-LAM DIVIDERS, TYP.

ACRYLIC LENS WITH

THUMBHOLES AT 36" O.C..

LIGHT FIXTURE.

1

34"

P-LAM

DIVIDER.

ANGLED METAL BRACKET.

METAL BRACKET.

34" P-LAM DIVIDERS, TYP.

LINE OF SLOT BEYOND

FOR METAL DIVIDER, TYP.

SLOT FOR METAL

DIVIDER, TYP.

METAL DIVIDER

SLOT FOR METAL

DIVIDER, TYP.

SLOT BELOW

FOR METAL

DIVIDER, TYP.

1

TELE758

STAFF LOUNGE778

ELEVATOR LOBBY700

WOMEN746

MEN745

PANTRY762ANCS

760ELEC761

ON CALL748

ON CALL748b

WC749a

NURSE7s

STATION

MEDICATION759

MEDICATION752

HOOD756

JC753

FAMILY 754

LOUNGE

PATIENT ROOM712

PATIENT ROOM711

NURSE MGR.751c

WC750

PATIENT ROOM710

PATIENT ROOM709

PATIENT ROOM708

PATIENT ROOM707

PATIENT ROOM706

PATIENT ROOM705

PATIENT ROOM704

PATIENT ROOM703

PATIENT ROOM702

PATIENT ROOM701

PATIENT ROOM713

PATIENT ROOM714

PATIENT ROOM715

PATIENT ROOM716

PATIENT ROOM717

PATIENT ROOM718

PATIENT ROOM719

PATIENT ROOM720

PATIENT ROOM722

STAIR

---

BBBB

B

BB

BB

BB

BB

BB

BB

BB

B

B B

BB

B B

BB

B B

BBBB

B B B B

B

B B

B B

B B

B

B B B

B

B B

B B

B B

B B

B B

B B

B

B

B B

B B

B

B

B B

B

B

B B

B

BB

B BB

BB

BB

BB

BB

BB

BB

BB

B

B

A2

A

A

A

A

A

A

A

A

A

A

A

AA

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

A

D

8'-10" A

8'-10" A8'-10" A8'-10" A8'-10" A

8'-10" A

8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A

8'-10" A8'-10" A8'-10" A

8'-0" A

8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F

8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F

8'-0" G

8'-10" G

X'-X" C

8'-0" G

7'-11" C

8'-0" G 8'-0" G 8'-0" G 8'-0" G 8'-0" G

8'-0" G8'-0" G8'-0" G8'-0" G8'-0" G8'-0" G

8'-0" B

8'-0" B

8'-0" B

8'-0" B

8'-0" G

8'-0" B

CCCCCCCC C C C

CCCCCCCCCCC

G

G

F FF

8'-0" B 8'-0" B 8'-0" B

8'-0" C

8'-0" C

8'-0" G

A

A

AA

F

F

D D D D DDDDDD

D D D D D D D D D DD

7'-11" D

ON CALL748c

EQUIPMENT765

A

A

A

A

J J JJ

A

K KK KK K K K K KK

K K K K K K K K K K K

A

8'-0" B

A

A

8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A

F F

F

F

F

F F

F

C.HOOD757

A

ANTE RM755

A

A

A

A

L

L

LLL

LL

Q

Q

Q

N N N N N N N N N NN

N N N N N N N N N N

PHARMACY752a

A

NURSE PRACTITIONER764

LOCKER ROOM778b

OFFICE775c

ELECT. CLOS.

766b

PATIENT LOUNGE769

PATIENT ROOM744

PATIENT ROOM743

PATIENT ROOM742

PATIENT ROOM741

PATIENT ROOM740

PATIENT ROOM739

PATIENT ROOM738

PATIENT ROOM737

PATIENT ROOM736

PATIENT ROOM735

PATIENT ROOM734

PATIENT ROOM723

PATIENT ROOM724

PATIENT ROOM725

PATIENT ROOM726

PATIENT ROOM727

PATIENT ROOM728

PATIENT ROOM729

PATIENT ROOM730

PATIENT ROOM731

PATIENT ROOM732

PATIENT ROOM733

NURSE7N

STATION

DIRTY764b

LINEN ALCOVE765b

CLEAN764a

SUPPLY

SOCIAL749

WORKER

F

F

L

L

L L

L

F

F

Q

F

F

7'-11" C

A A

D2

BB

BB

D2

D2

J J JJ

D

CARMEL'S747

OFFICE

Q

8'-0" B

Q

D2

Q

Q

D

F F

F

F

8'-0" B

B

B

A

A

A

8'-0" B

8'-0" C

8'-0" C

8'-0" B

8'-0" B

8'-0" B8'-0" B

8'-0" B

8'-0" G

8'-0" B

8'-0" B

8'-0" B

8'-0" B

8'-0" G

8'-0" G

A AAA

AA

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S SS S

S S

S S

S S

S S

S S

S S S

S

A2

A2A2

A2 A2

A2A2

D

D

Q

Q

8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A

8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A

8'-0" A

AA

8'-0" G

7'-11" C

8'-0" C

7'-11" C

7'-11" C

8'-0" B

A A A A A A A A A

A AAAAAA

A A

D2

D2 D2 D2 D2 D2 D2 D2D2 D2 D2 D2

D2 D2 D2

D2

D2 D2 D2D2

D2

A

D2

D

A

A

A

A

A

A

A

A

A

SC

SC

SC

SC

SC

SC

ABCDEFGHIJKL

1

2

3

4

N

N2

8'-0" C8'-0" C8'-0" C8'-0" C8'-0" C8'-0" C

7'-11" C

7'-11" C

7'-11" D

7'-11" D 7'-11" D 7'-11" D 7'-11" D

7'-11" D7'-11" D7'-11" D7'-11" D7'-11" D

7'-11" D

8'-0" C 8'-0" C 8'-0" C 8'-0" C

8'-0" G

A

NURSE PRACTITIONER764

---765

X-XXS

8'-0"E

EXAM 771

ROOM

NOURISHMENT780

STATION

CLEAN HOLDING778

ROOM

SOILED777

HOLDING

REST 776

ROOM

NURSE7N

STATION

MEDICATION774

JAN. CL.773

TELE768

CLEAN HOLDING #2772

EQUIP. 782

STORAGE

EQUIP. 779

STORAGE

CORRIDOR 7NW

PATIENT ROOM721

TUBE FOOD781

STORAGE

F

F

F

F

A

A

C

S

S

A

A

A

A

C

A

A

C

S

S

A

S

S

A

A

A

C

S

S

A

A

C

S

S

A

A

A

A

C

A

A

C

S

S

A

S

S

A

A

A

C

A

A

C

S

S

A

S

S

A

A A

A

S SAA

C C

A

A

C

S

S

A

A

A

C

S

S

A

A

A

C

S

S

A

A

A

C

S

S

A

A

A

C

S

S

A

A

A

C

S

S

A

C

A

A

A

S

S

C

A

A

A

S

S

C

A

A

A

S

S

C

A

A

A

S

S

C

A

A

A

S

S

Q Q

W

A

A

A

A

A

A

A

A

A

A

A

A

JJJ

A

W

W

W

Q

Q

Q

Q

J

JJJ

J

W

A2 A2

A2A2

A2 A2

A2A2

A

A

L

K K K K K K K K K K K

K K K K K K

A

F F

B B

B

B

B

B

B

B

B

B

A

A

A

A

A

G

F

7'-11" C

8'-0''G

7'-11" C

F

7'-11" C

B

B

B

B

BBB

B

B

B

B

B

B

B

BBBB

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

BBBBBB

B

B

B

BBBBBBBBBBBBBB

B B B B B B B

8'-0''G

8'-0''G

B

B

B

B

B

B

B

B

B

B

7'-11" C

7'-11" C

7'-11" C

7'-11" C

B B

AA

7'-11" D7'-11" D 7'-11" D 7'-11" D 7'-11" D

7'-11" D

7'-11" C

8'-0''C

8'-0''C8'-0''C8'-0''C8'-0''C

8'-0''C 8'-0''C 8'-0''C

8'-0''C

8'-0''C8'-0''G8'-0''G8'-0''G8'-0''G

8'-0''G

8'-0''G8'-0''G8'-0''G8'-0''G8'-0''G

8'-0''A

8'-0''G

8'-0''A

8'-0''A

8'-0''A

8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A

8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A

8'-10''A 8'-10''A

8'-0''F 8'-0''F

8'-0''F 8'-0''F 8'-0''F 8'-0''F8'-0''F8'-0''F8'-0''F8'-0''F8'-0''F

8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F

8'-0''B

8'-0''B

7'-11" D7'-11" D7'-11" D

7'-11" D

7'-11" D

7'-11" D

8'-10''G

7'-11''C

7'-11''C

8'-10''G

8'-0''G

X' X''C

AA

BB

BBB B

A A

8'-0''G

8'-0''G

7'-11''C

F F

BB

F

8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C

8'-7" C 8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C

8'-0''A

8'-0''A

STAIR

---F F

Q

A A A A A A A A A A A

AAAAAAAAA

SC

SC

7'-11''C

K KKKK

8'-0''G

Q

F

SC

SC

SC

7'-11" A

8'-7" C

CORRIDOR 7NE

POTENTIAL HOIST

LOCATION, IF

AUTHORIZED BY

OWNER

31

1

2

2

2 32

3

1

3

1

2

7'-11''C

8'-0''A

A A

F

F

F

F

W

CLOSET766

F

8'-0" C

8'-0''C

ADA RESTROOM766a

AA

ELEVATOR LOBBY700N

6'-8''C

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U2

U1

U2

V

V

U

U

U

V

U

U

U

V

G

REMARKS

NOTE:

SYMBOL DESCRIPTION

REFLECTED CEILING PLAN LEGEND

SUBSCRIPT 'E' DENOTES EXISTING TO REMAIN

SUBSCRIPT 'R' DENOTES EXISTING TO BE RELOCATED

1. SEE ELECTRICAL DRAWINGS FOR LOCATIONS OF EMERGENCY FIXTURES. SEE PC PLAN FOR LOCATION OF HILL-ROM DEVICES.

2. SEE MEP DRAWINGS FOR LOCATIONS OF ALL CEILING MOUNTED DEVICES.

3. COORDINATE LOCATIONS OF ALL CEILING MOUNTED DEVICES WITH CEILING GRID, LIGHT FIXTURES AND ARCHITECT IN FIELD.

A

U

2'-0"x 2'-0" RECESSED CEILING MOUNT LENSED

FLUORESCENT

LIGHTOLIER SILVERESCENT 2' x 2' RECESSED FLUORESCENT STATIC LENS TROFFER #

EX-S-2-G-FS-VA-2-U4-277V-SB; 277V ELECTROLIC RAPID-START BIAX BALLAST; (2) T8 LAMPS.

3'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORKLEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-225-3 EBO-DIM-SYM; DIMENSIONS: 4"WX36"LX2 5

8"H(NOMINAL LENGTH: 39"); LAMP: (2) FO25-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE

CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.

6" COMPACT FLUORESCENT DIMMABLE DOWNLIGHTLIGHTOLIER CALCULITE; COMPACT FLUORESCENT HORIZONTAL OPEN DOWNLIGHT; REFLECTOR:

8031-CCLW-PC8; COMFORT CLEAR FINISH, WHITE TRIM RING; FRAME-IN KIT: 6132B-U-PC8; ELECTRONIC RAPID

START BALLAST; LAMP: (1) 32W TTT. COORDINATE WITH EXISTING BUILDING SWITCHING CONTROLS.

P FLUSH CEILING/WALL MOUNT

SPEAKER

SPEAKERS FURNISHED BY CLIENT, INSTALLED BY CONTRACTOR. CONTRACTOR TO RUN 16 GA.

PLENUM RATED STEREO SPEAKER WIRE TO SPEAKER LOCATIONS.

B6" COMPACT FLUORESCENT DIMMABLE WALLWASHER

LIGHTOLIER CALCULITE; COMPACT FLUORESCENT HORIZONTAL OPEN WALLWASHER; REFLECTOR:

8081-CCLW-PC8; COMFORT CLEAR FINISH, WHITE TRIM RING; FRAME-IN KIT: 6132BCU3; DIMMING BALLAST; LAMP:

(1) 32W TTT. ARROW INDICATES DIRECTION OF REFLECTOR. COORDINATE WITH EXISTING BUILDING SWITCHING

CONTROLS.

C FLUSH-MOUNTED FLUORESCENT CEILING FIXTURETECH LIGHTING BOXIE CEILING COLLECTION 700BXLS-CF SURFACE MOUNTED. ELECTRONIC BALLAST. LAMP: (2)

13W 2GX7 BASE TWIN TUBE. DIMENSIONS: 9"x9"x2.2" HIGH

F

G FLUORESCENT WALL SCONCESHAPER SERIES 652 FLUORESCENT INTERIOR WALL LUMINAIRE #652-CFL/1-120V-NA; DIMMING BALLAST; (1) 32W

LAMP. SEE ELEVATIONS FOR MOUNTING HEIGHTS.

JHALOGEN PENDANT FIXTURE

MONORAIL LIGHTING ONYX TEARDROP PENDANT LIGHT #HS178; BRONZE FINISH; 35W MR16 HALOGEN LAMP;

12V MINIATURE ELECTRONIC TRANSFORMER.

LIGHTOLIER ALTER SOFT LIGHTS 2'x4' INDIRECT FLUORESCENT 2 LAMP, T8 18" DEEP MICROPERFORATED MESH

LAMP SHIELD. #QVS2GPFOS232277SR; 277V ELECTRONIC RAPID START BALLAST. G.C TO COORDINATE NUMBER

OF FIXTURES WITH LENGTHS OF RUNS.

VANITY FIXTURE

L 2'x4' LIGHTOLIER FLUORESCENT DIRECT/INDIRECT

FIXTURE

QUNDER-COUNTER TASK LIGHTING

LIGHTOLIER PRISTINE HW SERIES TASK LIGHT #PC2W13T2 120V;PT;HW; 22" LENGTH.

SEE TYPICAL MOUNTING HEIGHTS SHEET. GC TO CENTER FIXTURE RUNS WITHIN OPENINGS, G.C TO

COORDINATE NUMBER OF FIXTURES WITH LENGTHS OF RUNS.

SHAPER 605 SERIES INTERIOR WALL LUMINAIRE #605-25-T5/2/14-120V-SCL-DL. 25" LENGTH; (2) 14W T5 LAMPS;

120V BALLAST; LACQUERED SATIN CHROME FINISH; DAMP LOCATION. INSTALL FIXTURE ABOVE MIRROR, TYP.

HILL-ROM SPECIALITE WALL-MOUNTED PATIENT LIGHT #P645; (4) 48" T8 BULBS; 25W RAPID-START BALLAST.

LIGHT PROVIDED BY CLIENT; GC TO PROVIDE WIRING AND INSTALLATION.WALL-MOUNTED BEDLIGHT

CEILING-MOUNT SECURITY CAMERA COORDINATE WITH ENGINEERING DRAWINGS AND WMC.SC

VISA LIGHTING CB6504 CUSTOM 14" LENGTH. LAMP: (1) FS 8W-BSIL-BSIL. 120 V. CENTERED ABOVE SINK.

COORDINATE WITH ELEVATIONS AND DETAILS.MILLWORK MOUNTED FLUORESCENT VANITY LIGHT

K 2" ADJUSTABLE RECESSED FIBER-OPTIC DOWNLIGHT

FIBERSTARS FUTURA ADJUSTABLE RECESSED ACCENT FIXTURE #FE-1604; ALUMINUM FINISH; 25° BEAM

SPREAD; 75 FSPT FIBERS PER FIXTURE. ILLUMINATOR: FIBERSTARS ILLUMINATOR #405N; SPECIAL 400 FIBER

CAPACITY; NO COLOR FILTER; DIMMING WHEEL; 277V. GC TO COORDINATE LOCATIONS AND QUANTITIES OF

ILLUMINATORS. ALL FIBERS TO BE EQUAL LENGTH.

W DIMMABLE LINEAR FLUORESCENT MOUNTED IN COVE

LEGION SERIES 820; REMOTE STAGGERED CHANNELS; 820-260 EBO; LENGTH: VIF; LAMP: (2) 40W T8; REMOTE

DIMMABLE BALLAST. PROVIDE COMBINATION OF LENGTHS AS NECESSARY TO FIT IN RUN OF COVE. PROVIDE

CUSTOM ACRYLIC LENS FOR INFECTION CONTROL.

U1

U2

4'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORK

5'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORK

DIMMABLE LINEAR FLUORESCENT BELOW MILLWORKBARTCO LIGHTING BFL281; LOW PROFILE LINEAR T5 FLUORESCENT WITH INTEGRAL DIMMING BALLAST;

LENGTH: 58"; LAMP: (1) 35W T5; PROVIDE UNIVERSAL OPAL LENS WITH SNAP-ON COVER (LNO).V

LEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-232-4 EBO-DIM-SYM; DIMENSIONS: 4"WX48"LX2 58"H

(NOMINAL LENGTH: 51"); LAMP: (2) FO32-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE

CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.

LEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-240-5 EBO-DIM-SYM; DIMENSIONS: 4"WX60"LX2 58"H

(NOMINAL LENGTH: 63"); LAMP: (2) FO40-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE

CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.

8'-0" CEILING HEIGHT TYPICAL U.O.N.B 9'-0"

REMARKSDESCRIPTIONSYMBOL

CEILING TYPE LEGEND

CEILING TYPE /

CEILING HEIGHT

B NOT USED NOT USED.

CEILING GRID: ARMSTRONG SUSPENSION SYSTEM WITH15

16" CLEAN ROOM GRID. CEILING TILE: 2' x 2' x 58" THICK

CLEAN ROOM VL 868, TYPICAL. PAINT ALL EXPOSED

CUT EDGES WITH MANUFACTURER'S RECOMMENDED

PAINT SPECIFICATION.

SEE GENERAL NOTES FOR INSULATION REQUIREMENTS

ON UNDERSIDE OF SLAB ABOVE.

2'x2' ACOUSTICAL

CEILING TILEA

FURNISH AND INSTALL EDGE BEAD WITH JOINT

COMPOUND AT ALL EXPOSED GYPSUM WALLBOARD

EDGES. TAPE SPACKLE AND PREPARE FOR NEW FINISH.

SEE SECTIONS AND DETAILS. PROVIDE FACED

INSULATION SECURED TO UNDERSIDE OF SLAB ABOVE.

GYPSUM WALLBOARD

CEILING WITH GWB FASCIA

AT CEILING HEIGHT

CHANGES

C

SEE FINISH PLAN FOR VENEER SPECIFICATIONS.MDF CEILING SOFFIT W/

WOOD VENEERD

---EXISTING CEILING TO

REMAINE

FURNISH AND INSTALL EDGE BEAD WITH JOINT

COMPOUND AT ALL EXPOSED GYPSUM WALLBOARD

EDGES. TAPE SPACKLE AND PREPARE FOR NEW FINISH.

SEE SECTIONS AND DETAILS. SEE GENERAL NOTES

FOR INSULATION REQUIREMENTS ON UNDERSIDE OF

SLAB ABOVE.

MOISTURE-RESISTANT

GYPSUM WALLBOARD

CEILING WITH GWB FASCIA

AT CEILING HEIGHT

CHANGES

F

G

CEILING GRID: ARMSTRONG SUSPENSION SYSTEM15

16" PRELUDE XL GRID. CEILING TILE: 2' x 2' x 34" THICK

OPTIMA #3150, TYPICAL. PAINT ALL EXPOSED CUT EDGES

WITH MANUFACTURER'S RECOMMENDED PAINT

SPECIFICATION. SEE GENERAL NOTES FOR INSULATION

REQUIREMENTS ON UNDERSIDE OF SLAB ABOVE.

2'x2' ACOUSTICAL

CEILING TILE

S ---EXISTING SLAB

FIRE PROTECTION/LIFE SAFETY PLAN LEGEND

CEILING MOUNT/WALL

MOUNT SELF

ILLUMINATING EXIT LIGHT

DESCRIPTIONSYMBOL REMARKS

1. EXISTING FIRE PROTECTION AND LIFE SAFETY DEVICES, INCLUDING SPEAKERS, STROBES,

EMERGENCY FIXTURES, EXIT LIGHTS, SMOKE DETECTORS AND SPRINKLERS TO BE REUSED

TO FULLEST EXTENT POSSIBLE.

2. SEE ENGINEERING DRAWINGS FOR FIRE ALARM AND LIFE SAFETY DEVICES.

3. COORDINATE LOCATIONS OF ALL CEILING MOUNTED DEVICES WITH CEILING GRID, LIGHT

FIXTURES AND ARCHITECT IN FIELD.

NOTES:

RECESSED MOUNT, EDGE LIT. SHADED QUADRANT

INDICATES ILLUMINATED FACE. ARROWS INDICATE

DIRECTION OF TRAVEL. COORDINATE WITH

BUILDING STANDARD.

REFLECTED CEILING PLAN GENERAL NOTES

1. EACH FIXTURE LOCATED IN DROPPED ACOUSTICAL CEILING SHALL BE CENTERED ON

EACH 2'X2' TILE, AS SHOWN.

2. ALL ELECTRICAL SWITCHES AND COVER PLATES SHALL BE MOUNTED VERTICALLY,

STRAIGHT, AND ALIGNED, AND SHALL MATCH SPEC INFO AS NOTED.

3. CEILING SUSPENSION RODS AND BLACK IRONS SHALL BE HUNG BY SECURING TO THE

CLIP TABS ON THE STRUCTURAL METAL DECK. NO SCREWS OR OTHER MECHANICAL

STUDS OR FASTENERS SHALL BE USED IN THE DECK UNLESS APPROVED, IN WRITING, BY

BUILDING MANAGEMENT.

4. ALL DIMMERS, SWITCHES, AND COVERPLATES TO BE LIGHTOLIER; MODEL: VEGA SLIDE

OR EQ., COLOR: WHITE U.O.N. COORDINATE WITH BUILDING STANDARD.

5. LETTERS NEXT TO LIGHT FIXTURES INDICATE SPECIFICATION INFORMATION FOR EACH

FIXTURE. SEE REFLECTED CEILING PLAN LEGEND FOR CLARIFICATION.

6. NUMBERS NEXT TO FIXTURES INDICATE SWITCH GROUPINGS.

7. ALL SWITCHES IN A GROUP ARE TO BE GANGED WHERE POSSIBLE WITH A SINGLE

COVERPLATE.

8. PROVIDE MINIMUM OF (1) ONE LIGHT SWITCH PER FIXTURE TYPE PER ROOM, U.O.N.

9. ALL LAMPS SHALL BE RATED 3000°K COLOR TEMPERATURE. LAMPS THAT DO NOT

MEET THESE SPECIFICATIONS WILL NOT BE ACCEPTED.

10. ANY ADDITIONAL EQUIPMENT NEEDED FOR INSTALLATION OF THE SPECIFIED

FIXTURES SHALL BE PROVIDED BY THE CONTRACTOR.

11. ANY NECESSARY GRID LOCATION CHANGES OR FIXTURE LOCATION CHANGES SHALL

BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION.

12. ALL DIMENSIONS ARE TO CENTER OF THE FIXTURE AND ARE TAKEN FROM THE

FINISHED FACE OF WALL.

13. SEE SECTIONS AND ELEVATIONS FOR CEILING HEIGHTS NOT NOTED.

14. LAMP ALL FIXTURES FOLLOWING SUBSTANTIAL COMPLETION.

15. EXISTING LIGHTING TO REMAIN WHERE NOTED. CONTRACTOR TO SURVEY EXISTING LOADS

AND CIRCUITING AND RECIRCUIT/REWIRE AS NECESSARY.

16. CONTRACTOR TO FURNISH AND INSTALL FIRE AND SMOKE DAMPERS AS NECESSARY IN

NEW AND EXISTING DUCTWORK TO ACHIEVE REQUIRED FIRE COMPARTMENTALIZATION.

17. FOR EXTENT OF EXISTING DUCTWORK TO REMAIN, SEE MECHANICAL DRAWINGS.

18. NOTIFY ARCHITECT IF GRID LAYOUT RESULTS IN A TILE 6" OR LESS IN ANY DIMENSION,

PRIOR TO INSTALLATION.

19. UNDER NO CIRCUMSTANCE SHALL ANY FASTENING TO FACE OF WINDOW BLIND POCKET

OCCUR.

20. PROTECT, TO SATISFACTION OF BUILDING MANAGEMENT, EXISTING DUCT SMOKE

DETECTORS OR REPLACE FOLLOWING SUBSTANTIAL COMPLETION.

21. CAULK BETWEEN CEILING GRID EDGE AND WALLS AT ALL VISIBLE LOCATIONS, TYP. MATCH

COLOR OF CAULK TO COLOR OF CEILING GRID.

22. LIGHTING FIXTURE COMPONENTS SHALL BE SUITABLE FOR THE VOLTAGE OF THE BUILDING

CIRCUITS TO WHICH THEY ARE APPLIED. DIMMERS SHALL BE SIZED FOR INDICATED LOADS.

23. ALL DIMMING CIRCUITS SHALL HAVE SEPARATE NEUTRALS. SEE ELECTRIC DRAWINGS

24. ALL BALLASTS TO BE BUILDING APPROVED OR EQ. SEE BUILDING RULES AND

REGULATIONS.

25. FURNISH AND INSTALL HOLD DOWN CLIPS FOR RECESSED PARABOLIC FIXTURES, TYP.

26. PAINT ALL EXPOSED CUT EDGES OF CEILING TILES WITH MANUFACTURER APPROVED

PAINT, TYP. MATCH COLOR TO TILE.

27. SEE SHEET A-202.0.0 FOR RCP DIMENSIONS

28. FURNISH AND INSTALL ACRYLIC LIGHT SHELF COVER AT ALL OPEN LIGHT FIXTURES. SEE

FINISH, ELEVATIONS AND SECTIONS.

29. PROVIDE RIGID INSULATION SECURED TO UNDERSIDE OF SLAB ABOVE, TYP. AT ALL

LOCAITONS BELOW ROOF. INSULATION NOT REQUIRED ON UNDERSIDE OF SLAB BELOW MER.

ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:

1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.

2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.

3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.

4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.

7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

9. WET MOP WITH DISINFECTANT.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.

11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA COMMITTEE MEMBER.

13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.

15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION AND LEAVE ELEVATOR

BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE

PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER FLOORS OPENING ON TO THIS SHAFT.

KEYED NOTES

PATCH EXISTING GWB FASCIA ABOVE WINDOW HEADER, TYP. FABRICATE NICHE FOR

RECESSED MECHOSHADE MECHO/4 WIDE BRACKET WITH 2" CLOSURE MOUNT AND WALL

ANGLE. COORDINATE WITH WINDOW SHADES. SEE ELEVATIONS, FINISH PLAN & DETAILS.

GWB SOFFIT, TYP.. SEE DETAIL SHEET.

MILLWORK SOFFIT, TYP.. SEE ELEVATIONS, DETAILS AND FINISH PLAN.

CURTAIN TRACK, TYP. SILENT GLISS USA: SYSTEM 6010 WITH 61475 GLIDER STAINLESS

STEEL HOOK. SEE FINISH PLAN FOR CURTAIN MATERIAL SPECIFICATION.

LOW POINT OF BOWED CEILING. SEE ELEVATIONS FOR DETAILS AND HEIGHTS.

LIGHT FIXTURE MOUNTED IN PARTIAL HEIGHT PARTITION BELOW. SEE SECTIONS AND

DETAILS.

TEMPORARY 2-HOUR-RATED FIRE PARTITION TO BE INSTALLED IN THIS AREA. CEILING

GRID, TILES AND FIXTURES TO REMAIN IN THIS AREA TO GREATEST EXTENT POSSIBLE.

REPLACE CEILING GRID AND TILES AS REQUIRED UPON DEMOLITION OF TEMPORARY

PARTITION.

GC TO PROVIDE TEMPORARY EXIT SIGNAGE. COORDINATE LOCATION WITH ARCHITECT.

EXTEND GWB HEADER ABOVE NURSE SERVER CABINET TO SLAB, TYP. COORDINATE

HEIGHT OF CEILING WITH MILLWORK. SEE ELEVATIONS AND DETAILS.

PROVIDE BLOCKING ABOVE CEILING FOR FUTURE CEILING-MOUNTED SIGNAGE.

COORDINATE LOCATION WITH ARCHITECT AND WMC.

LINE OF LIGHT COVE ABOVE, SEE ELEVATIONS AND DETAILS.

COORDINATE INFILL OF EXISTING SLAB ABOVE WITH STRUCTURAL DRAWINGS.

---

---

---

---

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-301.00

SEVENTH FLOOR

REFLECTED CEILING PLAN

REFLECTED CEILING PLANA-301

1SCALE:1/8"=1'-0"

1

1

1

1

1

1

1

1

1

1

1

111111

111111

1

3'-3" EQ1 1'-0" EQ1 EQ2 EQ2 EQ3 1'-0" EQ3 EQ4 EQ4 EQ5 1'-0" EQ5

C W H C W H

STAFF LOUNGE

778

ELEVATOR LOBBY700

WOMEN746

MEN745

PANTRY762S ELEC

761

ON CALL748

OM PATIENT ROOM704

PATIENT ROOM703

PATIENT ROOM702

PATIENT ROOM701

OM PATIENT ROOM719

PATIENT ROOM720

PATIENT ROOM722

ON CALL748c

EQUIPMENT765

NURSE PRACTITIONER764

LOCKER ROOM778b

OFFICE775c

ELECT. CLOS.

766b

PATIENT LOUNGE769

PATIENT ROOM744

PATIENT ROOM743

PATIENT ROOM742

PATIENT ROOM741

PATIENT ROOM740

PATIENT ROOM739

PATIENT ROOM738

PATIENT ROOM737

PATIENT ROOM736

PATIENT ROOM735

PATIENT ROOM734

PATIENT ROOM723

PATIENT ROOM724

PATIENT ROOM

725

PATIENT ROOM726

PATIENT ROOM727

PATIENT ROOM

728PATIENT ROOM

729

PATIENT ROOM

730PATIENT ROOM

731

PATIENT ROOM

732

PATIENT ROOM

733

NURSE7N

STATION

DIRTY

764b

LINEN ALCOVE

765b

HOCLEAN

764a

SUPPLY

CARMEL'S747

OFFICE

W

H

C

W

H

C

W

H

C

W

H

CW

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

NURSE PRACTITIONER764

---765 FHC

E

FEC

FHCE

EXAM 771

ROOM

NOURISHMENT780

STATION

CLEAN HOLDING778

ROOM

SOILED777

HOLDING

REST 776

ROOM

NURSE7N

STATION

MEDICATION774

JAN. CL.773

TELE768

CLEAN HOLDING #2772

EQUIP. 782

STORAGE

EQUIP. 779

STORAGE

CORRIDOR 7NW

PATIENT ROOM721

TUBE FOOD781

STORAGE

W

H

C

W

H

C

C

W

H

WH

C

STAIR

--- E

FP

CORRIDOR 7NE

E

CLOSET

766

ADA RESTROOM766a

ELEVATOR LOBBY700N

A-401.00

SEVENTH FLOOR

ELEVATIONS AND

SECTIONS

SECTION ELEVATIONA-401

11/4"-1'-0"

ACT CEILING

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

SECTION ELEVATIONA-401

21/4"-1'-0"

SECTION ELEVATIONA-401

31/4"-1'-0"

SECTION ELEVATIONA-401

41/4"-1'-0"

KEY PLAN A-401

0NOT TO SCALE

1

A-401

2

A-401

3

A-401

4

A-401

ACT CEILING

ACT CEILING

6'' WALL BASE

6'' WALL BASE

STAINLESS STEEL CORNER GUARD AT

ALL OUTSIDE CORNERS, TYP.

CLERK DESK

GC TO INSTALL BLACKIRON AS

REQUIRED, TYP.

HANDRAIL

DIALYSIS CONNECTIONS

WALL INDUCTION UNIT

MILLWORK NURSE

SERVER CABINET

LINE OF REVEAL

LINE OF REVEAL

MILLWORK

PANELS WITH

METAL TRIM

MILLWORK

P-LAM CABINET

LINE OF MILLWORK NURSE

SERVER CABINET BEYOND.

SEE DETAILS.

GWB CEILING, TYP.

ACT CEILINGGWB CEILING, TYP.

MILLWORK VANITY SINK WITH MIRROR

AND LIGHT

2

A-501

HAND SANITIZER DISPENSER

01

A-405

PATIENT ROOM 743PATIENT ROOM 744 PATIENT ROOM 741PATIENT ROOM 742 PATIENT ROOM 739PATIENT ROOM 740 PATIENT ROOM 737PATIENT ROOM 738 PATIENT ROOM 735PATIENT ROOM 736 PATIENT ROOM 734

PATIENT LOUNGE 769

JC 773

EQUIPMENT STORAGE 782

MEDICATION 774 NURSE STATION 7N RESTROOM 776 SOILED HOLDING 777

PATIENT ROOM 744 PATIENT ROOM 743 PATIENT ROOM 742 PATIENT ROOM 741 PATIENT ROOM 740 PATIENT ROOM 739 PATIENT ROOM 738 PATIENT ROOM 737 PATIENT ROOM 736 PATIENT ROOM 735 PATIENT ROOM 734

PATIENT ROOM 734 PATIENT ROOM 735 PATIENT ROOM 736

6'' WALL BASEDIALYSIS CONNECTIONS

PATIENT ROOM 737 PATIENT ROOM 738 PATIENT ROOM 739 PATIENT ROOM 740 PATIENT ROOM 741 PATIENT ROOM 742 PATIENT ROOM 743 PATIENT ROOM 744

RECESSED CABINET

PULLS, SEE DETAIL

SHEETS.

RECESSED CABINET

PULLS, SEE DETAIL

SHEETS.

TOUCH AND RELEASE CABINET

HARDWARE SEE DETAILS SHEETSCLOSER WITH HOLD OPEN,

SEE DETAIL SHEETS

MILLWORK CEILING BEYOND

MILLWORK PANEL

6'' WALL BASE

6'' WALL BASE

RECEPTACLES

1 1 1 1 11

1 1 1 1 1

1

OFFICE TASK CHAIR (BY OTHERS)

GENERAL NOTES

1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL DRAWINGS FOR CIRCUITING.

2. G.C.SHALL PROVIDE AND INSTALL SOLAR SHADES ON ALL PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL

SHEETS FOR MOUNTING DETAILS AND POWER PLAN FOR POWER REQUIREMENTS.

3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY

DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD CONDITIONS.

4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.

5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.

6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND

ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.

7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN .DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE

QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.

KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET

#K-4330-0:COLOR WHITE; SLOAN SLIMLINE BEDPAN WASHER

FLUSHOMETER #BPW-1105; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN

FRONT SEAT WITH ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL

MOUNTING HEIGHTS SHEET.

PURELL HAND SANITIZER (BY OTHERS)

42" 5HIGH LATERAL FILE (BY OTHERS)

18" PEDESTAL FILE (BY OTHERS)

PRINTER 21"HX16"WX16"D (BY OTHERS)

TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE POWER.

COORDINATE FINAL LOCATION AND TYPE WITH WMC.TV

KEYED NOTES

18" WIDE X 36" HIGH ANGLED WALL-MOUNTED MIRROR:BOBRICK# B-293 1836. SATIN STAINLESS STEEL FINISH.COORDINATE WITH LOCATION OF VANITY FIXTURE. SEE RCP.

WALL-MOUNTED SOAP DISPENSER (BY WMC, INSTALLED BY GC)

WALL MOUNTED PAPER TOWEL DISPENSER: GEORGIA PACIFICCOMBINATION C-FOLD/ MULTIFOLD PAPER TOWEL DISPENSERITEM# 56650-01 UPC UCC: 12 073310566504.FINISH: TRANSLUCENT SMOKE

WALL-MOUNTED TOILET PAPER DISPENSER: BOBRICK # B-4288,SATIN STAINLESS STEEL FINISH.

WALL-MOUNTED SANITARY NAPKIN DISPOSAL: BOBRICK # B-254,SATIN STAINLESS STEEL FINISH.

SURFACE MOUNTED TOWEL PIN: BOBRICK # B-677.

GRAB BARS: ELCOMA STAINLESS STEEL GRAB BARS: 24"#01-2224-KC, 36" #01-2236-KC, 42" #01-2242-KC. REFER TO PLANAND ELEVATIONS FOR SIZE.

PULL DOWN GRAB BARS: ELCOMA 30" FLIP UP SAFETY RAILSTAINLESS STEEL WITH TOILET PAPER HOLDER; MODEL#96-2230SW05-TF

VERTICAL GRAB BARS: ELCOMA 18" STAINLESS STEEL GRAB BAR,#01-2218-KC.

SHOWER ROD AND HOOKS: SHOWER CURTAIN ROD WITHCONCEALED MOUNTING 1" (25MM) DIAMETER ROD, 20-GAUGE(1.0MM), TYPE 304 STAINLESS STEEL, SATIN FINISH.BOBRICK 204-1 SHOWER CURTAIN HOOKS. BOBRICK TB-207 YPE304 STAINLESS STEEL. VERIFY REQUIRED LENGTHS IN FIELD.

**SEE TYPICAL MOUNTING HEIGHTS SHEET AND SHEETS A-401THROUGH SHEET A-407 FOR INSTALLATION LOCATIONS.

SHELV. SHELVING (BY OTHERS)

UNDER COUNTER REFRIGERATOR (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

PLUMBING GASES LEGEND

SYMBOL DESCRIPTION

V

O

A

W

H

C

OXYGEN CONNECTION

AIR CONNECTION

VACUUM CONNECTION

WASTE CONNECTION

HOT WATER CONNECTION

COLD WATER CONNECTION

PLUMBING CONNECTIONS ARE SHOWN FOR COORDINATION PURPOSES ONLY. SEE PLUMBING DRAWINGS FOR DETAILS.

NOTE:

18" x 48" COFFEE TABLE (BY OTHERS)

24" x 24" COFFEE TABLE (BY OTHERS)

TWO SEAT GANGED LOUNGE CHAIR (BY OTHERS)

"M"

"H"

"MP"

"T"

"N"

"Q"

"G"

"PG"

"VG"

"C"

NOTE: SHOWN FOR COORDINATION PURPOSES ONLY. SEE ENGINEERING DRAWINGS

FLOOR

MOUNTDESCRIPTION

CLNG

MOUNTMOUNT

WALL

LIFE SAFETY/SECURITY/EQUIPMENT LEGEND

REMARKS

MEDICAL GAS SHUT-OFF VALVE

FIRE EXTINGUISHER AND RECESSED

CABINET (STAINLESS STEEL)

SEE SHEET FA-1 FOR GENERAL LOCATION. CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO

INSTALLATION.

MG

FEC

BEDSIDE CABINET (BY OTHERS)

PYXISIVDD

COF

ICE

EKG

MW

SOAP DISPENSER (BY OTHERS)

LH LINEN HAMPER 33"HX18"WX20"D (BY OTHERS)

DIGITAL CLOCK. PRIMEX SNS7Y202F-1: WIRELESS SYNCHRONOUS NETWORK

SYSTEM (SNST). DISPLAY DIMMER CONTROLLED. 6-DIGIT DISPLAY, RED LED,

FLUSH MOUNT. 120VAC/50-60 CYCLE 18” CORD W/PIGTAIL. GC TO

COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

CL

COMPACT MICROWAVE (BY OTHERS). GC TO COORDINATE POWER, SEE PC

PLAN AND ELEVATIONS.

COFFEE MACHINE (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

WALL MOUNTED ICEMAKER (BY OTHERS). GC TO COORDINATE POWER,

BLOCKING, WALL BRACKETS AND WATER/ DRAINAGE REQUIREMENTS, SEE PC

PLAN, MEP DRAWINGS AND ARCHITECTURAL ELEVATIONS.

ELECTROCARDIOGRAM: 46"HX18"WX29"D (BY OTHERS)

DOUBLE PYXIS IV DISPENSER UNIT 79-1/2"HX52"WX28D (BY OTHERS)

CORIAN INTEGRAL SINK #810 WITH SLOAN FAUCET ETF-700-4-BDM: 4 TRIM

PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING VALVE.

TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30 SECOND

TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS SHEET

AND F-2.7 FOR DETAILS.

EQUIPMENT LEGEND

HOSPITAL BED, HEADBOARD, BED LOCATOR AND PHYSIOLOGIC

MONITOR DOCKING STATION (BY WMC, INSTALLED BY GC)

DF

HOUSE

CART

LINEN

CART

HOUSEKEEPING CART (BY OTHERS)

DEFIBRILLATOR 40HX24WX24D (BY OTHERS)

LINEN CART 36"HX36"WX22"D (BY OTHERS)

CRASH CART (BY OTHERS)

ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:

1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.

2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.

3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.

4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.

7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

9. WET MOP WITH DISINFECTANT.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.

11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.

12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA

COMMITTEE MEMBER.

13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.

15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION

AND LEAVE ELEVATOR BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE

AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER

FLOORS OPENING ON TO THIS SHAFT.

FURNITURE/ PLUMBING LEGEND

SYMMONS # 1-801S-458-FSB. HYDAPIP SURFACE MOUNTED

SHOWER SYSTEM WITH HAND SPRAY.

PL-10

PL-5

PL-3

PL-2

CORIAN INTEGRAL SINK MODEL #820 WITH SLOAN FAUCET ETF-700-4-BDM: 4

TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING

VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30

SECOND TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS

SHEET AND F-2.7 FOR DETAILS.

PL-6

FIAT SB SERIES SB2424. PRECAST TERRAZZO ONE PIECE MOP

BASIN WITH 6” HIGH CURB.

ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #LR2522; SINGLE

HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL FAUCET;

DUAL PADDLE CONTROL.

NURSE STATION TASK CHAIR (BY OTHERS)

LOUNGE TASK CHAIR (BY OTHERS)

5H 42

OFFICE GUEST CHAIR (BY OTHERS)

DESK WITH RETURN AND OVERHEAD CABINETS (BY OTHERS). DIMENSIONS

VARY BY ROOM. COORDINATE BLOCKING LOCATIONS WITH FURNITURE

VENDOR.

REF

MED

REF

MEDICATION REFRIGERATOR: 34.5"X27"X28" (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

"B" SHOWER SEAT: BOBRICK FOLDING SHOWER SEAT WITH PADDED

CUSHION #B-517 / B-518 (SEE PLAN FOR R/L ORIENTATION).

WALL MOUNTED PAPER TOWEL DISPENSER: G.C. TO CONFIRM MODEL WITH

W.M.C.

WALL MOUNTED PAPER TOWEL DISPENSER AT VANITY: G.C. TO CONFIRM

MODEL WITH W.M.C.

WALL-MOUNTED PAPER TOWEL/WASTE DISPOSAL UNIT: BOBRICK# B-43699,

SATIN STAINLESS STEEL FINISH.

CB

O2

CONFIDENTIALITY BIN 36"HX19"WX19"D (BY OTHERS)

OXYGEN CART 4512"HX231

2"WX18"D (BY OTHERS)

FAP FIRE ALARM PANEL EXISTING TO REMAIN

FIRE ALARM PULL EXISTING TO BE RELOCATED.FP

PROVIDE BLOCKING AS REQUIRED FOR ALL WALL MOUNTED

EQUIPMENT AND MILLWORK, TYP. COORDINATE LOCATIONS AND WITH

ARCHITECT AND WMC.

TEMPORARY PARTITION TO BE INSTALLED IN THIS AREA. SEE

PARTITION AND PHASING PLANS.

FHCFIRE HOSE CABINET EXISTING TO REMAIN

SRA

SIMPLEX (FIRE ALARM) REMOTE

ANNUNCIATOR.EXISTING TO BE RELOCATED.

CODE

CART IV

CODE CART (WITH IV POLE, SHARPS AND OXYGEN TANK ATTACHED):

55"HX38"WX25"D (BY OTHERS)

CENTRAL LINE CART: 47"HX32"WX24"D (BY OTHERS)

GOMCO SUCTION: 33-1/2"HX16"WX16"D (BY OTHERS).

LINE

CART

GS

ROLLING BLOOD PRESSURE MACHINE 54"HX20"WX20"D (BY OTHERS).BP

WOW: LAP-TOP WITH CART 44"HX30"WX24"D (BY OTHERS).WOW

SCALE HOYER: 50"HX28"WX48"D (BY OTHERS).

SAGE WARMER: 52"HX32"WX20"D (BY OTHERS).

SCALE WHEELCHAIR: 50"HX24"WX36"D (BY OTHERS).

SCALE

HOYER

SGW

SC

WC

PYXIS COMPUTER CART: 57"HX23"WX28"D (BY OTHERS)

PYXIS STORAGE CART: 48"HX23"WX27"D (BY OTHERS)

PYXIS TOWER: 78"HX30"X28"D (BY OTHERS)

PYXIS

CC

PYXIS

SC

PYXIS

TWR

COPY/

FAX

COPY AND FAX MACHINE: 45"HX39"WX49"D (BY OTHERS).

GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.

NDL/

STRNEEDLE/SYRINGE STORAGE 79-1/2"HX31"WX28D" (BY OTHERS)

TM

SHP

SHARPS WALL MOUNTED DISPOSAL 22"HX14"WX8"D (BY OTHERS)

PACS MONITOR 13"HX16"WX6"D -- 18"H WITH STAND ( BY OTHERS).

PREMISE MONITORS 13"HX16"WX6"D EACH -- TWO STACKED TOTAL 30- 12"H

WITH STAND (BY OTHERS).

NURSE CALL MONITOR 11"HX14"WX6"D EACH -- 18"H WITH STAND

(BY OTHERS).

KEYBOARD, CPU, AND MONITOR (BY OTHERS)

ELECTRONIC WHITE-BOARD, DIMENIONS TBD (BY OTHERS). GC TO PROVIDE

BLOCKING AND COORDINATE POWER. COORDINATE FINAL LOCATION AND

TYPE WITH WMC.

WS STANDARD WASTE RECEPTACLE 31"HX20"WX16"D (BY OTHERS)

EWB

TRANSPORT MONITOR 12"HX12"WX12"D (BY OTHERS)

a

b

c

d

THREE SEAT GANGED LOUNGE CHAIR (BY OTHERS)CRASH

CART

CHEMO

BIN

RED

WASTE

BINRED WASTE BIN (BY OTHERS).

CHEMO BIN (BY OTHERS)

CA

PL-13

ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #DLFR(Q)191810;

SINGLE HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL

FAUCET; DUAL PADDLE CONTROL.

FUTURE TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE

POWER. COORDINATE FINAL LOCATION AND TYPE WITH WMC.FTV

RECESSED DIALYSIS CONNECTION. MATCH MOUNTING HEIGHTS TO 7

SOUTH.

FUTURE LOCATION FOR TV, TYP. .

KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET

#K-4330-0:COLOR WHITE; SLOAN UPPERCUT DUAL-FLUSH FLUSHOMETER

#WES-111; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN FRONT SEAT WITH

ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL MOUNTING HEIGHTS

SHEET.

BEDSIDE GUEST CHAIR (BY OTHERS)

PL-14

KOHLER MORNINGSIDE WHEELCHAIR LAVATORY K-12638 WITH SLOAN FAUCET

ETF-700-4-BDM;4 TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK

MECHANICAL MIXING VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60

HZ (35 VA). 30 SECOND TIME OUT. SEE MEP DRAWINGS.

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

TELE758

STAFF LOUNGE778

ELEVATOR LOBBY700

WOMEN746

MEN745

PANTRY762ANCS

760ELEC761

ON CALL748

ON CALL748b

WC749a

NURSE7s

STATION

MEDICATION759

MEDICATION752

HOOD756

JC753

FAMILY 754

LOUNGE

PATIENT ROOM712

PATIENT ROOM711

NURSE MGR.751c

WC750

PATIENT ROOM710

PATIENT ROOM709

PATIENT ROOM708

PATIENT ROOM707

PATIENT ROOM706

PATIENT ROOM705

PATIENT ROOM704

PATIENT ROOM703

PATIENT ROOM702

PATIENT ROOM701

PATIENT ROOM713

PATIENT ROOM714

PATIENT ROOM715

PATIENT ROOM716

PATIENT ROOM717

PATIENT ROOM718

PATIENT ROOM719

PATIENT ROOM720

PATIENT ROOM722

O

VV

O

AA

V O

A

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E E E

E

E E

E

E

E

E

E E

E

E E

E

E E E

E

E

E E

EE

E

E E

E E

E

STAIR

---CM CM

CM CM

ON CALL748c

EQUIPMENT765

SH

ELV

. C.HOOD757

CH

EM

O H

OO

D(D

UC

TE

D)

LA

MIN

AR

FL

OW

HO

OD

ANTE RM755

SH

ELV

.S

HE

LV

.

PHARMACY752a

MG

MG

NURSE PRACTITIONER764

LOCKER ROOM778b

OFFICE775c

ELECT. CLOS.

766b

PATIENT LOUNGE769

PATIENT ROOM744

PATIENT ROOM743

PATIENT ROOM742

PATIENT ROOM741

PATIENT ROOM740

PATIENT ROOM739

PATIENT ROOM738

PATIENT ROOM737

PATIENT ROOM736

PATIENT ROOM735

PATIENT ROOM734

PATIENT ROOM723

PATIENT ROOM724

PATIENT ROOM725

PATIENT ROOM726

PATIENT ROOM727

PATIENT ROOM728

PATIENT ROOM729

PATIENT ROOM730

PATIENT ROOM731

PATIENT ROOM732

PATIENT ROOM733

NURSE7N

STATION

DIRTY764b

LINEN ALCOVE765b

C.O.W

HOYER

LIFT

ME

D.

CA

RT

CODE

CART

W

H

C

W

H

C

W

H

C

W

H

C

HOCLEAN

764a

SUPPLY

SOCIAL749

WORKER

C.O.W.

C

CARMEL'S747

OFFICE

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

CW

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

C

W

H

W

H

C

CC

CC

FSU

PS

PS

FSU

36

P

36

PP

P

CC

CC

BB36

BB36

MG

FEC

E

EE

E

E EE

EE

EE

O

VV

O

AA

A

EE

EEE

E EE

EE

EE

O

VV

O

AA

E

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E EE

EE

EE

OOV

V

AA

EE

EE

E

E

O

V O

V

A A

EE

EEE

E EE

EE

E O

VV

O

AA

EE

EEE

E EE

EE

EE

O

VV

O

AA

E

EE

EEE

E EE

EE

EE

O

VV

O

A

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E EE

EE

EE

O

VV

O

AA

EE

EEE

E

E

E

CL

E

E

E

E

E

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CLCLCL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CLCL

CA

CODE

CART

M

CA

WL

LHWS

WL

REF

DF

PY

X

TM

PY

X

DD

A

PY

X

SM

HOUSE

CART

TV IV WL

IVC WL CR

AS

H

CA

RT

M

MED.

CART

PY

X

TM

PY

X

SM

PYXDM

PYX

DA

PY

X

DD

A

PYX

DM

PYX

DA

COF

ICE

REF/

FRZREF/

FRZ

UC EC SH

LIN

EN

CA

RT

REF/FRZ

MW

TV

TV

WS

CA

CA

WS

WSLH

WL

WL

WL

WL

WL

WL WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

LH

LH

LH LH

LH

LH LH LH LH

CA CA

CA CA

CA CA CA CA CA

WL

WL

LHWS

WS

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

CA

LH LH LH LH LH LH LH LH LH LH

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WSWS WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WS

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WL

WLS H S H S H S H S H S H S H S H S H S H S H

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TVTVTV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

ABCDEFGHIJKL

1

2

3

4CHEMO

BIN

SH

ELV

.

RED

WASTE

BIN

PA

SS

-T

HR

U

36

365H

30

5H

30

5H

stack of

4 extra chairs

O

V

A

V

A

O

5H

3'-0"

4'-0"

4'-0"

4'-0"

COPIER

3'-3"3'-3"

NURSE PRACTITIONER764

36 5H

COPIER

3'-3"3'-3"

---765

MGE

MGE

FHC

E

FEC

FHCE

EWB

EXAM 771

ROOM

NOURISHMENT780

STATION

CLEAN HOLDING778

ROOM

SOILED777

HOLDING

REST 776

ROOM

NURSE7N

STATION

MEDICATION774

JAN. CL.773

TELE768

CLEAN HOLDING #2772

EQUIP. 782

STORAGE

EQUIP. 779

STORAGE

ICE

CORRIDOR 7NW

PATIENT ROOM721

TUBE FOOD781

STORAGE

REF

MW

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

OOV

V

AA

EE

EE

E

E

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

E E

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

EE

E E

EE

EE

E E

EE

EE

W

H

C

W

H

CS S

CO

PIE

R

S SS S S SS S S

C

W

H

WH

C

TV

STAIR

---

E

E

E

SC

SC

HOUSE

CART

O

V

A

V

A

O

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2 PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-2

PL-3

PL-10

PL-10

PL-11

PL-3

PL-3

PL-2

PL-3

PL-2

PL-3 PL-3PL-3 PL-3 PL-3 PL-3 PL-3 PL-3 PL-3

PL-6PL-2

5H

42

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CRASH

CART

EC UC

PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5

PL-5

PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

CHEMO

BIN

RED

WASTE

BIN

S

36

36

P

H H H H H

HHHHH

H H H H

HHHHHH

FP

E

EE

EE

E

H

PL-13

PL-5SB

SB

SC

SC

SC

CORRIDOR 7NE

POTENTIAL HOIST

LOCATION, IF

AUTHORIZED BY

OWNER

KRR

SRA, RFP, R

31

1

2

2

2 32

3

1

3

1

2

E

5H

5H

5H

5H

5H 60

36

72

72

84

PYXIS

CC

PYXIS

SC

PL-11

WOW

MED

REF

NDL/

STR

PYXIS

IVDD

SHP

PYXIS

CC

PYXIS

SC

WOW

MEDREF

NDL/

STR

PYXIS

IVDD

SW

SW

TM

TM

d

a

a

a

a

a

a

a

a

a

cb

cb

a

a

P

EWB

SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP

SHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHP

CODE

CART IVDF

LINE

CARTGS

BP

BP

EKGWOW

WOW

WOW WOW

WOW

WOW

SCALE

HOYERLINEN

CART

SGW

SGW

SC

WC

CB

O2

CB

O2

SW SW SW SW SW

SW SW

SW SW SW SW

SW SW SW SW SW SW SW SW SW SW

CA CA CA CA CA

CA CA

CA CA CA CA

CA CA CA CA CA

LH LH LH LH LH LH LH LH LH LH LH

LHLHLHLHLHLHLHLHLHLHLH

S

CA CA

CA CACA CACA CACA CACA

CLOSET766 SHP

CA CA CA CA CA CA

CA CACA CACA CACA CACA

H

ADA RESTROOM766a

ELEVATOR LOBBY700N

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

FTV

TV

CL

TV

CL

TV

CL

PL-14 PL-1A

SW

Project No. 06-104.024

No. Date Description

REVISIONS

01 05.22.09 FOR DEMOLITION

copyright date: 05.01.09

All drawings and written materials represented on this sheet constitute the copyrighted work and

are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in

part, nor may any of the drawings or written materials appearing within, be incorporated into

another work for any reason without the written consent of BAM Studio. This sheet must be

returned upon the request of the Architect.

No. Date Description

Valhalla Campus

Valhalla, New York 10595

Westchester Medical Center

Main Building

7 North Renovation

BAM StudioSecond Floor415 West Broadway

New York, NY10012

T: 646.522.5550

F: 646.349.5556www.bam-studio.com

NORTH

02 06.18.09 FOR COORDINATION

03 07.02.09 FOR MEP COORDINATION

04 07.10.09 FOR PRICING

05 08.04.09 FOR CLIENT REVIEW

06 08.19.09 FOR PRICING

CMC-7121 7 South Change Order N-1 GC/H/E/P

OGS-S4963

07 09.22.09 FOR ABATEMENT COORDINATION

10.26.09 FOR CLARIFICATION

08.28.09 FOR CLARIFICATION

08 11.24.09 FOR PERMIT AND CONSTUCTION

A-701.0.0

SEVENTH FLOOR

FURNITURE, FIXTURES

AND EQUIPMENT PLAN

FURNITURE, FIXTURES AND EQUIPMENT PLANA-701

1SCALE:1/8"=1'-0"

1

1

1

11

1

1

1

1

1 1 1 1 1 11 1 1 1

11 1 1 1 1 1 11 1 1 1

1

1

1

1

1

1

1

1

Westchester Medical Center

Oncology SuiteProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2010

site location:Valhalla, NY

vicinity mapvicinity map

Issues:Renovation to the seven floors of in patient rooms needed to be phased to maintain hospital capacity. One floor at a time was renovated in a rolling, phased plan.

Action:Incorporated feedback gleaned from the tours of the full scale mock-up, BAM created a design that meets the needs of staff, doctors, patients and their families.

Results:Renovation of the first of seven floors was completed and passed inspections for full occupancy. Additional phases of renovation are currently underway.

Page 14: Peter C Wilson - Portfolio

↑ Corridor and entry to executive training theater and conference room. ↑ Reception desk. ↑ Corridor from reception to conference room area. ↑ Reception area.

↑ Executive conference room. ↑ Executive training theater. ↑ Executive conference room.

lexisnexis

corporate headquartersProject Manager / Lead Designer BAM STUDIO ARCHITECTS

completed:2005

site location:New York, NY

vicinity map

Issues:Part of one of the world’s largest publish-ers, LexisNexis needed their headquarters to reflect their strength as a technically saavy information systems provider for high-level potential customers.

Action:Working closely with the facilities group, BAM met with key internal executives to gain insight and feed- back. We synthesized their facility needs with their strategic goal to utilize the latest technology.

Results:Technologically advanced environment viewed as a model facility. Executives and customers strongly approve.

Page 15: Peter C Wilson - Portfolio

↑ Ponte Vecchio - Florence ↑ Public Bath - Tivoli

↑ Marble S. Sebastiano fouri le Mura - Rome

↑ Fountain and Stair- Villa d’Este

↑ Etruscan Headress

↑ Etruscan Serpent Bracelet

↓ Vicinity Map Sketches/Notes - Venice ↓ Form and Massing Studies ↓ Lighting, Circulation and Spatial Studies

↑ Roman Bath - Rome

university of washington masters program architecture in rome program - Fall 2000

university of washington - master’s thesis a public bath in venice

Faculty:Frank Ching - DrawingDavid Miller - DesignTom Bosworth - History

Thesis Committee:David Miller - DesignTom Bosworth - History

sketchbook concept sketches