    Line 3 (South-North)

    Surco Carabayllo

    5 LinesTotal Length : 133 km

    Total Investment: US$12,000 MM(including currently operational

    LIne 1)

    5 LinesTotal Length : 133 km

    Total Investment: US$12,000 MM(including currently operational

    LIne 1)

    Line 5 (South-North)

    Chorrillos - Miraflores

    Line 4 (East-West)

    Ate Vitarte - Callao

    Line 2 (East-West)Ate Vitarte - Callao

    Line 1 (South-North)

    Villa El Salvador - San Juan deLurigancho

    BASIC NETWORK OF THE LIMA METRO

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    3/16

    LINE 2 AND FAUCETT GAMBETTA SECTION

    OF THE BASIC NETWORK OF THE LIMA METRO

    Line 2 has a capacity to

    transport more than 1 millionpassengers per day

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    4/16

    Location

    Lima andCallao

    Location

    Lima andCallao

    Design

    Build,Operate

    and

    Transfer

    Design

    Build,Operate

    and

    TransferInvestment

    US$5billion

    (estimated)

    Investment

    US$5billion

    (estimated)

    Modality: Co-financed

    Length: about 35 KmRoute: 13 districts

    Current project status: Profile approved by MTC (Ministry of

    Transport and Communication) Estimated Project Award date: Fourth quarter 2013

    D.B.O.T.

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    5/16

    35

    Stations

    35

    Stations

    2Deposit

    Yards

    2Deposit

    Yards

    12Districts

    12Districts

    2Third Ways

    2Third Ways

    2Connections

    COSAC and

    L1

    2Connections

    COSAC and

    L1

    35 Km

    Length

    35 Km

    LengthWholly

    Underground

    Wholly

    Underground

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    6/16

    Railway

    System HighStandards

    Technology

    HighStandards

    Technology

    AutomaticPilot

    Technology

    AutomaticPilot

    Technology

    ModernityTechnology

    ModernityTechnology

    PlatformDoorsTechnology

    PlatformDoorsTechnology

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    7/16

    Number of trains(6 cars per train)

    LINE 2FAUCETT AVE. GAMBETTA AVE.

    SECTION

    Capacity per train

    Demand(at start of operation)

    Frequency

    COSAC

    Line 1

    Demand (in 2030)

    8

    MAIN SPECIFICATIONS

    1,200 passengers per train

    More than 600 thousand passengers/day

    3 min. in rush hour and 4.5 min in off-peak time

    Interconnection

    More than 900 thousand passengers/day

    Interconnection

    35

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    8/16

    Simple

    TunnelSection

    Simple

    TunnelSection

    Two-WaySection

    Two-WaySection

    TBMBuilding method

    TBMBuilding method

    SegmentsLining

    SegmentsLining

    Tunnel

    SafetyTechnology

    SafetyTechnology

    Pressure

    Control

    Technology

    Pressure

    Control

    Technology

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    9/16

    StationsCut &

    CoverType

    Cut &

    CoverType

    CaveType

    CaveType

    Street level

    Court

    Mezzanine

    Platform

    Vertical connections

    Technical areas

    Service/office areas

    Station

    elements:

    Station

    elements:

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    10/16

    Other

    Elements

    Yards

    Maneuvering

    Yards

    Maneuvering

    ShaftsVentilation

    ShaftsVentilation

    Workshopsand deposit

    Workshopsand deposit

    ExitsEmergency

    ExitsEmergency

    MAIN SPECIFICATIONS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    11/16

    Electromechanical

    construction and equipmentUS$ 2.936 billion

    Rolling Stock and

    ExpropiationUS$ 1.089 billion

    Expenses and Contingencies US$ 529 million

    General Sales Tax (IGV) US$ 820 million

    TOTAL US$ 5.373 billion

    PRELIMINARY EXECUTION BUDGET

    Budget acc. to

    profile

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    12/16

    PPP

    DFBOTDFBOT

    Build

    Operate

    Transfer

    Build

    Operate

    Transfer

    Period

    35years

    35years

    5 yearsClosure and

    Construction of Stage 1

    5 yearsClosure and

    Construction of Stage 1

    30 yearsOperation and

    maintenance

    30 yearsOperation and

    maintenance

    Payments to theConcessionaire

    For

    Investment

    For

    Investment

    For

    Operation andMaintenance

    For

    Operation andMaintenance

    InvestmentFinancing

    Co-financingfor the Investment

    Co-financingfor the Investment

    CONCESSION SCHEME

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    13/16

    Start

    Construction

    StartOperation

    EndOperation

    Line 2Line 2

    600KPassengers

    per day

    600KPassengers

    per day

    918KPassengers

    per day

    918KPassengers

    per day

    35 yearsConcession Period

    Operation Stage

    Construction Stage

    Line 2 and Faucett

    Ave. Gambetta

    Ave. section

    Line 2 and Faucett

    Ave. Gambetta

    Ave. section

    Build andOperation Stages

    CONCESSION PERIOD

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    14/16

    CONCESSIONAIRE

    Provider of rolling stockConstructor (C) Operator (O)

    Must be a part of the Bidder

    General experience: Civil works in metro-type, underground

    railway transportation systems Experience period: Last 10 years

    Tunnel construction with TBM Construction of undergroundstations

    Specific experience 1 Project of 15 Km, 15 stations and

    investments for US$ 800 million or 4 Projects jointly comprising 20 Km, 20

    stations and investments of US$ 1 billion.

    Stay: No less than 7 years

    Assets: US$ 500 million

    May be a part of the Bidder (excluding)

    May be related to more than one Bidder, only asProvider (Contract of Provision of MR)

    General experience:

    Provision for one or more metro-typeunderground railway transportation systems

    Experience period: Last 03 years

    Specific experience:

    Annual production of 240 urban train cars(Metro) in average.

    Production of 20 trains with ATP per year,

    Trains should be equipped with GoA 4 or GoA3

    Stay: No less than 7 years

    Assets: US$ 400 million

    Must be a part of the Bidder.

    Specific experience: Experience period: no less than10 years Operation of at least one metro-type underground

    railway transportation system or Urban RailwaySystem, with more than 150 million passengers per

    year. The number of passenger cannot include passengers

    from more than one system.

    Assets: US$ 200 million

    Stay: During the entire concession period

    Technical Assistance Contract should be submitted if theOperator does not meet the requirements.

    Operating Technical Advisor demonstrates compliancewith requirements.

    Technical Advisors stay: No less than 10 years

    In such case, the operator: Experience period: no less than 3 years Assets: US$ 50 million

    OperatorOperatingTechnicalAdvisor

    The constructormust also demonstrate: 10 years of experience in supply and

    installation of Electromechanical Equipment in no less than 2 Lines, with alength of no less than 15 Km and usingAutomatic Train Protection (ATP)

    technology.

    SHORT-LISTING REQUIREMENTS

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    15/16

    Activity Proposed Date

    Aproval of Pre-Investment Studies Second quarter 2013

    Official Announcement

    Publication of official announcement and bidding terms First quarter 2013

    Short-Listing

    Submission of Envelope No. 1 Up to third quarter 2013Short-listing Results Third quarter 2013

    Contract

    Delivery of First Contract Draft First quarter 2013

    Delivery of the final version of the Contract Third quarter 2013

    Submission of Proposals

    Submission of Envelopes No. 2 and No. 3, Opening of Envelope

    No. 3 and Project AwardFourth quarter 2013

    SCHEDULE

  • 7/29/2019 Peru - The Metro of Lima and Callao March 2013.pdf

    16/16

    www.proinversion.gob.pe