Performance Reward Grant
June 2007
Rewardometer
Economic Development & Enterprise
• Y1 performance -
• Y3 outcome risk -
– 6*green, 4*amber, 1*red, 1*n/a
– 1*red = HSE [slow start, long lead time for interventions but 260 clients now referred]
– 2*green, 2*amber = skills (NEET) & growth (start-ups)
Classified Non-principal Road Maintenance
%Repairs
Unclassified Non-principal Road Maintenance
%Repairs
16 – 18 yr olds Not in Employment Education or Training
%NEET
EDE Reward-ometer
On target to achieve £1,479,038 (68%) of the £2,175,064 reward value available in this block.
We risk missing out on £696,025 (32%)- £1,479,038
- £2,175,064
Target % Reward ValueHSE 60% £522,019.20NEET 60% £522,019.20Roads (Classified) 100% £217,500.00Roads (Un - classified) 100% £217,500.00
%
Children & Young People
• Y1 performance -
• Y3 outcome risk -
– 3*green, 1*amber, 2*n/a
– 2*green, 1*red = exam results (KS2 Maths & 5 A-C GCSEs incl. English & Maths)
Permanent Exclusions from Schools
Exclusions
Fixed-Term Exclusions from Schools
PupilDays
Key Stage 2 - Maths
%Level 4
GCSE 5 A-C incl. English & Maths
%5 A-C
Stats Neighbours= 48.4
CYP Reward-ometer
On target to achieve £435,016 (20%) of the £2,175,064 reward value available in this block.
We risk missing out on £1,740,064 (80%)
- £435,016
- £2,175,064
Target % Reward ValueKS2 - Maths 0% £0.00GCSE 0% £0.00Exclusions (Fixed) 100% £108,754.00Exclusions (Perm) 100% £326,262.00
%
Healthier Communities & Older People
• Y1 performance -
• Y3 outcome risk -
– 1*green, 1*amber, 1*n/a
– 2*green, 1*amber = falls (interventions being delivered but innate risk higher)
4 Week Smoking Quitters
Quitters
Fracture Related Falls
Fallers
HCOP Reward-ometer
On target to achieve £2,262,083 (87%) of the £2,610,096 reward value available in this block.
We risk missing out on £348,013 (13%)
- £2,262,083
- £2,610,096
Target % Reward ValueSmoking 100% £870,032Obesity 100% £870,032Falls 60% £522,019
%
Safer & Stronger Communities
• Y1 performance -
• Y3 outcome risk -
– 4*green, 5*amber, 2*red, 5*n/a
– 4*green, 1*amber = crime (2007/8 target of 14% reduction unlikely to be hit, DV repeats should reduce now interventions in place)
Satisfaction with Bedfordshire County Council
%Satisfied
Non Biodegradable Waste
Tonnage
Biodegradable Waste
Tonnage
SSC Reward-ometer
On target to achieve £3,045,112 (78%) of the £3,915,144 reward value available in this block.
We risk missing out on £870,032 (32%)
- £3,045,112
- £3,915,144
Target % Reward ValueFear of Crime 60% £522,019.20Volunteering 60% £522,019.20Council Satisfation 100% £870,032.00Waste (Non bio) 100% £348,013.00Waste (Bio) 100% £522,019.00Sport 60% £261,009.60
%
Summary & Conclusion
• Y1 performance –
• Y3 outcome risk –
– majority of targets achieved / on track
– exam results is high risk – summer 2007 results will be critical
Overall Reward-ometer
On target to achieve £7,221,250 (66%) of the £10,875,384 reward value available in total.
We risk missing out on £3,654,134 (34%)
If we can turn the amber into green, we would achieve £9,135,320 (84%)
- £7,221,250
- £10,875,384
%
- £9,135,320