P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE – Universites Paris 6 & 7) for the H.E.S.S. collaboration HESS (high energy stereoscopic system) 28 th ICRC Tsukuba Japan - 5, August 2003

Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Performance of the H.E.S.S. camerasPascal Vincent

(LPNHE – Universites Paris 6 & 7)

for the H.E.S.S. collaboration

HESS (high energy stereoscopic system) 28th ICRC Tsukuba Japan - 5, August 2003

Page 2: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003Performance of the HESS cameras 28th ICRC Tsukuba Japan - 5, August 2003Pascal Vincent - LPNHE-ParisP.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

LPNHE-ParisJ-P.Denance, J.Guy, J-F.Huppert, P.Nayman, M.deNaurois, M.Rivoal, L.Rolland, J-P.Tavernet, F.Toussenel, P.Vincent

LLRL-M.Chounet, B.Degrange, G.Fontaine, P.Manigot

PCCP.Espigat, M.Punch

MPIK-HeidelbergG.Herman, A.Kohnle, C.Masterson, T.Saitoh

Page 3: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Requirements :

Low threshold ~ 120 GeVDynamic range up to few 10 TeVGood collection efficiencyEnergy resolution ~ 10-20%Fast trigger.Modularity : easy to repair

Fully embedded system

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

OG 2.5 Poster 2-P-112, A K Konopelko et al.

Page 4: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Camera Mechanics Camera Mechanics Modular system of 60 drawers of 16 phototubes each

Only 3 cables for power supply, central trigger and network.

WaterProof (pneumatic front lid protection against sun & water) Weight ~ 900 Kg

Page 5: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Winston cWinston coonesnes

In the front of the camera 960 Winston cones collect ~70% of light

Page 6: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Front-end electronics Front-end electronics

60 drawers of 16 PMs (photonis PMT XP 2960) : QE ~ 25%

+ active bases

DC-DC converter 0-1500 V

HV & current readout

Current limit

1 "Slow Control" card : High voltage control and monitoring

Temperature & Current monitoring

Counting scalers

2 cards with Analogue Memory ship (x8 PMTs).

Page 7: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Analogue MemoryAnalogue MemoryARS0ARS0

Analogue Memory ARS0 built for ANTARES experiment (SEI-Dapnia)

5 buffers /chip, 128 cells per channel.

Sampling @ 1 GHz

Readout ~ 1 Mhz

Controlled by two parameters

Readout window (~16 ns)Readout delay (50-70 ns)

Readout : Sampling or integrated charge mode

Page 8: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Readout & First level triggerReadout & First level triggerARS0

Connection to photo-tubes

Trigger channelsAnalogue

Fpga

8 x comparators

Adder

Enable/disable(4 channels)

outputlocal trigger

Fanout signalentry

Amplifications

Buffers

12 bits ADC

Digital

Multiplexor

Readout channels

Page 9: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Camera trigger based on sectorisation (x64 pixels)Camera trigger based on sectorisation (x64 pixels)

38 overlapping sectors38 overlapping sectors

Page 10: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

SvOutPlaceObject

Parallel transfer on 4(↗8) bussesAcquisition system

Readout systemReadout system

Page 11: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

LinearityHigh gain 1 ⇨ 200 eLow gain 10 ⇨ 1 600 e

Page 12: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

SvOutPlaceObject

Single e determination @ 2.105 of gain

Page 13: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Calibration System for the first camera

LED system

960 LEDs with programmable intensity from 0.6 to more than 10.000 ePulse width of ~ 2 nsSynchronisation < 1nsControlled by camera CPU

Camera response

Page 14: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Second Calibration System

LED system for gain estimation @ single e

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Page 15: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

First light june 11, 2002

Installation of the first camera, by the end of may 2002

Installation of the second camera, february 2003

New busses & CPU

© W.Hofmann

Page 16: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Camera 3 & 4 under constructionCamera 3 & 4 under construction

Camera 3Camera 4

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Busses x 4(↗8) busses

Page 17: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Camera 3 has left construction area for Camera 3 has left construction area for NamibiaNamibia

August 31, 2003for the opening ceremony of the 28th ICRC

Page 18: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Acquisition speedAcquisition speedLimited by :

readout of the analogue memories.data transfer on the drawer's busses. readout by the CPU.

Dead time @ 250 Hz

Page 19: Performance of the H.E.S.S. cameras · 2016-01-28 · P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

Camera installation Camera installation scheduleschedule

2002 2003 2004

Camera 1

Camera 2+Upgrade of camera 1

Camera 3

Camera 4+Upgrade of Cameras 1, 2 & 3

June

Fevrua

ry

Septem

ber

December

P.Vincent LPNHE-Paris for H.E.S.S. collaboraton 28th ICRC - Tsukuba - Japan - 5, August 2003

That's all folks!