Upload
buck
View
91
Download
8
Tags:
Embed Size (px)
DESCRIPTION
Performance-Based Communication and Surveillance (PBCS). Closing remarks. Presented to:ICAO Asia-Pacific RCP/RSP Workshop (Bangkok , Thailand). By:Tom Kraft [email protected]. Date: 13-14 May 2013. APAC RCP/RSP Workshop Program. RNP. Safety realization. C. N. ATM. RCP. RSP. S. - PowerPoint PPT Presentation
Citation preview
Federal AviationAdministrationPerformance-Based
Communication and Surveillance (PBCS)Closing remarks
Date: 13-14 May 2013
Presented to: ICAO Asia-Pacific RCP/RSP Workshop (Bangkok, Thailand)
By: Tom [email protected]
APAC RCP/RSP Workshop Closing13-14 May 2013
2Federal AviationAdministration
APAC RCP/RSP Workshop ProgramTime(min)
Session 1 – Understanding RCP/RSP & PBCS Discussion Leader
20 Introductory Remarks Fredric LecatTom Kraft
45 ICAO SARPS – Guidance Paul Radford45 Global Operational Data Link Document (GOLD) Tom Kraft15 Derivation of RCP/RSP specifications Tom Kraft35 Introduction to Performance Based Communication and
Surveillance (PBCS)Paul Radford
30 Qualification of service provision: ANSP and CSP ARINC/SITA30 Qualification of aircraft equipment for certification Jerome Condis15 Operational authorization to use data link Tom Kraft45 Post-Implementation Monitoring Guidance Paul Radford30 Performance monitoring in the Fukuoka FIR Koji Nakaitani20 Interpreting the results Paul Radford10 GOLD Performance Analysis Tool Paul Radford
APAC RCP/RSP Workshop Closing13-14 May 2013
3Federal AviationAdministration
Safety realization• Benefits come from ATM (e.g. reducing separation minima)
• PBN (e.g. RNP) by itself does NOT give you ATM
• PBCS implementation plays important role in ATM– Recognized problem
– Endorsed GOLD
– Endorsed Regional PBCS implementation plan
– Conduct PBCS workshops
– Implement PBCS in the Region
2008 2009 2010 2011 2012 2013 2014 2015
11
22
3NAT Region
APAC Regions
44
5
What is missing?12345
ATMRCPRNP
RSPS
NC
APAC RCP/RSP Workshop Closing13-14 May 2013
4Federal AviationAdministration
RCP/RSP Workshop Aim – Day 1
• Promote PBCS implementation– What is PBCS and what are RCP and RSP
specifications?– What amendments are being proposed for
Annexes 6 and 11, Doc 4444, Doc 8168, and Doc 9869 to include PBCS provisions?
– What guidance material is provided by GOLD?
APAC RCP/RSP Workshop Closing13-14 May 2013
5Federal AviationAdministration
RCP/RSP Workshop Aim – Day 1
• Promote PBCS implementation– How do RCP/RSP specifications relate to C and S
requirements for application of separation minima?
– Why and how does PBCS effectively apply RCP/RSP specifications to ensure safe application of ATM through prescriptive requirements, initial qualification and continued operational safety
– How does post-implementation monitoring, analysis and corrective action improve performance?
APAC RCP/RSP Workshop Closing13-14 May 2013
6Federal AviationAdministration
APAC RCP/RSP Workshop Program
Time(min)
Session 2 – Planning for PBCS implemenation in the APAC Region
Discussion Leader
30 State of the data link implementation in the South Pacific
Toby Farmer
15 An overview of NAT PBCS Implementation Plan Tom Kraft
45 General Discussion on APAC PBCS Planning and Implementation
Frederic Lecat,Tom Kraft and Paul Radford
15 Wrap-up/ Summary of outcomes Li Peng and Frederic Lecat
APAC RCP/RSP Workshop Closing13-14 May 2013
7Federal AviationAdministration
RCP/RSP Workshop Aim – Day 2
• Promote a timely APANPIRG conclusion to endorse an APAC Regional PBCS Implementation Plan– Develop draft plan– To complement APAC Regional
PBN Implementation Plan– Compatible with the global air navigation planning
and performance-based concepts to ensure effective and harmonized PBCS implementation
ATMRCPRNP
RSPS
NC
APAC RCP/RSP Workshop Closing13-14 May 2013
8Federal AviationAdministration
NAT PBCS implementation planning tasksTASK ID TASK DESCRIPTOR COMPLETE BY LEAD
GENERAL PROJECT DEVELOPMENT & MANAGEMENT1 Plan NAT IMG/38 and NAT SPG/47 NAT CNSG2 Target dates NAT IMG/38 and NAT SPG/47 NAT IMG3 RCP/RSP specifications NAT SPG/47 NAT SARSIG4 NAT PBCS Workshop(s) 2012-2013 ICAO/ States
DOCUMENTATION
5 Operational concepts NAT IMG/42and NAT SPG/49NAT ATMG in coordination with CNSG
6 GOLD amendments NAT IMG/42 and NAT SPG/49 GOLD ad-hoc group
7 Contingency procedures NAT IMG/42 and NAT SPG/49 NAT ATMG/ CNSG
8 Restoration of service NAT IMG/42 and NAT SPG/49 NAT ATMG/ CNSG
9 Flight plan requirements
a) NAT IMG/42 and NAT SPG/49 (as part of the NAT SUPPs PfA) and GOLD
b) amend Doc 4444 target date - NAT SPG/50
NAT CNSGICAO (Global)
10 PfA for NAT Regional Supplementary Procedures (NAT SUPPS) NAT IMG/42 and NAT SPG/49 NAT CNSG NAT ATMG
11 AIPs and other State documents supporting NAT SUPPS Consistent with Task 10 States14 GOLD proposal for RCP/RSP compliance determination NAT IMG/42 and NAT SPG/49 CNSG15 GOLD proposal for guidelines on operator eligibility NAT IMG/42 and NAT SPG/49 OPS/AIR
IMPLEMENTATION ACTIVITIES12 ATC automation changes Before the start of operational trials of
RLongSM or RLatSM. NAT ANSPs
13 Confirm actual CPDLC and ADS C performance Prior to operational implementation ANSPs, DLMA, CNSG, SARSIG
AIRWORTHINESS AND OPERATIONAL ELIGIBILITY
16 State regulations and guidance material End of 2014, Prior to operational implementation of RLatSM or RLongSM
SOG, States, ANSPs, Users
POST IMPLEMENTATION TASKS17 Post-implementation monitoring ANSPs, DLMA,
CNSG
Completed On track
APAC RCP/RSP Workshop Closing13-14 May 2013
9Federal AviationAdministration
APAC PBCS implementation planning
• Did the workshop provide the APAC Region with an understanding of PBCS and RCP/RSP specifications?
• Is there a convincing argument for PBCS implementation in the APAC?– What should be considered in planning for APAC PBCS
implementation?
– What tasks should be identified, who is lead and involved in competing the task and what is the schedule?
APAC RCP/RSP Workshop Closing13-14 May 2013
10Federal AviationAdministration
APAC PBCS Implementation PlanTASK ID TASK DESCRIPTOR COMPLETE BY LEADGENERAL PROJECT DEVELOPMENT & MANAGEMENT1 Plan2 Target dates3 Applicability of RCP/RSP specifications4 PBCS Workshop(s)DOCUMENTATION5 Operational concepts6 GOLD amendments7 Contingency procedures8 Restoration of service9 Flight plan requirements10 PfA for NAT Regional Supplementary Procedures (NAT SUPPS)11 AIPs and other State documents supporting NAT SUPPS14 GOLD proposal for RCP/RSP compliance determination15 GOLD proposal for guidelines on operator eligibilityIMPLEMENTATION ACTIVITIES12 ATC automation changes13 Confirm actual CPDLC and ADS C performanceAIRWORTHINESS AND OPERATIONAL ELIGIBILITY16 State regulations and guidance materialPOST IMPLEMENTATION TASKS17 Post-implementation monitoring
APAC RCP/RSP Workshop Closing13-14 May 2013
11Federal AviationAdministration
Are more PBCS workshops needed?
• When and where?
APAC RCP/RSP Workshop Closing13-14 May 2013
12Federal AviationAdministration
APAC RCP/RSP Workshop Closing13-14 May 2013
13Federal AviationAdministration
APAC RCP/RSP Workshop Closing13-14 May 2013
14Federal AviationAdministration
Global
J2011
F M A M J J A S O N DD
Plan update• Target dates • Performance
specifications
J2012
F M A M J J A S O N D J2013
F M A M J J A S O N D J F M
NAT States/ANSPs/DLMA
GOLD, NAT Doc 006/007• ADS-C conformance monitoring• Procedures for reroutes, non-normal
operations• Flight plan indicators for specifications• Operator/aircraft approval guidance update• Technical/monitoring updateGuidance on operational approvalDraft PfA NAT Doc 7030 - RLongSM, RLatSM
Proposed PANS/ATM & Draft GOLD Amendment
GOLD performance monitoring
New York – < 2010 Gander – 1Q/2011Shanwick – 4Q/2010 Santa Maria – 2Q/2011
Reykjavik –3Q/2011
Shannon –1Q/2013Bodo – TBD
6GOLD Jun 2010
12 12 11, 1612
DLMA Jun 2009
Plan DraftJun 2008
NAT SPG/47
NAT SPG/48
NAT SPG/49
RLongSM Trial
Data Link Mandate
State AIPs & other docs
6, 9
Endorsed RCP/RSP
Plan
Proposed GOLD AmendmentNAT Doc 006/007
Draft PfA NAT Doc 7030
12th ANC
Proposed PANS/ATM & GOLD Amendment
6, 9
NAT SPG/49• Adopt GOLD
Amendment • Process PfA
OPLINKPOPLINKP
NAT Groups1, 2, 3 5, 6, 7, 8, 9, 14, 15 101
6, 10
GOLD AmendmentPfA NAT Doc 7030
4, 13, 174
RCP/RSP Workshops
NAT PBCS implementation schedule (1 of 2)
APAC RCP/RSP Workshop Closing13-14 May 2013
15Federal AviationAdministration
Global
J2014
F M A M J J A S O N DD J2015
F M A M J J A S O N D J2016
F M A M J J A S O N D J F M
NAT States/ANSPs/DLMA
GOLD performance monitoringState AIP and other documents
Operational readiness
GOLD amendment Jun 2013PANS/ATM amendment Nov 2014
NAT SPG/50
NAT SPG/52
6, 9
NAT Groups
GOLD NAT adoptionPfA NAT Doc 7030
4, 11, 13, 16, 17
17
Coordination
Program management
11, 13, 16 Performance-based
Concept RLongSM
RLatSMNAT
SPG/51
6, 10
9
NAT PBCS implementation schedule (2 of 2)