1

PEO Ships-M

Col Gary WarnerMarine Corps Advisor, PEO Ships

[email protected]

PEO Ships Brief to NDIA26 January 2005

Page 2: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

2

PEO Ships-MPEO Ships Mission and Vision

Mission

PEO Ships acquires and supports the current and future Surface Fleet:

We translate warfighter requirements into combat capability, producing and supporting ships, boats, and craft from cradle to grave, enabling our nation and its allies to project presence in peace, power in war, and assure access anytime

Vision

PEO Ships is a focused Navy team, providing the world’s best ship innovation, acquisition, lifecycle support, and disposal leadership

Page 3: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

3

PEO Ships-M

MPF(F)

We Are Ships From Cradle To Grave

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Production & Deployment

Operations & Support

JHSV

LCSLPD 17

T-AKE

LHD 8 CG 47

DDG 51

JHSS

LCAC(X)

FFG 7

LCAC

DD 963

DD(X)

LHA 6

Page 4: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

4

PEO Ships-MConcept Refinement and Technology Development

LCAC(X)

• ICD development initiated Jun 05• Functional Area Analysis (FAA) draft completed Aug 05

• Functional Needs Analysis (FNA) draft completed Sep 05

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Production & Deployment

Operations & Support

JHSS

• Initial Capabilities Document in draft • Analysis of Alternatives to

commence in FY07• Preliminary Design/ Contract Design

scheduled for FY08-FY11• Detail Design and Construction

beginning in FY12

Page 5: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

5

PEO Ships-MConcept Refinement and Technology Development

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Production & Deployment

Operations & Support

JHSV

• MOA signed by Army and Navy merging HSC and TSV into JHSV under Navy Program Office (Jan 05)

• ADM designating Navy lead Apr 05• Focused AoA commenced Apr 05• ICD validated 1 Nov 05

Page 6: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

6

PEO Ships-MHSV Designs Assessed

Known Military Designs

Hybrid Designs

LM-LCS GD-LCS

INCAT 112

MDV-300

Austal 126

TSL - 140Austal 105

Mono-Hull Semi-Swath TrimaranWave Piercing Surface Effect

Known Commercial Designs

Page 7: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

7

PEO Ships-MConcept Refinement and Technology Development

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Production & Deployment

Operations & Support

MPF(F)

• MNS signed, May 2001• Milestone A DAB approval, Dec 2002• AoA completed, Apr 2004• RDT&E Risk Reduction activities• Senior DoN review• MPF(F) “hybrid squadron” finalized

Page 8: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

8

PEO Ships-M

• Squadron is 14 ships

• 6 hulls: 2 hot production lines, 1 new design

• Full MEB (1 vertical battalion and 2 surface battalions) are selectively offloadable

– Personnel for second surface battalion are on Sea Base

• 11 of 14 ships built to commercial survivability standards (minor enhancements), 3 ships to military survivability standards

• MLP required for surface interface

• Meets delivery timeline for vertical and surface battalions

• Significant Industrial Base stability

T-AKE

3• Lightship Displacement: 25,700 MT• Landing Spots: 2/ship• Personnel: 194/ship• Ship Speed 20 kts

1LHD • Lightship Displacement: 28,540 MT

• Landing Spots: 9/ship• Personnel: 3000/ship• Ship Speed: 22 kts

• Lightship Displacement: 36,289 MT• Landing Spots: 2/ship• Personnel: 345/ship (+500 surge)• Ship Speed 24 kts

LMSR

3

2LHA(R) • Lightship Displacement: 30,862 MT• Landing Spots: 9/ship• Personnel: 3000/ship• Ship Speed: 22 kts

MLP(w/Troops)• Light Ship Displacement: 28,423 MT• Landing Spots: VERTREP• Personnel: 1300/ship• Ship Speed 20 kts

3

MPF(F) Squadron

2

Legacy Dense Pack • Lightship Displacement: 19,900 MT• Landing Spots: 1/ship• Personnel: 62/ship• Ship Speed 18 kts

Page 9: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

9

PEO Ships-M

Landing Platform Technologies

MPF(F) Technology Development Efforts

Page 10: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

10

PEO Ships-M

Landing Platform Technologies

MPF(F) Technology Development Efforts

Page 11: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

11

PEO Ships-MMPF(F) Technology Development Efforts

Skin to Skin

Page 12: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

12

PEO Ships-M

• Provide ISO container and vehicle transfer between ships

• Facilitate personnel transfer• Accomplish series of at-sea demonstrations to validate

systems and prove operational procedures• Develop crane load motion control system

Skin-to-Skin Mooring and Cargo Transfer

Page 13: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

13

PEO Ships-M

Advanced Cargo Handling

MPF(F) Technology Development Efforts

Vehicle Maneuvering Testing

Page 14: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

14

PEO Ships-M

LHA 6

• Replace LHA Class Amphibious Assault Ship• Milestone A completed Jul 2001• Program redirected by DoN leadership Capabilities Letter, Apr 2004• Restructured to “aviation variant”• Procurement funding for lead ship, FY07 (PB06)• Received Milestone B approval 11 January 2006

System Development and Demonstration

Concept Refinement

TechnologyDevelopment

Production & Deployment

Operations & Support

System Development& Demonstration

Page 15: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

15

PEO Ships-MSystem Development and Demonstration

Concept Refinement

TechnologyDevelopment

Production & Deployment

Operations & Support

System Development& Demonstration

LCS

• Achieved MS A decision and program initiation, May 2004

• Detail Design & Construction contracted to Lockheed Martin & General Dynamics

• First Ship designated Freedom (LCS 1); keel laid 2 June 2005

• 2nd ship (GD) keel laid 19 January 2006

DD(X)

• DD(X) ORD approval, Jan 2004• System-level PDR completed, Mar 04• Ten Engineering Development Models

completed CDR

• Completed ship CDR, Sep 2005

• Received MS B approval, Nov 2005

Page 16: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

16

PEO Ships-M

LHD 8

• Contract awarded, 2001• Construction started, May 2003• Keel laid Feb 2004• Aux electrical drive for low speed fuel efficiency• Electrical auxiliary drive will be used in LHA 6• LHD 8 delivery scheduled, Feb 2008

Production and Deployment

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Operations & Support

Production & Deployment

Page 17: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

17

PEO Ships-M

T-AKE

• NASSCO awarded contract for Detail Design & Construction Contract, Oct 2001• Lead ship construction started, Sept 2003• 5 ships under construction

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Operations & Support

Production & Deployment

Production and Deployment

Page 18: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

18

PEO Ships-M

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Operations & Support

Production & Deployment

LPD 17

• Ship christening 2003• LPD 17 at-sea builder’s trials completed, Apr – May 2005• Acceptance Trials completed, Jun – Jul 2005• Ship delivered, Jul 2005• Crew moved aboard, Aug 2005• Commissioned, 14 Jan 2006

Construction underway for LPD 18, 19, 20, 21

Production and Deployment

Page 19: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

19

PEO Ships-MShips Operations, Support and Disposal

DD 963• Decommissioning

completed in 2005

FFG 7• 30 will remain in service• Upgrades include new

SSDGs, reverse osmosis plants, COTS slewing arm davits, Mk 53 Nulka and Mk 15 CIWS Blk 1B

• Removes Mk 13 launchers

CG 47

• 22 CGs to receive capability upgrades

• Five Baseline 1 cruisers decommissioned

• Phase 1 CG Mod starting in FY 06 with HM&E and Combat System stand alone packages

• Phase 2 CG Mod Integrated Combat Systems full-up package starting in FY 08 CG 52

Concept Refinement

TechnologyDevelopment

System Development& Demonstration

Production & Deployment

Operations & Support

DDG 51

• 62 Ships awarded and appropriated; 48 delivered

• 9 remaining ships to be constructed at BIW

• 5 remaining ships to be constructed at NGSS

• Final 18 ships are awarded under the FY98-FY01 MYP or FY02-FY05 MYP

LCAC• 73 craft to receive SLEP• 8 craft completed SLEP

Page 20: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

20

PEO Ships-MIn conclusion

• 2005 was a busy year at PEO Ships• 2006 looks to be the same• MPF(F) R&D is work in progress• Industry day for HSV is coming• No small boat requirements yet• LHA-3 is gone, LHA-6 is coming, LHA-7 is an unknown

Page 21: PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships Gary.Warner@Navy.Mil PEO Ships Brief to NDIA 26 January 2005

21

PEO Ships-M

Questions