KCRC WEST RAILKCRC WEST RAILCCCC--300300
TseunTseun Wan Station and Wan Station and Approach TunnelsApproach Tunnels
PentaPenta OceanOcean-- KierKierJoint VentureJoint Venture
22
TseunTseun Wan Station and Approach TunnelsWan Station and Approach Tunnels
•• Contract No. : CCContract No. : CC--300300
•• Client : KCRCClient : KCRC
•• Consultant : Atkins China Ltd.Consultant : Atkins China Ltd.
•• Contractor : Contractor : PentaPenta Ocean Ocean –– Kier Joint VentureKier Joint Venture
•• Contract Period : MarContract Period : Mar--1999 to Nov1999 to Nov--20032003
•• Duration : 4.5 yearsDuration : 4.5 years
•• Contract Sum : 1.7 BillionsContract Sum : 1.7 Billions
55
Presentation: Presentation: Construction Sequences and MethodsConstruction Sequences and Methods
1.1. Tunnel ConstructionTunnel Construction2.2. Box Culvert Construction and DiversionBox Culvert Construction and Diversion
Ma Ma TauTau Pa CulvertPa CulvertTai Hoi CulvertTai Hoi CulvertChung Hang Culvert Chung Hang Culvert
3.3. Station Structure Construction Station Structure Construction
4.4. Difficulties & Problems EncounteredDifficulties & Problems Encountered
66
Southern Transition Tunnel (STT) &Southern Transition Tunnel (STT) &Southern Approach Tunnel (SAT)Southern Approach Tunnel (SAT)
-- ~280m South of Station Connected to BD~280m South of Station Connected to BD--320 (320 (TsingTsing TsuenTsuen Tunnel)Tunnel)-- CutCut--andand--cover Tunnel & Design for Bottomcover Tunnel & Design for Bottom--up Constructionup Construction-- ““Top DownTop Down”” Construction for the Tunnel Underneath Construction for the Tunnel Underneath
Tai Ho Culvert and Ma Tai Ho Culvert and Ma TauTau Pa CulvertPa Culvert-- Max depths of Excavation ~ 22 mMax depths of Excavation ~ 22 m
77
Stage 1Stage 1--Construct Propping Slab for Construct Propping Slab for
supporting Ma supporting Ma TauTau Pa Culvert Pa Culvert --Construct tunnel roof slab for Construct tunnel roof slab for
supporting Tai Ho Culvertsupporting Tai Ho Culvert-- Culvert constructionCulvert construction-- Construct SAT between culvertsConstruct SAT between culverts
Construction Sequences for South TunnelConstruction Sequences for South Tunnel
Stage 2Stage 2Demolish old culvertDemolish old culvertTop down construction at Ma Top down construction at Ma TauTau
Pa and Tai Ho CulvertsPa and Tai Ho CulvertsDivert Wing Shun Street and Divert Wing Shun Street and
commence tunnel constructioncommence tunnel construction
88
North Transition Tunnel (NTT) Northern Approach Tunnel (NATNorth Transition Tunnel (NTT) Northern Approach Tunnel (NAT))-- ~320m North of Station Connected to DB~320m North of Station Connected to DB--350 (Tai Lam Tunnel)350 (Tai Lam Tunnel)-- CutCut--andand--cover Tunnel & Design for Bottomcover Tunnel & Design for Bottom--up Constructionup Construction-- ““Top DownTop Down”” Construction for the Tunnel Underneath Construction for the Tunnel Underneath
-- Chung Hung CulvertChung Hung Culvert-- New Intake Structure New Intake Structure fofo WSDWSD’’s s TsuenTsuen Wan Central Salt Water Wan Central Salt Water
Pumping StationPumping Station-- Diverted Hoi Diverted Hoi HingHing RoadRoad
99
Construction Sequence for North TunnelConstruction Sequence for North Tunnel
Stage 1Stage 1Complete NTT Complete NTT Construct Propping Slab for Construct Propping Slab for HuiHui
HingHing RoadRoadDivert Chung Hang CulvertDivert Chung Hang Culvert
Stage 2 Stage 2
Divert Flow for TWPS Intake and Divert Flow for TWPS Intake and demolish old Intake demolish old Intake
Divert Divert HuiHui HingHing Road and demolish Road and demolish old roadold road
ReRe--provision of Chung Hang Culvertprovision of Chung Hang Culvert
1010
Tunnel Construction: Protection of Existing Utilities Tunnel Construction: Protection of Existing Utilities During Diaphragm Wall ConstructionDuring Diaphragm Wall Construction
Guide wall between utilities
Steel frame for enclosing utilities
1111
Tunnel Construction: Tunnel Construction: Supporting of Existing Utilities before ExcavationSupporting of Existing Utilities before Excavation
1212
•• ffffff
Tunnel Construction: PreTunnel Construction: Pre--LoadingLoading
fff
Pre-Loading at 2nd Layer of Strut
Backing Concrete between Walling and Diaphragm Wall
Struts Hanged on the Brackets
1313
Tunnel Construction: PreTunnel Construction: Pre--LoadingLoading
Set up for Pre-loading
Insert Shim Plates
Release the Loading
1515
Top Down Construction: Top Down Construction: Strut Installation and ExcavationStrut Installation and Excavation
--Stage 1Stage 1Install 1Install 1stst layer strut & prelayer strut & pre--loadingloadingDewater to 1 m below required Dewater to 1 m below required levellevelExcavate to below 2Excavate to below 2ndnd of strutof strut
1616
--Stage 2Stage 2Install of 2Install of 2ndnd layer strut & layer strut & prepre--loadingloadingDewater 1 m below Dewater 1 m below formation levelformation levelExcavate to formation levelExcavate to formation level
1818
Stage 4Stage 4i) Construct Base slab i) Construct Base slab
-- Formwork erection & Formwork erection & concretingconcreting
1919
Stage 5Stage 5--Fill mass concrete between Fill mass concrete between base slab and diaphragmbase slab and diaphragm--Remove struts Remove struts --Construct wall and roof Construct wall and roof slabslab
2020
Stage 6Stage 6-- Backfill the gap between Backfill the gap between
tunnel wall and diaphragm walltunnel wall and diaphragm wall-- Remove strut and backfillingRemove strut and backfilling
Stage 7Stage 7-- Backfilling and removal of strutsBackfilling and removal of struts
2626
Collapse of FormworkCollapse of Formwork-- Slump of concreteSlump of concrete-- Pouring rate of concretePouring rate of concrete
11
Ma Ma TauTau Pa Culvert Pa Culvert -- Stage 1 Construction: Stage 1 Construction: -- Construct diaphragm wall and propping slabConstruct diaphragm wall and propping slab-- Construct culvert Bay 8 and Bay 9 over propping slabConstruct culvert Bay 8 and Bay 9 over propping slab-- Divert Wing Shun Street over the culvert (Bay 5 to Bay 11)Divert Wing Shun Street over the culvert (Bay 5 to Bay 11)
Propping Slab & Retaining Wall
Bay 6
Bay 5
Bay 7
Bay 8
Bay 11
Bay 10
Bay 9
*Existing Wing Shun to be diverted after completion
of Bay 5 to Bay 11
*Diaphragm Wall cannot be constructed until
existing culvert has been diverted
Diaphragm WallSlurry wall to -9 mPDact as water cut-off
Stage 2 connectionfor Bay 1 to Bay 4
Bay 4
Bay 3
22
Stage 1:Stage 1:Completion of culvert construction Bay 5 to Bay 11 (Dec 2000)Completion of culvert construction Bay 5 to Bay 11 (Dec 2000)
Bay 10 & 11
Bay 5, 6 & 7
Bay 8 & 9
33
Stage 2:Stage 2:Divert Wing Shun Road over box culvertDivert Wing Shun Road over box culvertDemolish existing culvert for tunnel construction after completDemolish existing culvert for tunnel construction after completion of ion of
culvert diversion and construction (Mar 2001)culvert diversion and construction (Mar 2001)
Propping Slab & Retaining Wall
44
Hacking couplers at DWHacking couplers at DW
Propping Slab
Box Culvert
Tunnel Box to be constructed
by “Top Down” Method
Wing Shun Street
Tie beam between RWover culvert roof slab
Tie beam between RW
55
Water come from theweep pole of RW
Propping Slab
Box culvert (Bay 8 & 9)over propping slab
Tie beam between RWover culvert roof slab
77
Second Stage Second Stage Diversion and ConnectionDiversion and Connectionfor Ma for Ma TauTau Pa Box Culvert Pa Box Culvert
Criteria:Criteria:•• 3 Cells3 Cells•• No Blockage at Wet Season (1 Apr No Blockage at Wet Season (1 Apr –– 31 Oct)31 Oct)•• Allow to Block Allow to Block ““One CellOne Cell”” during Dry Season during Dry Season
(1 Nov (1 Nov -- 31 Mar) by DIA Report31 Mar) by DIA Report
Considerations:Considerations:-- ProgrammeProgramme-- Diversion and Connection MethodsDiversion and Connection Methods
(1+1+1 or A+B+C)(1+1+1 or A+B+C)
88
ProgrammeProgramme and Diversion Method Considerationand Diversion Method Consideration
2nd Stage”-Diversion and Connection
for Bay 1 to Bay 4 Programme: Jan 01 – Mar 01 (3 months)
Delay will affect Tunnel Construction
1st Stage- Construction of diaphragm wall,
propping slab and Bay 5 to Bay 8
Programme: Jan 00 - Dec 00 (12 months)Delay will affect Culvert Connection
& Wing Shun StreetDiversion
Bay 11
Bay 10
Bay 9
Bay 8
Bay 7
Bay 6
Bay 5
Bay 4
Bay 3
99
Stage 1Stage 1-- Drive new sheet piles and leftDrive new sheet piles and left--in old sheet piles to form waterin old sheet piles to form water--tight cofferdamtight cofferdam-- Install the strut systemInstall the strut system-- Grout curtain is to be installation underneath box culvertGrout curtain is to be installation underneath box culvert
Cell BCell A Cell C
Sheet pile to be cut
Grout Curtain
1010
Stage 2Stage 2-- Block Cell B, water flow at Cell A and Cell CBlock Cell B, water flow at Cell A and Cell C-- Demolish Cell B roof slab for temporary wall installationDemolish Cell B roof slab for temporary wall installation
Stage 1 Restrain Stage 1 Restrain -- Reaction bock fixed on Reaction bock fixed on
old culvert roof slabold culvert roof slabCell B
Cell A Cell C
1111
Stage 3Stage 3-- Relocation stop gates to Cell A, water flow at Cell B and Cell Relocation stop gates to Cell A, water flow at Cell B and Cell CC-- Install struts and provide stage 1 restraintInstall struts and provide stage 1 restraint-- Demolish Cell A and excavate to Demolish Cell A and excavate to --2.15 2.15 mPDmPD-- Construct New Cell A (B1, B2, B3 & B4) and New Cell B (B4)Construct New Cell A (B1, B2, B3 & B4) and New Cell B (B4)
Cell CCell B
Cell A
1212
Stage 4Stage 4-- Remove the bulkheads at New Cell A at outfallRemove the bulkheads at New Cell A at outfall-- Relocation stop gates to Cell C, so water flow at New Cell A anRelocation stop gates to Cell C, so water flow at New Cell A and Cell Bd Cell B-- Demolish Cell C roof slab for temporary wall installation Demolish Cell C roof slab for temporary wall installation
Cell ACell B Cell C
1313
Stage 5Stage 5-- Relocation stop gates to Cell B, so water flow at New Cell A anRelocation stop gates to Cell B, so water flow at New Cell A and Cell Cd Cell C-- Remove stage 1 restraint and provide stage 2 restraintRemove stage 1 restraint and provide stage 2 restraint-- Demolish Cell BDemolish Cell B-- Excavate to Excavate to --2.5mPD and construct New Cell B 2.5mPD and construct New Cell B
Cell BCell CCell A
1414
Stage 6Stage 6-- Remove bulkheads of Cell B at OutfallRemove bulkheads of Cell B at Outfall-- Relocate stop gates to Cell C, so water flow at New Cell A and Relocate stop gates to Cell C, so water flow at New Cell A and New Cell BNew Cell B-- Demolish Cell CDemolish Cell C-- Excavate to Excavate to --2.5mPD and construct New Cell C2.5mPD and construct New Cell C
Cell BCell CCell A
1515
Tai Ho Culvert Construction:Tai Ho Culvert Construction:Stage 1Stage 1-- Construct diaphragm wall and tunnel roof slab (STT Construct diaphragm wall and tunnel roof slab (STT –– S23 to S27)S23 to S27)-- Construct Culvert Bay 9 and Bay 11 over tunnel roof slabConstruct Culvert Bay 9 and Bay 11 over tunnel roof slabStage 2: Stage 2: Diversion and connectionDiversion and connection
Diaphragm Wall cannot be constructed until
existing culvert has been diverted
Diaphragm Wall
Tunnel Roof Slab
Bulkheads at precast culvert constructed
under CC-350 l
Stage 1
Stage 2 – Diversion & Connection
Bay 12
Bay 10
Bay 6 Bay 3
Bay 2
Bay 1
Bay 9
Bay 8
Bay 7
Bay 5
Bay 4
Bay 11
1717
Tai Ho Culvert and Tunnel Roof Slab (NTT)Tai Ho Culvert and Tunnel Roof Slab (NTT)
Bay 9 & 10Bay 11 & 12
Bay 6, 7 & 8
1919
Stage 1 Construction: Stage 1 Construction: Rebar Fixing for Tunnel Roof Slab (NTT)Rebar Fixing for Tunnel Roof Slab (NTT)
2121
TrimmeTrimme concrete to stop water seepageconcrete to stop water seepage-- Timing for concreting?Timing for concreting?-- Thickness of concrete?Thickness of concrete?-- Special technique?Special technique?
2222
Second Stage Second Stage Diversion and ConnectionDiversion and Connection
for Tai Ho Culvert Box Culvertfor Tai Ho Culvert Box Culvert
DIA ReportDIA Report•• Allow to Block Allow to Block ““Two CellsTwo Cells”” during Dry Season during Dry Season
with providing Bywith providing By--pass Channelpass Channel
Considerations:Considerations:-- ProgrammeProgramme-- Diversion and Connection MethodsDiversion and Connection Methods
(2+1+1 or AB+C+D)(2+1+1 or AB+C+D)
2323
Stage 1Stage 1-- Drive new sheet piles and liftDrive new sheet piles and lift--in old sheet piles to form waterin old sheet piles to form water--tight cofferdamtight cofferdam-- Construction of ByConstruction of By--Pass ChannelPass Channel-- Grout curtain is to be installation underneath box culvertGrout curtain is to be installation underneath box culvert
Grout Curtain
By-pass Channel
Sheet pile to be lift-in
A B DC
2424
Tai Ho Culvert Tai Ho Culvert –– Construction of ByConstruction of By--pass Channelpass Channel
2525
Stage 2Stage 2-- Seal up all Balancing Seal up all Balancing
holes between cellsholes between cells-- Demolish part of Demolish part of
wall between cellswall between cells-- Installation stop Installation stop
gates at Cell A & Cgates at Cell A & C-- Flow at Cell B, D Flow at Cell B, D
and byand by--pass channelpass channel-- Install temporary Install temporary
wall at Cell Cwall at Cell C
CBAD
2626
Stage 3Stage 3-- Relocation stop gates Relocation stop gates
from C to Bfrom C to B-- Flow at Cell C, D Flow at Cell C, D
and byand by--pass channel pass channel -- Demolish Cell A and ADemolish Cell A and A-- Dewater and excavateDewater and excavate-- Construct Construct
Cell A (B1Cell A (B1--B3), B3), Cell B (B1Cell B (B1-- B4), B4), Cell C (B4) and Cell C (B4) and Cell D (B5) Cell D (B5)
A B C D
2727
Stage 4Stage 4-- Demolish bulkheads Demolish bulkheads
of Cell A and B at of Cell A and B at outfall outfall
-- Relocation stop gates Relocation stop gates to from A, B to C, Dto from A, B to C, D
-- Flow at Cell New Flow at Cell New Cell A, B and byCell A, B and by--pass pass channel channel
-- Demolish Cell C and DDemolish Cell C and D-- Dewater and excavateDewater and excavate-- ConstructConstruct
Cell C (B1Cell C (B1--B3)B3)
DCBA
2929
Completion of Cell C Completion of Cell C –– Flow to Cell A, B & C (Jan 2001)Flow to Cell A, B & C (Jan 2001)
C
Cell C Cell B Cell A
Cell D
By-pass channel
3030
Stage 5Stage 5-- Demolish bulkhead of Demolish bulkhead of Cell C at outfallCell C at outfall-- Relocation stop gates Relocation stop gates
to to Dto to D-- Divert flow at New Divert flow at New
Cell A, B and C Cell A, B and C -- Demolish Cell D Demolish Cell D -- Dewater and Dewater and
excavateexcavate-- Construct Construct
Cell D (B1Cell D (B1--B4)B4)
*Demolish old culvert *Demolish old culvert for diaphragm wall for diaphragm wall construction*construction*
B C DA
3131
Construct Cell D & Demolish of Existing Culvert (Feb 2001)Construct Cell D & Demolish of Existing Culvert (Feb 2001)
Cell A
Cell B
Cell C
Cell D
3232
Completion of Cell D & Commencement of DW Construction Completion of Cell D & Commencement of DW Construction (Mar 2001)(Mar 2001)
3333
Completion of Diaphragm & Commencement of Excavation Completion of Diaphragm & Commencement of Excavation (May 2001)(May 2001)
3535
Box Culvert Construction Box Culvert Construction for 8for 8--Cells Cheung Hang CulvertCells Cheung Hang Culvert
DIA ReportDIA Report
Wet SeasonWet Season•• Allow to Block Allow to Block ““Two CellsTwo Cells”” with providing Bywith providing By--pass pass
Channel (either 12m or 10m)Channel (either 12m or 10m)
Dry SeasonDry Season•• Allow to Block Allow to Block ““Four CellsFour Cells””
3939
Construction Sequences for Propping SlabConstruction Sequences for Propping Slab
1) Demolish of Culvert 1) Demolish of Culvert 2) Excavate and expose coupler at DW2) Excavate and expose coupler at DW
4) Reinstate the culvert4) Reinstate the culvert3) Steel fixing for Propping Slab3) Steel fixing for Propping Slab
11
•• TseunTseun Wan StationWan StationSize: 40 m (W) x 400 m (L) x 20 m (D)Size: 40 m (W) x 400 m (L) x 20 m (D)Three Tracks & Underground Two Level (Platform Level and ConcourThree Tracks & Underground Two Level (Platform Level and Concourse se Level)Level)Two Level Superstructure Accommodating Passenger Circulation andTwo Level Superstructure Accommodating Passenger Circulation andPlants RoomsPlants RoomsFoundation comprise Large Foundation comprise Large DiametreDiametre Bored Piles, HBored Piles, H--Pile & Diaphragm Pile & Diaphragm Wall acts as Permanent External Station Wall & Provide TemporaryWall acts as Permanent External Station Wall & Provide TemporaryExcavation SupportExcavation Support
33
Station Station –– Strut Installation Method & Sequence 1Strut Installation Method & Sequence 1
PrePre--installation installation •• Carry Pumping TestCarry Pumping Test•• Recharge the water to original Recharge the water to original
levellevelStage 1Stage 1•• Dewater to Dewater to ––0.5mPD0.5mPD•• Excavate to 0.5mPDExcavate to 0.5mPD•• Install 1Install 1stst of Strutsof Struts•• Preloading of the strutsPreloading of the struts
44
Stage 2Stage 2•• Dewater to Dewater to ––9.5mPD9.5mPD•• Excavate to Excavate to ––8.5mPD8.5mPD
Station Station –– Strut Installation Method & Sequence 2Strut Installation Method & Sequence 2
55
Stage 3Stage 3GL46 GL46 -- GL50GL50•• Preloading 2Preloading 2ndnd of Strutsof Struts•• Dewater & continue excavationDewater & continue excavation
Station Station –– Strut Installation Method & SequenceStrut Installation Method & Sequence
66
Station Station –– Strut Installation Method & SequenceStrut Installation Method & Sequence
Stage 4Stage 4•• Dewater 1 m below formation Dewater 1 m below formation
level (~12.5mPD)level (~12.5mPD)•• Excavate to formation levelExcavate to formation level•• Construct Truck SlabConstruct Truck Slab•• After completion of Pumping Test After completion of Pumping Test
in adjacent NTT, remove slurry in adjacent NTT, remove slurry wall.wall.
77
Strutting System for StationStrutting System for Station
1) Construct Truck Slab at Platform Level
2) Remove 2nd
layer strut
3) Construct Concourse Slab
99
Remove 1Remove 1stst Struts after Casting of Concourse SlabStruts after Casting of Concourse Slab