Upload
adiputraimoet
View
213
Download
0
Embed Size (px)
Citation preview
7/29/2019 Penta Completions School Package 2012
1/3
PPPEEENNNTTTAAA CCCOOOMMMPPPLLLEEETTTIIIOOONNNSSSSUCKER ROD PUMPING SYSTEMS
Design, Analysis and Optimization2012 Schools
Calgary Estevan
May 8 - 10 & 15 - 17 May 1-3October 2 - 4
This School will be of great interest to anyone involved with rod pumping
systems including engineers, production technologists, productionsuperintendents, field foreman, and service personnel.
Course Description: This course covers the necessary skills to enable youto maximize your rod pumping efficiency. (As per course outline on reverse)
Instructor: Fred Morrow, Registered Professional Engineer. Graduate ofTexas A&M University. Member of SPE. Fred has enjoyed a career closelyinvolved with the design and manufacture of various components of suckerrod pumping systems. Author and co-author of numerous papers on artificial
lift technology Fred has taught related courses worldwide including Canadafor the last 25 years.
Location:Ramada Hotel Perfect Inns & Suites708 8
thAvenue S.W. Calgary, Alberta 134 2
ndAvenue Estevan, Sask.
Reservations: 1-800-661-8684 Reservations: 1-866-435-5555
Tuition Fee: 3-Day school $950.00 CDN. Includes: tuition, course manual,
continental breakfast and coffee/juice.
Refund or Cancellation Policy: Cancellations less then 2 weeks prior toschool will be subject to $250.00 cancellation fee. No refund made forcancellations less than 3 working days prior to course beginning.Penta Completions reserves the right to cancel the course for insufficientenrollment, should this happen a full refund would be issued.
7/29/2019 Penta Completions School Package 2012
2/3
CCCOOOUUURRRSSSEEE OOOUUUTTTLLLIIINNNEEE
I. Wellbore Characteristics
A. Geological and reservoir concepts relatedTo vertical and horizontal wells
B. Porosity and Permeability
C. Reservoir Pressure and Bubble PointPressure
D. Vogel's and Linear Inflow PerformanceRelationships (I.P.R. Curves)
E. Pressure Decline and PressureMaintenance
II. Beam Lift System Components
A. Down hole Rod Pumps1. API Types2. Specialty Pumps3. Classifications4. Fluid Load and Pressures5. Proper Spacing and Fit
B. Rods and Tubing
1. API Steel Designs2. Special High Strength Rods3. Fiberglass Rods4. Continuous Rods5. Tubing Anchors and Packers
C. Unit Pumpers1. Types of Pump Jacks2. Counterbalance3. Load Range Diagrams
D. Prime Movers1. Electric Motors
2. Electric V.F.D.3. Single Cylinder Gas Engines4. Multi Cylinder Gas Engines
III. Design of Beam Pumping Systems
A. Design Guidelines Utilizing1. Plunger Constants2. Fluid Load3. Pump Stroke and Efficiency4. Impulse Factors5. Pumping Speeds6. Rod and Tubing Stretch7. Gearbox and Structure Capacity8. Prime Mover Selection
B. Deviated or Horizontal Rod String Design
1. Use of Guides and RollerCouplings2. Bottom Hole Pump Guidelines
IV. Dynamometer Analysis of Existing Wells
A. Dynamometer Card Interpretation1. Surface Cards2. Down Hole Cards3. Dynamometer Card Shapes
B. Fluid LevelsC. Depression Tests and Pressure Build-upsD. Optimizing Existing Wells
V. Rod Pumping Challenges
A. Gas Interference1. Cause, prevention and solutions2. Gas Separators
B. Fluid PoundC. Well Problems
1. Paraffin Build-up2. Back Pressure Valves3. Intermittent Pumping
C. Gearbox OverloadD. Sucker Rod FailuresE. Pump Off Control
This is the outline for the 3 day school
7/29/2019 Penta Completions School Package 2012
3/3
NAME: ___________________________________________
POSITION/TITLE: _________________________________
COMPANY REPRESENTED: ________________________
ADDRESS: ________________________________________
________________________________________
________________________________________
BUS PHONE: (__) ________________
FAX: (__) ________________
EMAIL: ___________________________________________
PREFERRED SCHOOL DATE: _______________________
______ PAYMENT ENCLOSED ($950.00 Cdn. + Tax)G.S.T. #868805847
(Cheques payable to Penta Completions Supply & Services)
________ INVOICE COMPANY P.O. #________________
SIGNATURE _______________________________
Return cheque to: Penta Completions Supply & Services#610, 910 7th Avenue S.W.Calgary, AlbertaT2P 3N8