PENNTEX IDLE CONTROLLER FOR INTERNATIONAL T444E '96& later 3400 SERIES CHASSIS INSTALLATION: r .... THEE.C.M. MUST BE PROGRAMMED TO THEFOLLOWING SETTINGS "'TT 'NOTE: Vehicles manufactured afterJanuary I, 1995 the REltOfE & ,w-CAB controlsettings can be changed usingthe electronic service tool. Refer to publications TMT-2281, TMT-2284 for more information on the following engine speed control paramete settings. These parameters canbe programmed by thefactory or dealer. Use formPFM-121 10 (Appendix A of TMT-2284) when ordering chassis. Service Tool Parameter Required Settino PTOMODE IN-CAB + REMOTE IN.CAB PTOMODE PRESET DISABLE CAB CONTROLS NO REMOTE PEDALPRESENT NO SETSWITCH RPM 12OO RESUME SWITCH RPM 12OO VARPTOMAXENGRPM 25OO ENGRPMRAMP RATE 250 MAXPTO ROAD MPH 20 .TTT DISCONNECT THEGROUND GABLE FROM ALL BATTERIES ****T 11) Remove retaining bolts andlower fuse panel as shown in fig.1. 2) Connecl the red wire from idler to circuit #86 at the back of thefuse panel as in fig.1-A. This is a lt. green 18 awg. wire from fuse #16(RADIO & CB RADIO, 10A). This wire should provide +12volts when the ignitio switch is in the runposition. 3) Connect the orange wire fromidler to circuit #44 at the air park brake switch (pressure switch behind fuse panel near kick panel, fig.2-A).This is an 18 awg. gray wire that grounds the park brake warning lamp through the pressure switch when the parkbrake is set. Do notconnect to t*448. 4) Connect thegreen wire from idler to circuit #708at the main brake switch. Thisis a 14 awg. red wire that should be +12 volts only when thebrake pedal is pressed (fig. 3-A). 5) Connect the blackwirefromidler to chassis ground. 6) ff the chassis is equipped within-cab controls for CRUISEIPTO (ON/OFF, SET/RESUME switches, fig. 4-A) disconnect these switches fromthe E.C.M. at the 12 pinMATE-N-LOCK connector #394. These switches are p! required for PennTex idler operation. Plug Penntex idlefs mating connectors into each halfof O.E.M. connector #394 (E.C.M. & in-cab controls if equipped) as in fig, 4-8,C. 7) Mount idle speed controller (inside vehicle) in a location that is both easily accessible to driver and within wiring harnesses reach.(Harness extensions for controller areavailable) 8) Secure all loose wires andharness away from sharp edges andmoving parts. 9) Re-installfuse panel. 10) Re-connect ground cable to all batteries.

PENNTEX IDLE CONTROLLER FOR '96 & later 3400 SERIES …penntex idle controller for international t444e '96 & later 3400 series chassis installation: r.... the e.c.m. must be programmed

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PENNTEX IDLE CONTROLLER FOR '96 & later 3400 SERIES …penntex idle controller for international t444e '96 & later 3400 series chassis installation: r.... the e.c.m. must be programmed

PENNTEX IDLE CONTROLLERFOR

INTERNATIONAL T444E'96 & later 3400 SERIES CHASSIS

INSTALLATION:r.... THE E.C.M. MUST BE PROGRAMMED TO THE FOLLOWING SETTINGS "'TT

'NOTE: Vehicles manufactured after January I, 1995 the REltOfE & ,w-CABcontrol settings can be changed using the electronic service tool.

Refer to publications TMT-2281, TMT-2284 for more information on the following engine speed control parametersettings. These parameters can be programmed by the factory or dealer. Use form PFM-121 10 (Appendix A ofTMT-2284) when ordering chassis.

Service Tool Parameter Required SettinoPTO MODE IN-CAB + REMOTEIN.CAB PTO MODE PRESETDISABLE CAB CONTROLS NOREMOTE PEDALPRESENT NOSET SWITCH RPM 12OORESUME SWITCH RPM 12OOVAR PTO MAX ENG RPM 25OOENG RPM RAMP RATE 250MAXPTO ROAD MPH 20

.TTT DISCONNECT THE GROUND GABLE FROM ALL BATTERIES ****T

11) Remove retaining bolts and lower fuse panel as shown in fig. 1.

2) Connecl the red wire from idler to circuit #86 at the back of the fuse panel as in fig. 1-A. This is a lt. green18 awg. wire from fuse #16 (RADIO & CB RADIO, 10A). This wire should provide +12 volts when the ignitionswitch is in the run position.

3) Connect the orange wire from idler to circuit #44 at the air park brake switch (pressure switch behind fusepanel near kick panel, fig. 2-A). This is an 18 awg. gray wire that grounds the park brake warning lampthrough the pressure switch when the park brake is set. Do not connect to t*448.

4) Connect the green wire from idler to circuit #708 at the main brake switch. This is a 14 awg. red wire thatshould be +12 volts only when the brake pedal is pressed (fig. 3-A).

5) Connect the black wire from idler to chassis ground.

6) ff the chassis is equipped with in-cab controls for CRUISEIPTO (ON/OFF, SET/RESUME switches, fig. 4-A)disconnect these switches from the E.C.M. at the 12 pin MATE-N-LOCK connector #394. These switches arep! required for PennTex idler operation. Plug Penntex idlefs mating connectors into each half of O.E.M.connector #394 (E.C.M. & in-cab controls if equipped) as in fig, 4-8,C.

7) Mount idle speed controller (inside vehicle) in a location that is both easily accessible to driver and withinwiring harnesses reach. (Harness extensions for controller are available)

8) Secure all loose wires and harness away from sharp edges and moving parts.

9) Re-installfuse panel.

10) Re-connect ground cable to all batteries.

Page 2: PENNTEX IDLE CONTROLLER FOR '96 & later 3400 SERIES …penntex idle controller for international t444e '96 & later 3400 series chassis installation: r.... the e.c.m. must be programmed

TESTING:

1) Turn ignition switch to RUN position, but DO NOT START ENGINE. The air park brake should be set & gearselector in park. The "LOW'battery indicator (red), on the idler, should be lit. After aprox. 10 seconds lhe"HIGH IDLE" indicator (yellow) should light up.

2) Press the main brake pedal. The "HIGH IDLE" indicator (yellow) should turn off. Release the brake and itshould come back on with no delay.

3) Making sure that the vehicle can not role, release the air park brake. The "HIGH IDLE" indicator should turnoff. Set air park brake. The'HIGH IDLE" indicator (yellow) should light up.

4) Turn ignition lo OFF position. All idler indicators should be off.

5) Start engine and press the'MANUAL ENGAGE" button. The "HIGH IDLE" indicator (yellow) should lightand the engine idle speed should increase to 1200 RPM. Wait for alternator lo recharge battery enough forthe "LOW indicator (red) to go off and the "OK" indicator (green) to come on. lf the battery is very low thealternator may take a few minules to recharge the battery before the voltage can increase. The alternatormust also be capable of putting out more current than the fully loaded vehicle draws.

6) Press brake pedal to insure idle speed returns to normal and the "HIGH IDLE" indicator turns off. lF thebatteries are not fully recharged the idler may automatically return to high idle. Repeat this step until battery isrecharged.

7) lf the vehicle is equipped with in-cab CRUISE/PTO controls (fig. 4-A) they should function normally as theywould with "IN-CAB PTO MODE'set to "PRESET". To test these make certain that the PennTex idler is notengaged. Press the "ON' button momentarily. Press the "SET" button momentarily and the idle speed shouldincrease. Press the brake pedal or "OFF" button to disengage. The same should work for the 'RESUME'button.

r8) |NSTALIATION COMPLETE.

Page 3: PENNTEX IDLE CONTROLLER FOR '96 & later 3400 SERIES …penntex idle controller for international t444e '96 & later 3400 series chassis installation: r.... the e.c.m. must be programmed

-15 Tt{ql E , 34Oo Chassis

,:

Fis.?