PENNDOT PROJECT INFORMATION Larimer Avenue Slide Repair SR 2065, Section A09 Wilkins Township, Allegheny County

PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PENNDOT PROJECT INFORMATION

Larimer Avenue Slide RepairSR 2065, Section A09

Wilkins Township, Allegheny County

Page 2: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PROJECT TEAM

Design Division

Direct questions to:

Dan Bliss, P.E. - Project Manager at 412.429.4943 or [email protected].

Mark J. Young - District Environmental Manager

Nick Krobot, P.E. - Assistant District Environmental Manager

Press Office

Steve Cowan - District Press Officer

Please complete survey at end of presentation

Page 3: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PURPOSE OF PRESENTATION & PROJECT INTRODUCTION

SR 2065, Section A09 (Larimer Avenue) Project

The purpose of this presentation is to introduce the project to the public, gather feedback, and present the construction staging

The purpose of the project is to reestablish the roadway.

Page 5: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PROPOSED PROJECT IMPROVEMENTS

The project includes a landslide located on Larimer Avenue.

The project will impact both lanes, spanning a length of approximately 685 ft.

The proposed repair is the Geotechnical treatment of pipe dowels and the application of a GRS (Geosynthetic Reinforced Soil) slope to the failed areas.

Roadway construction will also be applied within the failure area.

The road will be closed and traffic will be detoured during construction. The detour will utilize Rodi Road to Business 22 to SR 376 to SR 130.

Construction anticipated to begin late-July 2019 and be completed by November 2019.

Page 6: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

Public outreach begins with the NEPA (National Environmental Policy Act) process:

NEPA requires agencies to integrate environmental values into their decision-making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions

NEPA also includes public involvement activities and gathering feedback from the public

Image courtesy of MDOT

Page 7: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PRELIMINARY DETOUR PLAN

APPROXIMATELY 7.5 MILE

DETOURS

Landslide

Page 8: PENNDOT PROJECT INFORMATION · PROPOSED PROJECT IMPROVEMENTS The project includes a landslide located on Larimer Avenue. The project will impact both lanes, spanning a length of approximately

PROJECT SURVEY