Penn State Transportation Engineering and Safety Conference

PROJECT LOCATION

MANHATTAN, KS

PROJECT LIMITS

TRAFFIC OPERATIONS

Traffic Counts were obtained on April 2 & 3, 2013.

• Miovision Cameras • Vehicle Queue Counts

Vehicle Queue Counts used for calibration of Synchro Analysis Software.

FIELD OBSERVED VEHICLE QUEUES

PM PEAK PERIOD

FIELD OBSERVED VEHICLE QUEUES

PM PEAK PERIOD

21 Vehicles (525 feet)

FIELD OBSERVED VEHICLE QUEUES

PM PEAK PERIOD

21 Vehicles (525 feet)

25 Vehicles (625 feet)

CALIBRATION PROCEDURE

Used Field Observed Values • Green Times

• Cycle Lengths Adjusted Synchro Values • Decision Making Location

• Lane Utilizations

CALIBRATED MODEL VEHICLE QUEUES

PM PEAK PERIOD

CALIBRATED MODEL VEHICLE QUEUES

PM PEAK PERIOD

20 Vehicles (500 feet)

CALIBRATED MODEL VEHICLE QUEUES

PM PEAK PERIOD

20 Vehicles (500 feet)

20 Vehicles (525 feet)

2013 EXISTING PM LEVEL OF SERVICE

2013 EXISTING PM LEVEL OF SERVICE

SB Vehicle Queue 725’ (29 vehicles)

2013 EXISTING PM LEVEL OF SERVICE

Overall LOS E

2013 EXISTING PM LEVEL OF SERVICE

EB Thru LOS F & Vehicle Queue 525’

20-YEAR NO BUILD LEVEL OF SERVICE

20-YEAR NO BUILD LEVEL OF SERVICE

SB LT LOS F with Vehicle Queue 750’

20-YEAR NO BUILD LEVEL OF SERVICE

Vehicle Queue 1325’

OBERVATIONS / FINDINGS

EB K-18 Ramp & K-113 • Southbound Left-Turn Volume • Vehicles Begin Positioning North of

Southwind

Rosencutter Intersection • Westbound Left-Turn Movement (211 vph) • Outside Westbound Thru Queue • Not Enough Green Time for Eastbound

Thru Traffic • NB/SB Approaches along with Heavy WB

Left Reduces Eastbound Green Time • Consider Improvements at Rosencutter

VE JOB PLAN

ALTERNATIVE EVALUATION

Best performance with the greatest acceptance at a reasonable cost.

Defendable Decisions Document

K18 & K113 SPECULATION &

SCREENING

1 Close access to north leg of Rosencutter R1 68 increase lane widths over 12' R72 Do nothing S 69 decrease lane widths S3 double roundabouts (on south side) S 70 build another power cat into pavement R84 double roundabout (ramp terminals) S 71 full intersection at stagg and rosencutter S5 roundabout at Rosencutter S 72 parrallel routes or bipasses R86 interchange at Rosencutter R3 73 inclusion of bus terminal R57 modify/optimize signal timings S 74 side by side left turns in interchange S8 RI/RO norht leg of Rosencutter S 75 signal at north ramps S9 RIRO south leg of Rosencutter S 76 construct all at once S

10 Two lane roundabout S 77 construct all in phases S11 one lane roundabout R2 78 I-70 fiber S12 no left turns at rosencutter S 79 utility corridor along K-18 S13 no connection of allison to interchange S 80 loop ramps with roundabout R714 close south leg of Rosencutter completey R5 81 EB K-18 onramp metering during peak hour S15 T Stagg hill into Rosencutter S 82 go back to the way it was R416 T rosencutter intto Stagg Hill S 83 two lane exit WB K-18 S17 diverging diamond S 84 reconstruct Rosencutter with bridge placement S18 signalize north terminal S 85 underpass at Rosencutter R1 & 719 dual lefts K-113 SB to K-18 EB S 86 elevated roundabout @ rosencutter R1 & 720 dual lefts at rosencutter WB to SB S 87 close EB onramp with improvements to Stagg Hill Road S21 RIRO at Poliska Lane S 88 close WB offramp R2 & 422 widen bridges at Wildcat Creek S 89 close EB off ramp R2 & 423 pedestrian sidwalk from westwood to Target S 90 close WB on ramp R2 & 424 pedestrian sidwalk from Sheridan to LEC S 91 split diamond R325 bike lanes on stagg hill S 92 light rail to fort riley and base R826 5' sidewalks S 93 cul-de-sac south leg of rosencutter R527 10' multi use path S 94 cul-de-sac north leg of rosencutter R128 ped tunnel under ramps S 95 include park and ride to fort riley R829 ped bridge over ramps R2 96 K-18 ramp traffic under rosencutter R330 at grade crosswalks S 97 flyover on ramp over rosencutter R331 sidewalk in KDOT r/w S 98 retrofit DDI S32 large roundabout including south terminal and Allison S 99 brand new DDI S33 large roundabout under bridges R2 100 restricting left turns during peak hours S34 fully directional interchange at K-18 & 113 R3 101 split diamond with texas turnarounds R335 at grade intersection at K-18 & K-113 R1-4 102 high occupancy vehicle lanes R736 Trumpet interchange S 103 dedicated thru lanes thru rosencutter R637 fly over SB to EB R2-3 104 michigan left for EB rosencutter R238 tunnel under from SB to EB R2-3 105 michigan left for WB rosencutter R239 SPUI S 106 jughandles for Rosencutter R2 & 340 loop ramp SB to EB S 107 multi directional lanes using ITS R241 closing north leg of rosencutter and create frontage roads to east R3 108 ITS signage S42 closing north leg of rosencutter and create frontage roads to west S 109 use drivable shoulder during peak hours R743 closing north leg of rosencutter and create frontage roads to north R1&3 110 improve johnson valley drainage issues R844 closing south leg of rosencutter and create frontage roads to east R5 111 detention/retention in between ramps R845 three lanes on Stagg hill S 112 improve signage into community S46 6 lane section for K-18 (widen inside) S 113 signage for way finding S47 6 lane section for K-18 (widen outside) S 114 widen interchange bridges R548 double left at rosencutter EB to NB R7 115 improve pavement markings S49 3/4 access at Rosencutter (with signal) S 116 reconstruct all pavements R3 & 450 3/4 access at Rosencutter (without signal) R5 117 salvage all reusable pavement S51 DDI with no connection to Allision S 118 shoulder rumble strips R452 ITS optimizing S 119 add center rumble strips R453 Directional reversing roundabout S - PETER 120 improve K-18 lighting S54 sync all signals S 121 interconnect rosencutter with ITS system S55 DDI with roundabout at allision R2 122 interconnect south terminal with ITS system S56 double lanes for EB on ramp S 123 reverse frontage roads from dunbar R157 single lane for EB on ramp S 124 Stagg hill and rosencutter roundabout S58 K-18 EB three lane section east of roesencutter S 125 Two-way stop at Rosencutter R2 & 459 three lane section NB to eliminate weave R8 126 K-18 over Rosencutter with no access S60 connect linear trail to shopping aera S 127 Multi level roundabout S - PETER61 put sidewalk in stagg hill r/w S

Speculation

127 IDEAS Rejection ReasoningR1 Violates ConstraintR2 Not FeasibleR3 Too ExpensiveR4 Low Public AcceptanceR5 Combine with other optionsR6 Duplicate IdeaR7 High Cost/Low BenefitR8 Outside Scope/Beyond Study Area

ALTERNATIVE DEVELOPMENT

No Build Southbound Dual Left Turn

Southbound Dual Left Turn Loop On-Ramp

Roundabouts Diverging Diamond

Continuous Flow Intersection

ALTERNATIVE COMPARISON

Dual Lefts Roundabouts DDI Continuous Flow

Performance 5th 3rd 4th 1st 2nd

Acceptance 3rd 1st 4th 2nd 5th

Cost 1st 4th 3rd 4th 2nd

Average Ranking 3rd 2nd 4th 1st 3rd

No Build

ROSENCUTTER / RICHARDS DRIVE

• Significant congestion is occurring • Overall intersection Level of

Service E • Eastbound thru movement

operates with a Level of Service F • Eastbound vehicle backup 25

vehicles • Multiple alternatives considered • Future improvements to Wildcat Creek

Bridges will impact the intersection

SPECULATION OF ALTERNATIVES FOR ROSENCUTTER / RICHARDS DRIVE

• Roundabouts • Overpass

• Widen Bridges at Wildcat Creek

• Dual Lefts • 6 lanes on K-18

• ITS optimization • Reduce speed on K-18

• Interchange at Rosencutter • Full access intersection

• Flyover ramp over Rosencutter

• Split diamond • Frontage roads

• K-18 under Rosencutter • Right in/Right outs • ¾ access

Alternatives to Consider ROSENCUTTER / RICHARDS DRIVE

Alternatives to Consider ROSENCUTTER / RICHARDS DRIVE

PROPOSAL DEVELOPMENT DDI and ¾ Access • Rosencutter/Richards

• ¾ Access • K-113

• DDI • Traffic Control at Allison

• Constructing Cost: $3.1 Million

PROPOSAL DEVELOPMENT Dual Left Turns and ¾ Access • Rosencutter/Richards

• ¾ Access

• K-113 • Dual Lefts for eastbound and southbound traffic • Maximum 7 lane section between ramps • 6 Lanes north of north ramp • Signals at both ramps

• Traffic Control at Allison

• Construction cost: $3.5 Million

Public Involvement

Methods • In-Touch • Post Cards • Community Voice • Phone Calls • E-mails

Themes • Bicycles and

Pedestrians in the Design

• Residential Access to K-18

• Roundabouts • Seth Childs and K-18 • Other

Diverging Diamond Operation

Diverging Diamond Operation

Diverging Diamond Operation

Bicycle & Pedestrian Facilities

WHERE ARE WE NOW?

Diverging Diamond Interchange • No Rosencutter Modifications • Currently in Design Phase • Looking at potential cost savings Est. Construction Costs have increased • Clearance Issues for Southbound Lane • Lower the Road Profile

JIM JUSSEL, PE, PTOE 913-441-1100 [email protected]

THANK YOU!

K-18/K113 Intersection Improvements