Upload
montana-mcknight
View
21
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Pendahuluan. Mengapa ekonomi teknik diperlukan? Mengapa (engineers) perlu mengetahui aspek ekonomi dalam pekerjaan-pekerjaan keteknikan. WHAT IS ECONOMICS ?. The study of how limited resources is used to satisfy unlimited human wants. LAND. - PowerPoint PPT Presentation
Citation preview
Pendahuluan
•Mengapa ekonomi teknik diperlukan?
•Mengapa (engineers) perlu mengetahui aspek ekonomi dalam pekerjaan-pekerjaan keteknikan
WHAT IS ECONOMICS ?The study of how limited resources is used to satisfy unlimited human wants
LANDLAND
All gifts of nature, such as: water, air, minerals, sunshine, plant and tree growth, as well as the land itself which is applied to the production process.
All gifts of nature, such as: water, air, minerals, sunshine, plant and tree growth, as well as the land itself which is applied to the production process.
LABORLABOR
The efforts, skills, and knowledge of people which are applied to the production process.
The efforts, skills, and knowledge of people which are applied to the production process.
Dollar Bills
CAPITALCAPITAL
• Real Capital (Physical Capital )– Tools, buildings, machinery -- things which have been
produced which are used in further production• Financial Capital
– Assets and money which are used in the production process
• Human Capital– Education and training applied to labor in
the production process
• Real Capital (Physical Capital )– Tools, buildings, machinery -- things which have been
produced which are used in further production• Financial Capital
– Assets and money which are used in the production process
• Human Capital– Education and training applied to labor in
the production process
•Mengapa sebuah pabrik dibangun?
•Bagaimana memastikan bahwa investasi yang ditanamkan akan mendatangkan pendapatan yang lebih besar?
•Bagaimana menghitung nilai pabrik apabila akan dipindahtangankan kepada pihak lain?
•Bagaimana bendung dapat memberi manfaat bagi masyarakat luas? Bagi petani? Bagi upaya pengendalian banjir?•Bagaimana mengetahui dampak ekonomi bagi pemindahan penduduk yang seringkali terjadi dalam proyek banjir? Apakah biaya ini sepadan dengan manfaat yang akan diperoleh?
•Dari mana kita mengetahui manfaat pembangunan jalan?
•Bagaimana mengetahui kelayakan pembangunan jalan?
•Apakah ada bedanya kelayakan ekonomi dan finansial investasi kelayakan
Dalam pekerjaan-pekerjaan sipil yang dilakukan didaerah perdesaan, apa yang perlu diperhatikan untuk memastikan manfaat pembangunan bisa diperoleh secara optimal?
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers300
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
Unused Resources
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
UnavailableResources
Unused Resources
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
Personel Computers
500
300
Unused Resources
PRODUCTION POSSIBILITY FRONTIER
500
Video Recorders
Personel Computers
500
300
Unused Resources
PRODUCTION POSSIBILITY FRONTIER
600
400
Proses Pengambilan Keputusan
step rational decision making proses:1. Mengenal Permasalahan2. Definisikan Tujuan3. Kumpulkan Data yang Relevan4. Identifikasi alternatif yang memungkinkan (feasible)5. Seleksi kriteria untuk pertimbangan alternatif terbaik6. Modelkan hubungan antara kriteria, data dan alternatif7. Prediksi hasil dari semua alternatif8. Pilih alternatif terbaik
Biaya ?
• Biaya Historis• Biaya mendatang (Future Cost)• Biaya Kesempatan (Opportunity Cost)• Biaya siklus hidup (penelitian, pengembangan,
perancangan, pembuatan, pengetesan, operasional, perawatan
Biaya ?
• Biaya Modal (Kuiper,1971): jumlah semua pengeluaran yang dibutuhkan mulai dari prastudi sampai proyek selesai dibangun.
Biaya modal terdiri dari: 1. Biaya langsung (direct cost)ex: pembangunan jembatan: biaya pembebasan tanah, biaya galian dan timbunan, biaya beton bertulang, biaya konstruksi baja
Biaya ?
2. Biaya tidak langsung (indirect cost) biaya yang tidak diduga dari biaya langsung (5 %,
10%, 15%, tergantung pada perencana atau pemilik)
biaya teknik (engineering cost): biaya pembuatan desain, studi kelayakan, biaya pengawasan
bunga
Biaya ?
• Biaya tahunan (annual cost)biaya selama proyek berlangsung, terdiri:
bungadepresiasibiaya operasi pemeliharaan
Biaya ?Biaya tetap (fixed cost)
Biaya yang besarnya tidak dipengaruhi oleh volume produksiex: biaya gedung, biaya tanah, biaya mesin, peralatan
Biaya variabel (variable cost)Biaya yang besarnya tergantung pada volume produksiex: biaya bahan baku, biaya tenaga kerja langsung
1. Biaya Tetap Total (Total Fixed Cost),
TFC = f (Konstan).
2. Biaya Variabel Total (Total Variabel Cost), TVC = f (output atau Q).
3. Total Cost (Total Cost), TC = TFC + TVC
Q
Biaya Produksi
TFC
TVC
TC
1. Average Fixed Cost, AFC = TFC/Q
2. Average Variabel Cost, AVC = AVC/Q
3. Average Cost,
• Biaya Marjinal (Marginal Cost);MC = ∆TC/ ∆Q
AVCAFCQ
TVCTFC
Q
TCAC
Biaya Produksi
Q
ACAVC
TFC
MC