12
ISU PWK DAN STUDI KASUS ARTIKEL TERKAIT ISU PEMBANGKIT LISTRIK TENAGA LAUT OLEH: ZULKIFLI D52110274 PRODI PENGEMBANGAN WILAYAH DAN KOTA JURUSAN ARSITEKTUR FAKULTAS TEKNIK UNIVERSITAS HASANUDDIN 2013

Pembangkit Listrik Tenaga Air Laut

Embed Size (px)

Citation preview

Page 1: Pembangkit Listrik Tenaga Air Laut

ISU PWK DAN STUDI KASUS

ARTIKEL TERKAIT

ISU PEMBANGKIT LISTRIK TENAGA LAUT

OLEH:

ZULKIFLI

D52110274

PRODI PENGEMBANGAN WILAYAH DAN KOTA

JURUSAN ARSITEKTUR

FAKULTAS TEKNIK

UNIVERSITAS HASANUDDIN

2013

Page 2: Pembangkit Listrik Tenaga Air Laut

Wales gives consent to pioneering tidal array scheme

 

Welsh Government approves the 10MW Skerries Tidal Stream Array

Wales’ first commercial tidal energy farm and one of the largest to be consented in the UK

The array will be developed by Siemens-owned Marine Current Turbines 

Skerries will supply up to 10,000 homes with eco-friendly electricity 

The Welsh Government has given its approval to the development of the Skerries Tidal Stream Array, which will be Wales’ first commercial tidal energy farm. The Skerries tidal array, one of the largest of its kind to be consented in the UK, will be developed by Siemens-owned Marine Current Turbines (MCT) and will supply up to 10,000 homes.

Following commissioning, the array, located off the north-west coast of Anglesey in North Wales will consist of five SeaGen 2MW tidal stream turbines in an area between the Skerries group of rocks and islands and Carmel Head about 1km off the Anglesey coast close to the port of Holyhead, in approximately 20 to 40m water depth. 

SeaGen is the first proven full-scale commercial tidal turbine developed by MCT, which has operated successfully in Strangford Lough in Northern Ireland since 2008.

In addition to the generation of eco-friendly electricity for up to 10,000 homes in Anglesey, the 10MW Skerries tidal array will deliver other significant benefits to the local community and supply chain during construction and installation as well as in the long-term through jobs in operations

Page 3: Pembangkit Listrik Tenaga Air Laut

and maintenance and environmental monitoring. The project will make use of the local port facilities at Holyhead for the installation and operations and maintenance. 

The first minister of Wales Carwyn Jones said:

“I am delighted to announce that the Welsh Government has granted a MarineLicence for the Skerries Tidal Stream Array project, which moves Wales a step closer to hosting the first scheme of this kind in the UK. This demonstrates the significant benefits of choosing Wales for marine energy investment, with our unique tidal resources, good port facilities and proximity to the grid.”

“We have supported and worked closely with the company from the minute they showed their initial interest in the development of the site, including financial support towards early feasibility studies. The next step is to develop the industry so that tidal power can contribute towards our future energy mix.”

Acquiring a Marine Licence from the Welsh Government was part of the eligibility criteria for the Marine Energy Array Demonstration (MEAD) Fund. Granting consent has enabled the Company to secure the award from DECC.

Greg Barker, minister of state, Department of Energy and Climate Change commenting on the MEAD Fund said:

“This £20 million will give MeyGen and SeaGeneration Wales the boost they need to leap to the next level and test their innovative turbines in formations out at sea. These projects will provide valuable insight into how best to harness the power of the sea and take us one vital step closer to realising the full potential of marine in our future energy mix. The UK, with its amazing natural resource and outstanding technical know-how is already leading the way on marine power for the rest of the world to follow, and I want to ensure we stay top of this table. I am delighted that MeyGen and SeaGeneration Wales are rising to the challenge and wish them every success.”

The approval of the Skerries Scheme by the Welsh Government has followed extensive environmental studies and technical assessments as well as widespread public consultation over the past four years.  The consent reflects the ambitions of the Welsh Government to develop a low carbon economy, especially renewable energy sources, such as wind and tidal.

Achim Woerner, chief executive officer of Siemens Energy Hydro and Ocean Unit said:

“We welcome the Welsh Government’s decision to grant approval for the Skerries scheme, the largest of its kind in the UK to date. The consent is an important milestone in Wales’ transition to a low carbon economy and the tidal farm will provide a very positive economic boost to Anglesey and North Wales. 

We are also delighted that the Skerries project which is being developed by Sea Generation Wales Ltd* has been selected for the £10M Marine Energy Array Demonstration award. These developments confirm the viability of the SeaGen technology for larger scale deployment and the overall potential for the sector.”

Page 4: Pembangkit Listrik Tenaga Air Laut

RWE npower renewables which supported the development of the proposals by MCT throughout the consenting process, said it was delighted the project had been consented and looked forward to seeing the array installed and operational off the Anglesey coast.

RWE npower renewables' Hydro Development Manager, Richard Church, said: 

“Our involvement in the development of the Skerries scheme has proved to be valuable, in terms of the knowledge we have gained about the consenting process and about this new and innovative technology."

The project is targeted to enter commercial operation in 2015.

(source : http://www.marineturbines.com )

Siemens increases stake in Marine Current Turbines

British tidal energy company, Marine Current Turbines Ltd, today announces that Siemens is increasing its share in the company to 45%.

“With this increase in its stake, Siemens is strengthening its activities in ocean power generation. We will actively shape the commercialization process of innovative marine current power plants,” said Michael Axmann, CFO of the newly founded Solar & Hydro Division within Siemens’ Energy Sector.

Marine Current Turbines (MCT) has evolved from a pioneer to a technology leader in horizontal axis marine current turbines and now has 25 employees. In February 2010 Siemens acquired a minor stake in the Bristol-based company and thus entered the marine tidal current market. Financial details of today’s announcement are not disclosed.

Ocean power is emerging with strong growth rates driven by global CO2 reduction commitments. Until 2020, experts anticipate double-digit growth rates for the ocean power market. Based on further estimates the global potential for power generation using tidal power plants is 800 terrawatt-hours (TWh) per annum. For comparison, that is equivalent to between three and four percent of power consumption worldwide.

Dr Andrew Tyler, CEO of MCT said: “Through the expansion of the partnership with Siemens, we have further strengthened our position in the tidal energy market. We have the increased backing of a major industrial player which is essential to support the commercialization of our proven technology. We are about to approach investors to secure funding for our first two tidal array projects, and Siemens’ increased investment as well as UK Government support should give investors the confidence that we have the necessary backing to deliver these crucial projects and the ones to follow.”

MCT plans to present two Project Investment Prospectuses to the market within the next month for its 8 megawatts (MW) Kyle Rhea project in Scotland and its 10 MW Anglesey Skerries project in Wales. For both projects, applications for leases from The Crown Estate have already been

Page 5: Pembangkit Listrik Tenaga Air Laut

approved. The UK Government’s recent ROCs Banding announcement (October 20) will support these projects with 5 ROCs per megawatt hour proposed for tidal energy.

In addition, MCT is planning to deploy a tidal system into the FORCE facility in Canada’s Bay of Fundy and has an approval for a lease from The Crown Estate to deploy a 100 MW tidal farm off Brough Ness, on the southern most tip of the Orkney Islands in Scotland.

MCT has already successfully implemented its first commercial scale demonstrator project SeaGen in Northern Ireland’s Strangford Lough. Since November 2008, SeaGen’s two axial turbines, with a combined capacity of 1.2MW, have been feeding power into the grid to supply the equivalent of around 1500 homes. SeaGen has to date generated over 2.7GWh of electricity to the grid, the largest amount of electricity in the whole of the ocean power sector.

Marine current turbines generate electricity by utilizing tidal current flows. The SeaGen turbine is fixed on a structure and is driven by the flow of the tides with a key advantage that the generated power is precisely predictable in the tidal cycle. This technology effectively is similar to that of a wind turbine with the rotor blades driven not by wind power but by tidal currents. Water has an energy density of more than 800 times that of wind. Twin rotors rotate with the movement of the tidal flow and pitch through 180 degrees to optimally track tidal current direction and speed.

Marine current turbines are part of Siemens’ Environmental Portfolio. In fiscal 2010, revenue from the Portfolio totaled about EUR28 billion, making Siemens the world’s largest supplier of ecofriendly technologies. In the same period, Siemens’ products and solutions enabled customers to reduce their carbon dioxide (CO2) emissions by 270 million tons, an amount equal to the total annual CO2 emissions of Hong Kong, London, New York, Tokyo, Delhi and Singapore.

( Source : http://www.marineturbines.com )

Arus Laut Indonesia Timur Bisa Hasilkan Listrik

TEMPO.CO, Bandung - Lautan di kawasan timur Indonesia tak hanya berpotensi akan minyak dan gas bumi, tapi juga penghasil arus listrik. Studi para dosen dan alumni ITB menemukan potensi energi terbarukan di sejumlah selat di sana sebagai penghasil listrik. Sumbernya berasal dari arus laut.

Guru besar Oseanografi ITB, Safwan Hadi, mengatakan, ada tiga sumber listrik baru dari kelautan di Indonesia, yaitu angin, gelombang, dan arus laut. Potensi gelombang laut penghasil listrik berada di laut selatan Jawa dan laut barat Sumatera. "Dari ketiganya, arus laut yang paling berpotensi. Arus laut bisa menggerakkan turbin untuk menghasilkan listrik," ujarnya di sela diskusi 55 Tahun Deklarasi Djuanda di ITB, Kamis, 13 Desember 2012.

Batas minimal arus laut yang bisa menghasilkan listrik yaitu arus berkecepatan 2 meter per detik. Arus sekencang itu hingga 3 meter per detik ditemukan di sejumlah selat di Indonesia timur. "Selat Lombok, Selat Alas antara Lombok dan Sumbawa, Larantuka, dan Selat Bali," kata Safwan.

Turbin arus laut yang sempat dirintis ITB bekerja sama dengan Politeknik Negeri Bandung sempat

Page 6: Pembangkit Listrik Tenaga Air Laut

mandek setelah penggagasnya, Iskandar Alisjahbana, wafat. Kini, kata Safwan, pembuatan turbin itu dilanjutkan sebuah perusahaan lokal di Jakarta yang pendanaannya dibantu Bank Dunia dan telah diuji coba di Selat Bali. "Turbin dari Spanyol ada, tapi harganya sangat mahal," katanya.

Potensi listrik dari Selat Lombok, misalnya, berkisar 80-100 kilowatt per turbin. Masalah yang masih harus diperbaiki pada riset berikutnya, kata Safwan, yaitu meningkatkan daya listrik yang dihasilkan. Juga kapasitas penyimpan listrik untuk menstabilkan pasokan setrum ketika arus menyurut.

Peringatan 55 Tahun Deklarasi Djuanda yang lahir pada 13 Desember 1957 digelar Masyarakat Garis Depan Nusantara, ITB, Wanadri, dan Rumah Nusantara. Deklarasi itu, ujar panitia acara Ipong Witono, berhasil meyakinkan PBB dalam pembuatan konvensi tentang hukum laut pada 30 April 1982, sehingga wilayah Indonesia daratan dan lautan bisa bersatu. Djuanda Kartawidjaja, yang saat itu jadi Perdana Menteri pada 1957-1959, dibantu pakar hukum laut dari Universitas Padjadjaran Mochtar Kusumaatmadja. Nama Ir.H. Djuanda diabadikan sebagai nama jalan di Kota Bandung sebagai pengganti nama Jalan Dago.

( Sumber : http://www.tempo.co/read/news/2012/12/13/061447961/Arus-Laut-Indonesia-Timur-Bisa-Hasilkan-Listrik )

Sumber Energi Arus Laut dari Selat Larantuka Flores Timur

Uji Coba Prototipe Pembangkit Listrik Tenaga Arus Laut, BPPT

by: Erwandi

Kecepatan arus laut yang keluar masuk Selat Larantuka antara Pulau Flores dan Pulau Adonara, sangat fenomenal. Pada saat bulan baru dan  bulan purnama kecepatan arus laut yang keluar dari Selat Larantuka menuju Laut Flores pada beberapa titik dapat mencapai 4.0 meter/detik. Arus laut dengan kecepatan seperti itu sungguh menyimpan energi kinetik yang besar, yang dapat diubah menjadi tenaga listrik.

Illustrasi Konsep Turbin Arus Laut Sumbu Vertikal

Page 7: Pembangkit Listrik Tenaga Air Laut

Berdasarkan hal itu maka pada akhir Maret 2010 lalu, seminggu sebelum perayaan Semana Santa, Pekan Suci Paskah di Larantuka, tim perekayasa Unit Pelaksana Teknis Laboratorium Hidrodinamika Indonesia (UPT LHI) BPPT mulai menguji coba prototipe Pembangkit Listrik Tenaga Arus Laut (PLTAL). Turbin PLTAL yang dipasang adalah turbin poros vertikal tipe Darrieus berbilah turbin lurus. Berdiameter putar 2 m dan panjang bilah 2 m, dengan efisiensi total 35%, turbin dapat menghasilkan listrik 2 kW pada kecepatan arus 1.4 m/detik. Generator PLTAL yang digunakan adalah generator tipe magnet permanen (permanent magnetic generator) dengan kapasitas 3.5 kW pada putaran 250 rpm. Untuk menstabilkan daya listrik yang naik turun mengikuti naik turunnya kecepatan arus laut maka output listrik AC 3 phasa diubah menjadi DC. Arus DC diubah kembali menjadi AC stabil bertegangan 220 V dan frekuensi 50 Hz melalui inverter kapasitas 2 kW.

Prototipe PLTAL dipasang pada posisi kurang lebih 100 m dari dermaga penyeberangan Dusun Tanah Merah Desa Wureh Kecamatan Adonara Barat Pulau Adonara. Agar ponton penyangga turbin tidak hanyut terbawa arus laut maka 4 buah jangkar dan sistem tambat dipasang untuk menjaga agar ponton tetap pada tempatnya.

Prototipe Pembangkit Listrik Tenaga Arus Laut saat senja. Air laut di tengah ponton bergolak karena putaran turbin yang menghasilkan nyala lampu.

Pada uji coba pertama itu,  disaksikan oleh masyarakat desa Wureh dan aparat Pemda Flores Timur, PLTAL sukses berputar menghasilkan listrik berfluktuasi antara 900 – 2000 W.

Bulan Juni 2010 lalu, kembali  tim perekayasa UPT LHI menguji coba PLTAL setelah perbaikan sistem tambat dan radial arms turbin. Dalam uji coba kedua ini tim perekayasa dibantu staf dinas PU Pemda Flores Timur dan penduduk desa Wureh sukses menguji prototipe PLTAL. Listrik menyala dan disalurkan ke lampu-lampu yang dipasang di atas prototipe. Meskipun saat uji coba bentuk bulan terlihat separuh, atau saat pasang perbani (neap tide), yakni saat arus laut paling lemah dalam siklus arus laut bulanan, PLTAL tetap menghasilkan listrik. PLTAL tidak menghasilkan listrik hanya saat pergantian arah arus laut, dari arus masuk ke arus keluar dari Selat Larantuka atau sebaliknya. Lama pergantian arah arus laut berkisar antara 0.5 – 1 jam.

Page 8: Pembangkit Listrik Tenaga Air Laut

Seperti pernah disinggung dalam tulisan penulis tentang sumber energi arus laut (Kompas, Senin 29 Agustus 2005), arus laut yang keluar masuk Selat Larantuka dan selat-selat lain di sepanjang Nusa Tenggara Barat dan Nusa Tenggara Timur terutama disebabkan oleh gaya tarik menarik antara bumi, bulan, dan matahari. Gaya ini menimbulkan pasang naik dan pasang surut di Laut Sawu, dan Laut Flores. Karena ada perbedaan tinggi muka air laut antara kedua laut tersebut maka air mengalir dan bertambah kecepatannya menjadi arus laut yang deras saat melewati selat-selat sempit.

Sejak tahun 2006 melalui pembiayaan DIPA APBN, tim perekayasa dari UPT LHI BPPT telah melakukan pemetaan potensi energi arus laut di Indonesia dengan menggunakan teknik simulasi numerik. Hasil pemetaan, seperti dilaporkan ke anggota Dewan Energi Nasional, menunjukkan bahwa potensi daya listrik Selat Larantuka lebih dari 6000 MW bergantung pada jumlah turbin yang dipasang. Potensi ini baru pada satu selat, padahal di Propinsi Nusa Tenggara Timur terdapat banyak selat yang potensinya sama atau lebih besar dari Selat Larantuka.

Prototipe PLTAL dengan latar dermaga Tanah Merah Desa Wureh Adonara

Berdasarkan simulasi numerik tersebut, pada tahun 2007 tim perekayasa UPT LHI mulai melakukan proses rancang bangun PLTAL. Dalam proses pengkajian jenis turbin PLTAL yang cocok untuk perairan Indonesia, dipilih turbin arus laut poros vertikal tipe Darrieus dengan tiga bilah turbin. Turbin tipe ini konstruksinya sederhana, mudah pembuatannya, mudah pemeliharaannya, dan murah. Model uji bilah turbin yang lurus memanjang dan berpenampang bentuk foil, seperti sayap pesawat terbang, berbahan aluminium, dapat dibuat dengan mudah di pabrik pengecoran velg sepeda motor di Surabaya. Keuntungan lainnya bilah turbin dapat dipasang pada dua buah engsel, seperti daun pintu,  agar dapat digerakkan pada sudut serang (angle of attack) tertentu. Manfaatnya untuk menaikkan gaya angkat (lift), menambah besarnya momen putar (torsi), dan meningkatkan efisiensi turbin.

Page 9: Pembangkit Listrik Tenaga Air Laut

Turbin arus laut berputar saat arus lemah

Model uji turbin arus laut berdiameter putar 1 meter dan panjang bilah 1 meter, telah diuji di kolam uji tarik (towing tank) LHI BPPT. Model uji ini berkapasitas 1 kW. Dari pengujian beberapa potongan foil bilah turbin yang berbeda, dipilih foil LHI-18 hasil rancangan tim perekayasa PLTAL. Dengan foil LHI-18 turbin arus laut dapat berputar pada kecepatan arus sangat rendah 0.30 m/detik. Rata-rata efisiensi turbin tanpa generator 42%.

Tahun 2008 dimulai proses perancangan prototipe PLTAL. Karena keterbatasan dana riset, prototipe yang seharusnya dapat diselesaikan pada akhir tahun 2008, baru lengkap dan siap diluncurkan pada tahun 2009. Uji coba PLTAL akhirnya dapat dilakukan di Selat Larantuka pada akhir Maret 2010 dan bulan Juni 2010 lalu.

Oktober 2010 nanti dengan anggaran penelitian DIPA APBN dan dibantu tambahan anggaran APBD-P Kabupaten Flores Timur tim perekayasa PLTAL merencanakan untuk melakukan uji coba prototipe PLTAL dengan kapasitas 10 kW. Listrik direncanakan akan disalurkan untuk menerangi dermaga dan sebagian penduduk dusun Tanah Merah Adonara yang selama ini belum mendapat aliran listrik.

Erwandi,

Anggota tim perekayasa UPT Laboratorium Hidrodinamika Indonesia, BPPT