51
8/21/2019 Pelamis Guide http://slidepdf.com/reader/full/pelamis-guide 1/51 OCEAN POWER DELIVERY LTD. www.oceanpd.com The Pelamis Wave Energy Converter - An update on performance and operational aspects Max Carcas Business Development Director 

Pelamis Guide

Embed Size (px)

Citation preview

Page 1: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 1/51

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

The Pelamis Wave Energy Converter - An update on performance and operational aspects

Max CarcasBusiness Development Director 

Page 2: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 2/51

- Incorporated January 1998- £7.5m VC investment 2002-2004- £2.5m support from UK DTI- Based in Edinburgh- Combined ‘wave’ experience of 

over 50 years

- 32 full-time personnel

OCEAN POWER DELIVERY 

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 3: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 3/51

Environmental:• Global warming• EU/UK Kyoto commitments

Socio-economic:

• Hidden costs of conventional generation• Renewables increasingly affordable• Industrial-economic potential

ENERGY POLICY DRIVERS

 UK ENERGY POLICY OBJECTIVES:

Security of supply:• Electricity demand

continuing to rise• Existing power plants

reaching end of life• UK to be net importer 

of gas in <5 years

Hydro 1%

Other

fuels 2½%Imports

3%

Oil 1%

Gas

37%

Coal

33½%

Nuclear 

22%

0

10

20

30

40

50

60

70

80

92 93 94 95 96 97 98 99 00 01

GW

Coal fired

Combined Cycle Gas TurbineOil fired

Mixed/dual fired

Nuclear 

Hydro

Renewable & Other 

   G  e  n .   C  a  p  a  c   i   t  y

   A  v  e .   D  e  m  a  n   d

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 4: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 4/51

• Today >40GW installed,8GW last year 

• Fastest growth area inelectricity generatingindustry

• Denmark: >20,000employed, $3-4bn inexports

• Costs of generationhave fallen by ~80% asmarket has grown

• In the UK firstcommercial wind farmwas only developed 12years ago

WIND POWER

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Growth in Global Market for Wind Turbines

0

1000

2000

3000

4000

50006000

7000

8000

9000

  1   9   8   3

  1   9   8   5

  1   9   8   7

  1   9   8   9

  1   9   9  1

  1   9   9   3

  1   9   9   5

  1   9   9   7

  1   9   9   9

   2   0   0  1

   2   0   0   3

   M   W    i  n  s   t  a   l   l  e   d  p  e

  r  y  e  a

0

5000

10000

15000

20000

2500030000

35000

40000

45000

   C  u  m  m  u   l  a   t   i  v  e

   M   W

MW installed per year 

Cumulative MW installed

Source: BTM

Consult Aps

Page 5: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 5/51

WHY WAVE ENERGY?

Huge Resource & Market- Most dense renewable resource- UK ~50-80TWh/year 

~15-25% UK demand>£20bn CapEx

- World >2000TWh/year >£500bn CapEx

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 6: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 6/51

WHY WAVE ENERGY?

Forecastability

-Numerous calibratedWIND-WAVE models

-Existing offshoreforecasting services

-Immunity to localclimatic effects

- Small hourly &diurnal variation

Wave height (ft)

Peak period (sec)

Wave forecast images courtesy of LOLA

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 7: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 7/51

WHY OFFSHORE…?- Best resource in deep water >50m

- Plenty of space plus high ‘power-density’

- Minimal environmental impact

- Minimum visual intrusion

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

SOUTH UIST

Variation of wave energy resource with water depth

0

20

40

60

80

0 20 40 60 80 100 120

Water depth (m)

   M  e  a  n  p  o  w  e  r   (   k   W   /  m   )

Page 8: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 8/51

OFFSHORE TECHNOLOGY

The offshore/marine sector’s

contribution:

“No major technical barriers to the

development of wave energy

prototypes have been identified.

All issues raised under design,construction, deployment and

operation can be addressed by

transfer of technology from other 

industries, especially the offshore

industry”

DTI Report - Wave Energy: Technology Transfer &

R&D Recommendations

Ove Arup, October 2000

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 9: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 9/51

THE PELAMIS WECConcept

− Articulated cylinder −Self-referenced−Slack moored−Head-on to incident waves

Complete machine

- 150m length- 3.5m diameter - 750kW rating- 2.7GWh p.a.

Power Conversion Module

- 4 x hydraulic rams  (2 heave, 2 sway)- 2 x 157kVA/ 125kW  motor/generator sets- 250kW rating

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 10: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 10/51

KEY FEATURES

• Survivability – core theme…• 100% available technology• Hydraulic Power Take Off • Power smoothing• Tuneable• Maximum flexibility

• Minimum work on-site• Off-site maintenance

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

POWER SMOOTHING

POWER LIMITING

Page 11: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 11/51

DEVELOPMENT PATH

Experimental

Modelling- 14 tank test programmes- 5 test models at 80th, 50th,35th,33rd &  20th scales- Survivability characteristic validated- Numerical power predictions validated- Mooring dynamics validated- Further tank programmes

Numerical

Modelling- Frequency domain simulation- Time-domain simulation- Structural analysis- Power take-off & control- Mooring dynamics- Extreme load analysis

  1/7th scale

  full systems

  prototype

  Independent

 Design

  Verification

  Full-scale

Power 

  Conversion

  Module   F  u   l   l  -  s  c  a   l  e ,  p  r  e  -  p  r  o   d  u  c   t   i  o  n

  p  r  o   t  o   t  y  p  e

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 12: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 12/51

1/7th SCALE PROTOTYPE

-‘Full systems’ prototype- Same hydraulics system- Same control system- First tests October 2001- Concept verified at 1/7th scale

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 13: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 13/51

POWER CONVERSION MODULETEST-RIG

Successful verification of full-scale power take off system on land

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 14: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 14/51

DESIGN VERIFICATION

• Work undertaken by WS Atkins, Europe’spremier offshore design consultants

• All aspects of design and construction

• Assessed to same factors of safety asmanned offshore oil & gas installations

• Application of DNV/API offshore designcodes

• Fatigue and extreme load analysis over 

design life of machine (ULS, ALS, FLS)• Verified and insured

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 15: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 15/51

FULL-SCALE PROTOTYPE

• Machine is pre-productionprototype• Supported by UK DTI• Build/assembly through

managed subcontracts

• Initial sea trials behind

vessel• Testing at EMEC

• Power prediction• Connection/ detachment• Survivability, operability,

maintainability, reliability

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 16: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 16/51

P-750 PROTOTYPE ‘PHILOSOPHY’

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

- Pre-production unit- 15 year design life- Conservative design

- Design independently verified(WS Atkins)- Systems proven- Moorings system as for farm- Fully instrumented- SCADA- Insured

DESIGN DRIVERS:

- Build methods- Deployment methods- Maintenance methods

Page 17: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 17/51

Page 18: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 18/51

Page 19: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 19/51

Page 20: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 20/51

Page 21: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 21/51

Page 22: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 22/51

Page 23: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 23/51

Page 24: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 24/51

Page 25: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 25/51

Page 26: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 26/51

Page 27: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 27/51

Page 28: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 28/51

Page 29: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 29/51

FINAL ASSEMBLY, ROSYTHFINAL ASSEMBLY, ROSYTH

Page 30: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 30/51

EMEC

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 31: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 31/51

EMEC, ORKNEY

Page 32: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 32/51

Page 33: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 33/51

Page 34: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 34/51

MOORINGS INSTALLED

Page 35: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 35/51

PELAMIS INSTALLED

Image © Aquatera.co.uk

Page 36: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 36/51

Image © Aquatera.co.uk

Page 37: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 37/51

ONWARD PROGRAMME- Rigorous testing of prototype

- Commercialisation- Project development…

  (Cornwall, Scotland, Portugal, USA + others…)

- Target = demonstration projects installed during 2005

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

 Year 2003 2004 2005

Quarter 1 2 3 4 1 2 3 4 1 2 3 4

FULL-SCALE DEMONSTRATOR

Build

Launch

Test

PROJECTS - PHASE ONE

PROJECTS - PHASE TWO

Page 38: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 38/51

PROJECTS – PHASE ONE

Example (2005)- 4-10 x 750kW machines- 3-7.5MW rated output- BUT infrastructure & development

work for whole project

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 39: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 39/51

PHASES TWO AND ONWARDS

EXAMPLE

- 39 x P-750 machines- 30MW- £30-50m installed cost- 2.0km x 0.5km- 30 MW/km2

- 110 GWh/year   (~20,000 homes)

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 40: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 40/51

PORTUGALGRUPO ENERSIS

- 3-5MW demonstration, Nazaré- Target build/install 2005- Wave measurement underway- Survey underway- Local manufacturing content- 20MW accepted by DGE

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 41: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 41/51

WIND PROSPECT

- Wind Prospect (2nd UK wind farm, Burbo)- Ocean Prospect formed- Phased wave-farm deployment- Demo at ‘Wave Hub’?- General site survey underway- Target installation 2006

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

SW ENGLAND

Page 42: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 42/51

UNITED STATES OF AMERICA

Electrical Power Research Institute

- Public/private project part funded byDOE, NREL and individual states

- Project: four state wave energydemonstration projects in Maine, Oregon,Washington, Hawaii

- Pelamis selected by EPRI as the bestand only system currently recommendedfor deployment.

- Target installation 2006OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 43: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 43/51

- Consortium development- Sites identified- Staged development- Target: first stage installed 2005/6- Onward routemap defined- Expected funding from £50m DTI

marine deployment fund

SCOTLAND

    2    0    0    0

   m

5 0 0 m 

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 44: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 44/51

COST REDUCTIONMECHANISMS

• Required returns on capital

• Economies of Scale• Learning by doing

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 45: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 45/51

REQUIRED RETURNS

Influenced by:• Risks during project

development• Risks during

construction/installation• Risks during operation

(technical & political)• Availability of debt• Project length• Due diligence costs• Bankable warranties• Future uncertainty

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 46: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 46/51

ECONOMIES OF SCALE

• Planning – Onshore costs, Env. Impacts, Seabed survey,

Resource assessment and measurement

• Construction – Cable costs, Cable lay costs, Grid connection,

Machine installation• Machine

 – Bulk ordering of components, Tooling costs, Plantoverhead, Verification costs

• Operation

 – Insurance, Maintenance, Spares

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 47: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 47/51

ECONOMIES OF SCALE

Economies of scale - example of ratio of fixed costs to variable costs (machines)

1-4, 4-10 and 10-28 machine project examples

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

1 2 3 4 4 5 6 7 8 9 10 10 12 14 16 20 24 28No. of machines in project

   T  o   t  a   l   P  r  o   j  e  c   t   C  o  s   t

0%

10%

20%

30%

40%

50%

60%

70%

   N  o  n  m  a  c   h   i  n  e  c  o  s   t  s

   %  o   f   t  o   t  a   lMachine costs

Non-machine costs

Fixed costs % of total

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 48: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 48/51

EXPERIENCE & TECHNOLOGICALIMPROVEMENT

• Project capital costs – Machine cost – components

 – Prototype – Batch – Series production

 – Development costs (EIA etc)

• Project operation – Improvements in energy capture

 – Insurance costs

 – O&M costs

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 49: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 49/51

BRIDGING THE GAP- High initial costs...- High initial risks...- High initial opportunities…

- Costs fall as a result of technical refinement

- Costs fall in line withinstalled capacity

- Costs fall as a result of investor confidence

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 50: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 50/51

THE OPPORTUNITY

• First projects: attractive returns,

through market enablementmechanisms (eg: UK: RenewableObligation + Capital grants;Portugal €c23/kWh)

OPDManufacture and

supply waveenergy converters

Developer Plan, permit,finance and

install wave farms

Operator Own and operatewave farms, sell

electricity generated

 Additional renewables generating capacity required by 2010 to meet targets(assumes typical 30% capacity factor for all ren ewables)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

   U  n   i  t  e

  d    K   i

  n  g   d  o

  m

   F  r  a  n

  c  e

   I  r  e   l  a  n  d

   D  e  n  m

  a  r   k

   N  o  r  w

  a  y

  S  p  a   i  n

   P  o  r  t  u

  g   a   l

  S  o  u  t   h 

  A  f  r   i  c

  a

  A  u  s  t  r  a   l   i  a

   V  a  n  c

  o  u  v  e

  r    I  s   l  a  n

  d

  C  a   l   i  f

  o  r  n   i  a   *

   G   W   r

  e  q  u   i  r  e   d   t  o   b  e   i  n  s   t  a   l   l  e   d

Total Requirement: 60GW, approx £50bn

* proposed targets for California and South Africa. SA target for all energy use in 2012.

• Strategic:

 Accessible globalmarket size >£50bnby 2010, unlimitedby resource

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

Page 51: Pelamis Guide

8/21/2019 Pelamis Guide

http://slidepdf.com/reader/full/pelamis-guide 51/51

OCEAN POWER DELIVERY LTDOCEAN POWER DELIVERY LTD

OCEAN POWER

DELIVERY LTD.

www.oceanpd.com

 

www.oceanpd.com