16

Pedro Alban - Architecture and Art Portfolio

Embed Size (px)

DESCRIPTION

2012 - June 2014

Citation preview

Summary

pedro alban calmonart and architecture portfolio

resume2 de Julho Masterplan2 de Julho Social HousingAA visiting SchoolJapanese RestaurantArt

468

121416

cv

pedro albanArchitecture and Urbanism undergraduateFaculty of Architecture - Universidade Federal da Bahia

resumePedro Alban is a Brasilian Architecture and Urbanism student, currently receiving an interchange scholarship from the Science Without Borders program to study at Leeds Metropolitan University. Besides having creative skills in the development of projects on different platforms - Revit, Photoshop, Autocad, Indesign - he is also highly interested in issues linked to architectural educatiion, theory and pragmatics. Currently running a blog of his own drawings, Pedro has a varied professional experience in architectural offices. He won, as part of a team, the first prize in the workshop “Que Cidade é Essa?” for urban proposals in salvador.

EducationUniversidade Federal da Bahia (March 2011- in course)Faculty of Architecure and UrbanismGraduate prediction November 2017

Leeds Metropolitan Univesity (January 2014 - in course)Ba Architecture - Faculty of Architecture and Arts

LanguagesPortuguese - NativeEnglish - Speaks and Writes fluentlySpanish - speaks and writes fluently

InternshipsGMF Arquitetos - January 2012Development of architecural project for Festival de Verão - music FestivalParticipation in construction supervision at the festival

Urplan - September 2012 - January 2013Development of Residential Institutional and Urbanism projectsProduction of physical and digital modelsExecution of road plans and sectionsparticipation in the creative process of projects

Dendê Arquitetura - February - July 2013Development of residential and institutional projectsProduction of physical and digital modelsParticipation in the creative process of projects

Cinematic Commons - June 2014 - In courseResearch on the Essay Film Genre at Leeds Metropolitan University March UnitResearch and writingProduction of drawings and diagrams

collectivesZSU Skateramps - PartnerExecution of projects for skateparks in BrazilProjects for Salvador’s City Hall, aproved, not built

FDN Skate Crew - PartnerOrganization of skateboarding events, reproposition of use in public squares

4/5

academicUniversidade Federal da Bahia - 2013Faculty of Architecture and UrbanismDirector of External relations at the students directoryOrganization of Architectural Week - Lectures, Workshops and expositions

Cinematic Commons - June 2014 - In courseResearch on the Essay Film Genre at Leeds Metropolitan University March UnitResearch and writingProduction of drawings and diagrams

Erea Niterói - April 2013Regional Encounter of Architecture StudentsLectured in a workshop about origami techiniques applied to architecture

FREELANCEFellas SkateboardingBrandSkateboard Graphic Illustration

workshops AA visiting school - July 2013Workshop on Landscape Urbanism with Eva Castro (Plasma Studio) and Frederico Ruberto (Remix Studio)Development of Urban Projects for São PauloParametric design (Rhino and Grasshopper)

Que Cidade é Essa? - Competition for urban proposals in SalvadorFirst Prize as a team

publications and ehxibitionsMuseu da MisericórdiaExposition of projects from Que Cidade é Essa Workshop

http://issuu.com/pedroalbanDigital Portifolio, CV and Essays

http://tedioprodutivo.tumblr.comArt Blog

competencesPhotoshopIllustratorIndesignPremiere (in course)AutocadRevitRhino and Grasshopper (in course)

[email protected]+44 7762921278

2 de Julho is a neighbourhood Located in Salvador’s historical centre, Bahia. It’s great views towards the sea and strategic location within the city have been driving a massive gentrification process in the place. The relatively low density of the community and the already existing infrastructures of the site were key factors to the development of a masterplan.

The project aimed a redesign of the neighbourhood from the perspective of their present residents but which also allowed and prepared the site for more dense occupation. Through research with the locals and the tracing of various narratives, The masterplan developed a sense of identity which lacks in the current government planing.

Spaces and Connections were the main drivers of the plan. The idea was to reassemble the site, which presents a speed highway and a strong topography slope dividing it, and its both existing and future planned infrastructures. The rethinking of the community’s squares and plazas looked for a more optimized use by the many groups of inhabitants, commerciaries, residents, children, and addressed the issues of security and violence through architectural and urban design.

Flexibility and nonregulated design were also key to the project. The manner that old people playing chess, ephemeral structures of street commerce and wooden tables of bars occupy the square, with densities that change on the day/night, weekdays/weekends basis was taken into account for the role it plays in site and its identity. Between the planned and the unplanned, 2 de rethinks identity’s role in Salvador’s new developments.

2 de julho masterplan

6/7

Calha em perfil metálico

detalhe em escala 1/20 demonstrando relação visual de criança no nível mais baixo

2 de Julho’s interest in a social housing comes from the present hospitals, schools, transport facilities and other infrastructures already present in the site. Developed as a continuous design process of the masterplan, the building presents in its conception many of the same interests which drove the project at the urban scale. Flexibility and Identity are taken to the level of self construction.

The idea of a house which is designed for self-constructed ampliations, exhausted by architects such as Alejandro Aravena, takes here a vertical approach. The flats (accessible not included) are designed without partitions and with a double ceiling height, allowing for the inhabitants to choose their own furniture, layout... Three meter spans permit easily constructible floors. Hydraulic facilities and stairs already installed make possible to build with minimum effort. Through this decisions, the project obtains, besides flexibility, a sense of identity lacking in most of government housing projects.

Formally, The building is comes from the stacking of blocks (flats), which differ in length and height according to family types and accessibility. While still maintaining a optimized structure series of cantilevers and voids are generated by the operation. A slight rotation of the blocks aims better ventilation and less sun exposition.

The result is a building that, in its form and program, shows the role community should play in design decisions. The project is a experiment in what lacks at the neighbourhood current developments, identity.

2 de julho SOCIAL Housing

Families Single Inhabitant

Acessible flat

8/9

art

10/11

AA’s 2013 São Paulo visiting school had as a theme the drawing of future scenarios for Campo de Marte’s site, currently a private flight airport in city centre. The place, really close to the polluted city’s canal Tietê, presented future potentials, with the planning of a high-speed train station and the many possible revitalizations of the river. Taking both precise reality data and delirious forward thinking, the team tried to develop a plan which changed spatial conditions in time.

The project had as a main feature the generation of new topographies based on the piling up of construction waste. The waste, leftover from demolished buildings and constructions in general, would arrive from the Hidroanel, an existing plan which makes a ring of navigable waters through Tietê and other rivers in the city. By receiving the dumped material, the site not only makes money, but develops a spatial condition in constant growth, which them affects uses, paths of access, water flows and so on.

Analyses of the site, in present and future time, inform and change de design, studying uses according to slope, wind... Buildings and landscape are generated at the same time, taking in account the radiuses and speeds of the machinery and the yearly amount of waste. Between an understanding of real conditions and the ability to suggest new futures, Campo de Marte rises as a new way of linking spaces and developments through urban planning.

AA visiting school

1

4

5

7

8

2

3

6

1

4

6

5

7

8

2

3

12

4

6

3

5

7

8

WATER FLOW

FLOOD RISK

SLOPES

highest risk

medium risk

CONSTRUCTION WASTE + SOIL

REUSABLE or RECYCLABLE waste as aggregation

133000000 Ton/year45500 m³/year

Hidroanel circuit, important collect and disposal sites

12/13

Leisure Uses

Comercial Uses

Culture Uses

TRAJECTORY

THE EXCAVATOR

184.5º max rotation

184º

175º

180º 180º180º

CAPACITY 592 kg 0.9 m3MAX RADIUS 118mMIN RADIUS 45mMAX ROTATION 184.5º

Studies of transparency drove the this project for a Japanese restaurant in Rio vermelho, a bohemian area in Salvador. The concept driving the project was that of the illusions of transparency, which is achieved by nontransparent but reflective materials.

The relationship between metallic sheets guides the look of observers up, keeping degrees of privacy for the users. From the inside, the short distance and lower position of the table area doesn’t allow the “periscopes” to function properly, keeping a calm and isolated environment.

Issues of the site’s size and logistical relationships in industrial kitchens were also taken into account, making for a functional project which tries to simplify complexities inherent to this kinds of project.

Japanise restaurant

3,50 m²VEST FEM

8,24 m²TRIAGEM

5421

A

B

52

52

41

41

5,19 m²LIXO

2,48 m²PNE

6 7

14,95 m²

CARGA EDESCARGA

3

3,27 m²VEST M

1,96 m²RESERVATÓRIO

+0,15

-0,16 -0,1558,93 m²

SALÃOPRINCIPAL

3,14 4,05 3,05 3,55 4,59 2,10

4,90

2,05

22,08

3,16 0,92

1,95 2,08

2,20

1,55

0,42

0,15

0,15

1,06

2,20

1,64

1,95 0,90 1,18 0,42

1,85

1,78

1,05 1,60

0,55

1,54

3,80

21,85

1,01

4,18 2,37

7,34

1,20

8

3,61 m²RECEPÇÃO

-0,15

PASSEIO PASSEIO

PASS

EIO

+0,00 +0,00

E=28

,00

P=17

,33

E=28,00P=17,06

123456

1

2

3

4

5

6

7

8

1 2

RAMPAi=8%

8,00 m²LAVAGEM

20,56 m²COCÇÃO

9,00 m²DEPÓSITO

8,16 m²escritório

5421

A

B

52

52

41

41

7,43 m²

SANITÁRIOMASC

5,57 m²SANITÁRIO FEM

6 73

3,14 4,05 3,05 3,55 4,59 2,10

2,66

1,10

2,50

0,84

7,10

8

1,01

1,26 3,85 2,60 1,50 1,03 10,24 1,01

1,66

0,84

3,12 6,05

5,51

1,05

1,05 1,35 1,25

N

12345678910111213141516

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

+2,75

+2,75

1,04 m²DML

+2,75

14/15

5 4 2 167

5,85

5,63

0,52

3

SANITÁRIO COCÇÃO COCÇÃO CIRCULAÇÃO

SALÃO PRINCIPAL PNE RESERVATÓRIO LIXO CARGA E DESCARGA

8

0,30

5,33

Telha metálica i=5%Estrutura em madeira

0,33

0,60

0,05

0,12

0,40

0,39

0,15

VIS

TA A

VIS

TA A

0,05 0,20 0,05

0,15

PROJETO

ALUNO

PROFESSORES

PRANCHA DATA

ORIGAMI - RESTAURANTE JAPÔNES

PEDRO ALBAN CALMON

CIONE FONA E MARCIO CAMPOS06/04/201422:27:00DETALHE

7

ESCALA 1 : 20

FACHADA DETALHE1

PLATIBANDA COMREVESTIMENTO EM CHAPAMETÁLICA h = 40 cm

RIPADO DE SEÇÃO 50X30mmE ESPAÇAMENTO DE 70mm

BRISE EM CHAPA METÁLICA DOBRADAESP:3mm

ESCALA 1 : 20

VISTA AA2 ESCALA 1 : 20

PLANTA BAIXA TÉRREO3

MONTANTE VERTICAL DA ESQUADRIA

VIGA METÁLICA PERFIL I h =40cm

BIT DE SUTENTAÇÃO DO VIDRO COMJUNTA DE SILICONE

BIT DE SUTENTAÇÃO DO VIDRO COMJUNTA DE SILICONE

PASSEIO

PILAR ESTRUTURAL EM AÇO SEÇÃO 20X15 cm

TUBULAÇÃO PARA ESCOAMENTO DE AGUAS

RUFO METÁLICO

TELHA METÁLICA i=4.5%

SUPORTE METÁLICO EM AÇO INOX PRESOEM CHAPA APARAFUSADA AO PILAR