9
PE15 PE15 PE14 IRV WTM LP LP DRP PLAQUE CONP MH CP NAME BOARD BENCH BRK CONB FP FP RB PWR BENCH BENCH BENCH WOODEN BRIDGE CONCRETE RAMP STEPS DRP DRP DRP FP ASPHALT FLG FLG WTR CYCLE LP SM LP FP KING EDWARD PARADE DEVONPORT BEACH PE07 PE09 PE01 PE10 PE11 PE08 PE13 PE14 PE02 PE02 PE06 PE02 PE02 PE02 PE03 PE04 PE05 PE02 PE06 PE02 PE08 PE08 PE10 PE12 ▲ JOINS SHEET L411 ▲ JOINS SHEET L411 PE15 PE15 200 100 50 10 0 mm 300 mm Scales Project No. Sheet. No. Project Sheet Revision Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:39:30 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L400.dwg L410 Drawn Approved Approved Date Auckland Environmental PO Box 5848 Auckland 1141 New Zealand +64 9 355 9500 AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARD WINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGN LANDSCAPE DRAWING SET GENERAL ARRANGEMENT SHEET 01 OF 02 DRAFT FOR COMMENT 3-AL186.00 L410 A C Hamilton / T Jones C Hamilton 30.11.2017 T Jones 1:100 A1 | 1:200 A3 Designed mm 1:100 0 @ A1 @ A3 1:200 2000 4000 6000 8000 10000 Approved Revision Date Revision Amendment A DRAFT - LOCAL BOARD CH 30.11.2017

PE15 FP KING EDWARD PARADE DEVONPORT BEACH

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

PE15PE15

PE14

IRV

WTM

LP

LP

DRP

PLAQUE

CONP

MH

CP

NAME BOARD

BENCH

BRK

CO

NB

FP

FP

RB

PWR

BEN

CH

BEN

CH

BEN

CH

WO

OD

EN B

RID

GE

CO

NC

RET

E

RAM

P

STEP

S

DRP

DRP

DRP

FP ASPHALT

FLG

FLG

WTR

CYCLE

LPSM

LP

FP

KING EDWARD PARADE

DEV

ON

POR

T BE

ACH

SW

SW

SW

SW

SW

SW

SW

SW

SWSW

SWSW

PE07PE09

PE01

PE10

PE11

PE08

PE13

PE14

PE02

PE02

PE06

PE02

PE02

PE02

PE03

PE04

PE05

PE02

PE06

PE02

PE08 PE08

PE10

PE12

▲ JOINS SHEET L411 ▲ ▲ JOINS SHEET L411 ▲

PE15

PE15

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:39:30 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L400.dwg L410

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

GENERAL ARRANGEMENTSHEET 01 OF 02

DRAFT FOR COMMENT

3-AL186.00 L410 A

C Hamilton / T Jones C Hamilton 30.11.2017

T Jones 1:100 A1 | 1:200 A3

Designed

mm1:100

0@ A1@ A31:200 2000 4000 6000 8000 10000

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

AutoCAD SHX Text
N
Page 2: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

PE15

PE15PE15

PE14

MH

SGN

CP

CP

FP

LP

PWR

CHM

SM

FP

RCY

RB

BEN

CH

BEN

CH

WO

OD

EN B

RID

GE

DRP

DRP

KING EDWARD PARADE

FP

TK

DEV

ON

POR

T BE

ACH

▼ JOINS SHEET L410 ▼ ▼ JOINS SHEET L410 ▼

mm1:100

0@ A1@ A31:200 2000 4000 6000 8000 10000

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:39:34 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L400.dwg L411

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

GENERAL ARRANGEMENTSHEET 02 OF 02

DRAFT FOR COMMENT

3-AL186.00 L411 A

C Hamilton / T Jones C Hamilton 30.11.2017

T Jones 1:100 A1 | 1:200 A3

Designed

AutoCAD SHX Text
N
Page 3: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

BEAN'S BEACON PLAY TOWER PE02 PE03

PE04 PE05 PE06

ROCK POOL HIDES GROUP SPINNER

BALANCE SPRINGERS STEPPING STONES SINGLE ROCKER

Refer to sheets L610, L611, L612, L613 for conceptual basis formanufacturers shop drawings.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Below ground cubby formed with circular manhole and detailedconcrete apron.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Oyster or similar 'Intertidal reef' themed group spinner in mutedoff-white colour. 'OmniSpinner' ex. Landscape Structures shown.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Cats Eye or similar 'Intertidal reef' themed balance springers.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Arrangements of Shellfish or similar 'Intertidal Reef' themed steppingstones.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

'Intertidal reef' themed single rockers in muted off-white / white washcolour.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

To be confirmed. To be confirmed. To be confirmed.

To be confirmed. To be confirmed. To be confirmed.

PE01

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:30 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L600

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 01 OF 03

DRAFT FOR COMMENT

3-AL186.00 L600 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Page 4: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

PE07 PE08 PE09

PE10 PE11 PE12

CRAWL TUNNEL BARNACLE CLIMBING HOLDS CARGO NET CRAWL

ROPE CLIMB WIDE EMBANKMENT SLIDE SAND PLAY STRUCTURE

To be confirmed. To be confirmed. To be confirmed.

To be confirmed. To be confirmed. To be confirmed.

Crawl tunnel diagonally angled through constructed mound form.Colour TBC.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Arrangement of resin climbing holds. Colour TBC.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Net structure formed into constructed landform with crawl tunnelunder. Rope to be muted off-white/jute colour.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Neptunes Necklace or similar 'Intertidal reef' themed ropes withclimbing holds for scaling embankment. Colour TBC.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

1.2 - 1.8m high group embankment slide in stainless steel ormuted off-white coloured plastic.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Sand play structure in linear, low form with timber materiality.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:33 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L601

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 02 OF 03

DRAFT FOR COMMENT

3-AL186.00 L601 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Page 5: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

PE13 PE14 PE15

PE15 PE15

THREE BAY SWING SERIOUS AIR SWING FLOTSAM JETSAM TRAIL

FLOTSAM JETSAM TRAIL FLOTSAM JETSAM TRAIL

To be confirmed. To be confirmed. To be confirmed.

To be confirmed. To be confirmed.

Three bay swing with 1x basket swing, 2x vandal resistant strapseats and 2x toddler seats with safety harnesses. Slim-line, round,shaved log timber frame and legs to match timber used for PE15 -Flotsam Jetsam Trail.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Senior serious air swing. Slim-line, round, shaved log timber frameand legs to match timber used for PE15 - Flotsam Jetsam Trail.

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour

Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:36 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L602

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 03 OF 03

DRAFT FOR COMMENT

3-AL186.00 L602 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

Page 6: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:39 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L610

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 01 OF 04

DRAFT FOR COMMENT

3-AL186.00 L610 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Timber 'board & batten' style siding. 60x40mm verticalbattens in randomised setout of 150,300,600,1200mmcentres as shown. Painted Resene 'Soapstone' colour.Timber board siding painted Resene 'Colonial White'.

Finish timber board siding 600mm above floor level toallow light spill into structure and further caregiver

visibility. Aperture covered by wire rope mesh with timberbattens continuing full height.

Safety railing over access aperture. Ensure form is acontinuation of cylindrical rope access tunnel with

emphasis on vertical structural components. Elements tobe painted Resene 'Soapstone'

Two open sided slides to edges as shown. Size and typeto be confirmed with Landscape Architect. Material to be

stainless steel with brushed finish or alternativelyapproved neutral coloured plastic.

Rope nets fixed to structure allow interaction with groundlevel and 'hammock' style play experience. Rope colourto be neutral to Landscape Architect approval.

Compliant access ladder to first storey. Powdercoat tomatch 'Resene Soapstone'

Wide cargo net style access up to firststorey. Rope colour to be neutral toLandscape Architect approval.

Tubular steel safety rail powdercoated Resene'Soapstone' colour with wire rope mesh infill panel. Flatsteel vertical supports in randomised setout of150,300,600,1200mm centres extending above safetyrail and below deck as shown.

Approx. 150x150mm universal columns set at anangle with central vertical column provide mainstructural support. Columns to be powdercoated tomatch Resene 'Colonial White'.

Clusters of stacked rock to reference BeanRock reef. Position to avoid critical fallheights from structure and play equipment.

Upper fenestration featuring red perspex and leadlightpattern referencing Bean Rock Lighthouse. Red colour toResene 'Bright Red'. Final colour and specification to beconfirmed by Landscape Architect.

Coloursteel or similar corrugate roofing to enclose secondstory. White colour to match Resene 'Soapstone'. Final colourand specification to be confirmed by Landscape Architect.

Fibre reinforced plastic or similar grating for first storeyflooring. Colour to be neutral to Landscape Architect

approval.

Scale: NTSEXPLODED AXONOMETRIC

Scale: NTSBEAN ROCK LIGHTHOUSE - DESIGN INSPIRATION

Resene Bright Red - RGB 146.42.49

Resene Colonial White - RGB 233.215.171

Resene Soapstone - RGB 236.229.218

Downpipe from guttering to be hidden. Run pipe withinstructure and within recess of Universal Columns to lowerstorey. Tie into nearest catchpit.

300mm wide x full height perspex windows to four sidesof top floor. Perspex in red colour to match upperfenestration.

Dressed and whitewashed hardwood timber decking tosecond storey flooring.

Two rope net tunnels to allow access to upper level. Ropecolour to be neutral to Lanscape Architect approval.

Approximately 350mm diameter cylindrical formedconcrete footing extended 1.2m above ground and

featuring 'spiral' off the form pattern from cardboard tube.

Page 7: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

AL612

DL612

BL612

CL612

1:500

@ A1@ A31:100 1000 30002000 4000 5000 mm

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:40 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L611

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 02 OF 04

DRAFT FOR COMMENT

3-AL186.00 L611 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Scale: 1:50 A1 | 1:100 A3PLAN VIEW

Scale: NTSPERSPECTIVE VIEW

5464

3464

6309

4000

650

2000

(ALL 6 EDGES)

3155

(ALL 6 EDGES)

GENERAL NOTES:

1. All dimensions in mm unless otherwise noted.2. Do not scale off drawings. Use dimensioned measurements only.3. To be read in conjunction with Landscape General Arrangement Drawings 3-AL186.00-L400-L411.4. These drawings are to form the basis for manufacturers shop drawings. Shop Drawings shall conform with the design intent

provided.5. Shop drawings to be submitted to Landscape Architect for approval prior to undertaking works.6. Nominated manufacturer to design and build structure.7. Manufacturer to ensure compliance with Playground Equipment and Surfacing Standards NZS 5828:2015.8. Final setout to be confirmed against issue for construction Landscape General Arrangement Drawings 3-AL186.00-L400-L411 to

approval of Landscape Architect.

1000(DECK WIDTH)

650

250

(ALL 8 EDGES)

AutoCAD SHX Text
N
Page 8: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:42 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L612

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 03 OF 04

DRAFT FOR COMMENT

3-AL186.00 L612 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

Scale: 1:50 A1 | 1:100 A3ELEVATION D

L611Scale: 1:50 A1 | 1:100 A3ELEVATION C

L611

Scale: 1:50 A1 | 1:100 A3ELEVATION B

L611Scale: 1:50 A1 | 1:100 A3ELEVATION A

L611

1:500

@ A1@ A31:100 1000 30002000 4000 5000 mm

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

1800

2400

2600

850

7900

600

TBC

650

3464

5464

1200

GENERAL NOTES:

1. All dimensions in mm unless otherwise noted.2. Do not scale off drawings. Use dimensioned measurements only.3. To be read in conjunction with Landscape General Arrangement Drawings 3-AL186.00-L400-L411.4. These drawings are to form the basis for manufacturers shop drawings. Shop Drawings shall conform with the design intent

provided.5. Shop drawings to be submitted to Landscape Architect for approval prior to undertaking works.6. Nominated manufacturer to design and build structure.7. Manufacturer to ensure compliance with Playground Equipment and Surfacing Standards NZS 5828:2015.8. Final setout to be confirmed against issue for construction Landscape General Arrangement Drawings 3-AL186.00-L400-L411 to

approval of Landscape Architect.

1000

TBC

10001000

1800

2400

2600

850

7900

600

TBC

650

2000

6309

1000

TBC

10001000 4000

1200

Page 9: PE15 FP KING EDWARD PARADE DEVONPORT BEACH

Approved Revision DateRevision Amendment

A DRAFT - LOCAL BOARD CH 30.11.2017

200

100

5010

0mm

300

mm

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:46 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L613

Drawn

Approved Approved Date

Auckland Environmental PO Box 5848Auckland 1141New Zealand

+64 9 355 9500

AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET

PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 04 OF 04

DRAFT FOR COMMENT

3-AL186.00 L613 A

T Jones C Hamilton 30.11.2017

T Jones As Shown

Designed

PLAY OPPORTUNITIES - FIRST STOREY

PLAY OPPORTUNITIES - SECOND STOREY

PLAY OPPORTUNITIES - GROUND LEVEL