7/28/2019 PE-TS-362-501-A001
1/41
T
RAI
2
TECHALL
SP
OWER
CHUR(
800M
NICALEOT C
ECIFIC
BHA
ECTO
POWEJVC
YERM
PROJSPECIANES
TION
AT HE
PROJE
CORF KPC
ARUS
ECT SICATI(DOU
NO.: P
VY ELE
CT ENGNOIDAINDIA
ORATI& BH
UPER
ECIFICN FOLE GI
-TS-36
CTRICA
INEERII
N LIML)
CRITIC
130/3
DER) I
2-501-
S LTD
G MAN
ITED
AL TP
T CAPTAN
001
AGEME
EM
T
7/28/2019 PE-TS-362-501-A001
2/41
TECHNICAL SPECIFICATION FOR
TG HALL EOT CRANE
2X800 MW YERMERUS STPP
Specification no.: PE-TS-362-501-A001Rev. 00Date: J un 12
Sheet 1 of 1
INDEX
S.N. DESCRIPTION PAGES
1.0 Project Information 4
2.0 Project Technical Data Sheet for 2X800MW YERMERUS STPP
9
3.0 Painting Specification (Annexure I ) 1
4.0 Crane Clearance Diagram Drg. No (PE-DG-362-501-A001) for TG hall crane
1
5.0 Write up for Load test procedure of Liftingbeam in Bidders works
5
6.0 BHEL standard QAP 11
7.0 Ref quality plan for Lifting beam 2
8.0 Scope of O&M service to be provided by thebidder
2
9.0 Specific Confirmation 3
10.0 Documents to be submitted along with offerAnnexure C.
1
Note:1.0 The Standard Technical Specification PE-TS-STD-501-A002 Rev 03 shall
be applicable for this project.2.0 Any contradiction between project specific specification PE-TS-362-501-
A001 & Standard specification PE-TS-STD-501-A001 Rev03, the data
given in project specific specification will be followed.
7/28/2019 PE-TS-362-501-A001
3/41
RAICHUR POWER CORPORATION LTD
PROJECT INFORMATION
SHEET 1TITLE
1.0 Owner : Raichur Power Corporation Ltd22/23, Sudarshan Complex,IInd floor, Sheshadri Road,Bangalore560 009Karnataka, India
2.0 Consultant : M/s Evonik Energy Services (I)Pvt. Ltd.,A-29, Sector 16Noida-201301(UP), India
3.0 Project Title : 2x800 MW Yermarus Thermal
Power Station
4.0 Location : YermarusRaichur DistKarnataka State, INDIAIt is situated at about 8 Kms fromRaichur on the Raichur-HyderabadState Highway-13 and 12 kmsaway from Bank of river Krishnaand about 5 kms from Raichur
Thermal Power Station
5.0 Nearest Railway : Chicksugur Railway Station whichis about 2 kms from site.
6.0 Nearest Airport : Hyderabad around 200 kms
7.0 Nearest Port Chennai around at about 470 kmsfromsite.
8.0 Latitude and Longitude : Latitude 16 16 55.9N
Longitude 77 20 38.6E
9.0 Elevation above mean sea level : 350-375 meters
10.0 Climatic Conditions
(a) Ambient Temperature
i. maximumtemperature
: 45o C
ii. minimum temperature : 6o C
7/28/2019 PE-TS-362-501-A001
4/41
RAICHUR POWER CORPORATION LTD
PROJECT INFORMATION
SHEET 2TITLE
iii. Design Temperaturefor all Electrical/MechanicalEquipment
: 50o
C Ambient
(b) Relative Humidity
i. Maximum during monsoon : 85%
ii. Minimum : 20%
iii. Average : 65%(c) Rainfall
Annual average rainMax. for one dayMax. intensityPeriod
::::
720 mm115 mm38 mm/hr
J une to September
(d) Wind Speedi. Prevailing wind
direction: West, South-East, North-West,
South-Westii. Maximum mean wind
speed
: 15.9 Kms / hr
(4.42 m/s)
iii. Average : 9.61 Km/hr(2.67 m/s)
11.0 Wind LoadCalculations for wind effect shall be in accordance with IS:875- (Part-3)latest revision taking into account the following :
(a) Basic wind speed of 39 m/sec as given in Fig.1 of the code.
(b) Factor K1 shall be taken as 1.06
(c) Terrain category shall be 2 and corresponding values shall betaken for K2
(d) Factor K3 shall be taken as 1.0
12.0 Wind Loading for Stack(a) For wind pressure as per clause 11.0 above(b) For RC stacks as per IS: 4998
7/28/2019 PE-TS-362-501-A001
5/41
RAICHUR POWER CORPORATION LTD
PROJECT INFORMATION
SHEET 3TITLE
13.0 Seismic data (as per IS:1893 latest issue)
(a) Zone : Zone III (as per IS:1893- latest )
(b) Importance factor (I) : 1.75
14.0 Auxiliary power supply : Auxiliary electrical equipment to besupplied against this specificationshall be suitable for operation on
the following supply system.
(a) For motors rated above1500 kW
: 11000V, 3 phase, 3 wire, 50Hzmedium earthed AC
(b) For motors rated 175KWand above and below1499KW.
3300V, 3 phase, 3 wire, 50Hzmedium earthed AC
(c) For motor rated 174 kWand below
: 415, 3 phase, 3 wire solidly earthedAC
(d) For motor control centre : 415V, 3 phase, 3 wire solidlyearthed AC
(e) DC. motor starters, DCsolenoids, DC alarm,control and protections
: 220 V DC, 2 wire, unearthed DC
(f) AC control & protectivedevices
: 110 V 1 phase, 50Hz, 2 wire ACsupply. The single-phase 110V ACsupply shall be derived by
Contractor by providing 415V/110Vcontrol transformers of adequaterating with MCCB /MCB on both theprimary and secondary sides.
(g) Uninterrupted powersupply
: 240 V, 1 phase, 50Hz, 2 wire ACsupply from UPS system for I&C(including indicator recorders) andUCMS only
7/28/2019 PE-TS-362-501-A001
6/41
RAICHUR POWER CORPORATION LTD
PROJECT INFORMATION
SHEET 4TITLE
(h) AC solenoids,indicators/recorders,space heaters (for motorsrated 30KW and above)
: 240V 1 phase, 2 wire, 50Hz ACsystem with effectively earthedneutral. The power supply shall bederived by CONTRACTOR byproviding 415V/ 240V transformerof adequate rating with MCCB/MCBon primary/secondary sides.
(i) Winding heating ofmotors below 30kW
: 24 V 1 phase,50Hz, AC with onepoint earthed. This shall be derivedby CONTRACTOR by providing
415V 3 phase, 3 wire, AC supplythrough an adequately rated step-down transformer of adequaterating with MCCB / MCB onprimary/secondary sides.
(j) Solid state controls(including solenoidvalves)
: 24 V DC, 2 wire, supply fromBattery chargers for instrumentationsystem only.
(k) Lighting fixtures : 240 V, 1 phase, 2 wire, 50Hz
system.
(l) Lighting fixtures andspace heaters in panels
: 240 V, 1 phase, 2 wire, 50Hzsystem.
(m) Construction supply : 415 V, 3 phase, 4 wire, 50 Hz ACsupply with neutral lead solidlyearthed.
(n) The above voltages may vary as follows :
All devices shall be suitable for continuous operation over the entirerange of voltage and frequency indicated below without any changein their performance.i. AC supply : Voltage variation 10%
Frequency variation 5%Combined voltage & frequency
variation 10%ii. DC supply : Voltage variation +10%
-20%
7/28/2019 PE-TS-362-501-A001
7/41
S.N.
1.0
2.0
3.0
4.0
5.0
5.1
5.2
6.0
7.0
`8.0
8.1
13
De
Design,and tecranestandanumbe
Numbe
Craneclassifi
Suitabl
outdooduty
Capacit
Main h
Ratedtonnes
OverloaSWC
Aux. H
Rated S
OverloaSWC
Span
Operati
CRANE
PERFO
Cranefull load
Main H
Aux. Ho
Crab trspeed
Crane tspeed
TECHNCIAL0/30T CAP TYERMERUS
scription
, fabricatioting of thconfirm td / cod
r of crane/s
cation
fo
r or indoo
y
ist
SWC
d Test loatonnes
ists
WC tones
d Test loatones
on from
RMANCE
speed wit
ist
ist **
velling
avelling
DATA SHEEG HALL EOTSTPP ( 2X80
IS: 3177
As per
M5 for(part-5)-
r
r
Indoor
As per
C
Full spe
1.6 (TG
7.5
15.0
30.0
T FORCRANES0 MW )
1999 (reaffi
able 1
echanical a993
able 1
3
As per a
abin +pend
ed M/Min
all crane)
DOC.
REV. 0
Page 1
Technical
ms 2006) &
nd Electrica
130T for T
(125%
0T (for TG h
(125% o
tached cran
ent push bu
(
(
(
O.PE-TS-3
DAT
of 10
Particulars
IS 807
l as per IS:
hall crane
of SWC)
all crane onl
SWC)
e clearance
ton +radio
reep spee
.16(10% ofthru VVVF.7510% of maithru VVVF.510% of maithru VVVF.010% of maithru VVVF
62-501-A00
E: 4/6/12
807-2006 a
y)
diagrams
emote cont
M/Min
main speedrives)
speedrives)
speedrives)
speedrives)
nd 13834
ol
7/28/2019 PE-TS-362-501-A001
8/41
8.2
8.3
8.4
9.0
9.1
9.2
9.3
9.4
13
Lift in
Main H
Aux Hoi
Hook A
Hand
COMPDETAIL
Trolley
Type
Methodfabricati
Materialto IS:
Rope d
Material
Numbe
Type of
Flange
Rope d
Standa
Constru
Factor
Type of
Sheave
Material
TECHNCIAL0/30T CAP TYERMERUS
eters
ist
st
pproaches
rail pipes
NENTS
ofon
conformin
rums
(Indicate IS
s provided
grooves
Flangeless
etails
d
ction
f safety
core
s details
DATA SHEEG HALL EOTSTPP ( 2X80
The liftinreach th
As per a
As per a
Refer att
32 mmheight oexceedin6mm thi
Fabricat
Fusion
IS: 2062
Main hoi
) SeamlesGr B & s
One for
Identical
Flanged
Extra
T FORCRANES0 MW )
g rope shallzero level.
tached cran
tached cran
ached cran
B Mediumf1100 mmg 1500 mmk)
d
elded
Gr. B
is t
s pipe ASTress relieve
ach hoist
Right hand
flexible plo
5.25 as pe
Steel/ Fib
Main hoi
F
DOC.
REV. 0
Page 2
be of suffi
e clearance
e clearance
clearance
lass of IS: 1and 600 mwith provisi
A -106 Grd
and Left han
IS:
gh steel / 6
IS
re
t
e 410 WB I
CS Gr. 280-
O.PE-TS-3
DAT
of 10
ient length
diagram
diagram
iagram
161 havingm and vertin of kick pl
Aux. Hoi
. B or fabric
d
266
x 36 constru
: 2062 Gr.
520 IS: 103
62-501-A00
E: 4/6/12
to permit th
top and bottcal post spte (100 mm
is t
ted Fe410
ction, Galva
.25 as per I
Steel / Fibr
Aux. Hoist
/
hook to
om rail atcing nothigh and
IS: 2062
nised
7/28/2019 PE-TS-362-501-A001
9/41
9.5
9.5.1
9.5.2
9.5.3
9.5.4
9.6
A.0
13
DiametEquival
in mm o
Typeprovide
Coupli
Couplin(betweegear bo
Type
Guards
Couplinbox and
Type
Guards
Couplinbox and
Type
Guards
Shafting
Design
ArrangeLubricati
Type of
Gear b
Hoist M
Type ogear bo
Classifi
Type of
Type(greasepump lu
TECHNCIAL0/30T CAP TYERMERUS
rnt sheave
n Root
of guar
g & Shaftin
g detailsn motor and)
nd Enclosur
g details (gewheels)
nd Enclosur
g details (gerope drum)
nd Enclosur
(Output)
f shafts
ent ofon
ubricant
x details
otions
mountingx
ation
gears
f lubricatio/ splash
brication)
DATA SHEEG HALL EOTSTPP ( 2X80
fs
Shouldcalculate
ds
g
MainHoist
s
r
s
r
s
M
f
Heli
/
T FORCRANES0 MW )
ot be lessd main she
Fab
Aux.
ross Trave
Main Hoist
Flexible ge
H
ical
DOC.
REV. 0
Page 3
than 62%ve diameter
ricated from
Hoist
Flexible g
Pro
l
Flexible g
Pro
red couplin
Pro
As per IS :
Grease cu
Gr
MH Micro
Horizonta
Suitable f
NA
Splash L
O.PE-TS-3
DAT
of 10
f.
Shouldof calcu
diameter
rolled steel
ross Travel
ared type
ided
Lo
ared type
ided
A
housed wit
ided
3177-1999
ps/ Nipples
ase
AH
l / Vertical
r M5 duty
Helica
brication
62-501-A00
E: 4/6/12
ot be lesslated main
.
plate
l Long
ng Travel
ux. Hoist
hin the dru
AH
l
han 62%sheave
ravel
micro
A
7/28/2019 PE-TS-362-501-A001
10/41
B.0
9.7
9.8
13
Differenand pini
Material(gear/pi
Casing
Travel
Typegear bo
Classifi
Type of
Type(greasepump lu
Differenand pini
Materialpinions)
Casing
Wheels
Material
Hardne
Type
Numbe
Specificconfor
Arrangelubricati
Lifting
Type
Safe lifti
TECHNCIAL0/30T CAP TYERMERUS
ce in Gon hardnes
snions)
otions
f mountinx
ation
gears
f lubricatio/ splash
brication)
ce in Gon hardnes
s (gear
details
s
s provided
ationing to
menton
ooks
ng capacity
DATA SHEEG HALL EOTSTPP ( 2X80
a
Main Ge
F
CT
Vertical
Helical
/
a
/ Main Ge
F
f
Ramshoswivelin
130 T f
T FORCRANES0 MW )
ars En 9/ 55
Hardabricated F
CT m
NA
NA
ars En 9/ 55
Hardabricated F
Cross tr
4 nos.
MH
rn shank wig type as pe
of IS: 57
or TG hall a
DOC.
REV. 0
Page 4
Min 2
C8/ IS2707
ess confor410w IS: 2
icro
M5
Splash L
Min 2
C8/ IS2707
ess confor410w IS: 2
vel
55 Mn 75 /
300 3
Double
IS: 31
Gr
ith safety latr latest editi49
per IS 574
O.PE-TS-3
DAT
of 10
BHN
r. 1or 2. Pi
ming to IS:62 Gr B &
LT
Vertical/
Horizontal
duty
Helical
brication
BHN
r. 1or 2. Pi
ming to IS:62 Gr B &
EN 9 (55 C
50 BHN
flanged
7-1999
ase
hn
Plaiswiveli
ed
30T f
62-501-A00
E: 4/6/12
inions En 19
3177tress reliev
LT mic
inions En 19
3177tress reliev
Long trav
8)
8 nos.
AH
n with safeting type asition of IS: 1
or TG hall a15560
/EN 24.
d
o
A
A
/EN 24.
d
l
latcher latest
5560
per IS:
7/28/2019 PE-TS-362-501-A001
11/41
9.9
A.0
B.0
9.10
9.11
9.12
10.0
10.1
13
Material
Brakes
Hoist M
Type of
Numbemotor
Braking
Travel
Type of
Numbemotor
Braking
Bearin
Type
Method
lubricati
Bearing
Bridge
Type &
Vertical
Type oto end c
Rails-B
Type / s
Standaconfor
Material
Motors
Hoist M
TECHNCIAL0/30T CAP TYERMERUS
otions
brake
provide
capacity
otions
brake
provide
capacity
s
on
life
girder
Quantity
Deflection
f connectioarriage
ridge girde
ection
ding to
otions
DATA SHEEG HALL EOTSTPP ( 2X80
/
1
/
1
f
Rails sewelded b
T FORCRANES0 MW )
Class 2 / IS:
MH
1+1
50%
CT
1+1
25%
An
Grease
10,0
Box type
LT rail
tions as pery thermit w
Suit
MH
DOC.
REV. 0
Page 5
: 1875
MH micro
EHT+
NA
NA
CT micr
EHT+
NA
NA
ifriction ball
lubrication
00 working
2 nos, Mat
Span
By fitted bol
IS: 3443 Grlding & fusi
IS:
Rail
ble for ambi
MH micr
O.PE-TS-3
DAT
of 10
Cla
A
DCEM
1+
150
o L
DCEM
1+
125
/ roller beari
ith separat
ours.
erial: IS 206
/ 900
ts
ade 50 C 12n welding
443
Steel
ent tempera
A
62-501-A00
E: 4/6/12
s IA or 3/ IS
A
1
%
L
1
%
ngs
pumps
2 Gr. A / B
CT rail
. J oint to be
ture of 500
H
: 1875
micro
NA
NA
micro
NA
NA
butt-
AH micro
7/28/2019 PE-TS-362-501-A001
12/41
10.2
13
Type
Enclosu
Numbe
Voltagefrequen
Class o
Rated c
Rating
Class o
Numbehour
Travel
Type
Enclosu
Numbe
Voltagefrequen
Class o
Rated c
Rating
Class o
Numbe
TECHNCIAL0/30T CAP TYERMERUS
re
s furnished
, phase ancy
protection
apacity (KW
insulation
of sta
otions
re
s furnished
, phase ancy
protection
apacity (KW
insulation
of sta
DATA SHEE
G HALL EOTSTPP ( 2X80
SC, sInve
T
415V +variation
IP 55
) Selectedmaximufrequenc
Motor naover theduty poi
Cl
ts
SC, sInve
T
415V +1
Combine
) Selectedmaximufrequenc
Motor naover the ipoint.
ts
T FORCRANES0 MW )
itable forter duty
EFC
1
0%, 3 Ph,= 10% abs
motor ratincontinuou
y variation,
meplate ratiinput powert.
lass F for s
CT
itable forter duty
EFC
2
0%, 3 Ph, 5
d voltage &
motor ratincontinuou
y variation,meplate ratinput power
lass F for
DOC.
REV. 0
Page 6
NA
NA
NA
0 Hz, 5 %lute
should havload dema
emperature
ng at 50 oCrequiremen
40
q. cage mot
that of
150 st
CT micr
NA
NA
NA
0 Hz, 5 %
frequency v
IP
should havload dema
emperatureng at 50 oCrequirement
40
sq. cage mo
to that o
150 st
O.PE-TS-3
DAT
of 10
SC, suiInvert
TE
Combine
e minimumd includingrise and oth
hall have atof driven e
CDF
rs with tem
class B
rts / hr
o
SC, suInver
T
riation =10
55
e minimumd includingrise and othshall haveof driven eq
CDF
tors with te
f class B
rts / hr
62-501-A00
E: 4/6/12
table forer duty
FC
1
voltage &
argin of 15voltage ander factor.
least 15%uipment at
rise limited
LT
itable forter duty
FC
4
% absolute
argin of 15voltage ander factor.at least 15uipment at
p rise limite
NA
NA
NA
requency
% over
arginated
to
LT micro
NA
NA
NA
% over
marginated duty
d
7/28/2019 PE-TS-362-501-A001
13/41
11.0
12.0
13.0
14.0
15.0
13
hour
Spacerequire
Limit s
Type
Numbe
ControlEnclosu
Power(DSL)
Type
Length
Control
Material
Numbelocation
Degree
MasterControl
Numbe
Voltagerating
Locatio
Cable
Material
Size
Type
Voltage
Voltage
TECHNCIAL0/30T CAP TYERMERUS
eaterent
itches
provided
voltage/re
conductor
panel
s and
of Protectio
lers
of steps
& curre
grade
drop
DATA SHEEG HALL EOTSTPP ( 2X80
Mai
RotarG
1
CT:(Fest
One
Mai
t
Min. 2.5
Cable f
T FORCRANES0 MW )
For
hoist
y gear +avity
+ 1
LT: PVC
Flexible traioon type) E
S
R
ach for MH,
Hoist
5
Powe
Copper
mm2 for Cu.
rom main is
DOC.
REV. 0
Page 7
motors abo
Aux. Hois
Rotary ge+Gravit
1 + 1
110 V
shrouded
ling cable mP insulated
itable for e
olled sheet
AH, CT an
IP
Aux Hois
5
110
In c
FRL
11
lating switc
O.PE-TS-3
DAT
of 10
ve 30 KW r
tCroTrav
rLever
2
/ IP 54
u conducto
ounting on rCu conduct
tire bay len
teel 2mm si
LT located
54
** CroTra
4
/10 A
abin
PVC
0 V
(1.5M abo
62-501-A00
E: 4/6/12
ting
sel
Lon
type Le
r bus bar.
etracting suor as per IS:
th
ze
on bridge pl
ssel
Lon
Control
Copper
Min. 1.5 m
e operating
g Travel
er type
2
port9968
tform
g Travel
4
2
floor) to
7/28/2019 PE-TS-362-501-A001
14/41
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
13
Contac
Switch
Fuses
Overlo
PortablExtingu
Type a
Locatio
Power
Transfo
Control
Lighting
Illumin
In cabin
Over Br
Under b
For in
crane c
Ventilat
Buffer
Numbe
Type
TECHNCIAL0/30T CAP TYERMERUS
ors
s
d relay
e Fireisher
d size
upply
rmer
tion
idge
ridge
spection
mponents
ion
DATA SHEEG HALL EOTSTPP ( 2X80
motor
AC 4 d
AC
Te
415 V,
40Wlamp
4 nos 6
4 nos 4
f One (1)
wire guainspectio
Springbring t
T FORCRANES0 MW )
terminal shae
uty for rever
23 for moto
perature co
One i
3 phase, 3len
lorescent fi 1 each, 2n
W Bulk-he24
00 W HPSV
ortable 40
rd) hand lan of crane c
On
Cross Tra
4
loaded/ hyhe loaded cpeed at a d
DOC.
REV. 0
Page 8
ll be so sizexceed 3% o
sing applicaappli
application,
H
pensatedprev
5.0 kg ,
n cabin** an
ire supply agth with cha
Qty /
2 X 100 %
One /
ture + Bulkos. 24V 5
d fittings wi- 5A - 3 pin
lamps
(SLS lamp
p with min.omponents
(1) no. Ele
el
raulic type rane to resteceleration r
O.PE-TS-3
DAT
of 10
that the vorated voltag
ion. AC 3 dation
AC 22 for o
C
i metallic wintor.
CP type
d Three on
t operating flge over swi
ating
/ 415/110V
15/240V
ead fitting 3 pin ind
h incandesindustrial so
with enclos
alf span len
tric fan in c
bber bufferrom speedate not exce
62-501-A00
E: 4/6/12
ltage drop de.
ty for non r
ther applica
th single ph
ridge
loor at centritch.
ith 60W incustrial sock
ent lamps acket
d type batt
gth flexible
bin.
Long Travel
4
. To be desif 50 % of theding 5 m/s
es not
versing
ion.
sing
of bay
ndescentt.
nd 4nos.
ry and
able for
ned toe rated.
7/28/2019 PE-TS-362-501-A001
15/41
26.0
27.0
28.0
29.0
30.0
31.0
13
Typerequire
bridge.
Positionpoint
Emerge
Typeplatfor
Length
Providesides
Operat
Type of
Area aclear he
Operat
Warnin
Positioncontroll
Type ofHoists/operati
Paintin
Whetheoperati
Liftingbforoper
TECHNCIAL0/30T CAP TYERMERUS
f platford on th
of acces
ncy escape
of accesto cabin
d on bot
rs Cabin
constructio
d minimumight
rs seat
gong
ofrs
control forCT/LTn
r tandemn required
eamandslinationtande
DATA SHEE
G HALL EOTSTPP ( 2X80
C
s
s
2
Footoperate
23
T FORCRANES0 MW )
hequered pl
500/1850 m
operated Brfrom insid
In
Sha
5T capacity l
DOC.
REV. 0
Page 9
te platform
From
Rung lad
By St
Full sp
Y
Closed ty
m with a cle
Revolv
ss gong su. Suitable fo
at 3
ront/ side of
Through
ll be as per
Y
ifting beam
O.PE-TS-3
DAT
of 10
6 mm thick
cabin
er at ends
ircase
n length
es
e with AC
ar head roo
ng type
pended outr 240 V AC.5 m
operators c
VVF drive
nnexure I b
S
ith slings s
62-501-A00
E: 4/6/12
s per IS :35
of 2000m
side the cabof noise leve
hair
elow
hall be provi
02
.
in andl 95 dBA
ded
7/28/2019 PE-TS-362-501-A001
16/41
PAIN
A)
Sur
Pri
Fini
Tot
B)
Sur
Pri
Fini
Tot
COLO
13
TING SP
Structural
ace prepa
er
sh Coat
l DFT
Electrical
ace prepa
er
sh Coat
l DFT
R SHADE
S. No
D
1 C
2 Bas
3 H
4 E
s
5 Pa
m
TECHNCIAL0/30T CAP TYERMERUS
CIFICAT
ation : De
( S
: Red
Mini
: Synt
Mini
: 125-
Control P
ation : Se
: Zinc
Mini
: Synt
Mini
: 110 -
Item
scription
ane Struct
ttom blocsembly
oks
d carriage
eep
nels and
tors
DATA SHEEG HALL EOTSTPP ( 2X80
ON FOR
greasing a
1/ ST 2 /
xide Zinc
um DFT
etic ename
um DFT 3
45
nel
en tank pr
phosphate
mum DFT
etic ename
um DFT
145
Color
re Golde
as per
Goldeas per
Golde
as per
Golde
as per
Steel
Purch
T FORCRANES0 MW )
OUBLE
d Mechani
T 3 as app
chromate a
30 per co
l (Alkyd m
5 per co
cess
Alkyd me
25- 35 p
l (Alkyd m
0-25 per
Shade
n yellow, s
IS-5
n yellow, sIS-5
n yellow, s
IS-5
n yellow, s
IS-5
rey/as req
ser.
DOC.
REV. 0
Page 1
IRDER
cal cleanin
licable)
s per IS: 2
at.
edium) as p
t.
ium)- 2 co
r coat.
edium) as p
coat.
ade 356
ade 356
ade 356
ade 356
ired by
O.PE-TS-3
DAT
0 of 10
OT CRA
with wire
74 ( Alkyd
er IS: 2932
at ,
er IS: 2932
Remarks
With blac
With 100
black zebr
With blac
62-501-A00
E: 4/6/12
ES
brush or h
medium)-
- 2 coats,
- 3 coats,
strip
m wide
a strip
strip
nd tool.
2 coat ,
7/28/2019 PE-TS-362-501-A001
17/41
7/28/2019 PE-TS-362-501-A001
18/41
2X800MWYERMERUSTGHALLCRANEOF130/30TCAPACITYINTANDEM
WriteuponLoadTestingLiftingBeamTestingatManufacturersWorks
Thiswriteup briefly describes the procedure for carrying out the load testing of lifting beam at
manufacturersworksbythesuccessfulbidderforthesaidproject.Intentionhereisnottoelaborate
onstep
by
step
procedure
for
testing
of
lifting
beam
but
to
broadly
outline
the
type
of
load
test
for
theliftingbeamrequiredtobecarriedoutbythebidder.Loadtestingofthebeamcanbecarriedby
anyofthefollowingthreealternatives.Briefprocedureforloadtestingoftheliftingbeamwithallthe
threealternativesismentionedisasunder:
ALTERNATIVEI
a)Liftingbeamassembly(lowerandupper liftingbeam)shallbehungsuitablyfromastructure
capableofholdingtheloadforwhichtheliftingbeamisdesigned(235T)withmargins,atthe
pointsfromwheretheliftingbeamissupposedtobeheldwiththehooksduringactualcrane
operation in tandem.Actual liftingpinsshallbeused forhanging the liftingbeam.Suitable
wireropes/chainsshallbeusedforhangingtheliftingbeamthroughpinstothestructure.
b)Loadshallbeappliedon the lower liftingbeamexactlybelowtheabovementionedhanging
arrangementwith thehelpofhydraulicjackofsuitablecapacity.Durationofapplicationof
loadshallbe30minutes.
c)Loadcellsshallbefixedbelowthehydraulicjacktoascertaintheloadapplied.
d)Deflectionoftheliftingbeamshallbemeasuredatthecentreandnoteddownunderloaded
condition.
e)After30minutes, the load shallbe removedand thedeflectionof the liftingbeamshallbe
measuredatthecentreagaintofindoutthepermanentdeflection,ifany.
f)Maximum deflection in the lifting beam should not exceed the allowable deflection as per
relevantIS/equivalentstandard.
g) Load testingof the liftingbeam atmanufacturersworks shall be acceptable inhorizontal
conditionalso(incasethebidderdoesnthavearrangementforverticaltestingofthebeam).
However, insuchcases,necessaryfixtures/arrangementsshallhavetobearrangedbythe
bidderto
demonstrate
testing
of
beam
under
similar
condition
of
loading
as
will
be
seen
by
thebeamduringactualtandemoperationofthecranes.
7/28/2019 PE-TS-362-501-A001
19/41
ALTERNATIVEII
a)Liftingbeamshallbeplacedonelevatedpedestalsinsteadofhangingfromthefixedstructure,
as mentioned in the alternative I above and the load shall be applied with the help of
hydraulicjackfrombelow.
b)AllotherrelevantconditionsshallremainsameasmentionedinalternativeIabove.
ALTERNATIVEIII
a) Liftingbeam shallbeplacedon theelevatedpedestalsasmentioned inalternative IIabove.
However the load shall be applied from the top of the lifting beam. Either dead load or
hydraulicloadcanbeusedforthispurpose.
b)IncasebidderpreferstogowithAlternativeIII,biddershallberequiredtotestthelowerlifting
beamalsointhesimilarfashionastheupperliftingbeam.c)Allotherrelevantconditionsshall
remainsameasmentionedinalternativeIabove.
(BiddersSignaturewithSeal)
7/28/2019 PE-TS-362-501-A001
20/41
7/28/2019 PE-TS-362-501-A001
21/41
7/28/2019 PE-TS-362-501-A001
22/41
7/28/2019 PE-TS-362-501-A001
23/41
7/28/2019 PE-TS-362-501-A001
24/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
d filletwelds Sizeandsurfacedefects Major Visual 100% ComponentDrg.
Component
Drg.
Major DPT 10%RANDOM
ASMESecVIII
Div1
ASMESecV
Div1
Append8 Append8
e DimensionsforGirder,end Major Dimensional 100% VendorMfg.Drg. VendorMfg.
carriageropedrumetc. Measurement
Camber,Verticality,bend
etc
f Heattreatmentofropedrum S tressrelieving Major ReviewofSR 100% ASMESecVIII,Div I ASMESecVIII,
I
chart
3 Gearboxcasing
a Material Surfacecondition Major Visual 100% ComponetDrg. ComponetD
Chemical&mech Major Measurement 100% ComponetDrg. ComponetD
Correlationwith 100% IS:2062 IS:2062T.C.Checktest
inabsesnceofT.C.
Correlation
b welding Welding&Dimensionalconformity Major Measurement 100% ComponetDrg. ComponetD
c Heattreatment stressrelieving Major ReviewofSRchart 100% Compone ntDrg./ ComponentD
ASMESecVIII,Div
I
ASMESecVI
Div Ifor
procedure.
4 PLATFORMS Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components
5 L.T.FRAMES Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components
6 HANDRAILINGS Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components
7 CABIN Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components
LEGEND :
MANAFACTURER/ CONTRACTOR C:BHELCQS
** M:MANAFACTURER/SUBCONTRACTOR
INDICATE"P"PERFORM"W"WITNESSAND"V"DOCUMENTREVIEW
D* RECORDSINDETIFIEDWITH'TICK'( )SHALLBE ESSENTIALLY
INCLUDEDBYCONTRACTORINQADOCUMENTATION
SUBCONTRACTOR
finalinsectionoffabricated
componentslistedinSr.1
above
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
25/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
N:CUSTOMER REVIEWEDBYSIGNATURE
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
26/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
8 Currentcollerctorarms Dimensionalconformity Minor Measurement 100% Mfr.Catalog Mfr.C at al og
9 DSLGuard Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components
10 Rails Dimensionalconformity, Minor Measurement 100% G.A.drg./IS:3443
Vendore
T.C./Appd.Data
Sheet
G.A.drg./IS :
Vendore
T.C./Appd.Da
SheetChemical&hardness Major Checkchemical&
hardness
One/Cast IS3443 IS:3443
11 MECHANICALCOMPONENTS
A a) wheels
i) Materials Chemicalscomposition and Major Corelationwith 100% Mfg.drg./IS :1570 Mfg.drg./IS :1
MechanicalProporties. mfr'sTC /BS 970 /BS 970
ii) Machined a) Dimensions Major Measurement 100% Component
Drawing
Component
Drawing
b) Hardness Mechanical 100% ApprovedData
Sheet/Mfg.Drg.
ApprovedDa
Sheet/Mfg.
c) UT NDT 100% ReferNote:6 ReferNote6
d) DPT NDT 100% 8 App8
b) Gears,Pinions,Shafts, i) ChemicalsComposition Major Correlationwith 100% Component
Drawing,
Component
Drawing,
Axlesetc &heattreatment,Mech mfr'sTC BS:970/IS:1570 BS:970/IS:
1570
Properties. Checktestin ApprovedData
Sheet
ApprovedDa
Sheet
absenceofTC
ii)UT(afterproofmachining) Major checkforUT 100% A SMESecV ReferNote6
(above50mmdia)
iii) Hardness Major checkfor 100% Mfg.drg.& Mfg.drg.&
Hardness ApprovedData ApprovedDa
iv) Dimensions Major Measurement 100% Component
Drawing
Component
Drawing
V)D.P.Testonteeth Major NDT 100% ASTME165 NoCrackand
of
i nd ic at ion
LEGEND :
MANAFACTURER/ CONTRACTOR C:BHELCQS `
SUBCONTRACTOR
D* RECORDSINDETIFIEDWITH'TICK'( )SHALLBE ESSENTIALLY
INCLUDEDBYCONTRACTORINQADOCUMENTATION
** M:MANAFACTURER/SUBCONTRACTOR
INDICATE"P"PERFORM"W"WITNESSAND"V"DOCUMENTREVIEW
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
27/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
N:CUSTOMER REVIEWEDSIGNATURE
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
28/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
B Pulleys,Brakedrums,coupling&othermajorsteelcastings&forging
i) Materials Physical/Chemical/Hardness Major Corelationwith 100% Components
Drawing
Components
Drawingexceptpulleys. mfr'sTC
ii) Machined a) Dimensions Major Measurement 100% Components
Drawing
Components
Drawing
b) DPT ingrooveafter Major NDT 100% ASTM E165 No.crack/Lin
machiningforpulleysonly. indication
C Gearboxassy&idlerunning Checkforoilleakage,Noiselevel, Major Visual& 100% Vendorstandard Smoothrunn
no
backlash,riseintemp.after2 Measurement oilleakage,N
Hrs.ofrunning. 85dbat1Mt
Max.Temp.
40Cabovea
D a) Topblcok,bottomblock dimensionalconformity Major Masurement 100% Assemblydrawing Assembly
drawing
b) Hook i)Chemicalcomposition,Heatt re at me nt , M aj or C he mi cal& 100%
Mechanicalpropertiesonintegeral Tensile
testbar
ii)UTonrawmaterialofhook Major UT 100% ASMEsecv Annex1
(Attached)
iii)Forgingoperationofhook Major Visual 100% IS:5749/IS:15560 IS:5749/IS:15
iv)Proofloadtest Major Mechanical 100% IS:5749/IS:15560 IS:5749/IS:15
v)UT&MPIafterproofloadtest Major UT &MPI 100% ASMEsec v Annex1forU
(UTonshankportiononly) Nocrack&li
indication(Fo
E Ropedrumassembly Die mnsionalconformity Major Measurement 100% Component
Drawing
Toleranceas
drg
LEGEND :
D* RECORDSINDETIFIEDWITH'TICK'( )SHALL
BE ESSENTIALLY
INCLUDEDBYCONTRACTORINQA
DOCUMENTATION
** M:MANAFACTURER/SUBCONTRACTOR
MANAFACTURER/ CONTRACTOR C:BHELCQS
SUBCONTRACTOR
INDICATE"P"PERFORM"W"WITNESSAND
"V"DOCUMENTREVIEW
Material:ClassIIIS:1875
Profile:IS:IS5749/IS15560
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
29/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
N:CUSTOMER REVIEWEDBYSIGNATURE
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
30/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
12 E le ct ri calcomponents
a) Motors( =
7/28/2019 PE-TS-362-501-A001
31/41
7/28/2019 PE-TS-362-501-A001
32/41
MANUFACTURER'SNAME&ADDRESS
SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN
NO. CHECK OFCHECK DOCUMENT NORMS
1 3 4 5 6 7 8
QP NO : PETSSTD501A001
REV :
DATE :
MANUFACTURINGQUALITYPLAN
COMPONENTS&
ITEM:
OPERATION
4
Format: QS-01-a1-P-9/F1/R1 BHEL-QAP
7/28/2019 PE-TS-362-501-A001
33/41
7/28/2019 PE-TS-362-501-A001
34/41
7/28/2019 PE-TS-362-501-A001
35/41
PROJECT : 2
QP. NO. :
BHEL DRG. NO.:
Rev. 0
DATE :
1 3 4 5 6 8 92
REFERENCE
DOCUMENT
SR.
NO.
CLASS
MANUFACTURING QUALITY PLAN
QUANTUM OF
CHECK
COMPONENT &
OPERATIONS
ITEM: 235T LIFTING BEAM
ASSEMBLY FOR 130/30 D/G EOT
CRANE
MANUFACTURER NAME & ADDRESS
FORMAT OF
RECORD
TYPE OF
CHECK
CHARACTERISTIC
PACKAGE :-T
CONTRACT
7
ACCEPTANCE
NORMS
b)
Surface defect & size Major Visual 100% Component Drawing inspection
report
DPT 10% at random Free from linear
indication
inspectio n
report
iii) Visual & dimensional Major Dim ensional &
measurement
100% Individual component
drawing
inspectio n
report
3) Visual &
Dimensional .
Major
.
.
Visual &
Dimensional
check
100% GA drawing of lifting
beam / IS 3177 & Tech.
Specification.
interrnal
inspection
report.
4) AS per approved QAP
5)
Visual
Major
Visual
100%
Load Test Procedure
Inspection
Report
LEGEND: FOR CUSTOMER USE
Contractor"C" CONTRACTOR(BHEL)
"N" CUSTOMER ( NTPC )
INDICATE "P" PERFORM, "W" WITNESS AND "V" VERIFICATION AS
" CHP" SHALL IDENTIFIED IN COLUMN " N "
NOTE: ITEMS NOT COVERED IN MQP, MAY BE CLEARED ON BASIS
OF "CERTIFICATE OF CONFIRMANCE"SIGNATURE
sub-contractor
REVIEWED
Final assembly of
Lifting Beam
Inspection of
fabricated lifting beam
Component Drawing
Fillet Weld
Individual component
drawing
INCLUDED BY CONTRACTOR IN QA DOCUMENTATION
Manufacturer/ "M" MANUFACTURER/ SUBCONTRACTOR
RECORDS IDENTIFIED WITH 'TICK ( ) SHALL BE ESSENTIALLY
GA drawing of lifting
beam /IS 3177 &
Tech-Specification.
Load Test at
manufacturers' works
as well as Site
Load Test Procedure
IS:3658
Review of QA
Documents
7/28/2019 PE-TS-362-501-A001
36/41
2X800 MW YERMERUS STPP, 2 NO'S 130/30T TG HALL EOT CRANE
OPERATION AND MAINTENANCE SERVICES FOR 2 YEARS SHALL
INCLUDE BUT NOT LIMITED TO FOLLOWING
1.0 For Operation of the Crane
An experienced crane operator shall be available as and when required by BHELfor at least 16hrs a day, daily.
2.0 For Maintenance of the Cranea) Break-Down Maintenance
i) In case of any break-down of the crane during the contract period,service engineer shall be made available at site within 72 hrs.
ii) All the critical spares and consumables, as deemed necessary by themanufacturer shall be made available at the site. No delay in crane
maintenance shall be allowed by BHEL due to non-availability ofrequired spare at site.
b)Preventive Maintenancei) Following work should be carried out quarterly
Bridge and Trolleywheel assy
Checking for wear, flat spots and cracks in flange. Ensuredrive wheels are of the same diameter.
Runway Checking alignment and elevation of gantry track. Checkingrail clamp bolts.
Machine Bolts Checking all foundation bolts of Electrical and Mechanicalequipments for tightness.Structural Bolts Checking for tightness. They should also be checked after
the first month of operation.Flexible Couplings Checking pins and teeth for wear, cleaning and greasing.Cross-shaftPlummer Blocks
Dismantling cap. Cleaning and checking oil seals and to bepacked with fresh grease.
Trolley Collectors Checking of cable trolleys / cabling / chain. Ensuringconnection of trolley wheels is kept through entire length ofspan.
Brakes All Brake assembly will be checked for loose connection,
earthing connection, linings for wear, leakages andadjustments to ensure brake is not rubbing the brake drumduring operation. Greasing pins and operation adjustment ofbrakes.
ResistorConnections
Checking, tightening connections at grid joints and at cableterminations.
Control Station Clean out control cabinets. Checking of all connection atpush buttons, master controllers contact tips, cams andterminals.
Control Panels All Control Panels will be checked for loose connection andcleaning the contactor contacts, if required will be replaced.
Electrical Motors All motion motors connection will be checked for loosecontacts in terminal box loose crimping of wire lugs, loose
7/28/2019 PE-TS-362-501-A001
37/41
contacts on slip ring assembly with carbon brush. Earthingsconnection with motor.
Safety Switches All limit switches will be checked for desired operation andlimits. Emergency switches will be checked.
Main Collectors Checking of worn collector shoes, sag in main runway wiring,ensuring contact is kept through entire length runway
properly.Electricalconnections
Checking throughout electrical equipments for looseconnection such as selector switches, junction boxes, minisolator switch etc.
Lubrication All gear box and thrusters oil level will be checked. Allbearings, couplings grease will be checked.
Testing After completion of checking and required rectification, trolleywill be checked for idle operation, for brake operation, limitswitch operation & safety switch operation. All motorcurrents will be checked on no load.
ii) Following work should be carried out annually.
Gear Boxes Oil seals will be checked, if required will be replaced. Gearand pinion teeth will be checked. Drain the oil cleaning gearbox and refill fresh oil.
Motor All motors insulation test and meager test will be carried out.Resistance Box All resistance boxes step resistance value will be checked.
iii) Besides the quarterly and annual preventive maintenance schedulementioned above, operator shall carry out any daily, weekly, monthlymaintenance schedule as deemed necessary and shall operate the craneonly when the fitness of the crane for operation has been ensured.
7/28/2019 PE-TS-362-501-A001
38/41
SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM
BIDDER
SPECIFICATION: PE-TS-362-5
TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C
PROJECT: 2X800 MW YERMERUS STPP
S.N. DESCRIPTION REPLY / COM
1.00 MECHANICAL1.01 Bidder to confirm that the Data sheet attached along with project
specific Technical Specification No. PE-TS-362-501-A001 Rev. 00 are
acceptable without any deviation. Bidder to confirm the same.
CONFIRMED
1.02 In case of any deviation, the same has been furnished in the separate
Deviation schedule attached along with the Technical Specification.
Bidder to note that deviation mentioned elsewhere will not be taken
cognizance of in any case. Bidder to confirm the same.
CONFIRMED
1.03 Bidder to note that QAP indicated in the standard technical specification
PE-TS-STD-501-A001 R03, is the minimum requirement. Finalisation of
the same shall be as per final approval by BHEL/CUSTOMER. Bidder
to confirm
CONFIRMED
1.04 Bidder to confirm that there is no deviation from the Crane Clearance
Diagram no. PE-DG-362-501-A001 Rev 01A . Bidder to specifically
note that in no case any deviation from the Crane Clearance diagrams
given by BHEL shall be accepted. Bidder to confirm the same.
CONFIRMED
1.05 Bidder to confirm that there is no deviation from the makes of various
sub vendors items as given in annexure-I Makes of Sub-vendors
Items , volume II-B, section-C. of standard technical specification PE-
TS-STD-501-A001 Rev. 03 Bidder shall confirm the compliance
CONFIRMED
1.06 The material offered is equal or better in grade than specified. Bidder
shall confirm the compliance
CONFIRMED
1.07 Bidder to note and confirm that there will be no price implication for
variation in Span, Lift and baylength upto 500 mm. Bidder to confirm
CONFIRMED
1.08 Bush as a antifriction bearing shall not be used. Bidder shall confirm
the compliance
CONFIRMED
7/28/2019 PE-TS-362-501-A001
39/41
SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM
BIDDER
SPECIFICATION: PE-TS-362-5
TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C
PROJECT: 2X800 MW YERMERUS STPP
1.09 Bidder to specifically note that there is specific requirement of the
painting for this particular project. Bidder to confirm the compliance to
the attached Painting specification.( Annexure I)
CONFIRMED
1.10 Bidder to confirm that in case of award of order, Hook drawing shall be
submitted to BHEL within one week of receiving the LOI. Bidder also to
submit Unpriced Purchase Order copy of Hook within 15 days from LOI
. Bidder to confirm
CONFIRMED
1.11 Bidder to confirm that in case of award of order, Motor Sizing
calculations shall be submitted within 15 days time of receiving the LOI
by the bidder. Bidder to confi rm the same.
CONFIRMED
1.12 Bidder to note that lifting beam has to be sourced from BHEL approved
suppliers only. Also the testing of the lifting beam at manufacturers
works shall have to be carried out by the bidder as per BHEL approved
QAP. List of sub-vendors and reference MQP (to be finalized during
detail engineering) for Lifting beam testing at manufacturers works, are
being furnished along with the specification. Bidder to confirm
acceptance.
CONFIRMED
2.00 ELECTRICALS
2.01 CABLES
a All CONTROL AND POWER cables shall be as per BHEL specification.
Bidder shall confirm the complianceCONFIRMED
b Makes of cables shall be as agreed in between BHEL / Customer during
contract stage and approved make shall only be supplied. Bidder shall
confirm the com liance
CONFIRMED
c Cable required between isolating switch / change over switch and DSL
included in the scope. Bidder to confi rm the same.CONFIRMED
2.02 MOTORS
a Class of insulation of Sq. cage motors shall be "F" and the temperature
rise to limited to class "B". Bidder shall confirm the compliance CONFIRMED
7/28/2019 PE-TS-362-501-A001
40/41
SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM
BIDDER
SPECIFICATION: PE-TS-362-5
TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C
PROJECT: 2X800 MW YERMERUS STPP
b Motor size shall be subjected to the approval of motor calculation.
Bidder shall confirm the compliance CONFIRMED
c The successful bidder shall submit the data sheet -C of LV motors
during detailed engineering and the same is subjected to customer
approval without any cost implication on account of the same.Bidder
shall confirm the compliance
CONFIRMED
d The minimum requirementindicated in the BHEL's Standard QAP shall
be complied for Electrical Items. Bidder shall confirm the compliance CONFIRMED
e Bidder to confirm that there is no technical deviation on "Electrical
portion of StanderdTechnical specification" and "Data sheet of Electrical
portion". Bidder to confi rm the same.
CONFIRMED
7/28/2019 PE-TS-362-501-A001
41/41
Annexure-C
VENDOR HAS TO SUBMIT ONLY FOLLOWING DOCUMENTS ALONG WITH THE OFFER,FOR TECHNICAL EVALUATION OF THE BID:-
1.0 Specific confirmation / Comments from the bidder as per BHEL Format.
2.0 NO DEVIATION CERTIFICATE Clearly mentioning that bidder hasconsidered No - Deviation from the technical specification provided byBHEL.
OR
DEVIATION Sheet, indicating clause wise technical deviation if any.
3.0 Unpriced format, duly mentioned Quoted against each Sl.no. below
each column.
Note1:- Any other standard document/ details furnished by the bidder i.e.Data sheet / Crane clearance diagram/ GA Drawing/ QAP etc. shall not betaken in to consideration for evaluation.
Note 2:- Bidder to note that if the bidder does not submit the documentsmentioned in Sl. No. 1.0 ,2.0, and 3.0 along with their offer then their offer isliable to be rejected.