PE-TS-362-501-A001

Embed Size (px)

Citation preview

  • 7/28/2019 PE-TS-362-501-A001

    1/41

    T

    RAI

    2

    TECHALL

    SP

    OWER

    CHUR(

    800M

    NICALEOT C

    ECIFIC

    BHA

    ECTO

    POWEJVC

    YERM

    PROJSPECIANES

    TION

    AT HE

    PROJE

    CORF KPC

    ARUS

    ECT SICATI(DOU

    NO.: P

    VY ELE

    CT ENGNOIDAINDIA

    ORATI& BH

    UPER

    ECIFICN FOLE GI

    -TS-36

    CTRICA

    INEERII

    N LIML)

    CRITIC

    130/3

    DER) I

    2-501-

    S LTD

    G MAN

    ITED

    AL TP

    T CAPTAN

    001

    AGEME

    EM

    T

  • 7/28/2019 PE-TS-362-501-A001

    2/41

    TECHNICAL SPECIFICATION FOR

    TG HALL EOT CRANE

    2X800 MW YERMERUS STPP

    Specification no.: PE-TS-362-501-A001Rev. 00Date: J un 12

    Sheet 1 of 1

    INDEX

    S.N. DESCRIPTION PAGES

    1.0 Project Information 4

    2.0 Project Technical Data Sheet for 2X800MW YERMERUS STPP

    9

    3.0 Painting Specification (Annexure I ) 1

    4.0 Crane Clearance Diagram Drg. No (PE-DG-362-501-A001) for TG hall crane

    1

    5.0 Write up for Load test procedure of Liftingbeam in Bidders works

    5

    6.0 BHEL standard QAP 11

    7.0 Ref quality plan for Lifting beam 2

    8.0 Scope of O&M service to be provided by thebidder

    2

    9.0 Specific Confirmation 3

    10.0 Documents to be submitted along with offerAnnexure C.

    1

    Note:1.0 The Standard Technical Specification PE-TS-STD-501-A002 Rev 03 shall

    be applicable for this project.2.0 Any contradiction between project specific specification PE-TS-362-501-

    A001 & Standard specification PE-TS-STD-501-A001 Rev03, the data

    given in project specific specification will be followed.

  • 7/28/2019 PE-TS-362-501-A001

    3/41

    RAICHUR POWER CORPORATION LTD

    PROJECT INFORMATION

    SHEET 1TITLE

    1.0 Owner : Raichur Power Corporation Ltd22/23, Sudarshan Complex,IInd floor, Sheshadri Road,Bangalore560 009Karnataka, India

    2.0 Consultant : M/s Evonik Energy Services (I)Pvt. Ltd.,A-29, Sector 16Noida-201301(UP), India

    3.0 Project Title : 2x800 MW Yermarus Thermal

    Power Station

    4.0 Location : YermarusRaichur DistKarnataka State, INDIAIt is situated at about 8 Kms fromRaichur on the Raichur-HyderabadState Highway-13 and 12 kmsaway from Bank of river Krishnaand about 5 kms from Raichur

    Thermal Power Station

    5.0 Nearest Railway : Chicksugur Railway Station whichis about 2 kms from site.

    6.0 Nearest Airport : Hyderabad around 200 kms

    7.0 Nearest Port Chennai around at about 470 kmsfromsite.

    8.0 Latitude and Longitude : Latitude 16 16 55.9N

    Longitude 77 20 38.6E

    9.0 Elevation above mean sea level : 350-375 meters

    10.0 Climatic Conditions

    (a) Ambient Temperature

    i. maximumtemperature

    : 45o C

    ii. minimum temperature : 6o C

  • 7/28/2019 PE-TS-362-501-A001

    4/41

    RAICHUR POWER CORPORATION LTD

    PROJECT INFORMATION

    SHEET 2TITLE

    iii. Design Temperaturefor all Electrical/MechanicalEquipment

    : 50o

    C Ambient

    (b) Relative Humidity

    i. Maximum during monsoon : 85%

    ii. Minimum : 20%

    iii. Average : 65%(c) Rainfall

    Annual average rainMax. for one dayMax. intensityPeriod

    ::::

    720 mm115 mm38 mm/hr

    J une to September

    (d) Wind Speedi. Prevailing wind

    direction: West, South-East, North-West,

    South-Westii. Maximum mean wind

    speed

    : 15.9 Kms / hr

    (4.42 m/s)

    iii. Average : 9.61 Km/hr(2.67 m/s)

    11.0 Wind LoadCalculations for wind effect shall be in accordance with IS:875- (Part-3)latest revision taking into account the following :

    (a) Basic wind speed of 39 m/sec as given in Fig.1 of the code.

    (b) Factor K1 shall be taken as 1.06

    (c) Terrain category shall be 2 and corresponding values shall betaken for K2

    (d) Factor K3 shall be taken as 1.0

    12.0 Wind Loading for Stack(a) For wind pressure as per clause 11.0 above(b) For RC stacks as per IS: 4998

  • 7/28/2019 PE-TS-362-501-A001

    5/41

    RAICHUR POWER CORPORATION LTD

    PROJECT INFORMATION

    SHEET 3TITLE

    13.0 Seismic data (as per IS:1893 latest issue)

    (a) Zone : Zone III (as per IS:1893- latest )

    (b) Importance factor (I) : 1.75

    14.0 Auxiliary power supply : Auxiliary electrical equipment to besupplied against this specificationshall be suitable for operation on

    the following supply system.

    (a) For motors rated above1500 kW

    : 11000V, 3 phase, 3 wire, 50Hzmedium earthed AC

    (b) For motors rated 175KWand above and below1499KW.

    3300V, 3 phase, 3 wire, 50Hzmedium earthed AC

    (c) For motor rated 174 kWand below

    : 415, 3 phase, 3 wire solidly earthedAC

    (d) For motor control centre : 415V, 3 phase, 3 wire solidlyearthed AC

    (e) DC. motor starters, DCsolenoids, DC alarm,control and protections

    : 220 V DC, 2 wire, unearthed DC

    (f) AC control & protectivedevices

    : 110 V 1 phase, 50Hz, 2 wire ACsupply. The single-phase 110V ACsupply shall be derived by

    Contractor by providing 415V/110Vcontrol transformers of adequaterating with MCCB /MCB on both theprimary and secondary sides.

    (g) Uninterrupted powersupply

    : 240 V, 1 phase, 50Hz, 2 wire ACsupply from UPS system for I&C(including indicator recorders) andUCMS only

  • 7/28/2019 PE-TS-362-501-A001

    6/41

    RAICHUR POWER CORPORATION LTD

    PROJECT INFORMATION

    SHEET 4TITLE

    (h) AC solenoids,indicators/recorders,space heaters (for motorsrated 30KW and above)

    : 240V 1 phase, 2 wire, 50Hz ACsystem with effectively earthedneutral. The power supply shall bederived by CONTRACTOR byproviding 415V/ 240V transformerof adequate rating with MCCB/MCBon primary/secondary sides.

    (i) Winding heating ofmotors below 30kW

    : 24 V 1 phase,50Hz, AC with onepoint earthed. This shall be derivedby CONTRACTOR by providing

    415V 3 phase, 3 wire, AC supplythrough an adequately rated step-down transformer of adequaterating with MCCB / MCB onprimary/secondary sides.

    (j) Solid state controls(including solenoidvalves)

    : 24 V DC, 2 wire, supply fromBattery chargers for instrumentationsystem only.

    (k) Lighting fixtures : 240 V, 1 phase, 2 wire, 50Hz

    system.

    (l) Lighting fixtures andspace heaters in panels

    : 240 V, 1 phase, 2 wire, 50Hzsystem.

    (m) Construction supply : 415 V, 3 phase, 4 wire, 50 Hz ACsupply with neutral lead solidlyearthed.

    (n) The above voltages may vary as follows :

    All devices shall be suitable for continuous operation over the entirerange of voltage and frequency indicated below without any changein their performance.i. AC supply : Voltage variation 10%

    Frequency variation 5%Combined voltage & frequency

    variation 10%ii. DC supply : Voltage variation +10%

    -20%

  • 7/28/2019 PE-TS-362-501-A001

    7/41

    S.N.

    1.0

    2.0

    3.0

    4.0

    5.0

    5.1

    5.2

    6.0

    7.0

    `8.0

    8.1

    13

    De

    Design,and tecranestandanumbe

    Numbe

    Craneclassifi

    Suitabl

    outdooduty

    Capacit

    Main h

    Ratedtonnes

    OverloaSWC

    Aux. H

    Rated S

    OverloaSWC

    Span

    Operati

    CRANE

    PERFO

    Cranefull load

    Main H

    Aux. Ho

    Crab trspeed

    Crane tspeed

    TECHNCIAL0/30T CAP TYERMERUS

    scription

    , fabricatioting of thconfirm td / cod

    r of crane/s

    cation

    fo

    r or indoo

    y

    ist

    SWC

    d Test loatonnes

    ists

    WC tones

    d Test loatones

    on from

    RMANCE

    speed wit

    ist

    ist **

    velling

    avelling

    DATA SHEEG HALL EOTSTPP ( 2X80

    IS: 3177

    As per

    M5 for(part-5)-

    r

    r

    Indoor

    As per

    C

    Full spe

    1.6 (TG

    7.5

    15.0

    30.0

    T FORCRANES0 MW )

    1999 (reaffi

    able 1

    echanical a993

    able 1

    3

    As per a

    abin +pend

    ed M/Min

    all crane)

    DOC.

    REV. 0

    Page 1

    Technical

    ms 2006) &

    nd Electrica

    130T for T

    (125%

    0T (for TG h

    (125% o

    tached cran

    ent push bu

    (

    (

    (

    O.PE-TS-3

    DAT

    of 10

    Particulars

    IS 807

    l as per IS:

    hall crane

    of SWC)

    all crane onl

    SWC)

    e clearance

    ton +radio

    reep spee

    .16(10% ofthru VVVF.7510% of maithru VVVF.510% of maithru VVVF.010% of maithru VVVF

    62-501-A00

    E: 4/6/12

    807-2006 a

    y)

    diagrams

    emote cont

    M/Min

    main speedrives)

    speedrives)

    speedrives)

    speedrives)

    nd 13834

    ol

  • 7/28/2019 PE-TS-362-501-A001

    8/41

    8.2

    8.3

    8.4

    9.0

    9.1

    9.2

    9.3

    9.4

    13

    Lift in

    Main H

    Aux Hoi

    Hook A

    Hand

    COMPDETAIL

    Trolley

    Type

    Methodfabricati

    Materialto IS:

    Rope d

    Material

    Numbe

    Type of

    Flange

    Rope d

    Standa

    Constru

    Factor

    Type of

    Sheave

    Material

    TECHNCIAL0/30T CAP TYERMERUS

    eters

    ist

    st

    pproaches

    rail pipes

    NENTS

    ofon

    conformin

    rums

    (Indicate IS

    s provided

    grooves

    Flangeless

    etails

    d

    ction

    f safety

    core

    s details

    DATA SHEEG HALL EOTSTPP ( 2X80

    The liftinreach th

    As per a

    As per a

    Refer att

    32 mmheight oexceedin6mm thi

    Fabricat

    Fusion

    IS: 2062

    Main hoi

    ) SeamlesGr B & s

    One for

    Identical

    Flanged

    Extra

    T FORCRANES0 MW )

    g rope shallzero level.

    tached cran

    tached cran

    ached cran

    B Mediumf1100 mmg 1500 mmk)

    d

    elded

    Gr. B

    is t

    s pipe ASTress relieve

    ach hoist

    Right hand

    flexible plo

    5.25 as pe

    Steel/ Fib

    Main hoi

    F

    DOC.

    REV. 0

    Page 2

    be of suffi

    e clearance

    e clearance

    clearance

    lass of IS: 1and 600 mwith provisi

    A -106 Grd

    and Left han

    IS:

    gh steel / 6

    IS

    re

    t

    e 410 WB I

    CS Gr. 280-

    O.PE-TS-3

    DAT

    of 10

    ient length

    diagram

    diagram

    iagram

    161 havingm and vertin of kick pl

    Aux. Hoi

    . B or fabric

    d

    266

    x 36 constru

    : 2062 Gr.

    520 IS: 103

    62-501-A00

    E: 4/6/12

    to permit th

    top and bottcal post spte (100 mm

    is t

    ted Fe410

    ction, Galva

    .25 as per I

    Steel / Fibr

    Aux. Hoist

    /

    hook to

    om rail atcing nothigh and

    IS: 2062

    nised

  • 7/28/2019 PE-TS-362-501-A001

    9/41

    9.5

    9.5.1

    9.5.2

    9.5.3

    9.5.4

    9.6

    A.0

    13

    DiametEquival

    in mm o

    Typeprovide

    Coupli

    Couplin(betweegear bo

    Type

    Guards

    Couplinbox and

    Type

    Guards

    Couplinbox and

    Type

    Guards

    Shafting

    Design

    ArrangeLubricati

    Type of

    Gear b

    Hoist M

    Type ogear bo

    Classifi

    Type of

    Type(greasepump lu

    TECHNCIAL0/30T CAP TYERMERUS

    rnt sheave

    n Root

    of guar

    g & Shaftin

    g detailsn motor and)

    nd Enclosur

    g details (gewheels)

    nd Enclosur

    g details (gerope drum)

    nd Enclosur

    (Output)

    f shafts

    ent ofon

    ubricant

    x details

    otions

    mountingx

    ation

    gears

    f lubricatio/ splash

    brication)

    DATA SHEEG HALL EOTSTPP ( 2X80

    fs

    Shouldcalculate

    ds

    g

    MainHoist

    s

    r

    s

    r

    s

    M

    f

    Heli

    /

    T FORCRANES0 MW )

    ot be lessd main she

    Fab

    Aux.

    ross Trave

    Main Hoist

    Flexible ge

    H

    ical

    DOC.

    REV. 0

    Page 3

    than 62%ve diameter

    ricated from

    Hoist

    Flexible g

    Pro

    l

    Flexible g

    Pro

    red couplin

    Pro

    As per IS :

    Grease cu

    Gr

    MH Micro

    Horizonta

    Suitable f

    NA

    Splash L

    O.PE-TS-3

    DAT

    of 10

    f.

    Shouldof calcu

    diameter

    rolled steel

    ross Travel

    ared type

    ided

    Lo

    ared type

    ided

    A

    housed wit

    ided

    3177-1999

    ps/ Nipples

    ase

    AH

    l / Vertical

    r M5 duty

    Helica

    brication

    62-501-A00

    E: 4/6/12

    ot be lesslated main

    .

    plate

    l Long

    ng Travel

    ux. Hoist

    hin the dru

    AH

    l

    han 62%sheave

    ravel

    micro

    A

  • 7/28/2019 PE-TS-362-501-A001

    10/41

    B.0

    9.7

    9.8

    13

    Differenand pini

    Material(gear/pi

    Casing

    Travel

    Typegear bo

    Classifi

    Type of

    Type(greasepump lu

    Differenand pini

    Materialpinions)

    Casing

    Wheels

    Material

    Hardne

    Type

    Numbe

    Specificconfor

    Arrangelubricati

    Lifting

    Type

    Safe lifti

    TECHNCIAL0/30T CAP TYERMERUS

    ce in Gon hardnes

    snions)

    otions

    f mountinx

    ation

    gears

    f lubricatio/ splash

    brication)

    ce in Gon hardnes

    s (gear

    details

    s

    s provided

    ationing to

    menton

    ooks

    ng capacity

    DATA SHEEG HALL EOTSTPP ( 2X80

    a

    Main Ge

    F

    CT

    Vertical

    Helical

    /

    a

    / Main Ge

    F

    f

    Ramshoswivelin

    130 T f

    T FORCRANES0 MW )

    ars En 9/ 55

    Hardabricated F

    CT m

    NA

    NA

    ars En 9/ 55

    Hardabricated F

    Cross tr

    4 nos.

    MH

    rn shank wig type as pe

    of IS: 57

    or TG hall a

    DOC.

    REV. 0

    Page 4

    Min 2

    C8/ IS2707

    ess confor410w IS: 2

    icro

    M5

    Splash L

    Min 2

    C8/ IS2707

    ess confor410w IS: 2

    vel

    55 Mn 75 /

    300 3

    Double

    IS: 31

    Gr

    ith safety latr latest editi49

    per IS 574

    O.PE-TS-3

    DAT

    of 10

    BHN

    r. 1or 2. Pi

    ming to IS:62 Gr B &

    LT

    Vertical/

    Horizontal

    duty

    Helical

    brication

    BHN

    r. 1or 2. Pi

    ming to IS:62 Gr B &

    EN 9 (55 C

    50 BHN

    flanged

    7-1999

    ase

    hn

    Plaiswiveli

    ed

    30T f

    62-501-A00

    E: 4/6/12

    inions En 19

    3177tress reliev

    LT mic

    inions En 19

    3177tress reliev

    Long trav

    8)

    8 nos.

    AH

    n with safeting type asition of IS: 1

    or TG hall a15560

    /EN 24.

    d

    o

    A

    A

    /EN 24.

    d

    l

    latcher latest

    5560

    per IS:

  • 7/28/2019 PE-TS-362-501-A001

    11/41

    9.9

    A.0

    B.0

    9.10

    9.11

    9.12

    10.0

    10.1

    13

    Material

    Brakes

    Hoist M

    Type of

    Numbemotor

    Braking

    Travel

    Type of

    Numbemotor

    Braking

    Bearin

    Type

    Method

    lubricati

    Bearing

    Bridge

    Type &

    Vertical

    Type oto end c

    Rails-B

    Type / s

    Standaconfor

    Material

    Motors

    Hoist M

    TECHNCIAL0/30T CAP TYERMERUS

    otions

    brake

    provide

    capacity

    otions

    brake

    provide

    capacity

    s

    on

    life

    girder

    Quantity

    Deflection

    f connectioarriage

    ridge girde

    ection

    ding to

    otions

    DATA SHEEG HALL EOTSTPP ( 2X80

    /

    1

    /

    1

    f

    Rails sewelded b

    T FORCRANES0 MW )

    Class 2 / IS:

    MH

    1+1

    50%

    CT

    1+1

    25%

    An

    Grease

    10,0

    Box type

    LT rail

    tions as pery thermit w

    Suit

    MH

    DOC.

    REV. 0

    Page 5

    : 1875

    MH micro

    EHT+

    NA

    NA

    CT micr

    EHT+

    NA

    NA

    ifriction ball

    lubrication

    00 working

    2 nos, Mat

    Span

    By fitted bol

    IS: 3443 Grlding & fusi

    IS:

    Rail

    ble for ambi

    MH micr

    O.PE-TS-3

    DAT

    of 10

    Cla

    A

    DCEM

    1+

    150

    o L

    DCEM

    1+

    125

    / roller beari

    ith separat

    ours.

    erial: IS 206

    / 900

    ts

    ade 50 C 12n welding

    443

    Steel

    ent tempera

    A

    62-501-A00

    E: 4/6/12

    s IA or 3/ IS

    A

    1

    %

    L

    1

    %

    ngs

    pumps

    2 Gr. A / B

    CT rail

    . J oint to be

    ture of 500

    H

    : 1875

    micro

    NA

    NA

    micro

    NA

    NA

    butt-

    AH micro

  • 7/28/2019 PE-TS-362-501-A001

    12/41

    10.2

    13

    Type

    Enclosu

    Numbe

    Voltagefrequen

    Class o

    Rated c

    Rating

    Class o

    Numbehour

    Travel

    Type

    Enclosu

    Numbe

    Voltagefrequen

    Class o

    Rated c

    Rating

    Class o

    Numbe

    TECHNCIAL0/30T CAP TYERMERUS

    re

    s furnished

    , phase ancy

    protection

    apacity (KW

    insulation

    of sta

    otions

    re

    s furnished

    , phase ancy

    protection

    apacity (KW

    insulation

    of sta

    DATA SHEE

    G HALL EOTSTPP ( 2X80

    SC, sInve

    T

    415V +variation

    IP 55

    ) Selectedmaximufrequenc

    Motor naover theduty poi

    Cl

    ts

    SC, sInve

    T

    415V +1

    Combine

    ) Selectedmaximufrequenc

    Motor naover the ipoint.

    ts

    T FORCRANES0 MW )

    itable forter duty

    EFC

    1

    0%, 3 Ph,= 10% abs

    motor ratincontinuou

    y variation,

    meplate ratiinput powert.

    lass F for s

    CT

    itable forter duty

    EFC

    2

    0%, 3 Ph, 5

    d voltage &

    motor ratincontinuou

    y variation,meplate ratinput power

    lass F for

    DOC.

    REV. 0

    Page 6

    NA

    NA

    NA

    0 Hz, 5 %lute

    should havload dema

    emperature

    ng at 50 oCrequiremen

    40

    q. cage mot

    that of

    150 st

    CT micr

    NA

    NA

    NA

    0 Hz, 5 %

    frequency v

    IP

    should havload dema

    emperatureng at 50 oCrequirement

    40

    sq. cage mo

    to that o

    150 st

    O.PE-TS-3

    DAT

    of 10

    SC, suiInvert

    TE

    Combine

    e minimumd includingrise and oth

    hall have atof driven e

    CDF

    rs with tem

    class B

    rts / hr

    o

    SC, suInver

    T

    riation =10

    55

    e minimumd includingrise and othshall haveof driven eq

    CDF

    tors with te

    f class B

    rts / hr

    62-501-A00

    E: 4/6/12

    table forer duty

    FC

    1

    voltage &

    argin of 15voltage ander factor.

    least 15%uipment at

    rise limited

    LT

    itable forter duty

    FC

    4

    % absolute

    argin of 15voltage ander factor.at least 15uipment at

    p rise limite

    NA

    NA

    NA

    requency

    % over

    arginated

    to

    LT micro

    NA

    NA

    NA

    % over

    marginated duty

    d

  • 7/28/2019 PE-TS-362-501-A001

    13/41

    11.0

    12.0

    13.0

    14.0

    15.0

    13

    hour

    Spacerequire

    Limit s

    Type

    Numbe

    ControlEnclosu

    Power(DSL)

    Type

    Length

    Control

    Material

    Numbelocation

    Degree

    MasterControl

    Numbe

    Voltagerating

    Locatio

    Cable

    Material

    Size

    Type

    Voltage

    Voltage

    TECHNCIAL0/30T CAP TYERMERUS

    eaterent

    itches

    provided

    voltage/re

    conductor

    panel

    s and

    of Protectio

    lers

    of steps

    & curre

    grade

    drop

    DATA SHEEG HALL EOTSTPP ( 2X80

    Mai

    RotarG

    1

    CT:(Fest

    One

    Mai

    t

    Min. 2.5

    Cable f

    T FORCRANES0 MW )

    For

    hoist

    y gear +avity

    + 1

    LT: PVC

    Flexible traioon type) E

    S

    R

    ach for MH,

    Hoist

    5

    Powe

    Copper

    mm2 for Cu.

    rom main is

    DOC.

    REV. 0

    Page 7

    motors abo

    Aux. Hois

    Rotary ge+Gravit

    1 + 1

    110 V

    shrouded

    ling cable mP insulated

    itable for e

    olled sheet

    AH, CT an

    IP

    Aux Hois

    5

    110

    In c

    FRL

    11

    lating switc

    O.PE-TS-3

    DAT

    of 10

    ve 30 KW r

    tCroTrav

    rLever

    2

    / IP 54

    u conducto

    ounting on rCu conduct

    tire bay len

    teel 2mm si

    LT located

    54

    ** CroTra

    4

    /10 A

    abin

    PVC

    0 V

    (1.5M abo

    62-501-A00

    E: 4/6/12

    ting

    sel

    Lon

    type Le

    r bus bar.

    etracting suor as per IS:

    th

    ze

    on bridge pl

    ssel

    Lon

    Control

    Copper

    Min. 1.5 m

    e operating

    g Travel

    er type

    2

    port9968

    tform

    g Travel

    4

    2

    floor) to

  • 7/28/2019 PE-TS-362-501-A001

    14/41

    16.0

    17.0

    18.0

    19.0

    20.0

    21.0

    22.0

    23.0

    24.0

    25.0

    13

    Contac

    Switch

    Fuses

    Overlo

    PortablExtingu

    Type a

    Locatio

    Power

    Transfo

    Control

    Lighting

    Illumin

    In cabin

    Over Br

    Under b

    For in

    crane c

    Ventilat

    Buffer

    Numbe

    Type

    TECHNCIAL0/30T CAP TYERMERUS

    ors

    s

    d relay

    e Fireisher

    d size

    upply

    rmer

    tion

    idge

    ridge

    spection

    mponents

    ion

    DATA SHEEG HALL EOTSTPP ( 2X80

    motor

    AC 4 d

    AC

    Te

    415 V,

    40Wlamp

    4 nos 6

    4 nos 4

    f One (1)

    wire guainspectio

    Springbring t

    T FORCRANES0 MW )

    terminal shae

    uty for rever

    23 for moto

    perature co

    One i

    3 phase, 3len

    lorescent fi 1 each, 2n

    W Bulk-he24

    00 W HPSV

    ortable 40

    rd) hand lan of crane c

    On

    Cross Tra

    4

    loaded/ hyhe loaded cpeed at a d

    DOC.

    REV. 0

    Page 8

    ll be so sizexceed 3% o

    sing applicaappli

    application,

    H

    pensatedprev

    5.0 kg ,

    n cabin** an

    ire supply agth with cha

    Qty /

    2 X 100 %

    One /

    ture + Bulkos. 24V 5

    d fittings wi- 5A - 3 pin

    lamps

    (SLS lamp

    p with min.omponents

    (1) no. Ele

    el

    raulic type rane to resteceleration r

    O.PE-TS-3

    DAT

    of 10

    that the vorated voltag

    ion. AC 3 dation

    AC 22 for o

    C

    i metallic wintor.

    CP type

    d Three on

    t operating flge over swi

    ating

    / 415/110V

    15/240V

    ead fitting 3 pin ind

    h incandesindustrial so

    with enclos

    alf span len

    tric fan in c

    bber bufferrom speedate not exce

    62-501-A00

    E: 4/6/12

    ltage drop de.

    ty for non r

    ther applica

    th single ph

    ridge

    loor at centritch.

    ith 60W incustrial sock

    ent lamps acket

    d type batt

    gth flexible

    bin.

    Long Travel

    4

    . To be desif 50 % of theding 5 m/s

    es not

    versing

    ion.

    sing

    of bay

    ndescentt.

    nd 4nos.

    ry and

    able for

    ned toe rated.

  • 7/28/2019 PE-TS-362-501-A001

    15/41

    26.0

    27.0

    28.0

    29.0

    30.0

    31.0

    13

    Typerequire

    bridge.

    Positionpoint

    Emerge

    Typeplatfor

    Length

    Providesides

    Operat

    Type of

    Area aclear he

    Operat

    Warnin

    Positioncontroll

    Type ofHoists/operati

    Paintin

    Whetheoperati

    Liftingbforoper

    TECHNCIAL0/30T CAP TYERMERUS

    f platford on th

    of acces

    ncy escape

    of accesto cabin

    d on bot

    rs Cabin

    constructio

    d minimumight

    rs seat

    gong

    ofrs

    control forCT/LTn

    r tandemn required

    eamandslinationtande

    DATA SHEE

    G HALL EOTSTPP ( 2X80

    C

    s

    s

    2

    Footoperate

    23

    T FORCRANES0 MW )

    hequered pl

    500/1850 m

    operated Brfrom insid

    In

    Sha

    5T capacity l

    DOC.

    REV. 0

    Page 9

    te platform

    From

    Rung lad

    By St

    Full sp

    Y

    Closed ty

    m with a cle

    Revolv

    ss gong su. Suitable fo

    at 3

    ront/ side of

    Through

    ll be as per

    Y

    ifting beam

    O.PE-TS-3

    DAT

    of 10

    6 mm thick

    cabin

    er at ends

    ircase

    n length

    es

    e with AC

    ar head roo

    ng type

    pended outr 240 V AC.5 m

    operators c

    VVF drive

    nnexure I b

    S

    ith slings s

    62-501-A00

    E: 4/6/12

    s per IS :35

    of 2000m

    side the cabof noise leve

    hair

    elow

    hall be provi

    02

    .

    in andl 95 dBA

    ded

  • 7/28/2019 PE-TS-362-501-A001

    16/41

    PAIN

    A)

    Sur

    Pri

    Fini

    Tot

    B)

    Sur

    Pri

    Fini

    Tot

    COLO

    13

    TING SP

    Structural

    ace prepa

    er

    sh Coat

    l DFT

    Electrical

    ace prepa

    er

    sh Coat

    l DFT

    R SHADE

    S. No

    D

    1 C

    2 Bas

    3 H

    4 E

    s

    5 Pa

    m

    TECHNCIAL0/30T CAP TYERMERUS

    CIFICAT

    ation : De

    ( S

    : Red

    Mini

    : Synt

    Mini

    : 125-

    Control P

    ation : Se

    : Zinc

    Mini

    : Synt

    Mini

    : 110 -

    Item

    scription

    ane Struct

    ttom blocsembly

    oks

    d carriage

    eep

    nels and

    tors

    DATA SHEEG HALL EOTSTPP ( 2X80

    ON FOR

    greasing a

    1/ ST 2 /

    xide Zinc

    um DFT

    etic ename

    um DFT 3

    45

    nel

    en tank pr

    phosphate

    mum DFT

    etic ename

    um DFT

    145

    Color

    re Golde

    as per

    Goldeas per

    Golde

    as per

    Golde

    as per

    Steel

    Purch

    T FORCRANES0 MW )

    OUBLE

    d Mechani

    T 3 as app

    chromate a

    30 per co

    l (Alkyd m

    5 per co

    cess

    Alkyd me

    25- 35 p

    l (Alkyd m

    0-25 per

    Shade

    n yellow, s

    IS-5

    n yellow, sIS-5

    n yellow, s

    IS-5

    n yellow, s

    IS-5

    rey/as req

    ser.

    DOC.

    REV. 0

    Page 1

    IRDER

    cal cleanin

    licable)

    s per IS: 2

    at.

    edium) as p

    t.

    ium)- 2 co

    r coat.

    edium) as p

    coat.

    ade 356

    ade 356

    ade 356

    ade 356

    ired by

    O.PE-TS-3

    DAT

    0 of 10

    OT CRA

    with wire

    74 ( Alkyd

    er IS: 2932

    at ,

    er IS: 2932

    Remarks

    With blac

    With 100

    black zebr

    With blac

    62-501-A00

    E: 4/6/12

    ES

    brush or h

    medium)-

    - 2 coats,

    - 3 coats,

    strip

    m wide

    a strip

    strip

    nd tool.

    2 coat ,

  • 7/28/2019 PE-TS-362-501-A001

    17/41

  • 7/28/2019 PE-TS-362-501-A001

    18/41

    2X800MWYERMERUSTGHALLCRANEOF130/30TCAPACITYINTANDEM

    WriteuponLoadTestingLiftingBeamTestingatManufacturersWorks

    Thiswriteup briefly describes the procedure for carrying out the load testing of lifting beam at

    manufacturersworksbythesuccessfulbidderforthesaidproject.Intentionhereisnottoelaborate

    onstep

    by

    step

    procedure

    for

    testing

    of

    lifting

    beam

    but

    to

    broadly

    outline

    the

    type

    of

    load

    test

    for

    theliftingbeamrequiredtobecarriedoutbythebidder.Loadtestingofthebeamcanbecarriedby

    anyofthefollowingthreealternatives.Briefprocedureforloadtestingoftheliftingbeamwithallthe

    threealternativesismentionedisasunder:

    ALTERNATIVEI

    a)Liftingbeamassembly(lowerandupper liftingbeam)shallbehungsuitablyfromastructure

    capableofholdingtheloadforwhichtheliftingbeamisdesigned(235T)withmargins,atthe

    pointsfromwheretheliftingbeamissupposedtobeheldwiththehooksduringactualcrane

    operation in tandem.Actual liftingpinsshallbeused forhanging the liftingbeam.Suitable

    wireropes/chainsshallbeusedforhangingtheliftingbeamthroughpinstothestructure.

    b)Loadshallbeappliedon the lower liftingbeamexactlybelowtheabovementionedhanging

    arrangementwith thehelpofhydraulicjackofsuitablecapacity.Durationofapplicationof

    loadshallbe30minutes.

    c)Loadcellsshallbefixedbelowthehydraulicjacktoascertaintheloadapplied.

    d)Deflectionoftheliftingbeamshallbemeasuredatthecentreandnoteddownunderloaded

    condition.

    e)After30minutes, the load shallbe removedand thedeflectionof the liftingbeamshallbe

    measuredatthecentreagaintofindoutthepermanentdeflection,ifany.

    f)Maximum deflection in the lifting beam should not exceed the allowable deflection as per

    relevantIS/equivalentstandard.

    g) Load testingof the liftingbeam atmanufacturersworks shall be acceptable inhorizontal

    conditionalso(incasethebidderdoesnthavearrangementforverticaltestingofthebeam).

    However, insuchcases,necessaryfixtures/arrangementsshallhavetobearrangedbythe

    bidderto

    demonstrate

    testing

    of

    beam

    under

    similar

    condition

    of

    loading

    as

    will

    be

    seen

    by

    thebeamduringactualtandemoperationofthecranes.

  • 7/28/2019 PE-TS-362-501-A001

    19/41

    ALTERNATIVEII

    a)Liftingbeamshallbeplacedonelevatedpedestalsinsteadofhangingfromthefixedstructure,

    as mentioned in the alternative I above and the load shall be applied with the help of

    hydraulicjackfrombelow.

    b)AllotherrelevantconditionsshallremainsameasmentionedinalternativeIabove.

    ALTERNATIVEIII

    a) Liftingbeam shallbeplacedon theelevatedpedestalsasmentioned inalternative IIabove.

    However the load shall be applied from the top of the lifting beam. Either dead load or

    hydraulicloadcanbeusedforthispurpose.

    b)IncasebidderpreferstogowithAlternativeIII,biddershallberequiredtotestthelowerlifting

    beamalsointhesimilarfashionastheupperliftingbeam.c)Allotherrelevantconditionsshall

    remainsameasmentionedinalternativeIabove.

    (BiddersSignaturewithSeal)

  • 7/28/2019 PE-TS-362-501-A001

    20/41

  • 7/28/2019 PE-TS-362-501-A001

    21/41

  • 7/28/2019 PE-TS-362-501-A001

    22/41

  • 7/28/2019 PE-TS-362-501-A001

    23/41

  • 7/28/2019 PE-TS-362-501-A001

    24/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    d filletwelds Sizeandsurfacedefects Major Visual 100% ComponentDrg.

    Component

    Drg.

    Major DPT 10%RANDOM

    ASMESecVIII

    Div1

    ASMESecV

    Div1

    Append8 Append8

    e DimensionsforGirder,end Major Dimensional 100% VendorMfg.Drg. VendorMfg.

    carriageropedrumetc. Measurement

    Camber,Verticality,bend

    etc

    f Heattreatmentofropedrum S tressrelieving Major ReviewofSR 100% ASMESecVIII,Div I ASMESecVIII,

    I

    chart

    3 Gearboxcasing

    a Material Surfacecondition Major Visual 100% ComponetDrg. ComponetD

    Chemical&mech Major Measurement 100% ComponetDrg. ComponetD

    Correlationwith 100% IS:2062 IS:2062T.C.Checktest

    inabsesnceofT.C.

    Correlation

    b welding Welding&Dimensionalconformity Major Measurement 100% ComponetDrg. ComponetD

    c Heattreatment stressrelieving Major ReviewofSRchart 100% Compone ntDrg./ ComponentD

    ASMESecVIII,Div

    I

    ASMESecVI

    Div Ifor

    procedure.

    4 PLATFORMS Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components

    5 L.T.FRAMES Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components

    6 HANDRAILINGS Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components

    7 CABIN Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components

    LEGEND :

    MANAFACTURER/ CONTRACTOR C:BHELCQS

    ** M:MANAFACTURER/SUBCONTRACTOR

    INDICATE"P"PERFORM"W"WITNESSAND"V"DOCUMENTREVIEW

    D* RECORDSINDETIFIEDWITH'TICK'( )SHALLBE ESSENTIALLY

    INCLUDEDBYCONTRACTORINQADOCUMENTATION

    SUBCONTRACTOR

    finalinsectionoffabricated

    componentslistedinSr.1

    above

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    25/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    N:CUSTOMER REVIEWEDBYSIGNATURE

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    26/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    8 Currentcollerctorarms Dimensionalconformity Minor Measurement 100% Mfr.Catalog Mfr.C at al og

    9 DSLGuard Dimensionalconformity Minor Measurement 100% ComponentsDrg. Components

    10 Rails Dimensionalconformity, Minor Measurement 100% G.A.drg./IS:3443

    Vendore

    T.C./Appd.Data

    Sheet

    G.A.drg./IS :

    Vendore

    T.C./Appd.Da

    SheetChemical&hardness Major Checkchemical&

    hardness

    One/Cast IS3443 IS:3443

    11 MECHANICALCOMPONENTS

    A a) wheels

    i) Materials Chemicalscomposition and Major Corelationwith 100% Mfg.drg./IS :1570 Mfg.drg./IS :1

    MechanicalProporties. mfr'sTC /BS 970 /BS 970

    ii) Machined a) Dimensions Major Measurement 100% Component

    Drawing

    Component

    Drawing

    b) Hardness Mechanical 100% ApprovedData

    Sheet/Mfg.Drg.

    ApprovedDa

    Sheet/Mfg.

    c) UT NDT 100% ReferNote:6 ReferNote6

    d) DPT NDT 100% 8 App8

    b) Gears,Pinions,Shafts, i) ChemicalsComposition Major Correlationwith 100% Component

    Drawing,

    Component

    Drawing,

    Axlesetc &heattreatment,Mech mfr'sTC BS:970/IS:1570 BS:970/IS:

    1570

    Properties. Checktestin ApprovedData

    Sheet

    ApprovedDa

    Sheet

    absenceofTC

    ii)UT(afterproofmachining) Major checkforUT 100% A SMESecV ReferNote6

    (above50mmdia)

    iii) Hardness Major checkfor 100% Mfg.drg.& Mfg.drg.&

    Hardness ApprovedData ApprovedDa

    iv) Dimensions Major Measurement 100% Component

    Drawing

    Component

    Drawing

    V)D.P.Testonteeth Major NDT 100% ASTME165 NoCrackand

    of

    i nd ic at ion

    LEGEND :

    MANAFACTURER/ CONTRACTOR C:BHELCQS `

    SUBCONTRACTOR

    D* RECORDSINDETIFIEDWITH'TICK'( )SHALLBE ESSENTIALLY

    INCLUDEDBYCONTRACTORINQADOCUMENTATION

    ** M:MANAFACTURER/SUBCONTRACTOR

    INDICATE"P"PERFORM"W"WITNESSAND"V"DOCUMENTREVIEW

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    27/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    N:CUSTOMER REVIEWEDSIGNATURE

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    28/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    B Pulleys,Brakedrums,coupling&othermajorsteelcastings&forging

    i) Materials Physical/Chemical/Hardness Major Corelationwith 100% Components

    Drawing

    Components

    Drawingexceptpulleys. mfr'sTC

    ii) Machined a) Dimensions Major Measurement 100% Components

    Drawing

    Components

    Drawing

    b) DPT ingrooveafter Major NDT 100% ASTM E165 No.crack/Lin

    machiningforpulleysonly. indication

    C Gearboxassy&idlerunning Checkforoilleakage,Noiselevel, Major Visual& 100% Vendorstandard Smoothrunn

    no

    backlash,riseintemp.after2 Measurement oilleakage,N

    Hrs.ofrunning. 85dbat1Mt

    Max.Temp.

    40Cabovea

    D a) Topblcok,bottomblock dimensionalconformity Major Masurement 100% Assemblydrawing Assembly

    drawing

    b) Hook i)Chemicalcomposition,Heatt re at me nt , M aj or C he mi cal& 100%

    Mechanicalpropertiesonintegeral Tensile

    testbar

    ii)UTonrawmaterialofhook Major UT 100% ASMEsecv Annex1

    (Attached)

    iii)Forgingoperationofhook Major Visual 100% IS:5749/IS:15560 IS:5749/IS:15

    iv)Proofloadtest Major Mechanical 100% IS:5749/IS:15560 IS:5749/IS:15

    v)UT&MPIafterproofloadtest Major UT &MPI 100% ASMEsec v Annex1forU

    (UTonshankportiononly) Nocrack&li

    indication(Fo

    E Ropedrumassembly Die mnsionalconformity Major Measurement 100% Component

    Drawing

    Toleranceas

    drg

    LEGEND :

    D* RECORDSINDETIFIEDWITH'TICK'( )SHALL

    BE ESSENTIALLY

    INCLUDEDBYCONTRACTORINQA

    DOCUMENTATION

    ** M:MANAFACTURER/SUBCONTRACTOR

    MANAFACTURER/ CONTRACTOR C:BHELCQS

    SUBCONTRACTOR

    INDICATE"P"PERFORM"W"WITNESSAND

    "V"DOCUMENTREVIEW

    Material:ClassIIIS:1875

    Profile:IS:IS5749/IS15560

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    29/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    N:CUSTOMER REVIEWEDBYSIGNATURE

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    30/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    12 E le ct ri calcomponents

    a) Motors( =

  • 7/28/2019 PE-TS-362-501-A001

    31/41

  • 7/28/2019 PE-TS-362-501-A001

    32/41

    MANUFACTURER'SNAME&ADDRESS

    SL. CHARACTERISTCS CLASS TYPEPF QUANTUM REFERENCE ACCEPTAN

    NO. CHECK OFCHECK DOCUMENT NORMS

    1 3 4 5 6 7 8

    QP NO : PETSSTD501A001

    REV :

    DATE :

    MANUFACTURINGQUALITYPLAN

    COMPONENTS&

    ITEM:

    OPERATION

    4

    Format: QS-01-a1-P-9/F1/R1 BHEL-QAP

  • 7/28/2019 PE-TS-362-501-A001

    33/41

  • 7/28/2019 PE-TS-362-501-A001

    34/41

  • 7/28/2019 PE-TS-362-501-A001

    35/41

    PROJECT : 2

    QP. NO. :

    BHEL DRG. NO.:

    Rev. 0

    DATE :

    1 3 4 5 6 8 92

    REFERENCE

    DOCUMENT

    SR.

    NO.

    CLASS

    MANUFACTURING QUALITY PLAN

    QUANTUM OF

    CHECK

    COMPONENT &

    OPERATIONS

    ITEM: 235T LIFTING BEAM

    ASSEMBLY FOR 130/30 D/G EOT

    CRANE

    MANUFACTURER NAME & ADDRESS

    FORMAT OF

    RECORD

    TYPE OF

    CHECK

    CHARACTERISTIC

    PACKAGE :-T

    CONTRACT

    7

    ACCEPTANCE

    NORMS

    b)

    Surface defect & size Major Visual 100% Component Drawing inspection

    report

    DPT 10% at random Free from linear

    indication

    inspectio n

    report

    iii) Visual & dimensional Major Dim ensional &

    measurement

    100% Individual component

    drawing

    inspectio n

    report

    3) Visual &

    Dimensional .

    Major

    .

    .

    Visual &

    Dimensional

    check

    100% GA drawing of lifting

    beam / IS 3177 & Tech.

    Specification.

    interrnal

    inspection

    report.

    4) AS per approved QAP

    5)

    Visual

    Major

    Visual

    100%

    Load Test Procedure

    Inspection

    Report

    LEGEND: FOR CUSTOMER USE

    Contractor"C" CONTRACTOR(BHEL)

    "N" CUSTOMER ( NTPC )

    INDICATE "P" PERFORM, "W" WITNESS AND "V" VERIFICATION AS

    " CHP" SHALL IDENTIFIED IN COLUMN " N "

    NOTE: ITEMS NOT COVERED IN MQP, MAY BE CLEARED ON BASIS

    OF "CERTIFICATE OF CONFIRMANCE"SIGNATURE

    sub-contractor

    REVIEWED

    Final assembly of

    Lifting Beam

    Inspection of

    fabricated lifting beam

    Component Drawing

    Fillet Weld

    Individual component

    drawing

    INCLUDED BY CONTRACTOR IN QA DOCUMENTATION

    Manufacturer/ "M" MANUFACTURER/ SUBCONTRACTOR

    RECORDS IDENTIFIED WITH 'TICK ( ) SHALL BE ESSENTIALLY

    GA drawing of lifting

    beam /IS 3177 &

    Tech-Specification.

    Load Test at

    manufacturers' works

    as well as Site

    Load Test Procedure

    IS:3658

    Review of QA

    Documents

  • 7/28/2019 PE-TS-362-501-A001

    36/41

    2X800 MW YERMERUS STPP, 2 NO'S 130/30T TG HALL EOT CRANE

    OPERATION AND MAINTENANCE SERVICES FOR 2 YEARS SHALL

    INCLUDE BUT NOT LIMITED TO FOLLOWING

    1.0 For Operation of the Crane

    An experienced crane operator shall be available as and when required by BHELfor at least 16hrs a day, daily.

    2.0 For Maintenance of the Cranea) Break-Down Maintenance

    i) In case of any break-down of the crane during the contract period,service engineer shall be made available at site within 72 hrs.

    ii) All the critical spares and consumables, as deemed necessary by themanufacturer shall be made available at the site. No delay in crane

    maintenance shall be allowed by BHEL due to non-availability ofrequired spare at site.

    b)Preventive Maintenancei) Following work should be carried out quarterly

    Bridge and Trolleywheel assy

    Checking for wear, flat spots and cracks in flange. Ensuredrive wheels are of the same diameter.

    Runway Checking alignment and elevation of gantry track. Checkingrail clamp bolts.

    Machine Bolts Checking all foundation bolts of Electrical and Mechanicalequipments for tightness.Structural Bolts Checking for tightness. They should also be checked after

    the first month of operation.Flexible Couplings Checking pins and teeth for wear, cleaning and greasing.Cross-shaftPlummer Blocks

    Dismantling cap. Cleaning and checking oil seals and to bepacked with fresh grease.

    Trolley Collectors Checking of cable trolleys / cabling / chain. Ensuringconnection of trolley wheels is kept through entire length ofspan.

    Brakes All Brake assembly will be checked for loose connection,

    earthing connection, linings for wear, leakages andadjustments to ensure brake is not rubbing the brake drumduring operation. Greasing pins and operation adjustment ofbrakes.

    ResistorConnections

    Checking, tightening connections at grid joints and at cableterminations.

    Control Station Clean out control cabinets. Checking of all connection atpush buttons, master controllers contact tips, cams andterminals.

    Control Panels All Control Panels will be checked for loose connection andcleaning the contactor contacts, if required will be replaced.

    Electrical Motors All motion motors connection will be checked for loosecontacts in terminal box loose crimping of wire lugs, loose

  • 7/28/2019 PE-TS-362-501-A001

    37/41

    contacts on slip ring assembly with carbon brush. Earthingsconnection with motor.

    Safety Switches All limit switches will be checked for desired operation andlimits. Emergency switches will be checked.

    Main Collectors Checking of worn collector shoes, sag in main runway wiring,ensuring contact is kept through entire length runway

    properly.Electricalconnections

    Checking throughout electrical equipments for looseconnection such as selector switches, junction boxes, minisolator switch etc.

    Lubrication All gear box and thrusters oil level will be checked. Allbearings, couplings grease will be checked.

    Testing After completion of checking and required rectification, trolleywill be checked for idle operation, for brake operation, limitswitch operation & safety switch operation. All motorcurrents will be checked on no load.

    ii) Following work should be carried out annually.

    Gear Boxes Oil seals will be checked, if required will be replaced. Gearand pinion teeth will be checked. Drain the oil cleaning gearbox and refill fresh oil.

    Motor All motors insulation test and meager test will be carried out.Resistance Box All resistance boxes step resistance value will be checked.

    iii) Besides the quarterly and annual preventive maintenance schedulementioned above, operator shall carry out any daily, weekly, monthlymaintenance schedule as deemed necessary and shall operate the craneonly when the fitness of the crane for operation has been ensured.

  • 7/28/2019 PE-TS-362-501-A001

    38/41

    SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM

    BIDDER

    SPECIFICATION: PE-TS-362-5

    TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C

    PROJECT: 2X800 MW YERMERUS STPP

    S.N. DESCRIPTION REPLY / COM

    1.00 MECHANICAL1.01 Bidder to confirm that the Data sheet attached along with project

    specific Technical Specification No. PE-TS-362-501-A001 Rev. 00 are

    acceptable without any deviation. Bidder to confirm the same.

    CONFIRMED

    1.02 In case of any deviation, the same has been furnished in the separate

    Deviation schedule attached along with the Technical Specification.

    Bidder to note that deviation mentioned elsewhere will not be taken

    cognizance of in any case. Bidder to confirm the same.

    CONFIRMED

    1.03 Bidder to note that QAP indicated in the standard technical specification

    PE-TS-STD-501-A001 R03, is the minimum requirement. Finalisation of

    the same shall be as per final approval by BHEL/CUSTOMER. Bidder

    to confirm

    CONFIRMED

    1.04 Bidder to confirm that there is no deviation from the Crane Clearance

    Diagram no. PE-DG-362-501-A001 Rev 01A . Bidder to specifically

    note that in no case any deviation from the Crane Clearance diagrams

    given by BHEL shall be accepted. Bidder to confirm the same.

    CONFIRMED

    1.05 Bidder to confirm that there is no deviation from the makes of various

    sub vendors items as given in annexure-I Makes of Sub-vendors

    Items , volume II-B, section-C. of standard technical specification PE-

    TS-STD-501-A001 Rev. 03 Bidder shall confirm the compliance

    CONFIRMED

    1.06 The material offered is equal or better in grade than specified. Bidder

    shall confirm the compliance

    CONFIRMED

    1.07 Bidder to note and confirm that there will be no price implication for

    variation in Span, Lift and baylength upto 500 mm. Bidder to confirm

    CONFIRMED

    1.08 Bush as a antifriction bearing shall not be used. Bidder shall confirm

    the compliance

    CONFIRMED

  • 7/28/2019 PE-TS-362-501-A001

    39/41

    SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM

    BIDDER

    SPECIFICATION: PE-TS-362-5

    TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C

    PROJECT: 2X800 MW YERMERUS STPP

    1.09 Bidder to specifically note that there is specific requirement of the

    painting for this particular project. Bidder to confirm the compliance to

    the attached Painting specification.( Annexure I)

    CONFIRMED

    1.10 Bidder to confirm that in case of award of order, Hook drawing shall be

    submitted to BHEL within one week of receiving the LOI. Bidder also to

    submit Unpriced Purchase Order copy of Hook within 15 days from LOI

    . Bidder to confirm

    CONFIRMED

    1.11 Bidder to confirm that in case of award of order, Motor Sizing

    calculations shall be submitted within 15 days time of receiving the LOI

    by the bidder. Bidder to confi rm the same.

    CONFIRMED

    1.12 Bidder to note that lifting beam has to be sourced from BHEL approved

    suppliers only. Also the testing of the lifting beam at manufacturers

    works shall have to be carried out by the bidder as per BHEL approved

    QAP. List of sub-vendors and reference MQP (to be finalized during

    detail engineering) for Lifting beam testing at manufacturers works, are

    being furnished along with the specification. Bidder to confirm

    acceptance.

    CONFIRMED

    2.00 ELECTRICALS

    2.01 CABLES

    a All CONTROL AND POWER cables shall be as per BHEL specification.

    Bidder shall confirm the complianceCONFIRMED

    b Makes of cables shall be as agreed in between BHEL / Customer during

    contract stage and approved make shall only be supplied. Bidder shall

    confirm the com liance

    CONFIRMED

    c Cable required between isolating switch / change over switch and DSL

    included in the scope. Bidder to confi rm the same.CONFIRMED

    2.02 MOTORS

    a Class of insulation of Sq. cage motors shall be "F" and the temperature

    rise to limited to class "B". Bidder shall confirm the compliance CONFIRMED

  • 7/28/2019 PE-TS-362-501-A001

    40/41

    SPECIFIC CONFIRMATION / COMMENTS REQUIRED FROM

    BIDDER

    SPECIFICATION: PE-TS-362-5

    TITLE: DOUBLE GIRDER EOT CRANE FOR TG HALL VOLUME-II B SECTION-C

    PROJECT: 2X800 MW YERMERUS STPP

    b Motor size shall be subjected to the approval of motor calculation.

    Bidder shall confirm the compliance CONFIRMED

    c The successful bidder shall submit the data sheet -C of LV motors

    during detailed engineering and the same is subjected to customer

    approval without any cost implication on account of the same.Bidder

    shall confirm the compliance

    CONFIRMED

    d The minimum requirementindicated in the BHEL's Standard QAP shall

    be complied for Electrical Items. Bidder shall confirm the compliance CONFIRMED

    e Bidder to confirm that there is no technical deviation on "Electrical

    portion of StanderdTechnical specification" and "Data sheet of Electrical

    portion". Bidder to confi rm the same.

    CONFIRMED

  • 7/28/2019 PE-TS-362-501-A001

    41/41

    Annexure-C

    VENDOR HAS TO SUBMIT ONLY FOLLOWING DOCUMENTS ALONG WITH THE OFFER,FOR TECHNICAL EVALUATION OF THE BID:-

    1.0 Specific confirmation / Comments from the bidder as per BHEL Format.

    2.0 NO DEVIATION CERTIFICATE Clearly mentioning that bidder hasconsidered No - Deviation from the technical specification provided byBHEL.

    OR

    DEVIATION Sheet, indicating clause wise technical deviation if any.

    3.0 Unpriced format, duly mentioned Quoted against each Sl.no. below

    each column.

    Note1:- Any other standard document/ details furnished by the bidder i.e.Data sheet / Crane clearance diagram/ GA Drawing/ QAP etc. shall not betaken in to consideration for evaluation.

    Note 2:- Bidder to note that if the bidder does not submit the documentsmentioned in Sl. No. 1.0 ,2.0, and 3.0 along with their offer then their offer isliable to be rejected.