Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
Job No
260637-00
Drawing No Issue
MWP2-ARP-XX-XX-DR-CF-80211 P1
Drawing Status
Preliminary
Job Title
Client
63 St Thomas StreetBristol BS1 6JZ+44 117 976 5432www.arup.com
0 270 540135
Metres
LegendSite boundary
Change in Flood ExtentDecrease in Flood Extent:Was inundated in 'basecase', now is flood freeIncrease in Flood Extent:Was not inundated in 'basecase', now is inundated
Difference in PeakFlood Levels (m)
< - 0.20-0.20 to -0.15-0.15 to -0.02-0.02 to -0.01-0.01 to 0.010.01 to 0.020.02 to 0.100.10 to 0.150.15 to 0.2> 0.20
!°
© Arup
London Borough of Enfield
Meridian Water Phase 2
A3
\\Global\london\PTG\ICL-JOBS\260000\260637-00 Meridian Water Phase 2\4 Internal Project Data\4-44 Flood Risk\FloodModelling\030_MasterplanModelling\MXD\Meridian_Masterplan Dec FRA Maps.mxd
13/0
1/20
20 1
6:14
:25
Post Mitigation Flood Risk:Impact on Peak Flood Level1 in 100 Years + 35% Climate Change
Scale at A3
1:10,000
Issue Date By Chkd Appd
P1 10/01/2020 TH TH JN
Contains OS data © Crown Copyright and database right 2019
4
Meridian Water
Pymmes Brook
Flood attenuation capacity
1/10 yr event = 2000m3
0.4m depth
01. Wetland Basins
- Concrete channel base retained - Partial naturalisation of river edge within Park.
/ wetland positioned along brook edge
02. Low Flow Channel
- Concrete channel base retained- Additional permanent tributary added around meander (new
- Partial naturalisation of river
- Flood alleviation areas / wetland forms network of interlocking tributaries and pools connecting to river
03. Partial Re-routing
- River partially rerouted outside of existing channel. Existing
- New channel to have naturalised river bed.
/ wetland positioned along new river edge.- Continuous wetland “strip” created along length of park.
04. Full Re-routing
- River path moved east of current
- New channel to have naturalised river bed.- Full naturalisation of river edge- Flood Alleviation areas / Wetland occupy new meander pockets
Key
Following feedback from the EA’s guidance to maximise the extent of the naturalisation of both base and edge Pymmes Brook wherever possible, the following studies look at the potential repositioning of the riverbed.
on usable recreational area and programming requirements, which must be balanced.
Strategic InfrastructureRiver Works
N
4050
100 Metres20010
Scale 1:2000
30
Leeside Road
Glover Drive
North Circular Road
Riv
er L
ee N
avig
atio
n
Salm
ons
Broo
k
Harbet RoadPymmes Brook
River Lea
eSR
eSR
eSR
SW SW
SW SW SW
SW
SW
SW
SW
SW
SW
SW
SWSW
SWSW
SW SW SW
SW SW SW
SW
SW
SW
SW
SWSW
SWSW
SWSW
SW
SWSW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SWSW
SWSW
SWSW
SW
SW
Notes1. All levels are given in metres above Ordnance
Datum (mOD)2. All dimensions in millimetres unless noted
otherwise.3. Refer to drawings MWP2-ARP-XX-XX-DR-CD-70501
to 70503 for drainage standard details.4. Manholes currently shown are indicative to show
change in network direction or change in pipediameter. Further assume manholes are locatedalong the carrier drains at approximately 40minterval.
5. Proposed collector pipe & SUDS connection areindicative and subject to change.
6. Drainage pipes should be composed of materialsresistant to the contaminants identified during siteinvestigations. Precautions should be incorporatedwithin any service trenches to prevent suchtrenches acting as a preferential path for leachatemigration off site.
Legend:SIW Application Boundary
Proposed SW Network(Attenuated Network)
Proposed SW Network(Canal Dischage Network)
Proposed SW Manhole
Proposed Headwall Outlet
Proposed Collector Pipe
Proposed SUDS Connection
Proposed Tree Pit
SW
SW
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-XX-XX-DR-CD-40001
P06
1:2000
S2 - Suitable for Information
Civil Engineer - Drainage
260637-00
Site WideSurface Water DrainageProposed Strategy
Meridian Water Strategic Infrastructure Works
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
Updated following design development
P02 22/03/19 TB PC JN
Outline Planning Issue
P03 21/06/19 TB PC JN
Updated following design development
P04 04/11/19 TB PS JN
JNPSTB19/12/19P05
Updated following comments received
Updated Planning Issue
P06 03/03/20 TB PS JN
N
Refer toMWP2-ARP-XX-XX-DR-CD-40101
Refer toMWP2-ARP-XX-XX-DR-CD-40102
Refer toMWP2-ARP-XX-XX-DR-CD-40103
Refer toMWP2-ARP-XX-XX-DR-CD-40104
Leeside Road
Glover Drive
North Circular Road
Riv
er L
ee N
avig
atio
n
Salm
ons
Broo
k
Harbet Road
Pymmes Brook
River Lea
Legend:SIW Application Boundary
LBH Highway Works Boundary
Notes1. Existing level information is based on the
topographical survey from Terrain between Julyand Sept 2018.
2. Levels are in metres above Ordnance Datum(mOD).
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-XX-XX-DR-CE-31101
P02
1:2000
S2 - Suitable for Information
Civil Engineer - Earthworks
260637-00
Proposed Formation Ground LevelsIsopach
Meridian Water Strategic Infrastructure Works
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
Preliminary Issue
P01 16/04/19 TB PC JN
Outline Planning Issue
P02 21/06/19 TB PC JN
N
N
100 Metres40100
Scale 1:2000
20
Formation Level Cut & Fill Table
MINIMUM LEVEL
-8.00
-3.00
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
MAXIMUM LEVEL
-3.00
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
5.00
COLOUR
00
Meridian Way
A7330
EE7330173301
FF
7330173301
G
G
73301
73301
H H73301 73301
I I73301 73301
Matchline. Refer Drawing MWP2-ARP-Z2-XX-DR-CH-73201Matchline. Refer Drawing MWP2-ARP-Z2-XX-DR-CH-73201
Legend:SIW Application Boundary
LBH Highway Works Boundary
Major Contour
Minor Contour
10.0
Notes1. Existing level information is based on the
topographical survey from Terrain between Julyand Sept 2018.
2. Levels are in metres above Ordnance Datum(mOD).
3. Major Contours are shown at 0.50m intervals andMinor Contours are shown at 0.10m intervals.
PlanScale: 1:500
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-Z2-XX-DR-CH-73202
P01
1:500
S2 - Suitable for Information
Civil Engineer - Highways
260637-00
Glover Drive & IKEA AccessPlan Sheet 2
Meridian Water Strategic Infrastructure Works
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
Outline Planning Issue
P01 21/06/19 TB JN JN
N
10 20 Metres50
Scale 1:500
N
Job No
260637-00
Drawing No Issue
MWP2-ARP-XX-XX-DR-CF-80105 P03
Drawing Status
Preliminary
Job Title
Client
63 St Thomas StreetBristol BS1 6JZ+44 117 976 5432www.arup.com
0 340 680170
Metres
Legend
Site boundary
Flood Depth (m)
< 0.2
0.2 - 0.4
0.4 - 0.6
0.6 - 0.8
0.8 - 1.0
1.0 - 1.2
1.2 - 1.4
> 1.4
!°
© Arup
London Borough of Enfield
Meridian Water Phase 2
A3
\\Global\london\PTG\ICL-JOBS\260000\260637-00 Meridian Water Phase 2\4 Internal Project Data\4-44 Flood Risk\FloodModelling\020_BaselineAssessment\tuflow\results\ExtractedResults\Meridian_BaselineFloodDepth_Plans.mxd
14/0
8/20
19 1
0:10
:35
Existing Flood Risk:Flood Depth1 in 100 Years + 35%Climate Change
Scale at A3
1:12,500
Issue Date By Chkd Appd
P03 2019-08-14 TH DvdL JN
Contains OS data © Crown Copyright and database right 2018
8.5
9.0
9.0
9.5
9.5
10.0
10.0 8.5
9.09.5
10.0
_______Salm
ons
Broo
k
Pym
mes
Bro
ok
119
120115
118118
18
35
2
43
6869
71
107
9
72
34
97
201936
40 41
33
65
70
70
67
54
51
4946
116
31
73
78
72
94
75
133
133
135
135
116
112
101
101
21
21
11
11
73
74
72
78
26
96
109
6
6
9
31
23
24
32
15
292827
30
2225
14
16
45
13
48
50
52
55
12
56
21
57
115
127
137
134
126
108
106
125
129
132
110
136
117109
122121
123
133116
113
135
118
114
128
131130
124
107
100
60
45
7798
93
72
911
18
101
95
8 633964
31
4238
10
44
73
74
99
102
104
88 8382
78
9084
81
89
86
1
85
6
7
9192
61
79
105
17
Legend:SIW Application Boundary
Major Contour
Minor Contour
Extent of Retaining Wall
10.0
Notes1. Existing level information is based on the
topographical survey from Terrain between Julyand Sept 2018.
2. Levels are in metres above Ordnance Datum(mOD).
3. Major Contours are shown at 0.50m intervals andMinor Contours are shown at 0.10m intervals.
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-XX-XX-SK-002
P02
NTS
S2 - Suitable for Information
Civil Engineer - Utilities
260637-00
Existing Land Parcel BoundariesProposed ContoursSketch
Meridian Water Phase 2
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
For Information
P01 01/07/20 TB EF JN
For Information
P02 10/12/20 TB EF JN
N
N
Land Parcel Boundary
100 Metres40100
Scale 1:2000
20
2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFReFReFReFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFReFReFReFR
eFR
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eSeS
eS
eS
eS
eS
eS
eS
eS
eS
_______
North Circular Road
Harbet Road
Riv
er L
ea N
avig
atio
n
Central Spine Road
8.400m
8.300m 8.200m
8.600m
8.200m
11.000m
24.7
m
14m
Legend:SIW Application Boundary
Proposed Major Contour(0.5m increments)
Proposed Minor Contour (0.1m increments)
10.0
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-XX-XX-SK-007
P01
1:1000
S2 - Suitable for Information
Civil Engineer - Utilities
260637-00
Proposed EarthworksEdmonton Marshes Exclusion ZoneLayout
Meridian Water Phase 2
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
For Information
P01 26/01/21 TB EF JN
N
N
50 Metres2050
Scale 1:1000
10
Notes1. Do not scale off this drawing.2. All dimensions are in metres unless otherwise
noted.3. The coordinate system used is Ordnance Survey
Grid.4. Private utilities are not shown on this drawing and
not all public utilities may be shown on thisdrawing. The Contractor is responsible forverifying the location of all existing utilities prior tocommencing any works.
Ground levels within hatch unchanged.
Existing Tower ZBD038
_______
Leeside Road
Glover Drive
North Circular Road
Riv
er L
ee N
avig
atio
n
Salm
ons
Broo
k
Harbet Road
Pymmes Brook
River Lea
eBT
eG2
eG2
eG2
eG2
eG2
eG1
x
x
eFx
xeF
x
x eF
xx
eFx
xeF
xx
eF
xx
eF
eCD
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT eBTeBT
eBT eBT eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBTeBT
eBT
eBT
eBTeBT
eBTeBT
eBT
eBT
eBTeBT
eBT eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
T
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeB
T
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBTeBT
eBT
eBTeBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eLP
eLP
eLP
eLP
eLP
eLP
eLP
e
eLP
eLP
eLP
eLP
eLP eLP
eLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLPeLP eLP
eLP
eLP
eLP
eLPeLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLPeLP
eLPeLP
eLP
eLP
eLPeLP
eLP
eLP
eLP eLP
eLPeLP
eLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMPeMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMPeMP
eMPeMP
eMP
eMP
eMP
eMPeMP
eMP eMPeMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eMP
eF
eF
eF
eFeF
eFeF
eF
eF
eF
eF
eF
eF
eF
eF
eF eFeF
eFeF
eFeF
eFeF
eF
eFeF
eF
eF
eF
eF
eF
eF
eF
eFeF
eFeC
DeC
DeC
DeC
eF
eF
eFeF
eF
eF
eF
eFeF
eF
eF
eF
eF
eF
eF
eF
eF
eFeF eF
eF
eF
eF
eF
x
x
eFx
x
eF
x
xeF
xx
eFx
xeF
xx
eFx
xeF
eFeF
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eSeS
eSeS eS
eS
SeS eS
eS
eS
eS
eS
eS
eS
eS
eS
eSeS
eS
eSeS
eS
eS
eS eS
eSeS
eS
eS
eS
eS
eS
eS
eS
eSeS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eCD
eC
eWeW eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eWeW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eWeW
eW
eWeW eW
eW
eW
eW
eWeW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eWeW
eW
eW
eW
eWeW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eWeW
eW
eW
eW
eW
eW
eW
eW eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eWeW
eW
eW
eW
eW
eWeW
eWeW
eWeW
eW
eW
eW
eW
eW
eW eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW
eW2
eW2
eW2
eW2
eW2
eW2
eW1
eW1
eW1
eW1
eW1
eW1
eWeW
eWeW
eW
eW
eW
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVMeVM
eVMeVM
eVMeVM
eVM
eVM
eVMeVM
eVMeVM
eVMeVM
eVMeVM
eVMeVM
eVMeVM
eVMeVM
eVMeVM
eVM
MeVM
eVM
eVM
eVM
eVM
eVMeVM
eVMeVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVMeVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVM
eVMeVMeVM
eVM
eVMeVM
eVM
eVM
eVMeVM
eVM
eVM
eVM
eVM
eVF
eVF
eVFeVF
eVFeVF
eVFeVF
eVF
eVFeVF
eVFeVF
eVFeVF
eVFeVF
eVFeVF
eVFeVF
eVFeVF
eVF
eVF
eVF
eVF
eVF
eVF eVF eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVFeVF
eVF
eVF
eVF
eVF
eVF eVF eVF eVF eVF eVF eVF eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eE
eE
eE
eE
eE
eE
eE eE
eE
eEeE
eEeE eE
eEeE
eE
eE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eEeE
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eE
eE
eE
eE eE
eE
eE
eE
eE
eE
eE
eE
eEeE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeH
VeH
VeH
VeH
VeH
V
eHV
eHV
eHV
eHV
eHV
eHV
eHVeH
VeH
VeH
VeH
VeH
V
eHV
eHV
eHV
eHV
eHVeH
VeH
VeH
VeH
VeH
V
eHV
eHV
eHV
eHV
eHV
eHV
eHVeH
VeH
VeH
VeH
VeH
V
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHV
eHV
eHV
eHVeHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHV
eHV
eHV
eE
eE
eE
eHV
eHV
eE
eE
eEeE
eE
eEeE
eEeE
eE
eE
eE
eEeHV
eHV
eHVeHV
eE
eE
eE
eEeE
eE
eE eE eEeE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eEeE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eEeE
eHV
eHV
eHV
eHV eHV
eHV
eHV
eHV
eHV eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eEeE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eEeE
eE
eEeE
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHVeHV
eHVeHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHVeHV
eHVeHV
eHVeHV
eHV
eHV eH
VeH
VeH
VeH
VeH
VeH
VeH
VeH
VeH
VeH
V
eEeE
eE
eEeE
eEeE
eEeE
eEeE
eE
eE
eE
eE
eE
eEeE
eEeE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eE
eE
eEeE
eHV
eE
eE
eE
eE
eE
eE
eE
eE
eEeE
eEeE
eE
eEeE
eEeE
eEeE
eE
eHV
eHV
eHV
eHV
eE
eHV
eIP
eHV
eHV
eHV
eHV
eHV
eLPeLP
eCR
eCR
eCR
eCR
eCR
eCR
eCR
eEHV
eEHV
eEH
VeE
HV
eEH
VeE
HV
eEH
VeE
HV
eEH
VeE
HV
eEH
VeE
HV
eEH
V
eEH
V
eEH
V
eEH
V
eIP
eIP
eIP
eIP
eIP
eIP
eIP
eIP
eIP
eIPeIP
eIP
eIP
eIP
eIP
eIP
eIP
eHVeHV
eHV
eHV
eE
eE
eEeE
eE
eE
eE
eE
eE
eE eE
eE
eE
eE
eE
eE
eE
eE
eE
eEeE
eE
eE
eEeE
eE
eE
eE
eE
eE
eHVeHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eHV
eHV
eHV
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE eE
eE
eEeEeEeEeEeEeEeE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eE
eE
eHVeHVeHVeHVeHVeHV
eEH
VeE
HV
eEH
VeE
HV
eEH
VeE
HV
eEH
VeE
HV
eEH
V
eEH
VeE
HV
eEH
VeE
HV
eEeE
eEeE
eE
eE
eHV
eHV
eHV
eHV
eEeE
eEeE
eEeE
eEeE
eEeE
eE
eE
eE
eE
eE
eE
eE
eEeE
eEeE
eEeE
eEeE
eE
eE
eE
eE
eE
eE
eE
eHV
eE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV eHVeHV eHV
eE
eHV
eHVeHV
eHVeHV
eHVeHV
eHV
eHVeHV
eHVeHV
eHVeHV
xx
eHV
x
xeHVx
xeHVx
xeHVx
x
eHV
eEeE
eE
eE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHVeHV
eHV
eHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eEeHV
eBT
eBT
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eEeE
eE
eE
eE
eE
eE
eE
eHV
eHV
eLP
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBTeBT
eBTeBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT eB
T eBT
eBT
eBT
eBTeBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eBT
eBT
eBT
eBT
eBT
eBT
eBT
eBTeBT
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP eLP
eLPeL
PeL
P
eLPeLP
eLP
eLP
eLP
eLP
eLPeLP
eLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP eLP
eLP
eLP
eLP
eLP
eLPeLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eLP
eF
eF
eF
eF
eF
eFeF eF
eF
eF
eF
eF
eFeF
eF
eFeF
eF
eS eS
eS
eS
eS
eS
eS
eS
eSeS
eS
eS
eS
eS
eSeS
eSeS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eS
eF
eF
eF
eF
eFeF
eF
eF
eF
eFeF
eF
eLP
eLP
eBT
eE
eBT
eBT
eBT
eHV eHV
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW2
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW1
eW
eW
eW
eE
eE
eE
eE
eEeE
eHV
eE
eEeE
eE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHV
eHV
eE
eE
eE
eE
eEeE
eE eE
eHV
eHV
eEeE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eE
eE
eE
eHV
eEeE
eE
eEeE
eHVeHV
eHV eHV
eHV
eHV
eHV
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eE
eEeHVeHV
eHV
eE eE
eE
eE
eE
eE eE
eE
eEeE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eE
eEeE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHV
xx
eHVx
xeHV
eE
eEeE
eE
eE
eE
eE eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eHV
eHV
eHV
eE
eS
eF
eW
eW
125mm
150mm
eWeW
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFReFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFR
eFReFR
eS
eMP
eMP
eMP
eMP
eMP
eSR
eSR
eSR
eSR
eSR
eS
eSR
eSR
eSR
eSeS
eS
eSeS
eS
eF
eF
eF
eF
eF
eF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eVF
eF
eF
eF
eW
eMP
eMP
eMP
eMP
eMP
eEeE
eEeE
eEeE
eE
eHVeHV
eHV
eEeE
eE
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eHV
eE
eE
eEHV
eEHV
eEHV
eEHV
eEHV
eEHV
eHV
eHV
eHV
eHV
eHV
eHV
eHVeHV
200mm
200mm
355mm
355mm
eS
300mm
375mm
eS
eS
eS
600mm
600mm
600mm
eS
150m
m
225m
m
100m
m
150m
m
225m
m 225m
m
150mm
eS225m
m
225mm
150mm
eS
eFeE
eE
eE
eE
eE
eE
eE
eE
eE
eHVeHV
eHV
eHV
eHV
eHV
X
X
X
XX
XX
XX
XX
X
375mm
375mm
225m
m
eS
eE
eEeE
eE
eE
eLP
eLP
eLP
eVM
Legend:SIW Application Boundary
LBH Highway Works Boundary
TWUL Water Tunnel
TWUL 54" Raw Water Main
TWUL 84" Conduit to Coppermills
Sludge Rising Main
Notes1. Existing level information is based on the
topographical survey from Terrain between Julyand Sept 2018.
2. Levels are in metres above Ordnance Datum(mOD).
eW1
eW2
eFR
A1 A B C D E F G H I J K L M N
1
2
3
4
5
6
7
8
9
10
11
Do not scale
Arup Job No
Suitability
Name
Rev
Project Title
Client
© Arup
Rev Date By Chkd Appd
Key Plan
Role
Scale at A1
Drawing Title
Unit E03, The Biscuit Factory100 Clements RoadLondon SE16 4DGTel +44(0)20 7566 6300
MWP2-ARP-XX-XX-DR-CE-31101
P02
1:2000
S2 - Suitable for Information
Civil Engineer - Earthworks
260637-00
Proposed Formation Ground LevelsIsopach
Meridian Water Strategic Infrastructure Works
13 Fitzroy StreetLondon W1T 4BQTel +44(0)20 7636 1531www.arup.com
Preliminary Issue
P01 16/04/19 TB PC JN
Outline Planning Issue
P02 21/06/19 TB PC JN
N
N
100 Metres40100
Scale 1:2000
20
Formation Level Cut & Fill Table
MINIMUM LEVEL
-8.00
-3.00
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
MAXIMUM LEVEL
-3.00
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
5.00
COLOUR